N

IC-5

IC-6
13

14

IL. 118.00 9

15
THIS UNIT
10

16

11
UASBR UASBR DC -2 .1

DE

6 W AT
E
RI NG
 
M P
SU

12
I C -2

7
2

IC-4 3
8

UASBR M AJJ AR

IC - 1

PL
A
TFO
R
M
BFP

DE
TE
W A
G  S
RI N
UMP

DC
- 1 .1

KEYPLAN

PLAN
EXISTING UNDERGROUND
1800∅ PIPE TO FPU 2 INLET
COMMON OUTLET SUMP OF FAL 2

A A CIVIL UNIT LIST
Sl.No. UNIT NOS SIZE
BYPASS LINE 2
1 PROPOSED INLET CHAMBER 3 01 4.0M x 4.0M x 5.866M HT.
2 PROPOSED INLET CHAMBER 4 01 5.0M∅ x 5.066M HT.
3 PROPOSED INLET CHAMBER 5 01 6.0M x 3.0M x 5.066M HT.
4 PIPE  OR DUCT 1800 ∅ 175 M
5 RCC CHANNEL 2.0M x 9.815M x 1.0M HT.

EXISTING UNIT/CHANNEL
PROPOSED UNIT/CHANNEL
AS PER SITE TBM : 123.235

TOC 123.866
REFERENCE : UPJN APPROVED HFD DRAWING NO. (GSJ/STP/KNP/002)

NOTES
1) ALL DIMENSIONS ARE IN MM, AND LEVELS ARE IN METERS.
TOC:122.537 1) DETAILING WILL BE DONE AFTER SURVEY OF SITE. 
122.00
R3 AS PER UPJN LETTER NO 583/W12/59  DT. 08.09.2022 VS 12.09.2022
TWL:122.00 TWL:122.00 TWL:122.00 R2 AS PER UPJN LETTER NO 498/W12/52  DT. 11.08.2022 VS 24.08.2022

FGL 121.500 FGL:121.500 FGL:121.500 R1 RELOCATED THE CHAMBER ON MAIN LINE AFTER  VS 25.07.2022


 IL:121.500  STC SUGGESTION ON 22.07.2022
REV DESCRIPTION DRAWN DATE
UASBR 9 TO 16  OUTLET  CLIENT:
RCC DUCT TO FAL 2 UTTAR PRADESH JAL NIGAM - KANPUR

 IL:119.200  IL:119.200
CONSESSIONAL :
 IL:118.800 5    IL:118.800
1800 MM PIPE OR DUCT 1800 MM PIPE OR DUCT  IL:118.400 KANPUR RIVER MANAGEMENT PVT. LTD.
 IL:118.00  IL:118.037 PROJECT TITLE :
1800∅ PIPE
TO FPU 210 MLD UASBR BASED SEWAGE TREATMENT PLANT AT KANPUR, U.P. 
5  

DRAWING TITLE :
PROPOSED INLET CHAMBER 5 PROPOSED INLET CHAMBER 6 PROPOSED RCC COMMON OUTLET
PROPOSED INLET CHAMBER 4 SUMP OF FAL 2 SECTIONAL PLAN, HFD, GA DRAWING OF BYPASS LINE 2
OPEN CHANNEL
SECTION : A-A Drawn by: VS Approved by : BPS Scale : 1 :60  SHEET: A1
Checked by: AB Date : 05/04/2022 Status : FOR APPROVAL
Drawing no: KRMPL/BING-210 MLD/STP/P-04 Rev: R3 SHEET 2 OF 5
ALL RIGHTS RESERVED ! T his drawing and the information contained theirin is the property of SHAPOORJI PALLONJI  Mumbai No part of this drawing may be reproduced, stored in a retrieval system,  
or transmitted in any form, or by any means,  electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright holder.