Project : AT&S SHEET

CHEE KONG G3 Secondary Beam A


ENGINEERING AND 1
CONSTRUCTION Designed by Checked by Date : Rev
SDN. BHD. AMRIT KELLY 30-Jun-23 A
Additional Chemical Bolts for G3 Secondary Beam
Design Codes used to design the connections:
Hilti Fastening Technology Manual pg 238

Existing Bolts Red Bolt is omitted from calculation


Yellow Anchor Bolts are exisiting
Green Chemical Bolts 3nos of M24 to be introduced

Forces from GTP = 280kn (shear force only)

Force per bolt = 280/12


= 23.33 kN

Based on Hilti guide, M24 bolt to be embedded at 210mm depth into RC beam
Hilti CC method which is simplified version of ETAG ANNEX C

Shear Forces
Concrete Edge Design Resistance
Vrd,c = Vrd0,c * fBV * fAr,v * Fb,v
= 18.5*1.22*2.0*0.5952
= 26.87 kN > 23.33 kN OK

where,
Vrd0,c = 18.5kN for M24 with 105mm min from concrete edge
fBV = 1.22 for Grade 30 concrete
Fb,v = 2.00

fAr,v = 3c+s/6cmin ((c/cmin)^0.5) c = cmin = concrete edge distance


= 0.5952 s = bolt to bolt distance = 80mm
Project : AT&S SHEET
CHEE KONG
G3 Secondary Beam A
ENGINEERING AND
2
CONSTRUCTION
SDN. BHD. Designed by Checked by Date : Rev
AMRIT KELLY 30-Jun-23 A

Steel Design Shear Resistance


Vrd,s = 124 kN per bolt for M24 HAS Grade 8.8 OK

System Design Shear


Resistance Vrd = lower of Vrd,c and Vrd,s
= 26.87 kN and 124 kN
= 26.87 kN OK