Professional Documents
Culture Documents
Block 22 - 06 - 23 - S&T
Block 22 - 06 - 23 - S&T
Block 22 - 06 - 23 - S&T
S&T 19:30 22:00 2:30 LC gate NN/39,TC 47,47AT maintenance work KLGR
Pt. 103/104, 117/118, BPAC PQZ-NCB
S&T 5:00 9:00 4:00 PQZ
Maintenance
Pt. 102 ground rod replacement, Sig S-46, C-46, TC
S&T 5:00 9:00 4:00 SJRR
46T, 46T2 Maintenance
Pt. 101/102, 105/106, Sig S-14, Sh-14, Sh-12, S-12
S&T 5:00 9:00 4:00 GDX
maintenance
22.06.2023 S&T 5:30 9:30 4:00 Pt. 101/102, 103/104 maintenance YLSC
JPE-NCB (DN)
(Thursday)
S&T 7:00 11:00 4:00 UFSBI both end JPE
22.06.2023 S&T 5:00 7:00 2:00 Dn BPAC with SMTA, Pt 11/13X KAMG
NCB-NBQ (UP)
(Thursday)
S&T 5:00 7:00 2:00 Point No.15/15A, 11/11A M/Work JOQ
S&T 5:00 7:00 2:00 Signal No. S-46, C-46, SH-44, DD M/Work SMTA
S&T 5:00 17:00 Pt. 12/12A, 14/14A P5 checking & adjustment BRQ
S&T 7:00 8:30 1:30 Dressing & Wiring in OFC Room APDJ S/C
S&T 7:00 8:30 1:30 Rope wire replacement of LCG SK-139 HSA
S&T 10:00 12:30 2:30 TC No.C6T, 7T, 7AT & East side all TC M/Work DLO
S&T 6:30 9:30 3:00 Sig C-3, C-46, TC C3T, C-46T, UD maintenance AGMN
22-06-2023 S&T 6:30 9:30 3:00 Pt. 101/102, 113/114 maintenance BXHT
NCB-GKJ
(thursday)
S&T 6:30 9:30 3:00 BPAC GUP & AGMN end maintenance GKJ
S&T 10:30 12:30 2:00 Sig S-12, S-14, SH-12, SH-14 for M/Work DHH