Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
INSTITUTIONAL DEMAND
B. Industrial Demand
Pahur Peth 17 Units 5000 85000
Pahur Kasbe 0 Units 0.000
85000 0.000 85000 Ltrs.
Total
Sr. No. Stage / Year Walandi
Population
Total Population
MAHARASHTRA JEEVAN PRADHIKARAN JAL JEEVAN MISSION YIS LLP.FORTRESS INFRACON LTD (JV)
Total 4.51
Total 5734 315370 89817 28785 433972 510555 9.33 0.51 0.19
ADHARWADI + 55 1898 104390 33662 4880 142932 168156 0.17 0.06 3.07
ADHARWADI TANDA
KORHALA + 55 981 53955 7698 2347 64001 75295 0.08 0.03 1.38
KORHALA TANDA
Total 7661 421355 98799 37724 557877 656327 0.66 0.24 12.00
Prepared By, ( )
(YIS LLP, Aurangabad) Sectional Engineer
Prepared By, ( )
(YIS LLP, Aurangabad) Sectional Engineer
1 KELGAON 55 4782 263010 57438 30496 350944 412876 0.41 0.151 206438 0 206438 207000
ADHARWADI +
2 55 1898 104390 33662 4880 142932 168156 0.17 0.061 84078 42000 42078 43000
ADHARWADI
KORHALA +
TANDA
3 55 981 53955 7698 2347 64001 75295 0.08 0.027 37648 0 37648 38000
KORHALA TANDA
Total A+B 7661 421355 98799 37724 557877 656327 0.66 0.240 328164 42000 288000
====== ======== ====== ============ ======== ======= ======= ========= ======== ======= ====== =========
====== ======== ====== ============ ======== ======= ======= ========= ======== ======= ====== =========
TABLE 1 - VELOCITY AND HEADLOSSES FOR DIFFERENT PIPE SIZES
--------- ------------ --------- ------------------- ------------ ----------- ----------- ------------- ------------ ----------- --------- --------------
Total head (m) for 1600 m length
Sr. Pipe Frictional Head Velocity in including 52.90 m static head
No. Size in loss per m/s
mm. 1000 m 1st stage flow 2nd stage flow
--------- ------------ --------- ------------------- ------------ ----------- ----------- ------------- ------------ ----------- --------- --------------
1 100 21.21 33.56 1.45 1.86 33.93 3.39 90.22 53.69 5.37 111.96
2 150 2.94 4.66 0.65 0.83 4.71 0.47 58.08 7.45 0.75 61.10
3 200 0.73 1.15 0.36 0.47 1.16 0.12 54.18 1.84 0.18 54.92
4 250 0.24 0.39 0.23 0.30 0.39 0.04 53.33 0.62 0.06 53.58
5 300 0.10 0.16 0.16 0.21 0.16 0.02 53.08 0.25 0.03 53.18
6 350 0.05 0.08 0.12 0.15 0.08 0.01 52.98 0.12 0.01 53.03
7 400 0.02 0.04 0.09 0.12 0.04 0.00 52.94 0.06 0.01 52.97
8 450 0.01 0.02 0.07 0.09 0.02 0.00 52.92 0.04 0.00 52.94
====== ======== ====== ============ ======== ======= ======= ========= ======== ======= ====== =========
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE CO
--------- ------------ --------- ------------------- ------------ ----------- ----------- ------------- ------------ ----------- --------- --------------
1st stage flow of 2nd stage flow of Cost Cost
0.66 liters/day 0.84 liters/day of of
pipe 1600
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ Rs unit pipe
Sr. in PIPE head plus % 50000 head plus % 50000 length line
No. mm in 100 per kw in 100 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
--------- ------------ --------- ------------------- ------------ ----------- ----------- ------------- ------------ ----------- --------- --------------
1 100 K9 90.00 27 1350 112.00 43 2150 1102 1763.2
2 150 K9 58.00 17 850 61.00 23 1150 1454 2326.4
3 200 K9 54.00 16 800 55.00 21 1050 1975 3160
4 250 K9 53.00 16 800 54.00 21 1050 2660 4256
5 300 K9 53.00 16 800 53.00 20 1000 3295 5272
6 350 K9 53.00 16 800 53.00 20 1000 4060 6496
7 400 K9 53.00 16 800 53.00 20 1000 4866 7785.6
8 450 K9 53.00 16 800 53.00 20 1000 5922 9475.2
====== ======== ====== ============ ======== ======= ======= ========= ======== ======= ====== =========
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
--------- ------------ --------- ------------------- ------------ ----------- ----------- ------------- ------------ ----------- --------- --------------
1st stage flow 0.66 mld 2nd stage flow 0.84 mld
GRAND
TOTAL
of
Cost Annual Capitalised Capitalise Cost Annual Capitalised Capitalise Capitalis PIPE
of Energy Energy Total of Energy Energy Total cost SIZE
Sr. pump Charges Charges Cost pump Charges Charges Cost for in
No. sets sets 30 yrs (mm)
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
--------- ------------ --------- ------------------- ------------ ----------- ----------- ------------- ------------ ----------- --------- --------------
1 1350 526 3583 6696 2150 839 5714 1437 8133 100.00
2 850 331 2254 5430 1150 449 3058 769 6199 150.00
3 800 312 2125 6085 1050 410 2792 702 6787 200.00
4 800 312 2125 7181 1050 410 2792 702 7883 250.00
5 800 312 2125 8197 1000 390 2656 668 8865 300.00
6 800 312 2125 9421 1000 390 2656 668 10089 350.00
7 800 312 2125 10711 1000 390 2656 668 11379 400.00
8 800 312 2125 12400 1000 390 2656 668 13068 450.00
*** TABLE 3 shows that the most economical size=
150 mm costing CAPITALISED Rs. 6199 thousands 150 MM DI K-9 PIPE IS PROPOSED
==== ====== ============ =============================
Maharashtra Jeevan Pradhikaran Circle, Aurangabad
Maharashtra Jeevan Pradhikaran Division, Aurangabad
WATER HAMMER CALCULATIONS OF DI PIPES (K-9) From WTP Sump to KELGAON WTP.
VELOCITY
D.I. PIPE THICKNESS NORMAL RATE OF WORKING ALLO. OF WATER TOTAL ALLOWABLE SUITABILITY
1.00 100.00 8.97 13.46 0.91 1.14 1.97 0.20 25.17 2.96 0.30 26.26
2.00 150.00 1.24 1.87 0.41 0.51 0.27 0.03 23.30 0.41 0.04 23.45
3.00 200.00 0.31 0.46 0.23 0.28 0.07 0.01 23.07 0.10 0.01 23.11
4.00 250.00 0.10 0.16 0.15 0.18 0.02 0.00 23.03 0.03 0.00 23.04
5.00 300.00 0.04 0.06 0.10 0.13 0.01 0.00 23.01 0.01 0.00 23.02
6.00 350.00 0.02 0.03 0.07 0.09 0.00 0.00 23.00 0.01 0.00 23.01
>>> * Other losses = 10% of frictional loss
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st stage flow of 2nd stage flow of Cost Cost
0.41 million liters/day 0.51 liters/day of of
pipe 220.00
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ Rs unit pipe
Sl. in PIPE head plus % ### head plus % 50000.00 length line
No. mm in 100.00 per kw in 100.00 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
1st stage flow 0.41 mld 2nd stage flow 0.51 mld
GRAND
TOTAL
of
Cost Annual Capital- Capital- Cost Annual Capital- Capital- Capital- PIPE
of Energy & ised ised of Energy & ised ised ised SIZE
Sl. pump Maint'nce M & E Total pump Maint'nce M & E Total cost in
No. sets Charges Charges Cost sets Charges Charges Cost for (mm)
30 yrs
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
*** TABLE 3 shows that the most economical si 150.00 mm cotsing CAPITALI1959.00 thousands
Maharashtra Jeevan Pradhikaran Circle, Aurangabad
Maharashtra Jeevan Pradhikaran Division, Aurangabad
WATER HAMMER CALCULATIONS OF DI PIPES (K-9) From WTP Sump to KELGAON ESR at WTP Premises
VELOCITY
D.I. PIPE THICKNESS NORMAL RATE OF WORKING ALLO. OF WATER TOTAL ALLOWABLE SUITABILITY
1.00 100.00 8.58 12.77 0.89 1.11 0.45 0.05 3.50 0.68 0.07 3.74
2.00 150.00 1.19 1.77 0.40 0.49 0.06 0.01 3.07 0.09 0.01 3.10
3.00 200.00 0.29 0.44 0.22 0.28 0.02 0.00 3.02 0.02 0.00 3.03
4.00 250.00 0.10 0.15 0.14 0.18 0.01 0.00 3.01 0.01 0.00 3.01
5.00 300.00 0.04 0.06 0.10 0.12 0.00 0.00 3.00 0.00 0.00 3.00
6.00 350.00 0.02 0.03 0.07 0.09 0.00 0.00 3.00 0.00 0.00 3.00
>>> * Other losses = 10% of frictional loss
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st stage flow of 2nd stage flow of Cost Cost
0.40 million liters/day 0.50 liters/day of of
pipe 53.00
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ Rs unit pipe
Sl. in PIPE head plus % ### head plus % 35000.00 length line
No. mm in 100.00 per kw in 100.00 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
1st stage flow 0.40 mld 2nd stage flow 0.50 mld
GRAND
TOTAL
of
Cost Annual Capital- Capital- Cost Annual Capital- Capital- Capital- PIPE
of Energy & ised ised of Energy & ised ised ised SIZE
Sl. pump Maint'nce M & E Total pump Maint'nce M & E Total cost in
No. sets Charges Charges Cost sets Charges Charges Cost for (mm)
30 yrs
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
*** TABLE 3 shows that the most economical si 100.00 mm cotsing CAPITALI 294.00 thousands
Prop. 150 mm because of frictional loss per 1000 KM
Sub-Divisional Engineer,
Executive Engineer,
M.J.P. Sub-Division
M.J.P. Division Aurangabad
Aurangabad
Maharashtra Jeevan Pradhikaran Circle, Aurangabad
Maharashtra Jeevan Pradhikaran Division, Aurangabad
Name of Scheme - kelgaon and 11 Villages R.R.W.S.Scheme in kelgaon sillod
Dist. Aurangabad (Under Jal Jeevan Mission)
Design of pure water pumping Machinery for Kelgaon ESR
Sr.No
Discription 2039 2054 unit
.
1 Daily Demand 0.40 0.50 MLD
2 Pumping Hours 16.000 16.000 Hr
WATER HAMMER CALCULATIONS OF DI PIPES (K-9) From WTP Sump to KELGAON ESR at WTP Premises
VELOCITY
D.I. PIPE THICKNESS NORMAL RATE OF WORKING ALLO. OF WATER TOTAL ALLOWABLE SUITABILITY
( )
Prepared By, Sectional Engineer
(YIS LLP, Aurangabad)
1.00 100.00 3.37 5.78 0.54 0.72 14.67 1.47 98.13 25.15 2.51 109.66
2.00 150.00 0.47 0.80 0.24 0.32 2.04 0.20 84.24 3.49 0.35 85.84
3.00 200.00 0.12 0.20 0.13 0.18 0.50 0.05 82.55 0.86 0.09 82.95
4.00 250.00 0.04 0.07 0.09 0.12 0.17 0.02 82.19 0.29 0.03 82.32
5.00 300.00 0.02 0.03 0.06 0.08 0.07 0.01 82.08 0.12 0.01 82.13
6.00 350.00 0.01 0.01 0.04 0.06 0.03 0.00 82.04 0.06 0.01 82.06
>>> * Other losses = 10% of frictional loss
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
1st stage flow 0.24 mld 2nd stage flow 0.33 mld
GRAND
TOTAL
of
Cost Annual Capital- Capital- Cost Annual Capital- Capital- Capital- PIPE
of Energy & ised ised of Energy & ised ised ised SIZE
Sl. pump Maint'nce M & E Total pump Maint'nce M & E Total cost in
No. sets Charges Charges Cost sets Charges Charges Cost for (mm)
30 yrs
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
1 600 229 3069 8463 5207 1994 26722 5833 14296 100.00
2 550 210 2814 9689 4111 1574 21094 4605 14294 150.00
3 550 210 2814 11955 3837 1469 19686 4297 16252 200.00
4 500 191 2560 14631 3837 1469 19686 4297 18928 250.00
5 500 191 2560 17393 3837 1469 19686 4297 21690 300.00
6 500 191 2560 20721 3837 1469 19686 4297 25018 350.00
*** TABLE 3 shows that the most economical s 150.00 mm cotsing CAPITA ### thousands
Maharashtra Jeevan Pradhikaran Circle, Aurangabad
Maharashtra Jeevan Pradhikaran Division, Aurangabad
VELOCITY
D.I. PIPE THICKNESS NORMAL RATE OF WORKING ALLO. OF WATER TOTAL ALLOWABLE SUITABILITY
( )
Prepared By, Sectional Engineer
(YIS LLP, Aurangabad)
1.00 100.00 0.51 0.84 0.19 0.25 0.03 0.00 9.03 0.04 0.00 9.05
2.00 150.00 0.07 0.12 0.09 0.11 0.00 0.00 9.00 0.01 0.00 9.01
3.00 200.00 0.02 0.03 0.05 0.06 0.00 0.00 9.00 0.00 0.00 9.00
4.00 250.00 0.01 0.01 0.03 0.04 0.00 0.00 9.00 0.00 0.00 9.00
5.00 300.00 0.00 0.00 0.02 0.03 0.00 0.00 9.00 0.00 0.00 9.00
6.00 350.00 0.00 0.00 0.02 0.02 0.00 0.00 9.00 0.00 0.00 9.00
>>> * Other losses = 10% of frictional loss
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st stage flow of 2nd stage flow of Cost Cost
0.09 million liters/day 0.11 liters/day of of
pipe 50.00
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ Rs unit pipe
Sl. in PIPE head plus % ### head plus % 35000.00 length line
No. mm in 100.00 per kw in 100.00 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
1st stage flow 0.09 mld 2nd stage flow 0.11 mld
GRAND
TOTAL
of
Cost Annual Capital- Capital- Cost Annual Capital- Capital- Capital- PIPE
of Energy & ised ised of Energy & ised ised ised SIZE
Sl. pump Maint'nce M & E Total pump Maint'nce M & E Total cost in
No. sets Charges Charges Cost sets Charges Charges Cost for (mm)
30 yrs
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
*** TABLE 3 shows that the most economical si 100.00 mm cotsing CAPITALI 112.00 thousands
Sub-Divisional Engineer,
Executive Engineer,
M.J.P. Sub-Division
M.J.P. Division Aurangabad
Aurangabad
Maharashtra Jeevan Pradhikaran Circle, Aurangabad
Maharashtra Jeevan Pradhikaran Division, Aurangabad
Name of Scheme - kelgaon and 11 Villages R.R.W.S.Scheme in kelgaon sillod
Dist. Aurangabad (Under Jal Jeevan Mission)
Design of pure water pumping Machinery for Kelgaon ESR
Sr.No
Discription 2039 2054 unit
.
1 Daily Demand 0.09 0.11 MLD
2 Pumping Hours 16.000 16.000 Hr
WATER HAMMER CALCULATIONS OF DI PIPES (K-9) From WTP Sump to KELGAON ESR at WTP Premises
VELOCITY
D.I. PIPE THICKNESS NORMAL RATE OF WORKING ALLO. OF WATER TOTAL ALLOWABLE SUITABILITY
( )
Prepared By, Sectional Engineer
(YIS LLP, Aurangabad)
7 Dia of Holes 25 mm
Data
9 Length of Channel 60 M
Calculations
Invert of approach channel at tail end of
1 716.85
Approach Channel
2 Top Width of Channel at FSL 1.02 M
9 Suitability OK
B Demand
C Design
3 Dia of JW 6.00 M
Collection
Demand Supply Total
S. N. Year Water Tax Efficiency
in Cum Days Revenue
in %
Prepared By,
(YIS LLP, Aurangabad)
Sub-Divisional
Engineer,
M.J.P. Sub-Division
Aurangabad
Total Cost
Total Maintainenc Irrigation Total
Electrical Chemical of Water
S.N. Year Estt. e and Water Direct
Charges Charges per 1000
Charges Repairs Charges Charges
litre
2024 0.0 12360 0 1 16170 194040 2 15360 368640 6 14790 1064880 1627560
2025 0.0 12607 0 1 16493 197916 2 15667 376008 6 15086 1086192 1660116
2026 0.0 12859 0 1 16823 201876 2 15980 383520 6 15388 1107936 1693332
2027 0.0 13116 0 1 17159 205908 2 16300 391200 6 15696 1130112 1727220
2028 0.0 13378 0 1 17502 210024 2 16626 399024 6 16010 1152720 1761768
2029 0.0 13646 0 1 17852 214224 2 16959 407016 6 16330 1175760 1797000
2030 0.0 13919 0 1 18209 218508 2 17298 415152 6 16657 1199304 1832964
2031 0.0 14197 0 1 18573 222876 2 17644 423456 6 16990 1223280 1869612
2032 0.0 14481 0 1 18944 227328 2 17997 431928 6 17330 1247760 1907016
2033 0.0 14771 0 1 19323 231876 2 18357 440568 6 17677 1272744 1945188
2034 0.0 15066 0 1 19709 236508 2 18724 449376 6 18031 1298232 1984116
2035 0.0 15367 0 1 20103 241236 2 19098 458352 6 18392 1324224 2023812
2036 0.0 15674 0 1 20505 246060 2 19480 467520 6 18760 1350720 2064300
2037 0.0 15987 0 1 20915 250980 2 19870 476880 6 19135 1377720 2105580
2038 0.0 16307 0 1 21333 255996 2 20267 486408 6 19518 1405296 2147700
2039 0.0 16633.0 0 1 21760 261120 2 20672 496128 6 19908 1433376 2190624
2040 0.0 16966 0 1 22195 266340 2 21085 506040 6 20306 1462032 2234412
2041 0.0 17305 0 1 22639 271668 2 21507 516168 6 20712 1491264 2279100
2042 0.0 17651 0 1 23092 277104 2 21937 526488 6 21126 1521072 2324664
2043 0.0 18004 0 1 23554 282648 2 22376 537024 6 21549 1551528 2371200
2044 0.0 18364 0 1 24025 288300 2 22824 547776 6 21980 1582560 2418636
2045 0.0 18731 0 1 24506 294072 2 23280 558720 6 22420 1614240 2467032
2046 0.0 19106 0 1 24996 299952 2 23746 569904 6 22868 1646496 2516352
2047 0.0 19488 0 1 25496 305952 2 24221 581304 6 23325 1679400 2566656
2048 0.0 19878 0 1 26006 312072 2 24705 592920 6 23792 1713024 2618016
2049 0.0 20276 0 1 26526 318312 2 25199 604776 6 24268 1747296 2670384
2050 0.0 20682 0 1 27057 324684 2 25703 616872 6 24753 1782216 2723772
2051 0.0 21096 0 1 27598 331176 2 26217 629208 6 25248 1817856 2778240
2052 0.0 21518 0 1 28150 337800 2 26741 641784 6 25753 1854216 2833800
2053 0.0 21948 0 1 28713 344556 2 27276 654624 6 26268 1891296 2890476
2054 0.0 22387.0 0 1 29287 351444 2 27822 667728 6 26793 1929096 2948268
Connect
Demand Avg. unit
ed Max. Demand Rate of
Connected Charges Tot. Qty. Hrs. of Running Energy Power Total Power
Year Deman Charges Pumping
HP /KW Per KVA Ltrs Pumping KWH Charges in Charges Charges
d In in Rs. in lps
In Rs. Rs
KVA
2024 17 21.0 1800 37766 510555.3 11.4 12.4 76152.71 7.5 571145.33 608911.58
2025 17 21.0 1836 38522 520295.5 11.4 12.7 77605.53 7.7 593682.30 632203.88
2026 17 21.0 1873 39292 530111.8 11.4 12.9 79069.69 7.8 616980.79 656272.80
2027 17 21.0 1910 40078 539852.0 11.4 13.1 80522.51 8.0 640883.49 680961.34
2028 17 21.0 1948 40879 549668.3 11.4 13.4 81986.68 8.1 665587.64 706467.05
2029 17 21.0 1987 41697 559408.5 11.4 13.6 83439.49 8.3 690929.54 732626.54
2030 17 21.0 2027 42531 569224.8 11.4 13.9 84903.66 8.4 717114.83 759645.77
2031 17 21.0 2068 43382 578965.0 11.4 14.1 86356.47 8.6 743973.30 787354.85
2032 17 21.0 2109 44249 588781.3 11.4 14.3 87820.64 8.8 771719.08 815968.26
2033 17 21.0 2151 45134 598521.5 11.4 14.6 89273.45 9.0 800175.28 845309.44
2034 17 21.0 2194 46037 608337.8 11.4 14.8 90737.62 9.1 829564.89 875601.74
2035 17 21.0 2238 46958 618078.0 11.4 15.0 92190.44 9.3 859704.18 906661.77
2036 17 21.0 2283 47897 627894.3 11.4 15.3 93654.60 9.5 890825.08 938721.82
2037 17 21.0 2328 48855 637634.5 11.4 15.5 95107.42 9.7 922736.92 971591.59
2038 17 21.0 2375 49832 647450.8 11.4 15.8 96571.58 9.9 955681.12 1005512.88
2039 17 21.0 2423 50828 657191.0 11.4 16.0 98024.40 10.1 989459.52 1040287.92
2040 22 28.0 2471 69127 669548.4 14.6 12.7 103927.03 10.3 1070021.56 1139148.18
2041 22 28.0 2520 70509 681830.9 14.6 13.0 105833.52 10.5 1111443.59 1181952.74
2042 22 28.0 2571 71919 694188.3 14.6 13.2 107751.63 10.7 1154218.96 1226138.30
2043 22 28.0 2622 73358 706470.8 14.6 13.4 109658.11 10.9 1198133.70 1271491.43
2044 22 28.0 2675 74825 718828.2 14.6 13.7 111576.22 11.1 1243472.95 1318297.83
2045 22 28.0 2728 76321 731110.7 14.6 13.9 113482.71 11.4 1290014.43 1366335.81
2046 22 28.0 2783 77848 743468.1 14.6 14.1 115400.82 11.6 1338054.91 1415902.72
2047 22 28.0 2838 79405 755750.6 14.6 14.4 117307.30 11.8 1387363.46 1466768.23
2048 22 28.0 2895 80993 768108.0 14.6 14.6 119225.41 12.1 1438249.43 1519242.29
2049 22 28.0 2953 82613 780390.5 14.6 14.8 121131.90 12.3 1490472.91 1573085.62
2050 22 28.0 3012 84265 792747.9 14.6 15.1 123050.01 12.6 1544355.87 1628620.84
2051 22 28.0 3072 85950 805030.4 14.6 15.3 124956.49 12.8 1599649.07 1685599.34
2052 22 28.0 3134 87669 817387.8 14.6 15.5 126874.60 13.1 1656688.12 1744357.40
2053 22 28.0 3197 89423 829670.3 14.6 15.8 128781.09 13.3 1715214.11 1804636.77
2054 22 28.0 3260.5 91211.1 842027.7 14.6 16.0 130699.2 13.6 1775576.32 1866787.44
2024 12 15.6 1800 28035 510555 11.4 12.4 56604.82 7.5 424536.15 452571.15
2025 12 15.6 1836 28596 520295 11.4 12.7 57684.71 7.7 441288.03 469883.73
2026 12 15.6 1873 29168 530112 11.4 12.9 58773.03 7.8 458605.95 487773.57
2027 12 15.6 1910 29751 539852 11.4 13.2 59852.92 8.0 476372.98 506123.95
2028 12 15.6 1948 30346 549668 11.4 13.4 60941.24 8.1 494735.69 525081.67
2029 12 15.6 1987 30953 559408 11.4 13.6 62021.13 8.3 513572.54 544525.45
2030 12 15.6 2027 31572 569225 11.4 13.9 63109.45 8.4 533036.18 564608.15
2031 12 15.6 2068 32203 578965 11.4 14.1 64189.34 8.6 553000.31 585203.71
2032 12 15.6 2109 32847 588781 11.4 14.4 65277.67 8.8 573623.96 606471.43
2033 12 15.6 2151 33504 598521 11.4 14.6 66357.55 9.0 594775.61 628280.03
2034 12 15.6 2194 34175 608338 11.4 14.8 67445.88 9.1 616621.14 650795.64
2035 12 15.6 2238 34858 618078 11.4 15.1 68525.77 9.3 639023.86 673881.86
2036 12 15.6 2283 35555 627894 11.4 15.3 69614.09 9.5 662156.24 697711.40
2037 12 15.6 2328 36266 637634 11.4 15.5 70693.98 9.7 685876.51 722142.77
2038 12 15.6 2375 36992 647451 11.4 15.8 71782.3 9.9 710364.15 747355.74
2039 12 15.6 2422.6 37731 657191 11.4 16.0 72862.19 10.1 735471.86 773203.28
2040 21 26.5 2471 65451 669548 14.6 12.8 98654.24 10.3 1015733.48 1081184.47
2041 21 26.5 2520 66760 681831 14.6 13.0 100464 10.5 1055053.90 1121813.91
2042 21 26.5 2571 68095 694188 14.6 13.2 102284.8 10.7 1095659.11 1163754.32
2043 21 26.5 2622 69457 706471 14.6 13.5 104094.56 10.9 1137345.89 1206803.00
2044 21 26.5 2675 70846 718828 14.6 13.7 105915.35 11.1 1180384.79 1251231.05
2045 21 26.5 2728 72263 731111 14.6 13.9 107725.11 11.4 1224564.93 1296828.11
2046 21 26.5 2783 73708 743468 14.6 14.2 109545.9 11.6 1270168.01 1343876.45
2047 21 26.5 2838 75183 755751 14.6 14.4 111355.66 11.8 1316974.94 1392157.55
2048 21 26.5 2895 76686 768108 14.6 14.6 113176.46 12.1 1365279.26 1441965.52
2049 21 26.5 2953 78220 780391 14.6 14.9 114986.21 12.3 1414852.99 1493072.98
2050 21 26.5 3012 79784 792748 14.6 15.1 116807.01 12.6 1466002.25 1545786.64
2051 21 26.5 3072 81380 805030 14.6 15.3 118616.77 12.8 1518490.20 1599870.28
2052 21 26.5 3134 83008 817388 14.6 15.6 120437.56 13.1 1572635.30 1655642.99
2053 21 26.5 3197 84668 829670 14.6 15.8 122247.32 13.3 1628191.91 1712859.74
2054 21 26.5 3260 86361 842028 14.6 16.0 124068.11 13.6 1685491.56 1771852.75
Proposed components
2 Approach Channel (L=60m) 1918520 2148742 1933868 50 0.0076 0.50% 9593 14697
3 Jackwell and Pump House (Dia.= 6 m) 4559823 5107002 4596302 50 0.0076 0.50% 22799 34932
4 Approach Bridge & RW (Length= 80m) 5632822 6308761 5677885 50 0.0076 0.50% 28164 43152
5 Approach Bund & Approach Road ( L=80 m) 1175492 1316551 1184896 50 0.0076 0.50% 5877 9005
Raw water Pumping Machinery 22.5HP, H =64 m & Q= 13
7 1066836 1194856 1075371 20 0.257 2.50% 26671 276370
lps ( 1 W + 1 S )
8 Raw Water Rising Main( 150 mm dia DI K-9 ,L= 1600 m ) 4145189 4642611 4178350 50 0.0354 2.50% 103630 147914
10 Package WTP of 1.0 MLD 5102767 5715099 5143589 50 0.0076 0.25% 12757 39091
5 Approach Bund & Approach Road ( L=80 m) 11.75 3.92 3.92 3.92
Raw water Pumping Machinery 22.5HP, H =64 m &
7 3.56 3.56 3.56
Q= 13 lps ( 1 W + 1 S ) 10.67
Raw Water Rising Main( 150 mm dia DI K-9 ,L=
8 41.45 20.73 20.73
1600 m )
10 Package WTP of 1.0 MLD 12.76 12.76 12.76 12.76
51.03
Pure Water Pumping Machinery at WTP HP - 10
11 1.51 1.51 1.51 1.51 1.51
(1W+1S) and 5 HP (1+1) 7.57
Pure Water Rising Main( 150mm dia DI K-9 ,L= 4570
12 27.03 27.03 27.03 27.03
m) 108.13
13 MBR (RCC ESR of Cap 0.31 LL and 24.0 m St. Ht.) 3.38 3.38 3.38 3.38 3.38
16.89
Pure Water Gravity Main (100 & 150 mm dia DI K-
14 67.59 16.90 16.90 16.90 16.90
7 ,L= 3640 m )
15 Elevated Service Reservoirs 22.53 22.53 22.53
67.59
Taluka Sillod
District Aurangabad
Taluka Sillod
District Aurangabad
12 Pure Water Gravity Main (100 & 150 mm dia DI K-7 ,L= 3640 m ) 0
3 Dewatering charges for estimation purpose for head works in river basin or 60.00 RM 6219 10% 6840.90 410,454.00
dam
MJP SSR 2021-22 I.N. 16(i) P.N.231
Disposing of excavated stuff at 2 km distance including loading, unloading, 245.72 Cum 212.14 0.00 10% 233.35 57,339.42
6 etc.
MJP SSR 2021-22 statement no II P.N. 17
0.00 722.00 716.50 5.50 1.00 1.200 1.00 1.10 1.50 1.500 1.20 2.03 1.50 1.80 1.50 2.48 1.50 3.81 1.80 4.21 4.83
20.00 0.55 0.55 Cu.m 1.23 1.23 Cu.m 2.16 43.23 Cu.m 3.89 77.88 Cu.m 4.83 193.02 Sq.m.
20.00 720.00 716.59 3.41 0.00 1.00 1.00 0.00 0.41 1.08 1.00 0.43 1.50 1.38 1.08 1.85 1.50 3.39 1.38 3.58 4.83
20.00 0.00 0.00 Cu.m 0.21 0.21 Cu.m 1.09 21.78 Cu.m 3.34 66.84 Cu.m 3.99 159.64 Sq.m.
40.00 718.50 716.68 1.82 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.32 1.06 1.00 0.33 1.50 3.07 1.06 3.10 3.16
20.00 0.00 0.00 Cu.m 0.00 0.00 Cu.m 0.17 3.30 Cu.m 1.63 32.69 Cu.m 1.71 68.54 Sq.m.
60.00 717.00 716.85 0.15 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.15 1.20 1.00 0.17 0.27
Total 60.00 0.55 Cu.m 1.44 Cu.m 68.31 Cu.m 177.41 Cu.m 421.21 Sq.m.
585.00
For Both Side 1170.00
Lift 1.5 to 3.0 (600.50 to 599.00) Soft Rock 78.25 Cum 1044.00 0% 1044.00 81693.00
Lift 3.0to 4.5 (599.00 to 597.50) Rock 52.10 Cum 1072.00 0% 1072.00 55851.20
Lift 4.5 to 6.0 (597.50 to 597.25) Rock 5.21 Cum 1100.00 0% 1100.00 5731.00
MJP SSR 2021-22 P.N. 44 I.N. 11 a
Providing and fixing in position C.I. /M.S. rose pieces in intake wells
including cost of all materials and labour, painting with three coats of
8 anti-corrosive oil paint, etc.complete as directed by Engineer-in-charge. 1207.60 Kg 100.00 0% 100.00 120760.00
Dia - 300 mm
Length - 0.900 m
MJP SSR 2021-22 P.N. 230 I.N. 13
Providing double flange sluice valve confirming for IS- 14846 including
worn gear arrangements as per test pressure,stainless steel spindle,
caps, including inspection charges, transportation upto departmental
9 2 No 36471.00 0% 36471.00 72942.00
store, unloading,stacking excluding GST levied by GOI & GOM in all
respect etc. complete.
300 mm dia PN 1.0
MJP SSR 2021-22 P.N. 132 I.N. 2
Providing and fixing in position C.I. dapuri steps or 22 mm dia. M.S. bar
step with proper anchorage, etc. and providing and applying 3 coats of
10 28.00 No 387.00 0% 387.00 10836.00
anti-corrosive paint, etc. complete as directed by Engineer-in-
charge.@0.30m c/c
MJP SSR 2021-22 P.N. 230 I.N. 11
Providing, hoisting and fixing in position inverted ‘J’ type 100 mm dia.
C.I. cowl type ventilators with mosquitoproof aluminium mesh at top
12 2.00 No 2352.00 0% 2352.00 4704.00
including No applying 2 coats of anti-corrosive paint, etc.complete as
directed by Engineer-in-charge, weighing not less than 35 kg
Dewatering charges for estimation purpose for head works in river basin
14 or dam. 1.00 No 81798.00 0% 81798.00 81798.00
Intake well 3.0m dia
MJP SSR 2021-22 P.N. 231 I.N. 16-ii
Disposing of excavated stuff at 2 km distance including loading, 47.02 Cum 212.14 212.14 9,974.74
15 unloading, etc.
MJP SSR 2021-22 statement no II P.N. 17
Measurements
S.N. Description Qty. Unit
No L B D
Providing and laying in situ following grades of Cement concrete of
trap/granite/quartzite/ gneiss metal for foundation and bedding
3 including dewatering, form work, compaction,curing, finishing and
etc, complete.
PCC M 150
Lift 0 to 5 0.785 4.90 4.90 0.15 2.83 Cum
Measurements
S.N. Description Qty. Unit
No L B D
Deduct for opening of Connecting main -0.785 0.38 0.38 0.30 -0.03
Landing for Rosepiece 2.000 1 1 0.15 0.3
Landing for Sluice valve 2.000 1 1 0.15 0.3
Quantity for 0 to 5 m 27.52 Cum
Providing and fixing in position C.I. /M.S. rose pieces in intake wells
including cost of all materials and labour, painting with three coats of
8 anti-corrosive oil paint, etc.complete as directed by Engineer-in- 2 603.80 1207.60 Kg
charge.
Dia - 300 mm
Length - 0.900 m
Measurements
S.N. Description Qty. Unit
No L B D
Providing double flange sluice valve confirming for IS- 14846 including
worn gear arrangements as per test pressure,stainless steel spindle,
9 caps, including inspection charges, transportation upto departmental 2 2.00 No
store, unloading,stacking excluding GST levied by GOI & GOM in all
respect etc. complete.
300 mm dia PN 1.0
Measurements
S.N. Description Qty. Unit
No L B D
Disposing of excavated stuff at 2 km distance including loading,
15 unloading, etc. 47.02 47.02 Cum
Exacavation Qty-Refiiling qty
16 Design and Approval 1 1 Job
Lift 1.5 to 3.0 (602.00 to 600.50) Soft Rock (1016+1*28=1044) 88.15 Cum 1044.00 0% 1044.00 92026.70
Lift 3.0 to 4.5 (603.00 to 601.5) Rock (1016+2*28=1072) 60.23 Cum 1072.00 0% 1072.00 64563.64
Lift 4.5 to 6.0 (601.50 to 600.00) Rock (1016+3*28=1100) 37.61 Cum 1100.00 0% 1100.00 41368.59
Lift 6.0 to 7.5 (600.00 to 599.45) Rock (1016+4*28=1128) 3.38 Cum 1128.00 0% 1128.00 3814.48
MJP SSR 2021-22 P.N. 44 I.N. 11 a
Refilling the trenches with available excavated stuff with soft material first
7 over pipeline and then hard material in 15 cm layers with all leads and 356.86 Cum 84.00 0% 84.00 29976.49
lifts including consolidation, surcharging, etc. complete.
MJP SSR 2021-22 P.N. 45 I.N. 15
Providing and fixing in position C.I. /M.S. rose pieces in intake wells
including cost of all materials and labour, painting with three coats of
8 anti-corrosive oil paint, etc.complete as directed by Engineer-in-charge. 1207.60 Kg 100.00 0% 100.00 120760.00
Dia - 300 mm
Length - 0.900 m
MJP SSR 2021-22 P.N. 230 I.N. 13
Providing and fixing in position C.I. dapuri steps or 22 mm dia. M.S. bar
step with proper anchorage, etc. and providing and applying 3 coats of
10 28.00 No 387.00 0% 387.00 10836.00
anti-corrosive paint, etc. complete as directed by Engineer-in-
charge.@0.30m c/c
MJP SSR 2021-22 P.N. 230 I.N. 11
Providing, hoisting and fixing in position inverted ‘J’ type 100 mm dia.
C.I. cowl type ventilators with mosquitoproof aluminium mesh at top
12 2.00 No 2352.00 0% 2352.00 4704.00
including No applying 2 coats of anti-corrosive paint, etc.complete as
directed by Engineer-in-charge, weighing not less than 35 kg
MJP SSR 2021-22 P.N. 216 I.N. 3
Dewatering charges for estimation purpose for head works in river basin
13 or dam. 1.00 No 53189.00 0% 53189.00 53189.00
Inspection well 2.0m dia
MJP SSR 2021-22 P.N. 231 I.N. 16-iiI
Measurements
S.N. Description Qty. Unit
No L B D
392.98
Providing and laying in situ following grades of Cement concrete of
trap/granite/quartzite/ gneiss metal for foundation and bedding
3 including dewatering, form work, compaction,curing, finishing and
etc, complete.
PCC M 150
Lift 5 to 10 0.785 3.90 3.90 0.15 1.79 Cum
In RCC M-300 BASE SLAB (Top RL597.80m) lift 5 to 10 m 0.785 3.60 3.6 0.4 4.07 Cum
Measurements
S.N. Description Qty. Unit
No L B D
Deduct for opening of Connecting main -1.571 0.38 0.38 0.3 -0.07
Landing for Rose piece 2.000 1 1 0.15 0.30
Quantity for 0 to 5 m 16.49 Cum
Lift 5 to 10 m
Vertical Wall below GL (598.50 to 597.80) 3.142 2.30 0.3 0.7 1.52
Roof slab 0.785 2.6 2.6 0.15 0.80
Deduct for MH frame -1.000 0.9 0.6 0.15 -0.08
Quantity for 5 to 10 m 2.23 Cum
Measurements
S.N. Description Qty. Unit
No L B D
Providing and fixing in position C.I. /M.S. rose pieces in intake wells
including cost of all materials and labour, painting with three coats of
8 anti-corrosive oil paint, etc.complete as directed by Engineer-in- 2 603.8 1207.6 Kg
charge.
Dia - 300 mm
Length - 0.900 m
10 % rate
Basic Rate Increase Final Rate Amount
Sr. No. Description Qty. Unit Lead
(Rs.) for Hilly (Rs) (Rs.)
Area
Below and above GL : Lift 10 to 15 m 1.15 MT 80852.20 10% 88937.42 102588
10 % rate
Basic Rate Increase Final Rate Amount
Sr. No. Description Qty. Unit Lead
(Rs.) for Hilly (Rs) (Rs.)
Area
Providing sand faced plaster externally in cement
mortar using approved screened sand, in all
positions including base coat of 15 mm thick in
cement mortar 1:4 using waterproofing compound
at 1 kg per cement bag curing the same for not
less than 2 days and keeping the surface of the
15 base coat rough to receive the sand faced
treatment 6 to 8 mm thick in cement mortar 1:4
finishing the surface by taking out grains and
curing for fourteen days scaffolding etc.complete.
PWD SSR 2021-22 I.N.32.11 P.N. 153
Net Qty for 2nd Lift 30.92 Sqm 604.99 14.35 10% 679.84 21024
Net Qty for 3rd Lift 60.01 Sqm 610.98 14.35 10% 686.43 41193
10 % rate
Basic Rate Increase Final Rate Amount
Sr. No. Description Qty. Unit Lead
(Rs.) for Hilly (Rs) (Rs.)
Area
Providing and applying priming coat over new/old
steel and other metal surfaces including preparing
the surface by thoroughly cleaning oil, grease, dirt
and other foreign matter and scoured with wire 27.50 Sqm 33.00 10% 36.30 998
20
brushes, fine steel wool, scrappers and sand
paper, scaffolding etc. complete.
10 % rate
Basic Rate Increase Final Rate Amount
Sr. No. Description Qty. Unit Lead
(Rs.) for Hilly (Rs) (Rs.)
Area
Providing and fixing in position M.S. ladder 0.50 M
wide consisting of 75 x 10 mm M.S. flats as
stringers and 16 mm dia M.S. bars in double rows
as steps placed at 25 cm c/c including cost of
27
material and labour involved, welding, anchoring
and applying 3 coats of anti-corrosive paint, etc.
complete as directed by Engineer-in-charge.
MJP SSR 2021-22 I.N. 5 P.N. 217 15.65 Rmt 1493.00 10% 1642.30 25694
Measurements
S.N. Description Qty. Unit
No L B D
Providing and laying in situ Cement concrete of
trap/granite/quartzite/ gneiss metal for RCC work in
foundation like raft, grillage, strip foundation and
footing of RCC columns and steel stanchions
including normal dewatering, form work,bally,steel
propups compaction, finishing and curing, etc,
complete. (By weigh batching and mix design for M-
250 and M-300 only. Use of L & T, A.C.C., Ambuja,
3 Birla Gold, Manikgad, Rajashree, etc. cement is
permitted.) (Excluding M.S. or Tor reinforcement)
In RCC M-300
MJP SSR 2021-22 I.N. 2 (d) P.N. 49
Lift 5 to 10 m
For Base Slab 0.785 7.20 7.20 0.4 16.28 Cum
Measurements
S.N. Description Qty. Unit
No L B D
Lift 5.0 to 10 m Above GL (727 m to 731.75 m) 3.140 6.30 0.30 4.75 28.19 Cum
lift 5 to 10 m Below & Above GL landings 2.00 1.20 1.20 0.15 0.43 Cum
For floor slab M-30 (Lvl 731.750 m) 0.785 6.60 6.60 0.30 10.26 Cum
Gallary M-30 (Lvl 731.75 m) 3.140 7.80 1.20 0.15 4.41 Cum
Net Qty for 5 to 10 m 60.20 Cum
Lift 10.0 to 15.0 m above GL
Pump House Roof slab M-30 (Lvl 737.25) 0.785 6.90 6.90 0.15 5.61 Cum
Net Qty for 10 to 15 m 5.61 Cum
8 Measurements
S.N. Description Qty. Unit
No L B D
MJP SSR 2021-22 I.N. 8(b) P.N. 52
80Kg/Cum
Below and above GL : Lift 0.0 to 5 m 60.210 80 4.82 MT
Below and above GL : Lift 5 to 10 m 82.032 80 6.56 MT
Below and above GL : Lift 10 to 15 m 14.419 80 1.15 MT
Lift 3rd (Lvl 733.85 to 737.25 m) 3.142 6.23 0.23 3.40 15.31
Deduction for Roliing Shutter -1.000 3.00 0.23 2.40 -1.66
Deuction for windows -4.000 1.50 0.23 0.30 -0.41
Deuction for Column -4.000 0.30 0.30 3.40 -1.22
Deuction for Lintel Beam -3.140 6.23 0.23 0.45 -2.02
Deuction for Corbel Beam -3.142 6.23 0.23 0.45 -2.03
Net Qty for 3rd Lift 7.96 Cum
Measurements
S.N. Description Qty. Unit
No L B D
Providing and fixing in position Mild steel fixed
staggered ( Z Type ) Ventilator as per detailed
drawing with hot deep zink coating including
fabricating with Mild steel 'Z 'Section of size 20mm x
12 25 mm and 3 mm thick at weight 1.42 Kg/Rmt,with 4.000 1.5 0.3 1.80 Sqm
stainless steel mosquito net of 304 Grade,4 mm thick
float glass ?as directed by Engineer In charge
including necessary welding, grinding, two coats of
oil paint etc.complete
PWD SSR 2021-22 I.N.39.77 P.N. 189
Measurements
S.N. Description Qty. Unit
No L B D
Net Qty for 3rd Lift 60.01 Sqm
Measurements
S.N. Description Qty. Unit
No L B D
20 Providing and applying priming coat over new/old
steel and other metal surfaces including preparing
the surface by thoroughly cleaning oil, grease, dirt 27.50 Sqm
and other foreign matter and scoured with wire
brushes, fine steel wool, scrappers and sand paper,
scaffolding etc. complete.
PWD SSR 2021-22 I.N.35.20 P.N. 165
Measurements
S.N. Description Qty. Unit
26 No L B D
ii) Rate on weight basis for any size and type of
frame and cover 180 Kg
MJP SSR 2021-22 I.N. 4 (ii) P.N. 217
32 Measurements
S.N. Description Qty. Unit
No L B D
Deduction for Rolling Shutter -2.000 3.00 0.15 -0.90 SQ.M
Net Qty 5.04 SQ.M
PWD SSR 2021-22 I.N. 33.81 P.N. 162
10 %
rate
Sr. Basic Rate Final Rate
Description Qty. Unit Lead Increase Amount (Rs.)
No. (Rs.) (Rs)
for Hilly
Area
Lift 0.0 to 5 m PCC M 150 23.26 Cum 5640.00 337.51 10% 6575.26 152968.46
MJP SSR 2021-22 I.N. 1(b) P.N.49
10 %
rate
Sr. Basic Rate Final Rate
Description Qty. Unit Lead Increase Amount (Rs.)
No. (Rs.) (Rs)
for Hilly
Area
13
10 %
rate
Sr. Basic Rate Final Rate
Description Qty. Unit Lead Increase Amount (Rs.)
No. (Rs.) (Rs)
for Hilly
Area
Lift 0 to1.5 m
For Piers 11.00 4.60 2.05 1.50 155.60
For foundation of R/W 1.00 11.60 6.70 1.50 116.58
Total Qty of Excavation in soft 272.18 Cum
Lift 0.0 to 5 m
For Piers 11.00 4.00 1.45 0.45 28.71 Cum
For foundation of R/W 1.00 11.00 6.10 0.45 30.20 Cum
Total Qty of RCC for foundation in M-30 58.91 Cum
Lift 0 to 5.0 m
For foundation of serge vessel 4.00 0.785 0.16 1.00 0.50 Cum
lift 0 to 5
For deck beam 2.00 80.00 0.30 0.50 24.00 Cum
Total Qty of RCC for Beams in M-30 for lift 0 to 5 m 24.00 Cum
Measurements
S.N. Description Qty. Unit
No L B D
For vertical wall of pier 1 GL 722.00 m and upto RL 731.75 m 1.00 3.00 0.45 10.7 14.38 Cum
For vertical wall of pier 2 GL 722.60 m and upto RL 731.75 m 1.00 3.00 0.45 10.1 13.57 Cum
For vertical wall of pier 3 GL 723.150 m and upto RL 731.75 m 1.00 3.00 0.45 9.5 12.83 Cum
For vertical wall of pier 4 GL 723.800 m and upto RL 731.75 m 1.00 3.00 0.45 8.9 11.95 Cum
For vertical wall of pier 5 GL 724.500 m and upto RL 731.75 m 1.00 3.00 0.45 8.2 11.00 Cum
For vertical wall of pier 6 GL 725.200 m and upto RL 731.75 m 1.00 3.00 0.45 7.4 10.06 Cum
For vertical wall of pier 7 GL 725.950 m and upto RL 731.75 m 1.00 3.00 0.45 6.7 9.04 Cum
For vertical wall of pier 8 GL 726.650 m and upto RL 731.75 m 1.00 3.00 0.45 6.0 8.10 Cum
For vertical wall of pier 9 GL 727.450 m and upto RL 731.75 m 1.00 3.00 0.45 5.2 7.02 Cum
For vertical wall of pier 10 GL 728.100 m and upto RL 731.75 m 1.00 3.00 0.45 4.5 6.14 Cum
For vertical wall of pier 11 GL 728.750 m and upto RL 731.75 m 1.00 3.00 0.45 3.9 5.27 Cum
Deck slab of bridge Top RL 731.75 m 1.00 80.00 4.00 0.25 80.00 Cum
RCC Block For RWRM DI K9 150mm Dia Pipe 15.00 0.60 0.50 0.50 2.25 Cum
Total Qty of RCC Vertical Wall/slab in M-30 for lift 0 to 5 m 209.15 Cum
Refilling the trenches with available excavated stuff with soft material first
over pipeline and then hard material in 15 cm layers with all leads and lifts
9 including consolidation, surcharging, etc. complete.
Providing and fixing G.I. pipe railing having 1.0 M height consisting 50 x 50 x
6 mm thick M. S. angles as verticals at 1.5 M c/c, and additional posts at
every corner with 3 rows of 25 mm dia G.I. pipes of medium class variety as
10 horizontal and painting 3 coats of oil paint over 1 coat of anticorrosive paint 2 80 160 Rmt
of approved colour and shade including cost of all labour, transporting
bends to curved shape, etc. complete.
Providing expansion joints in R.C.C. framed structure (at floor level) with
premoulded filler 25 mm thick and 3 mm thick aluminium plate as required,
11 bitumen poured filler and fixing T.W. battens on rear faces etc. complete as 4 5 0.35 7 Sqm
directed.
12 Dewatering charges for estimation purpose for head works in river basin or 80.00 Rmt
dam
14 Structural Design and Approval (2%) LS
10%
Basic
Increase Final Rate Amount
Sr. No. Description Qty. Unit Rate Lead
for Hilly (Rs) (Rs.)
(Rs.)
Area
As per statement
As per statement
S.N
Description No Length Width Depth Qty. Unit
.
BITUMINOUS CONCRETE:- Providing and laying
bituminous concrete using crushed aggregates of grading 1,
premixed with bituminous binder @ 5.20 per cent by weight
of total mix and filler transported to site with VTS , laid over a
previously prepared surface, finished to the required grade,
8 level, alignment, and rolling to achieve the desired 1 80.00 3.50 0.040 11.20 Cum
compaction for 50 mm compacted thickness with specified
grade of Bitumen,Excluding prime / tack coat. For Bitumen of
specified grade -- USING Batch mix type hot mix plant with
SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.
(VG-30 bulk bitumen rates are considered to arrive at rates)
Item No 2 ###
Providing and laying in situ following grades of Plain
Cement concrete of trap/ granite/ quartzite/ gneiss metal
2 for foundation and bedding including normal dewatering, ###
form work, compaction and curing, etc, complete.
PCC M 150
(MJP SSR 2021-22, I N.1, P.N. 49) 2.98 M3 5640.00 214.36 10.00% 6439.80 19191
Item No 3 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing and laying in situ Cement Concrete of trap
/granite/quartzite/ gneiss metal for RCC work in
foundation like raft, grillage, strip foundation and footing of
3 RCC columns and steel stanchions including normal ###
dewatering , formwork, bally, steel prop ups compaction,
finishing and curing, etc. complete. (Excluding M.S. or
Tor reinforcement).
RCC M-200
(MJP SSR 2021-22, I N.2, P.N. 49) 2.30 M3 6653.00 214.36 10.00% 7554.10 17374
Item No 4 ###
Providing and casting in situ Cement Concrete of
trap/granite/quartzite/gneiss metal of approved quality for
RCC works as per detailed drawings and designs or as
directed by Engineer-in-charge including normal
dewatering,centering, formwork, bally, steel
4 propups ,compaction, finishing the formed surfaces with ###
CM 1:3 of sufficient minimum thickness to give a smooth
and even surface where ever necessary or roughning if
special finishis to be provided and curing,
etc.complete.ExcludingM.S.orTorreinforcement) For all
types of Columns-
For RCC M-200 grade
(MJP SSR 2021-22, I N.3, P.N. 49) 1.23 M3 8014.00 214.36 10.00% 9051.20 11133
Item No 5 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing and casting in situ C.C. of trap / granite/
quartzite / gneiss metal of approved quality for RCC works
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work, bally, steel propups, compaction,
5 finishing the formed surfaces with C.M. 1:3 of sufficient ###
minimum thickness to give a smooth and even surface
wherever necessary or roughening if special finish is to be
provided and curing, etc. complete. (Excluding M.S. or Tor
reinforcement).For Beams / Braces / Lintels-
RCC M-200 grade
(MJP SSR 2021-22, I N.4, P.N. 50) 2.50 M3 7885.00 214.36 10.00% 19713
Item No 6 ###
Providing and casting in situ C.C. of trap / granite/
quartzite / gneiss metal of approved quality for RCC works
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work, bally, steel propups, compaction,
6 finishing the formed surfaces with C.M. 1:3 of sufficient ###
minimum thickness to give a smooth and even surface
wherever necessary or roughening if special finish is to be
provided and curing, etc. complete. (Excluding M.S. or Tor
reinforcement).Slabs / Landings / Vertical Walls / Waist
Slabs / Steps for Staircase.
For RCC M-250 for Roof Slab
(MJP SSR 2021-22, I N.5, P.N. 50) 2.12 M3 8466.00 214.36 10.00% 9548.40 20243
Item No 7 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing and casting in situ C.C. of trap / granite/
quartzite / gneiss metal of approved quality for RCC works
as per detailed drawings and designs or as directed by
Engineer-in-charge including normal dewatering,
centering, form work, bally, steel propups, compaction,
7 finishing the formed surfaces with C.M. 1:3 of sufficient ###
minimum thickness to give a smooth and even surface
wherever necessary or roughening if special finish is to be
provided and curing, etc. complete. Chajjas / Parapets /
Curtain Walls / Partition Walls / Pardies.
For RCC M-200 grade
(MJP SSR 2021-22, I N.6, P.N. 51) 0.39 M3 8430.00 214.36 10.00% 9508.80 3708
Item No 8 ###
Providing and fixing in position steel bar reinforcement of
various diameter for RCC pipes, caps footings,
foundation, slabs, beams, columns, canopies, staircases.
Newels, chajjas, lintels, pardies, copings, fins, arches, etc.
8 as per detailed designs, drawings and schedules; ###
including cutting, bending hooking the bars, binding with
wires or tack welding and supporting as required, etc.
complete. (including cost of binding wire) Tor Steel
Assuming 80 Kg of Steel per Cum of Concrete
(MJP SSR 2021-22, I No 8b, P.N. 52) 0.68 MT 73502.00 10.00% 80852.20 55238
Item No 9 ###
Providing second class Burnt Brick masonry with
conventional/ I.S. type bricks in cement mortar 1:6 in
9 foundations and plinth of inner walls/ in plinth external ###
walls including bailing out water manually , striking joints
on unexposed faces, raking out joints on exposed faces
and watering etc. Complete.
PWD SSR 2021-22 I.N.27.01 3.28 M3 7343.00 135.16 10.00% 8225.98 26981
Item No 10 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing second class Burnt Brick masonry with
10 conventional/ I.S. type bricks in cement mortar 1:6 in ###
superstructure including striking joints, raking out joints,
watering and scaffolding etc. Complete
(PWD SSR 2021-22 I.N.27.01) 8.06 M3 7570.00 135.16 10.00% 8475.68 68314
Item No 11 ###
Providing and fixing rolling shutter fabricated from steel
laths of minimum thickness 0.9 mm with lock plate of 3.15
mm thickness reinforced with 35 x 35 x 5 mm angle
section fitted with sliding bolts and handles for both sides,
deep M.S. channel section of depth and thickness not less
than 65 mm and 3.15 mm respectively with hold fast
arrangements, M.S. Bracket plate 300 x 300 x 3.15 mm
11 minimum size and shape with square bar, suspension ###
shaft of minimum 32 mm diameter, hood cover of M.S.
sheet not less than 0.9 mm thickness and of any size at
top and safety devices including mechanical gear
operation arrangement consisting of worm gear wheels
and worms of high grade cast iron or mild steel and one
coat of red lead primer etc. complete. (I.S. 62481979)
(With mechanical gear)
(PWD SSR 2021-22 I.N.39.25 P.No.181) 3.60 M2 4730.00 10.00% 5203.00 18731
Item No 12 ###
Providing and fixing 50 mm x 50 mm Mild Steel square
pipe framedsteel windows of various sizes as per details
with welded square bars12 mm at 10 cm center to center
12 without hot dip zinc coating without/ with ventilator ###
including fabrication, glazing with plain / obscuredglass
panes 5 mm thick of approved type and quality, all fixtures
andfastenings and finishing with one coat of primer
( PWD SSR 2021-22 I.N.39.66 P.N.188) 5.40 M2 3096.00 10.00% 3405.60 18390
Item No 13 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing and fixing in position Mild steel fixed staggered (
Z Type ) Ventilator as per detailed drawing with hot deep
zink coating including fabricating with Mild steel 'Z 'Section
13 of size 20mm x 25 mm and 3 mm thick at weight 1.42 ###
Kg/Rmt,with stainless steel mosquito net of 304 Grade,4
mm thick float glass ?as directed by Engineer In charge
including necessary welding, grinding, two coats of oil
paint etc.complete
(PWD SSR 2021-22, I.N.39.77, P.N. 189) 1.62 M2 3675.00 10.00% 4042.50 6549
Item No 14 ###
Providing internal cement plaster 20 mm.thick in Single
14 coats in cement mortar 1:3 without neeru finish,to ###
concrete,brick surface,in all positions including scaffolding
and curing etc. complete.
(PWD SSR 2021-22 I.N. 32.04) 45.90 M2 264.00 10.56 10.00% 302.02 13863
Item No 15 ###
Providing and applying Two coats of wall care Putty on
plastered surface and Ceiling and Walls to prepare
15 ###
surface even and smooth of approved make, etc
complete.
(PWD SSR 2021-22, I.N.32.34, P.N.155) 45.90 M2 87.00 10.00% 95.70 4393
Item No 16 ###
Providing sand faced plaster externally in cement mortar
using approved screened sand, in all positions including
base coat of 15 mm thick in cement mortar 1:4 using
waterproofing compound at 1 kg per cement bag curing
16 the same for not less than 2 days and keeping the surface ###
of the base coat rough to receive the sand faced
treatment 6 to 8 mm thick in cement mortar 1:4 finishing
the surface by taking out grains and curing for fourteen
days scaffolding etc.complete.
PWD SSR 2021-22 I.N. 32.11 45.72 M2 599.00 13.94 10.00% 674.23 30826
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Item No 17 ###
Providing cement based water proofing treatment to
terraces (Indian water proofing or alike) with brick bats laid
in required slope to drain the water for any span after
cleaning the base surface. Applying a coat of cement
slurry admixed with approved water proofing compound
and laying the brick bats on bottom layer in C.M.1:5
admixed with approved water proofing compound filling up
to half depth of brick bats, curing this layer for 3 days,
applying cement slurry over this layer joints of brick bats
17 with C.M.1:3 admixed with approved water proofing ###
compound and finally top finishing with average 20 mm.
thick layers of same mortar added with jute fiber at 1 Kg
per bag including finishing the surface smooth with
cement slurry admixed with approved water proofing
compound. Marking finished surface with false squares of
300mm x 300 mm. making the junctions at the parapet
rounded and tapered top for required height, with drip
mould at the junction of plaster and parapet and curing
and covering 10 years Guarantee against leak proofness
on Court
(PWD fee2021-22,
SSR stamp paper of Rs.P.N.150)
I.N.31.04, 500/- including ponding 14.14 M2 1080.00 29.57 10.00% 1220.52 17258
Item No 18 ###
Providing and applying priming coat on concrete/
masonary/ Asbestos Cement plastered surfaces including
18 scaffolding if necessary, preparing the surface by ###
thoroughly cleaning oil, grease, dirt and other foreign
matter and sand papering as required etc. complete.
(PWD SSR 2021-22, I.N.35.21, P.N.165) 45.90 Sqm 34.00 10.00% 37.40 1717
Item No 19 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing and applying two coats of exterior acraylic
emulsion paint confirming to corresponding I.S. of
19 approved manufacture and of approved colour to the ###
plastered surfaces including cleaning ,preparing the
plaster surface, applying primer coat ,scaffolding if
necessary , and watering the surface for two days etc
(PWD SSR 2021-22, I.N.35.25, P.N.165) 45.72 M2 240.00 10.00% 264.00 12070
Item No 20 ###
Providing and applying two coats of textured synthetic
paint of approved shade and quality and one coat of
20 primer before applying textured paint including scaffolding ###
if necessary preparing surface by thoroughly cleaning oil,
grease, dirt and other materials as required, etc.
complete.
(PWD SSR 2021-22, I.N.35.24, P.N.165) 45.90 M2 148.00 10.00% 162.80 7473
Item No 21 ###
Providing and applying priming coat over new/old steel
and other metal surfaces including preparing the surface
21 by thoroughly cleaning oil, grease, dirt and other foreign ###
matter and scoured with wire
brushes, fine steel wool, scrappers and sand paper,
scaffolding etc. complete.
(PWD SSR 2021-22, I.N.35.20, P.N.165) 9.00 M2 33.00 10.00% 36.30 327
Item No 22 ###
Providing and laying polished hand cut Kotah Stone
flooring 25mm to 30mm thick and 45cm to 55cm wide in
22 plain/diamond pattern on a bed of 1:6 C.M. including ###
cement float, filling joints with neat cement slurry, curing,
polishing and cleaning complete.
PWD SSR 2021-22, I.N.33.08, P.N.156) 9.00 M2 1231.00 9.29 10.00% 1364.32 12279
Item No 23 ###
10 %
Sr Increase Final
Description of Item Qty Unit Rate Lead Amount
No for Hilly Rate
Area
Providing and fixing in required position skirting or dado of
polished Kotah Stone slab 25 mm to 30 mm thick fixed on
23 base on plaster of cement mortar 1:4 including cement ###
float, filling joints with cement slurry, curing rubbing,
polishing and cleaning complete.
(PWD SSR 2021-22, I.N. 33.81, P.N. 162) 1.80 M2 1281.00 9.29 10.00% 1419.32 2555
Item No 24 ###
Filling in plinth and floors murum bedding in trenches with
approved murum from excavated materials from
24 foundation 15cm to 20cm layers including watering and ###
compaction, etc complete. (Bd-A-10/263)
Net Qty 13.49 M3 84.00 10.00% 92.40 1246
(MJP SSR 2021-22, I N.16, P.N. 45) ###
Item No 25 ###
Providing Service Connection , Electric meter and Service
25 1.00 Job 30000.00 10.00% 33000.00 33000
Connection charges.
Item No 26 ###
Point wiring for light/fan/bell in 20 mm ISI marked HMS
PVC conduit with 1.5 sq.mm (2+1E) FRLSH grade copper
26 wire with flush type switch and required accessories as ###
per specification No: WG-PW/SW
(PWD Electrical 2021-22 I.N. 1-9-6) 6.00 Job 437.00 10.00% 480.70 2884
Total 428139
Item No 2
Providing and laying in situ following grades of Plain Cement
concrete of trap/ granite/ quartzite/ gneiss metal for foundation
and bedding including normal dewatering, form work,
compaction and curing, etc, complete. Use of L & T, A.C.C.,
Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is
permitted.)
PCC M 150
Item No 3
f
Item No 5
i
n
i
s
h
i
n
g
a
n
d
Item No 6
Providing and casting in situ C.C. of trap / granite/ quartzite /
gneiss metal of approved quality for RCC works as per detailed
drawings and designs or as directed by Engineer-in-charge
including normal dewatering, centering, form work, bally, steel
propups, compaction, finishing the formed surfaces with C.M.
1:3 of sufficient minimum thickness to give a smooth and even
surface wherever necessary or roughening if special finish is to
be provided and curing, etc. complete. (By weigh batching and
mix design for M-250 and M-300 only. Use of L&T, A.C.C.,
Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is
permitted.) (Excluding M.S. or Tor reinforcement).Slabs /
Landings / Vertical Walls / Waist Slabs / Steps for Staircase.
For RCC M-200 for Roof Slab
1 3.76 3.76 0.15 2.12 M3
Item No 7
Item No 8
Providing and fixing in position steel bar reinforcement of
various diameter for RCC pipes, caps footings, foundation,
slabs, beams, columns, canopies, staircases. Newels, chajjas,
lintels, pardies, copings, fins, arches, etc. as per detailed
designs, drawings and schedules; including cutting, bending
hooking the bars, binding with wires or tack welding and
supporting as required, etc. complete. (including cost of binding
wire) Tor Steel
Assuming 80 Kg of Steel per Cum of Concrete
8.54 80/1000 0.68 MT
Item No 9
Item No 10
Providing second class Burnt Brick masonry with conventional/
I.S. type bricks in cement mortar 1:6 in superstructure including
striking joints, raking out joints, watering and scaffolding etc.
Complete
Item No 11
Item No 13
Item No 14
Providing internal cement plaster 20mm.thick in Single coats in
cement mortar 1:3 without neeru finish,to concrete,brick
surface,in all positions including scaffolding and curing etc.
complete.
2 3 3.5 21.00
2 3 3.5 21.00
Ceiling Plaster 1 3 3 9.00
Deduction for Roling Shutter -0.5 2 2.4 -2.40
Deuction for windows -1.5 1.5 1.2 -2.70
Net Qty Total 45.9 M2
Item No 15
Providing and applying Two coats of wall care Putty on
plastered surface and Ceiling and Walls to prepare surface
even and smooth of approved make, etc complete.
2 3 3.5 21.00
2 3 3.5 21.00
Ceiling Plaster 1 3 3 9.00
Item No 16
Providing sand faced plaster externally in cement mortar using
approved screened sand, in all positions including base coat of
15 mm thick in cement mortar 1:4 using waterproofing
compound at 1 kg per cement bag curing the same for not less
than 2 days and keeping the surface of the base coat rough to
receive the sand faced treatment 6 to 8 mm thick in cement
mortar 1:4 finishing the surface by taking out grains and curing
for fourteen days scaffolding etc.complete.
Item No 17
Item No 18
45.9 M2
Item No 19
45.72 M2
Item No 20
Providing and applying two coats of textured synthetic paint of
approved shade and quality and one coat of primer before
applying textured paint including scaffolding if necessary
preparing surface by thoroughly cleaning oil, grease, dirt and
other materials as required, etc. complete.
45.9 M2
Item No 21
9 M2
Item No 22
Item No 24
Filling in plinth and floors murum bedding in trenches with
approved murum from excavated materials from foundation
15cm to 20cm layers including watering and compaction, etc
complete. (Bd-A-10/263)
Total Excavation
Deduct Volume of Foundation 16.26
Deduct Volume of PCC -2.98
Deduct Volume of Plinth Columns 4 0.23 0.3 0.75 0.21
Net Qty Total 13.49 M3
Item No 25
Providing Service Connection , Electric meter and Service
Connection charges.
1 Job
2 Sluice/Reflux Valves
Providing double flange sluice valve confirming for IS- 14846
including worn gear arrangements as per test pressure,
stainless steel spindle, caps, including inspection
a charges, transportation upto departmental store, unloading,
stacking excluding GST levied by GOI & GOM in all respect etc.
Reflux valves
i)Providing and supplying ISI mark CI D/F reflux valves (non-
return valves ) of following dia including railway freight,
inspection charges, unloading from railway wagon, loading into
b
truck, transportation upto departmental stores, unloading,
stacking excluding GST levied by GOI & GOM in all respect etc.
complete. Reflux valves as per I.S.5312 Part I (1984). Without
by pass arrangement -
i 100mm dia PN -1.0 2 Nos. 5713 5713.00
MS FLANGE
Providing, fabricating, erecting, M.S. Flanges sleep on type (all
8 tables) of required size and thickness with both side machined.
12 LT Cable
Supplying, erecting & terminating XLPE armoured cable 3½
core 35 sq. mm. aluminium conductor with continuous 8.35 sq.
mm. (10 SWG) G.I. earth wire complete erected with glands &
a lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per 100 Rmt 264 26.4 290.40
specification no. CB-LT/AL
Main incomer from transformer to LT Panel
13 Earthling
Providing earthing with galvanized iron earth plate size 60 x 60
x 0.6 cm with funnel with a wire mesh for watering and brick
masonry block C.l. cover complete with all materials, testing &
a recording the results as per specification no. EA-EP 2 Nos. 5476 547.6 6023.60
(Pumps2)
|Travelling Trolley
16 Providing, erecting Travelling Trolley of capacity’ as below with 6
m lifi, tested to 50% over load
MJP Mech SSR 2021-2022 I.N. LF 2-2 P.N.15 1 No 11657.6 271.2 11928.78 6000 17928.78
Amount
198489.36
Amount
13670.00
10251.00
11426.00
9876.00
Amount
9996.80
7854.00
9064.00
Amount
363.00
128601.84
Amount
31350.00
30162.00
23265.00
Amount
3994.80
289726.00
29040.00
26620.00
Amount
2200.00
12047.20
22770.00
Amount
32621.60
22956.90
17928.78
Amount
18644.40
103917.00
1066836.00
Rate Analysis for LT Panel board at Raw Water Pumping Station of 25 HP x 2 Nos
13 MBR (RCC ESR of Cap 0.31 LL and 24.0 m St. Ht.) 1689355 0.17
14 Pure Water Gravity Main (100 & 150 mm dia DI K-7 ,L= 3640 m ) 6758507 0.68
13 MBR (RCC ESR of Cap 0.31 LL and 24.0 m St. Ht.) 1689355 0.17
14 Pure Water Gravity Main (100 & 150 mm dia DI K-7 ,L= 3640 m ) 6758507 0.68
Providing & Supplying ISI Standard D.I. specials & fitting with
sealing rubber gasket of S.B.R. complete with Cast iron
follower gland & M.S. nut bolts coated or otherwise protected
from rusting and suitable for D.I. Pipes including cost of
labour, materials and transportation to stores , loading and
2 unloading excluding GST levied by GOI and GOM in all
respect etc. complete as per IS- 9523.
Measurements
Sr. No. Description Qty. Unit
No. L B D
Providing double flange sluice valve confirming for IS- 14846
including worn gear arrangements as per test
pressure,stainless steel spindle, caps, including inspection
charges, transportation upto departmental store,
unloading,stacking excluding GST levied by GOI & GOM in
all respect etc. complete.
3
For Rating Class 150 (Working Pressure 20 kg/cm² & Test
Pressure 30 kg/cm²)
MJP SSR 2021-22 I.N.2a P.N.132
150 mm diameter sluice valve PN-1 2 2.00 Nos
100 mm diameter (scour valve) PN-1 2 2.00 Nos
Measurements
Sr. No. Description Qty. Unit
No. L B D
5 Providing Isolating Sluice Valve for Tamper proof Air Valve
Isolating Sluice Valve 50 mm dia 3 3.00 Nos
MJP SSR 2021-22 I.N.2a P.N.132
8 Measurements
Sr. No. Description Qty. Unit
No. L B D
MJP SSR 2021-22 SECTION- E Sr.No.5 pg.no..33
Lift 0 to 1.5m
Soft Rock 1 1520 0.75 0.35 399.00 Cum
Lowering laying and jointing with SBR ruber gaskets C.I. S/S
pipes of various classes with CI / MS specials of following
diameter in proper position, grade and alignment as directed
by Engineer-in-charge including conveyance of material from
stores to site of work, including cost of jointing materials and
rubber rings,labour, etc. complete.
11
Measurements
Sr.11
No. Description Qty. Unit
No. L B D
Note : Only SBR. Rubber gasket to be used as per IS- 5382
and IS -12820
C.I.'L.A.' Class / Mortar inlined DI K-9/K-7
MJP SSR 2021-22 I.N.2(a-vi) P.N.70
150 MM Dia. Without rubber rings 1 1600 1600.00 RM
Measurements
Sr. No. Description Qty. Unit
No. L B D
Providing and constructing B.B. masonry valve chamber with
15 cm thick 1:2:4 proportion PCC bedding, excluding
excavation, B.B. masonry in CM 1:5 Proportion precast
S.F.R.C. frame and cover, etc. complete as directed by
14 Engineer-in-charge.
As above of 90x90 cm internal size and depth upto 1.2 M with
S.F.R.C. frame and cover. 4 4.00 No
Thrust blocks for the pipeline by encasing the pipe with RCC
M -20 including all material, labour, mechanical mixing,
compaction, curing etc. complete as directed by Engineer in-
charge
16
Total Quantity of RCC 4 5 0.75 0.75 11.25
Deduct pipe diam. -4 0.785 0.15 0.0225 -0.50
MJP SSR 2021-22 I.N.2(b) P.N.49 10.75 Cum
Measurements
Sr. No. Description Qty. Unit
No. L B D
Providing and fixing in position air valve shaft including
providing and fixing GI Medium Class or 6 mm thick M.S.
pipe shaft 2.70 M long over branch flange of air valve tee,
providing PCC block of M-150 concrete, 150 mm thick around
the air valve tee including encasing of vertical shaft in PCC
M-150 as shown in type design together with providing and
17 making flanged joints wherever required and fixing of air
valve tee etc. complete ,as per type design and as directed
by Engineer-in-charge for following diameters of pipe lines
(type design attached.)
Foundation on murrum and hard strata 150 mm dia pipeline 3 3.00 No
MJP SSR 2021-22 I.N.17(a-ii) P.N.140
Rate Analysis for Internal and External Electrification at Raw Water Pumping Station
Add 10% on PWD
Basic SSR rate of
Sr. No. Particulars Qty. Unit Final Rate Amount
Rate completed for
works at Hilly Area
Kelgaon & 2 Villages Water Supply Scheme
1 Supplying and erecting LED square / circular 16 to 20W
down lighter having pressure die-cast aluminium housing,
opal translucent cover, mounting arrangement with board 4 nos 1281 128.1 1409.1 5636.40
for surface type or spring loaded mounting clips for flush
type complete.
PWD SSR (E) 2021-22 I.N. 2-1-5
External
6 Making cement concrete foundation including excavation (
45 x 45 x 120 ) cm deep in 1:3:6 cement concrete, 20 to
25 mm stone metal, (45 x 45 x 45) cm / 45 cm dia. x 45 4 nos 1245 124.5 1369.5 5478.00
cm height plinth duly plastered, with necessary curing and
finishing complete. (for 6 m pole)
6 Supplying and erecting ISI mark G.I. pipe pole ‘B’ grade
80 mm dia 6 m long with pole cap, base plate in provided
foundation as per specification no. OH-PL/GIP 4 nos 4829 482.9 5311.9 21247.60
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
Soft Strata
MJP SSR 2021-22 I.N.1 P.N.42
Lift 0 to 1.5 m 285.00 150.00 10.00% 165.00 Cum 47025
hards Murum
MJP SSR 2021-22 I.N.2 P.N.42
Lift 0 to 1.5 m 171.00 170.00 10.00% 187.00 Cum 31977
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
10 % rate
Sr. Basic Final Rate
Description Qty. Lead Increase for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly Area
MEASUREMENT
Sr. No. Particulars Qty. Unit
No L B D
Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound
macadam specification including spreading in
uniform thickness, hand packing to proper grade
and camber, applying and brooming requisite type
4 of screening/ binding Materials to fill up the 1.00 80.00 4.50 0.150 54.00 Cu.M
interstices of coarse aggregate, watering and
compacting ?with Intelligent Compactor with
compaction analyzer and V-Sat attachment.to the
required density. Grading I (Using Screening Type
B (11.2 mm) Aggregate)
MEASUREMENT
Sr. No. Particulars Qty. Unit
No L B D
Providing and applying tack coat on the prepared
surface heating by flames in Boiler and spraying
7 bitumen with sprayer on Granular surface treated 1 80.00 4.50 360.00 Sqm
with primer @ 2.75 kg/10 sqm(VG-30 bulk bitumen
rates are considered to arrive at rates)
%
Sr. Basic Final Rate Amount
Description Quantity Unit Lead Increas
No. Rate (Rs.) (Rs) (Rs.)
e
5) Backwashing, inlet & outlet facilities shall
be provided
Air blowers - Air Blowers are not required for WTP
having capacity less than and equal to 3 MLD, for
WTP having capacity more than 3 MLD air blowers
capacity of delevering 600 LPM per sqm of free air
of filter area 0.4 kg/sqcm at underdrain (100%
standby)
Wash water tank capacity equal to 2 % of designed
quantity of filer water in a day + 10 %
## wash water pump with 100 % standby (Minimum
3 HP with all accessories)
##
Backwash with water not less than 0.6 cum/sqm of
filter bed area in filter box.
# Piping of outlet upto sump
6) Laboratory equipments
7) External & Internal electrification
8) TCL solution tank with mixing, carrying and
dosing arrangement with piping.
9) Gravity feed gas chlorinator with 100%
standby
10) Four alum storage unit
11) Drainage arrangement
12) Providing room with RCC roof for office and Lab
space with necessary water supply & drainage
arrangement & internal roads
13) RCC sump of one hour cap.and pump
house on it.
14) Internal Road
15) Wire fencing with gate for WTP premises.
%
Sr. Basic Final Rate Amount
Description Quantity Unit Lead Increas
No. Rate (Rs.) (Rs) (Rs.)
e
16) All civil works for foundation, consisting of raised
RCC platform above G.L. or walls in B.B. masonry
or UCR masonry shall be provided as per needs at
site.
17) Bypass in the form of pipes or M.S. channels
included in the design, effecting bypass of such new
tank and filter
individually or both. (Limit upto 5.0 M. from W.T.P.
18) The entire M.S. fabricated tank provided with
FRP lining (5 mm thick) to inside face in contact with
water epoxy painting- two coats with one coat of
primer on outside. The thickness of plates employed
shall not
be less than 6 mm
19) Alum dosing and mixing arrangements to be
provided in twin tanks, each of 8 hours capacity,
capable of importing does of 20 ppm with 5%
solution. The alum tanks provided with a dose in
steps of 5 ppm and entire unit mounted on the top of
flocculator / settler box, in the form of prefabricated
structure, with access platform and ladder. Alum
boxes with FRP lining (5 mm thick) inside and epoxy
paint two coats with one coat of primer on
outside.
20) Both flocculator and settling basins provided
with hopper bottom with slope not less than 45
degrees to the horizontal drain pipes and valves
provided to both
flocculator and settling basin.
%
Sr. Basic Final Rate Amount
Description Quantity Unit Lead Increas
No. Rate (Rs.) (Rs) (Rs.)
e
21) Flow ratings to conform following
parameters :
a) Velocities in channels not to exceed 0.6
M./Second.
b) Velocities in filter outlet pipes and valves not to
exceed 1 M./Second.
c) Velocities in interconnecting pipe and controls not
to exceed 1M./Second.
d) Backwash with air : Not required.
e) Backwash with water : Not less than 0.6
M./ Sqm. of filter bed area in filter box.
23) Free board for all units not less than 300
mm
23) Rates as above include all taxes, octroi
and duties which would be specific to the
site locations.
Cu.
b. Add For Lead 150
m
sand 63.75 151.33 10% 166.46 10611.67
Metal Above 40 mm 127.5 186.18 10% 204.80 26112.10
%
Sr. Basic Final Rate Amount
Description Quantity Unit Lead Increas
No. Rate (Rs.) (Rs) (Rs.)
e
At every 3m Provide RCC pipes of Dia.300 mm & 150 Rmt 510.00 0% 510.00 76500.00
NP II Class,collar joint
MJP SSR 2021-22 I.N.1d P.N.97
At every 3m Provide RCC pipes of Dia.300 mm & 0.15 Km 22325.00 10% 24557.50 3683.63
NP II Class,collar joint
MJP SSR 2021-22 I.N.3vii P.N.99
Total Net Cost 5102767.00
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
1A SUBMERSIBLE PUMPS
Providing, erecting and giving test of submersible pump set conforming to IS
8034 and motor conforming to IS 9283, with water proof winding. Pump shall
be suitable for various delivery head and discharge with stainless steel shaft.
Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.C. Supply, with
cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust.
The pump set shall be suitable for direct coupling, with suitable suction
strainer. Pump should have suitable discharge out let as per manufacturer's
design. Antithrust stream lined non return valve shall be provided with the
pump. 3 m submersible copper conductor cable in single / double run and 2
pairs of suitable size erection clamp 10 mm thick shall be 2 Nos 38566.2 6079.2 44647.4
provided.Submersible monoblock pump set with bronze/stainless Steel
(CF8M) Impeller Horizhontal/ Vertical Pump.Motor with Water
lubriccated bearing to accept entire hydrualic thrust
For Adharwadi MBR
Duty head 85 m
Discharge of Pump 4.5 LPS
HP - 10
length of col. Assembly= 4m
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
2 GI Pipes
Providing erecting and testing G.I. pipe of B class and dia.excluding GST
levied by GOI and GOM in all respect including inspection charges,
transportation to stores, etc. complete as per IS-1239/2004.
3 Sluice Valves - PN - 1
Providing & Fixing double flange sluice valve confirming for IS- 14846
including worn gear arrangements as per test pressure, stainless steel
spindle, caps, including inspection charges, transportation upto departmental
store, unloading, stacking excluding GST levied by GOI & GOM in all respect
etc
A)80MM Dia (For Pumps) 4 Nos 6870
B)150MM Dia (For Rising Main) 2 Nos 13821
MJP SSR 2021-22 I.N. 2a P.N. 131
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
5 Kinetic Air Valve (P.N.-1)- Providing and supplying Kinetic Double Orifice
type Air Valves confirming to IS 14845 as per MJP’s standard specifications
combined with screw down isolating valve, small orifice elastic ball resting on
a gun metal orifice nipple, large orifice vulcanite ball seating on moulded seat
ring, inlet face and drilled, including insurance, third party inspection 2 Nos 9394.00
charges, loading, unloading, transportation upto departmental stores,
excluding GST levied by GOI & GOM in all respectetc. complete. Dia=40mm
(9064+330)
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
8 M.S.FLANGES
Providing favricating erecting M.S.flanges sleepon type of required size and
thickness with both side machined as per detailed specification and
approved layout of pumping machinery & size mentioned by the
6department. (weight of Flanges 8kg Each 25 Nos=200kg)
10 PRESSURE GAUGES
Providing erecting and testing Glyscerine filled pressure gauge Bourdon's
type of 150 mm dia as per IS 3624: 1987 with brass cock,syphon tube
etc.as per standerd. Specification.
11 CONCRETE FOUNDATION
Making cement concrete foundation in 1:2:4 cement concrete with
foundation bolts and nuts complete. (cost of wooden box is included) (for
pumps).
PWD Ele.CSR 2021-22 Item no 16-3-5/Page no 240 2 cum 4797.00
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
14 L.T.Panel
Providing erecting, Commissioning & giving satisfactory test and trial of
L.T.Panel comprising of specified Breakers, Bus bar,switches, FASD starter 1 No. 129858.00
indicating instruments etc as per specification.
15 Supplying, erecting & terminating XLPE armoured cable 3½ core 25sq. mm.
aluminium conductor with continuous 8.35 sq. mm. (10 SWG) G.I. earth wire
complete erected with glands & lugs, on wall/ trusses/pole or laid in provided 50 RMT 194.00
trench/ pipe as per specification no. CB-LT/AL
Main incomer from transformer to LT Panel
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
16 EARTHING
Providing earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm
complete with all materials, testing & recording the results as per
specification no. EA-EP
PWD Ele.CSR20221-22 I. N.9-1-1 4 No. 4238.00
17 G. I. EARTHING STRIPS
Supplying and erecting GI strip of required size used for earthing on wall
and/or any other purpose with necessary GI clamps fixed on wall painted
with bituminous paint in an approved manner with joints required. As per
specification no EA-EP..
PWD Ele.CSR 2021-22 I.N.9-2-3 50 kg 207.00
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
Material cost
Labour cost with
S.N. Description Qty. Unit with 2% for Basic Rate
20% for Hill Area
Hill Area
1.5 x 1.5 M internal size and depth upto 1.5 M 2 Nos 32621.6 32623.6
MJP SSR 2021-22 I.N. 2 F P.N. 221
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
44647.4 89294.8
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
23008.16 46016.32
4020
6690
27480.00
27642.00
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
23320.00
26892.00
18788.00
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
20220.00
6225.00
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
12108.28 12108.00
9504.34 9504.00
129858.00
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
18644.00
Add 10%
on PWD Manfacturer
SSR inspecting
Final Rate Amount (Rs.)
complete agency Charges
rate for and TPI Charges
Hilly Area
10.00% 35885.96 71772.00
360.08 1800.40
10000
3 Supplying and erecting Bus bar chamber triple pole with neutral with
four aluminium bars, 500V 100A complete as per specification no. 1.5 Mtr 5444 10.00% 5988.4 Rmt 8982.60
CP-BB(6-2-1 B&C Elect. CSR 2021-22)
Increase
10% rate
Sr No Particular Quantity Unit Basic Rate Final Rate Unit Amount
for Hilly
Area
5 Supplying, erecting & marking FPMCB 32A in provided distribution
board as per specification. No. SW-SWR/MCB (5-3-16 B&C Elect.
CSR 2020-21) for actuator- 4+ pump-4+1 For Lighting.+1 for 12 Nos. 955 10.00% 1050.5 Each 12606.00
capacitor+1foer WTP supplyu
6 Supplying & erecting LED type indicating pilot lamp with LED
colours Red / Yellow / Green, 230 / 250V on provided box / panel
with necessary material, wiring & connections etc (6-5-7 B&C Elect. 3 Nos. 245 10.00% 269.5 Each 808.50
CSR 2021-22)
Increase
10% rate
Sr No Particular Quantity Unit Basic Rate Final Rate Unit Amount
for Hilly
Area
10 Supplying and erecting Dual Source Intelligent flush mounted panel
meter three phase four wire (IPM) 415V CT/ PT site programmable
class1 Flush mounted (96 x 96 mm) meter with Voltage, current,
frequency, Power factor , ON hours ,kWh, EB and DG set metering
with LED Display (excluding CT'S) complete with RS 485
communication protocol, class 1 accuracy and wriring connections 1 Nos. 3749 10.00% 4123.9 Each 4123.90
and mounting hardware on provided panels complete with
calibration certificate from manufacture.(6-3-10 B&C Elect. CSR
2021-22)
12 Pannel wiring foot note No.5 (Page No.40 MJP Elect.CSR 2021-22)
(1792+1792+2986) ( 20 % add on labour cost) 1 Job 5017.2 Job 5017.20
Increase
10% rate
Sr No Particular Quantity Unit Basic Rate Final Rate Unit Amount
for Hilly
Area
15 F.A.S.D. Starter
Supplying and erecting Fully Automatic Star’ Delta starter to operate
squirrel cage induction motor working on 380- 440 Volt, 3 phase, 50
Hz! with no volt coil, over load element, and ON - OFF push
buttons, with necessary material and connected to supply, etc 2 Nos 7150 Each 14300.00
complete. Starter with original sheet steel encloser.
(MJP SSR E&M 2021-2022 LG 3-1 P.N. 27)
TOTAL 129857.54
Say Total Rs 129858.00
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing & Supplying ISI Standard D.I. specials &
fitting with sealing rubber gasket of S.B.R.
complete with Cast iron follower gland & M.S. nut
bolts coated or otherwise protected from rusting
and suitable for D.I. Pipes including cost of labour,
2 materials and transportation to stores , loading
and unloading excluding GST levied by GOI and
GOM in all respect etc. complete as per IS-
9523.
80to 300mm dia 2993.00 111.00 111.00 Kg 332223
MJP SSR 2021-22 I.N.10(i) P.N.73
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing and supplying at site ductile iron/
Spheroidal Graphite ( S.G.) iron single/ Double
chamber tamper proof air valve without isolating
sluice valve. Valves in accordance with BSEN
1074-4 of PN 10/16 rated,with body and bonnet
of ductile iron confirming to EN 1563/IS 1865
Gr.500/7 or Gr.400/15 floats,float guide,seat ring
of stainless steel 1.4436/1.4306,seat ring gasket
of WRAS approved EPDM rubber (suitable for
drinking water ), internal fasteners of stainless
steel A2.Body & Bonnet coated inside & outside
with electrostatically applied epoxy powder coated
4
blue colour (suitable for drinking water) as per DIN
30677-2 & GSK guidelines with a coating
thickness of min.250 microns. Flange connections
as per IS 1538 raised face & pressure testing at
manufactures works shall be done as per IS
14845.including transportation charges excluding
GST levied by GOI &GOM in all respect
etc.complete.(For PN 10 & 16)
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Excavation for foundation / pipe trenches in earth,
soils of all types, sand, gravel and soft murum,
including removing the excavated material upto a
distance of 50 metres and lifts as below, stacking
and spreading as directed, normal dewatering,
6 preparing the bed for foundation and excluding
backfilling, etc. complete. (Bd-A-1/259)
Soft Strata
MJP SSR 2021-22 I.N.1 P.N.42
Lift 0 to 1.5 m 942.56 150.00 10.00% 165.00 Cum 155523
hards Murum
MJP SSR 2021-22 I.N.2 P.N.42
Lift 0 to 1.5 m 771.19 170.00 10.00% 187.00 Cum 144212
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Excavation for foundation / pipe trenches in soft
rock and old cement and lime masonry foundation
asphalt road by all means including removing the
excavated material upto a distance of 50 M
beyond the area and lifts as below, stacking as
directed by Engineer-in-charge, normal
8 dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.( Bd -A-4/259)
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Filling in plinth and floors murum bedding in
trenches with approved murum from excavated
materials from foundation 15cm to 20cm layers
10 including watering and compaction, etc complete.
(Bd-A-10/263)
MJP SSR 2021-22 I.N.16 P.N.45
150 mm dia. DI - K-9 514.13 84.00 10.00% 92.40 Cum 47505
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Hydraulic testing of C.I/D.I pipe line to specified
pressure including cost of all materials and labour
and water for testing for specified length including
cutting,placing end cap making arrangement for
filling safe water using reciprocating type pumps
which should be able to provide specified test
pressure gauges and other necessary
12 equipments, labour, operation charges, etc.
required for testing. The rate under this item shall
also include cost of retesting, if necessary and
reinstating to original position using water supplied
by the contractor.
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:2:4 proportion PCC
bedding, excluding excavation, B.B. masonry in
CM 1:5 Proportion precast S.F.R.C. frame and
cover, etc. complete as directed by Engineer-in-
14 charge.
As above of 90x90 cm internal size and depth
upto 1.2 M with S.F.R.C. frame and cover. 3.00 17404.00 10.00% 19144.40 Nos 57433
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing and fixing in position air valve shaft
including providing and fixing GI Medium Class or
6 mm thick M.S. pipe shaft 2.70 M long over
branch flange of air valve tee, providing PCC
block of M-150 concrete, 150 mm thick around the
air valve tee including encasing of vertical shaft in
PCC M-150 as shown in type design together with
providing and making flanged joints wherever
17 required and fixing of air valve tee etc.
complete ,as per type design and as directed by
Engineer-in-charge for following diameters of pipe
lines (type design attached.)
Foundation on murrum and hard strata 150 mm
dia pipeline 9.00 5578.00 10.00% 6135.80 No 55222
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing & Supplying ISI Standard D.I. specials & fitting with
sealing rubber gasket of S.B.R. complete with Cast iron
follower gland & M.S. nut bolts coated or otherwise protected
from rusting and suitable for D.I. Pipes including cost of
labour, materials and transportation to stores , loading and
2 unloading excluding GST levied by GOI and GOM in all
respect etc. complete as per IS- 9523.
Measurements
Sr. No. Description Qty. Unit
No. L B D
Measurements
Sr. No. Description Qty. Unit
No. L B D
50 mm dia 9 9.00 Nos
Measurements
Sr. No. Description Qty. Unit
No. L B D
Excavation for foundation / pipe trenches in soft rock and old
cement and lime masonry foundation asphalt road by all
means including removing the excavated material upto a
distance of 50 M beyond the area and lifts as below, stacking
as directed by Engineer-in-charge, normal dewatering,
8 preparing the bed for foundation and excluding backfilling,
etc. complete.( Bd -A-4/259)
MJP SSR 2021-22 SECTION- E Sr.No.5 pg.no..33
Lift 0 to 1.5m
Soft Rock 1 4570 0.75 0.30 1028.25 Cum
Soft Rock 1 0 0.75 0.30 0.00 Cum
Measurements
Sr. No. Description Qty. Unit
No. L B D
0 1 0 0.75 0.15 0.00 Cum
Total Qty 514.13 Cum
Lowering laying and jointing with SBR ruber gaskets C.I. S/S
pipes of various classes with CI / MS specials of following
diameter in proper position, grade and alignment as directed
by Engineer-in-charge including conveyance of material from
stores to site of work, including cost of jointing materials and
rubber rings,labour, etc. complete.
11
Note : Only SBR. Rubber gasket to be used as per IS- 5382
and IS -12820
C.I.'L.A.' Class / Mortar inlined DI K-9/K-7
MJP SSR 2021-22 I.N.2(a-vi) P.N.70
100 MM Dia. Without rubber rings 1 4570 4570.00 RM
150 MM Dia. Without rubber rings 1 0 0.00 RM
Measurements
Sr. No. Description Qty. Unit
No. L B D
Lowering, laying, jointing in position following C.I.D/F Reflex
valves, Butterfly valves and Sluice valves including cost of all
labour jointing material including nut bolts and giving
satisfactory hydraulic testing etc complete ( Rates for all class
13 of valves )
MJP SSR 2021-22 I.N.4 P.N.135
150 mm diameter sluice valve PN-1 2 2.00 NO
100 mm diameter (scour valve) PN-1 1 1.00 NO
Isolating Sluice Valve 50 mm dia 9 9.00 NO
Measurements
Sr. No. Description Qty. Unit
No. L B D
Thrust blocks for the pipeline by encasing the pipe with RCC
M -20 including all material, labour, mechanical mixing,
compaction, curing etc. complete as directed by Engineer in-
charge
16
Total Quantity of RCC 4 5 0.75 0.75 11.25
Deduct pipe diam. -4 0.785 5 0.01 -0.16
MJP SSR 2021-22 I.N.2(b) P.N.49 11.09 Cum
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
Notes
The design of the structure be in accordance with relevant
I.S.specification (I.S. 3370 - 1965 or revised.)
The design shall satisfy the stipulations as per I.S.1893-
1984 and I.S.13920/1993 for seismic force and I.S.-
11682/1985 for R.C.C. staging of over head tanks.
For design having more than 6 columns, provision of
internal bracing is obligatory.External bracings is also
obligatory.
Plain round mild steel bars grade-I conforming to I.S.432
part-I or high yield strength deformed bars conforming to
I.S.1786 or I.S.1139 shall be used,grade-II mild steel bars
will not be allowed.
Irrespective of the type of foundation proposed in the
design, one set of bracing be provided at the ground level.
These rates include providing M.S. ladder for E.S.R.s upto
2 lakh litres capacity and providing spiral staircase for
E.S.R. above 2 lakh litres capacity.
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
Following rates are for seismic zoneIII. For zone IV, these
rates shall be increased by 5%and for zone II, these rates
shall be decreased by 5%. Concerned Executive Engineer
shall confirm the seismic zone for the scheme from seismic
zones plan before estimation and adopt appropriate rates
as per actual seismic zones. (Seismic maps attached in
this CSR).
Notes
Conditions from Sr.No. 1 to 10 shall form apart and parcel
of the tender and must be included in the draft tender
papers for works of R.C.C. E.S.R.
Conditions from Sr.No.11 to 16 are for estimation purpose
only and shall not appear in the tender.
MJP SSR 2021-2022 I.N. 1 P.N. 215
Proposed MBR Cap.-0.31 LL Staging Height - 24 m
For 25000 Litres 24 m staging Hieght 750358
Add for next per lit for 6000 Lit. 6000 94080
12 to 16 M --- 4 x 2 = 8% 844438
16 to 20 M --- 4 x 3% = 12% 303997.68
20 & 24 M --- 4 x 4% = 16% 1148435.68
Deduct for Seismic zone II -5.00% -57421.784
Total Cost For Proposed MBR Cap.-0.31 LL Staging
Height - 24 m 1.00 Job 1091013.90 10% 1200115.29 1200115.29
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
% Increase
Sr. No. Particulars Qty. Unit Basic Rate for Hilly Final Rate Amount
Area
6 Retro Reflective Test. For SIGN BOARD 1.00 No 3750.00 0.00% 3750.00 3750.00
Total Net Cost 1689355.00
E
Sr. No. Description Qty. Unit
L B D No.
Providing and supplying ISI standard Welded D.I. double
flanged pipes excluding GST levied by GOI & GOM in all
respect but including railway freight, insurance, unloading
from railway wagon, loading into truck transport to stores ,
unloading , stacking,etc. complete as directed by Engneer-in-
charge.( for 2.75 m bare pipe)
2
MJP SSR 2021-22 I.N.11 P.N.74
200 mm DI D/F 0 0 RM
150 mm DI D/F 123 123 RM
100 mm DI D/F 10 10 RM
Providing & Supplying ISI Standard D.I. specials & fitting with
sealing rubber gasket of S.B.R. complete with Cast iron
follower gland & M.S. nut bolts coated or otherwise protected
from rusting and suitable for D.I. Pipes including coat of
labour, materials and transportation to stores, loading and
3
unloading excluding GST levied by GOI &GOM in all respct
etc. complete as per IS -9523.
MJP SSR 2021-22 I.N.6 P.N.72
D/F Specials 80 to 300 mm dia 284.00 Kg
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing & Supplying ISI Standard D.I. specials &
fitting with sealing rubber gasket of S.B.R.
complete with Cast iron follower gland & M.S. nut
bolts coated or otherwise protected from rusting
and suitable for D.I. Pipes including cost of labour,
2 materials and transportation to stores , loading
and unloading excluding GST levied by GOI and
GOM in all respect etc. complete as per IS-
9523.
80to 300mm dia 1570.00 111.00 111.00 Kg 174270
MJP SSR 2021-22 I.N.10(i) P.N.73
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing and supplying at site ductile iron/
Spheroidal Graphite ( S.G.) iron single/ Double
chamber tamper proof air valve without isolating
sluice valve. Valves in accordance with BSEN
1074-4 of PN 10/16 rated,with body and bonnet
of ductile iron confirming to EN 1563/IS 1865
Gr.500/7 or Gr.400/15 floats,float guide,seat ring
of stainless steel 1.4436/1.4306,seat ring gasket
of WRAS approved EPDM rubber (suitable for
drinking water ), internal fasteners of stainless
steel A2.Body & Bonnet coated inside & outside
with electrostatically applied epoxy powder coated
4
blue colour (suitable for drinking water) as per DIN
30677-2 & GSK guidelines with a coating
thickness of min.250 microns. Flange connections
as per IS 1538 raised face & pressure testing at
manufactures works shall be done as per IS
14845.including transportation charges excluding
GST levied by GOI &GOM in all respect
etc.complete.(For PN 10 & 16)
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Excavation for foundation / pipe trenches in earth,
soils of all types, sand, gravel and soft murum,
including removing the excavated material upto a
distance of 50 metres and lifts as below, stacking
and spreading as directed, normal dewatering,
6 preparing the bed for foundation and excluding
backfilling, etc. complete. (Bd-A-1/259)
Soft Strata
MJP SSR 2021-22 I.N.1 P.N.42
Lift 0 to 1.5 m 682.50 150.00 10.00% 165.00 Cum 112613
hards Murum
MJP SSR 2021-22 I.N.2 P.N.42
Lift 0 to 1.5 m 546.00 170.00 10.00% 187.00 Cum 102102
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Excavation for foundation / pipe trenches in soft
rock and old cement and lime masonry foundation
asphalt road by all means including removing the
excavated material upto a distance of 50 M
beyond the area and lifts as below, stacking as
directed by Engineer-in-charge, normal
8 dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.( Bd -A-4/259)
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Filling in plinth and floors murum bedding in
trenches with approved murum from excavated
materials from foundation 15cm to 20cm layers
10 including watering and compaction, etc complete.
(Bd-A-10/263)
MJP SSR 2021-22 I.N.16 P.N.45
150 mm Dia. 409.50 84.00 10.00% 92.40 Cum 37838
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Hydraulic testing of C.I/D.I pipe line to specified
pressure including cost of all materials and labour
and water for testing for specified length including
cutting,placing end cap making arrangement for
filling safe water using reciprocating type pumps
which should be able to provide specified test
pressure gauges and other necessary
12 equipments, labour, operation charges, etc.
required for testing. The rate under this item shall
also include cost of retesting, if necessary and
reinstating to original position using water supplied
by the contractor.
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:2:4 proportion PCC
bedding, excluding excavation, B.B. masonry in
CM 1:5 Proportion precast S.F.R.C. frame and
cover, etc. complete as directed by Engineer-in-
14 charge.
As above of 90x90 cm internal size and depth
upto 1.2 M with S.F.R.C. frame and cover. 4.00 17404.00 10.00% 19144.40 Nos 76578
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing and fixing in position air valve shaft
including providing and fixing GI Medium Class or
6 mm thick M.S. pipe shaft 2.70 M long over
branch flange of air valve tee, providing PCC
block of M-150 concrete, 150 mm thick around the
air valve tee including encasing of vertical shaft in
PCC M-150 as shown in type design together with
providing and making flanged joints wherever
17 required and fixing of air valve tee etc.
complete ,as per type design and as directed by
Engineer-in-charge for following diameters of pipe
lines (type design attached.)
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
%
Increas
Sr. Basic Final Rate
Description Qty. Lead e for Unit Amount (Rs)
No Rate (Rs) (Rs)
Hilly
Area
Providing & Supplying ISI Standard D.I. specials & fitting with
sealing rubber gasket of S.B.R. complete with Cast iron
follower gland & M.S. nut bolts coated or otherwise protected
from rusting and suitable for D.I. Pipes including cost of
labour, materials and transportation to stores , loading and
2 unloading excluding GST levied by GOI and GOM in all
respect etc. complete as per IS- 9523.
Measurements
Sr. No. Description Qty. Unit
No. L B D
Measurements
Sr. No. Description Qty. Unit
No. L B D
Measurements
Sr. No. Description Qty. Unit
No. L B D
Excavation for foundation / pipe trenches in soft rock and old
cement and lime masonry foundation asphalt road by all
means including removing the excavated material upto a
distance of 50 M beyond the area and lifts as below, stacking
as directed by Engineer-in-charge, normal dewatering,
8 preparing the bed for foundation and excluding backfilling,
etc. complete.( Bd -A-4/259)
MJP SSR 2021-22 SECTION- E Sr.No.5 pg.no..33
Lift 0 to 1.5m
Soft Rock 1 2930 0.75 0.35 769.13 Cum
Soft Rock 1 710 0.75 0.35 186.38 Cum
Total Qty 955.50
Measurements
Sr. No. Description Qty. Unit
10 No. L B D
MJP SSR 2021-22 I.N.16 P.N.45
100 mm Dia. 1 2930 0.75 0.15 329.63 Cum
150 mm Dia. 1 710 0.75 0.15 79.88 Cum
Total Qty 409.50
Lowering laying and jointing with SBR ruber gaskets C.I. S/S
pipes of various classes with CI / MS specials of following
diameter in proper position, grade and alignment as directed
by Engineer-in-charge including conveyance of material from
stores to site of work, including cost of jointing materials and
rubber rings,labour, etc. complete.
11
Note : Only SBR. Rubber gasket to be used as per IS- 5382
and IS -12820
C.I.'L.A.' Class / Mortar inlined DI K-9/K-7
MJP SSR 2021-22 I.N.2(a-vi) P.N.70
100 MM Dia. 1 2930 2930.00 RM
150 MM Dia. 1 710 710.00 RM
Measurements
Sr. No. Description Qty. Unit
No. L B D
Measurements
Sr. No. Description Qty. Unit
No. L B D
Thrust blocks for the pipeline by encasing the pipe with RCC
M -20 including all material, labour, mechanical mixing,
compaction, curing etc. complete as directed by Engineer in-
charge
16
Total Quantity of RCC 7 5 0.75 0.75 19.69
Deduct pipe diam. -7 0.785 0.1 0.01 -0.01
Deduct pipe diam. -7 0.785 0.15 0.0225 -0.02
MJP SSR 2021-22 I.N.2(b) P.N.49 19.66 Cum
Measurements
Sr. No. Description Qty. Unit
No. L B D
1) Chair Type 2 (height=3m) 0 0 No
1) Chair Type 3 (height=6m) 0 0 No
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
providing and fixing accessories such as Stainless steel
ladder inside container & M.S. ladder outside, C. I.
manhole frame and covers, water level indicatiors,
lightening conductor, G. I. pipe railing around walk way
and top slab, providing spiral staire case from ground
level to roof level, M.S.Grill gate of 2 M height with
locking arrangement of approved design, providing and
applying three coats of Acrylic emulsion with silicon
additives to the structure including roof slab, epoxy
painting to internal surface & anti-termite treatment for
underground parts of the structures and giving
satisfactory water tightness test as per I.S. code, The
job to include painting the name of the scheme and
other details on the reservoir as per the directions of
Engineer-in-charge.
Notes
1) The design of the structure be in accordance with
relevent I.S. specification ( I.S. 3370 - 1965 or revised )
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
4) Plain round mild steel bars grade-I conforming to I.S.
432 part - I or high yield strength deformed bars
conforming to I.S. 1786 or I.S. 1139 shall be used,
grade -II mild steel bars will not be allowed.
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
10) 75 % part rate shall be payable for reinforcement
concrete and plastering items of containers of E.S.R. till
satisfactory hydraulic testing for water tightness is
given ; and till that work shall be treated as incomplete.
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
14) The rate shall be increased by 30 % for bearing
piles upto depth of 10 M and for further increased in
depth in by 5 M each, it shall be increased by another
10 % . These rates are applicable wherer raft is not
feasible. For pile foundations sulphate resistant cement
shall only be used. Single pile for the column is not
permitted, group of piles shall be designed with pile cap
for each column of ESR.
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
16) Following rates are for seismic zone III.For zone
IV , these rates shall be increased by 5 % and for zone
II , these rates shall be decreased by 5 %.Concerned
Executive Engineer shall confirm the seismic zone for
the scheme from seismic zones plan before estimation
and adopt appropriate rates as per actual seismic
zones. ( Seismic maps attached in this CSR).
Notes
1) Conditions from Sr. No. 1 to 10 shall form a part and
parcel of the tender and must be included in the draft
tender papers for works of R.C.C. E.S.R.
2) Conditions from Sr. No. 11 to 16 are for estimation
purpose only and shall not appear in the tender .
MJP SSR-2021-22 I.N.1 P.N.214
1 Pro ESR @ Kelgaon 2.07 LL 12Mtr STG HT
Cost of 2.07 LL, Capacity 12 m Staging
Cost of 2,00,000 Litres, 1.00 Job 2453410
Cost of 7000 Litres, 7000 Lit. 45920
Deduct for Seismic zone II -5.00% -124966.5
1.00 No 2374363.5 10% 2611799.85 2611799.85
Add for LEAD CHARGES 150.00
Sand 63.75 cum 151.33 151.33 9646.98
Metal 127.50 cum 186.18 186.18 23738.27
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
Cost of 20000 Litres, 20000 Lit. 313600
Deduct for Seismic zone II -0.05 -53197.9
1.00 No 1010760.1 10% 1111836.11 1111836.11
10 %
Sr. Basic Rate Increase Final Rate Amount
Description Quantity Unit Lead
No. (Rs.) for Hilly (Rs) (Rs.)
Area
Providing & Supplying ISI Standard D.I. specials &
fitting with sealing rubber gasket of S.B.R. complete
with Cast iron follower gland & M.S. nut bolts coated or
otherwise protected from rusting and suitable for D.I.
Pipes including coat of labour, materials and
3 transportation to stores, loading and unloading
excluding GST levied by GOI &GOM in all respct etc.
complete as per IS -9523.
MJP SSR 2021-22 I.N.6 P.N.72
D/F Specials 80 to 300 mm dia 506 Kg 73.00 73.00 36938.00
E
Sr. No. Description Qty. Unit
L B D No.
Pro ESR @ Korhala 0.38 LL 12Mtr STG HT 1 No.
Providing and supplying ISI standard Welded D.I. double
flanged pipes excluding GST levied by GOI & GOM in all
respect but including railway freight, insurance, unloading
from railway wagon, loading into truck transport to stores ,
unloading , stacking,etc. complete as directed by Engneer-in-
charge.( for 2.75 m bare pipe)
2
MJP SSR 2021-22 I.N.11 P.N.74
200 mm DI D/F 0 0 RM
150 mm DI D/F 69 69 RM
100 mm DI D/F 222 222 RM
Providing & Supplying ISI Standard D.I. specials & fitting with
sealing rubber gasket of S.B.R. complete with Cast iron
follower gland & M.S. nut bolts coated or otherwise protected
from rusting and suitable for D.I. Pipes including coat of
labour, materials and transportation to stores, loading and
3
unloading excluding GST levied by GOI &GOM in all respct
etc. complete as per IS -9523.
MJP SSR 2021-22 I.N.6 P.N.72
D/F Specials 80 to 300 mm dia 506.00 Kg
2 Adharwadi 0.45 LL 45000 25000 12 750358 20000 15.68 1063958 0% 0 -5% -53198 63.0 279.3 17594 1028354
3 Korhala 0.38 LL 38000 25000 12 750358 13000 15.68 954198 0% 0 -5% -47710 200.0 279.3 55855 962343
4379303
RCC GSR
MAHARASHTRA JEEVAN PRADHIKARAN JAL JEEVAN MISSION YIS LLP.FORTRESS INFRACON LTD (JV)
Item
Description of Item Qty Unit Rate Final Rate Amount
No.
As per MSDCL
Demand charges, service connection
4 charges,meter & security deposit for Head Works 2 Job 100000 200000
& WTP
ITEM NO.2
Provision for Alum,Bleaching powder,Chlorine Gas
cyclinder & electrical charges to paid by Deptt during 3
months. After complition.
1 ITEM NO. 1
Commissioning, running and maintaining the
scheme…….etc. complete.
2 ITEM NO.2
Provision for Alum,Bleaching powder,Chlorine Gas
cyclinder & electrical charges to paid by Deptt during 6
months. After complition.
(As per statement attached) 3 months 1 Job
6 Power consumption charges for operation of Raw water & pure water
pumping machinery ,water treatment plant & Area lighting at MBRs &
sumps for one year
Total 29.84 KW consumption per day i.e per year 135382.59 units as per
135382.59 7.50 1015369
rate Rs.7.50 per unit. For 12 months units 5460765
Total for 12 month 1110417
Basic %
Sr. Final Rate
Description Qty. Unit Rate Lead Increas Amount (Rs.)
No. (Rs)
(Rs.) e
Kelgaon Dam to
1 1.5*1.5*1.2 1 0.2 0.1 0.4 0.5 1.2
Kelgaon 1 km
BITUMEN at works
9 site (PWD SSR 21-22, MT 500 4365 4365.00 4365.00
P.N.7, I.N ©
Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/
granite/quartzite/gneiss metal for bed blocks, foundation blocks and such
other items including bailing out water, plywood/steel formwork, laying/
pumping, compacting, roughening them if special finish is to be provided,
finishing uneven and honeycombed surface and curing etc. complete. The
Cement Mortar 1:3 plaster is considered for rendering uneven and
honeycombed surface only. Newly laid concrete shall be covered by gunny
bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully
automatic micro processor based PLC with SCADA enabled reversible
Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With
2 natural sand/V.S.I. quality Artificial Sand
M 150 1:2:4
PWD SSR 2021-22 I.N.835
Sand lead 0.425 434.79 184.79
Metal Lead 0.85 323.43 274.92
Sand Royalty 0.425 0 0.00
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap /
granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip
foundations, grillage and footings of R.C.C. columns and steel stanchions
etc. including bailing out water, formwork ,cover blocks, laying/pumping,
compaction and curing roughening the surface if special finish is to be
3
provided (Excluding reinforcement and structural steel) etc. complete, with
fully automatic micro processor based PLC with SCADA enabled reversible
Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With
natural sand/V.S.I. quality Artificial Sand
For RCC M-250 grade Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase
MJP SSR 2021-22 I.N.5 P.N.49
For RCC M-300 grade Slabs / Landings / Vertical Walls / Waist Slabs /
Steps for Staircase
MJP SSR 2021-22 I.N.5 P.N.49
Sand lead 0.425 356.06 151.33
Metal Lead 0.85 219.04 186.18
Total Rate 337.51 Cu.M.
Providing second class Burnt Brick masonry with conventional/ I.S. type
bricks in cement mortar 1:6 in superstructure including striking joints, raking
out joints, watering and scaffolding etc. Complete
Providing internal cement plaster 20mm. thick in two coats in cement mortar
1:3 without neeru finish, to concrete, brick surface, in all positions including
scaffolding and curing etc. complete.
Prime coat - Providing and applying primer coat with bitumen emulsion on
prepared surface of granular Base including cleaning of road surface and
13 spraying, primer at the rate of 0.60 kg/sqm using mechanical means.
15
PWD SSR 2021-22 I.N. 3.19
Sr.15
No. Item Quantity Rate Total Unit
Providing and applying tack coat on the prepared surface heating by fames
in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface
2.5 kg/10 sqm.VG-30 bulk bitumen
19
PWD SSR-2021-22 I.N. 3.30
Asphalt Lead 0.0005 4365.00 2.18
Total Rate 2.18 Sqm
Providing and laying handcut polished Kotah Stone flooring 25mm to 30mm
thick and 30cm wide in plain/diamond pattern on a bed of 1:6 C.M. including
cement float, filling joints with neat cement slurry,
curing, polishing and cleaning etc. complete For Skirting
21
PWD SSR 2021-22 I.N.
Sand lead 0.022 434.79 9.57
Sand Royalty 0.022 0 0.00
Total Rate 9.57 Sqm
Providing and laying handcut polished Kotah Stone flooring 25mm to 30mm
thick and 30cm wide in plain/diamond pattern on a bed of 1:4 C.M. including
cement float, filling joints with neat cement slurry,
curing, polishing and cleaning etc. complete. For Flooring
22
PWD SSR 2021-22 I.N.33.07
Sand lead 0.022 434.79 9.57
Sand Royalty 0.022 0 0.00
Total Rate 9.57 Sqm
Supplying hard murum/ kankar at the road site, including conveying and
stacking complete.
PWD SSR 2021-22 I.N. 2.29
23
Murum Lead 1.2 125.23 150.27
Murum Royalty 1.2 141.34 169.61
Total Rate 319.88 Cu.M.
Providing and laying ceramic tiles of approved quality and 7mm thick for
flooring in required position laid on a bed of 1:4 cement mortar including
cement float, filling joint with white / colour cement slurry cleaning curing
complete.
26 PWD SSR 2020-21, I.N. 33.24
Sand lead 0.05 434.793 21.739652
Sand Royalty 0.05 0
Total Rate 21.739652 Cu.M.
Providing and laying vitrified tiles of approved first quality colour and size of
600mm X 600mm of 10mm thickness for flooring in reuired position laid on a
bed of 1:4 cement morter incluing neat cement float,filling joints with
white/coloured cement slurry, curing and cleaning complete.
27
PWD SSR 2020-21, I.N. 33.42
Sand lead 0.032 434.793 13.913377
Sand Royalty 0.032 0 0
Total Rate 13.913377 Cu.M.
CALCULATIONS:-
1 Weight of water /m
= 3.1415 / 4 x ID^2 x 1000
66.78
2 Weight of shell / m
(Ps = 7850 Kg/Cum)= Ps x 3.1415 x ID X tk
= 56.61 Kg/m
3 Weight of cement lining
= 3.1415 x ID X Tk x 2400
= 23.49 Kg/m
4 Live Load 5 Kg/m
5 Total weight of Chair - w
= 151.88 Kg/m
6 Total Weight for whole span - W
=wxL
1063.19 Kg
7 Horizonal Thrust =uxW =u x W
425.28 Kg
Height of chair = 1m
Maximum B. M. at foundation Level
= Force x Lever arm
44521 Kg -cm
Depth Required d = (M / Q / b)^0.5
7.82 cm
Prvide depth as = 15.00 cm
Over all depth = 15.00 cm
Area of steel required = Ast =
= M / ( 6st x j x 1.43 cm 2 kg
Provide steel as main 10 5 Main 7.38
mm No on both face
Saddle bar 10 Saddle 3.92
Stirrups 6 34 14.7
26
DESIGN OF FOOTING
Length of footing 1m
width of footing 1m
Assume depth of footing (Overall) 20 cm
Side depth of footing 20 cm
Area = 1m
Weight of pipe - W 1063.19 Kg
2 Pipe wall thickness in mm - tk 8 Excavation in soft soil in Cum 0.75 2.042 1 2.042 150 150 306.28
3 Width of Chair in m - B 0.8
4 Co-efficient of friction between Excavation in hard Rock in C 0.1 0.272 1 0.272 1017 1017 276.88
block & soil strata 'µ' 0.4
5 Angle of Saddle in degree "0" 120 P. C. C. in Cum 0.08 0.205 1 0.205 5640 459.71 6100 1249.22
6 Thickness of morter lining in mm 10
Internal Diameter of pipe - I.D. 272 R.C.C. Stem in Cum 0.429 1 0.429 8014 459.71 8474 3633.10
7 Safe bearing capacity of soil 10
in T/Sqm R.C.C. Footing in Cum 0.326 1 0.326 6653 459.71 7113 2318.74
8 Height of earth fill in m at footing level - 'h' 1
9 Angle of repose in degree 30 Steel in MT 0.058 1 0.058 73502 73502 4240.61
10 Spacing of chairs in m - ' L' 10 Total amount 12025.00
CALCULATIONS:-
1 Weight of water /m
= 3.1415 / 4 x ID^2 x 1000
= 58.11
2 Weight of shell / m
(Ps = 7850 Kg/Cum)= Ps x 3.1415 x ID X tk
= 59.19 Kg/m
3 Weight of cement lining
= 3.1415 x ID X Tk x 2400
= 22.02 Kg/m
4 Live Load 5 Kg/m
5 Total weight of Chair - w
= 144.31 Kg/m
6 Total Weight for whole span - W
=wxL
1443.11 Kg
7 Horizonal Thrust =uxW =u x W
577.24 Kg
Height of chair = 3m
Maximum B. M. at foundation Level
= Force x Lever arm
199504 Kg -cm
Depth Required d = (M / Q / b)^0.5
16.55 cm
Prvide depth as = 20.00 cm
Over all depth = 20.00 cm
Area of steel required = Ast =
= M / ( 6st x j 4.82 cm 2 kg
Provide steel as main 10 6 Main 24
mm No on both face
Saddle bar 10 Saddle3.92
Stirrups 6 34 15
43
DESIGN OF FOOTING
Length of footing 1.5 m
width of footing 1.5 m
Assume depth of footing (Overall) 20 cm
Side depth of footing 20 cm
Area = 2.25 m
Weight of pipe - W 1443.11 Kg
a1= 0.21 m2
Moment =
= B x d 2 / 2 x (a + 2/3 x a1) 148645 Kg-cm
Depth required = d=(M/Q/b)^0.5 10.44 cm
Prvide depth as 15.00 cm
Overall depth 15.00 cm
Side depth of footing 20.00 cm
SAFE
Area of steel required = Ast =
= M / ( 6st x j x d)
= 4.79 cm 2 kg
Prvide steel as main 8.00 13 Main 7.33
distribution 8.00 13 7.22
Check for overturning :- 15
Factor of safety against overturning
= Stabilizing moment / Overturning moment
2.83 >2
SAFE
Check for sliding :-
Factor of safety against sliding
= Sliding force / Horizontal Thrust
= 'µ' x W / P
= 4.02 >1.4
SAFE
2 Pipe wall thickness in mm - tk 8 Excavation in soft soil in Cum 0.75 3.467 1 3.467 150 150 520.03
3 Width of Chair in m - B 0.8
4 Co-efficient of friction between Excavation in hard Rock in C 0.1 0.462 1 0.462 1017 1017 470.11
block & soil strata 'µ' 0.4
5 Angle of Saddle in degree "0" 120 P. C. C. in Cum 0.08 0.353 1 0.353 5640 459.71 6100 2151.98
6 Thickness of morter lining in mm 10
Internal Diameter of pipe - I.D. 272 R.C.C. Stem in Cum 0.909 1 0.909 8014 459.71 8474 7700.48
7 Safe bearing capacity of soil 10
in T/Sqm R.C.C. Footing in Cum 0.596 1 0.596 6653 459.71 7113 4239.17
8 Height of earth fill in m at footing level - 'h' 1
9 Angle of repose in degree 30 Steel in MT 0.085 1 0.085 73502 73502 6260.82
10 Spacing of chairs in m - ' L' 10 Total amount 21343.00
CALCULATIONS:-
1 Weight of water /m
= 3.1415 / 4 x ID^2 x 1000
= 58.11
2 Weight of shell / m
(Ps = 7850 Kg/Cum)= Ps x 3.1415 x ID X tk
= 59.19 Kg/m
3 Weight of cement lining
= 3.1415 x ID X Tk x 2400
= 22.02 Kg/m
4 Live Load 5 Kg/m
5 Total weight of Chair - w
= 144.31 Kg/m
6 Total Weight for whole span - W
=wxL
1443.11 Kg
7 Horizonal Thrust =uxW =u x W
577.24 Kg
Height of chair = 6m
Maximum B. M. at foundation Level
= Force x Lever arm
399007 Kg -cm
Depth Required d = (M / Q / b)^0.5
23.41 cm
Prvide depth as = 20.00 cm
Over all depth = 20.00 cm
Area of steel required = Ast =
= M / ( 6st x j 9.64 cm 2 kg
Provide steel as main 10 6 Main 46
mm No on both face
Saddle bar 10 Saddle3.92
Stirrups 6 34 15
65
DESIGN OF FOOTING
Length of footing 2m
width of footing 2m
Assume depth of footing (Overall) 20 cm
Side depth of footing 20 cm
Area = 4m
Weight of pipe - W 1443.11 Kg
a1= 0.23 m2
Moment =
= B x d 2 / 2 x (a + 2/3 x a1) 369806 Kg-cm
Depth required = d=(M/Q/b)^0.5 14.25 cm
Prvide depth as 15.00 cm
Overall depth 15.00 cm
Side depth of footing 20.00 cm
SAFE
Area of steel required = Ast =
= M / ( 6st x j x d)
= 11.91 cm 2 kg
Prvide steel as main 8.00 13 Main 9.91
distribution 8.00 13 9.8
Check for overturning :- 20
Factor of safety against overturning
= Stabilizing moment / Overturning moment
2.97 >2
SAFE
Check for sliding :-
Factor of safety against sliding
= Sliding force / Horizontal Thrust
= 'µ' x W / P
= 6.73 >1.4
SAFE
External
Sr.
Particulars Qty. Unit
No.
6 Making cement concrete foundation including
excavation ( 45 x 45 x 120 ) cm deep in 1:3:6 cement
concrete, 20 to 25 mm stone metal, (45 x 45 x 45) cm / 4 nos
45 cm dia. x 45 cm height plinth duly plastered, with
necessary curing and finishing complete. (for 6 m pole)
7 Supplying and erecting ISI mark G.I. pipe pole ‘B’ grade
80 mm dia 6 m long with pole cap, base plate in
provided foundation as per specification no. OH-PL/GIP 4 nos
Sr.
Particulars Qty. Unit
No.
11 Supplying and erecting mains with ISI mark WP 2 x 2.5
sq. mm. 1100 V grade aluminium PVC insulated and
PVC sheathed wires on G.I. bearer wire No. 8 SWG
complete erected with required size of porcelain reel 70 m
insulators and 16 SWG G.I. binding wire.
ITEM NO.2
Provision for Alum,Bleaching powder,Chlorine Gas
cyclinder & electrical charges to paid by Deptt
during 3 months. After complition.
1 ITEM NO. 1
Commissioning, running and maintaining the
scheme…….etc. complete.
2 ITEM NO.2
Provision for Alum,Bleaching powder,Chlorine
Gas cyclinder & electrical charges to paid by
Deptt during 6 months. After complition.
(As per statement attached) 3 months 1 Job
MAHARASHTRA JEEVAN PRADHIKARAN JAL JEEVAN MISSION YIS LLP FORTRESS INFRACON LTD JV
Err:509
A Obligatory RLs
1 HFL 573.31 M
B Design
Intake Well of 3.0 m dia is proposed with the depth 3.15 m below ground
and hieght 1.00 m above the ground
7 Dia of Holes 20 mm
Err:509
Name of Scheme - kelgaon and 2 Villages
R.R.W.S.Scheme
Design of Proposed Jack well
A Obligatory RLs
1 HFL 730.75 M
2 Full Reservoir Level 727.87 M
3 Sill Level 721.00 M
4 River Bed level 714.63 M
5 Average ground level at jackwell location 726.00 M
6 Proposed RL of Top Rose Piece 724.00 M
7 Proposed RL of Bottom Rose Piece 721.00 M
B Design
Diameter of Jack well Required as per
1 6.00 M
space requirement for Pumping Machinery
2 Depth required for bowl assembly 1.00 M
3 RL of bottom of bowl assembly 725.00 M
8 450 0.01 0.01 0.05 0.05 0.04 0.00 48.05 0.04 0.00 48.05
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ -------------- ------------- -------------- -------------------
1st stage flow 0.41 mld 2nd stage flow 0.41 mld
GRAND
TOTAL
of
Cost Annual Capitalised Capitalised Cost Annual Capitalised Capitalised Capitalise PIPE
of Energy Energy Total of Energy Energy Total cost SIZE
Sr. pump Charges Charges Cost pump Charges Charges Cost for in
No. sets sets 30 yrs (mm)
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ -------------- ------------- -------------- -------------------
1 1400 552 3760 11932 1400 614 4182 1020 12952 100.00
2 700 276 1880 11512 700 307 2091 510 12022 150.00
3 600 237 1614 14351 600 263 1791 437 14788 200.00
4 550 217 1478 18370 550 241 1641 400 18770 250.00
5 550 217 1478 22270 550 241 1641 400 22670 300.00
6 550 217 1478 26975 550 241 1641 400 27375 350.00
7 550 217 1478 31927 550 241 1641 400 32327 400.00
8 550 217 1478 38416 550 241 1641 400 38816 450.00
Err:509
Err:509
Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
WATER HAMMER CALCULATIONS OF DI PIPES (K-9)
Required HP 15 BHP
Hence, Proposed 30 HP (1W+1S) 15 BHP
Walandi
Err:509
Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
CALCULATION OF LEAST-COST PIPE SIZE
PURE WATER RISING MAIN IN DI K9 PIPE FOR SHIV NAGAR MBR (Prop Abd Road+Exi Abd Road+Exi Plice Station ESR+Shiv Nagar MBR )
Design of Economic Size of Rising Main INPUT DATA
From : WTP ===== ====== ======= ========== ======= ======= ====== ===========
TO : Shiv Nagar MBR
1) Water requirement : YearDischarge
P I P E D A T A
A. Initial 2024 #REF! mld ------------------ ------------- ------------ ----------- -------------------
B. Intermediate 2039 #REF! mld DIAMETERMATERIAL CLASS HWC RATE
C. Ultimate 2039 #REF! mld MM. Rs/M
------------------ ------------- ------------ ----------- -------------------
2) Pumping main LENGTH 1520 M 100.00 DI K9 140 952.00
3) Static head for pump ST.HEAD #REF! M 150.00 DI K9 140 1383.00
4) Design period YEAR 15 yr. 200.00 DI K9 140 1870.00
5) Combined eff. of pump set EFF. % 65% % 250.00 DI K9 140 2485.00
6) Cost of pumping unit Rs./KW 30000 Rs 300.00 DI K9 140 3106.00
7) Interest rate INTEREST 9.00 % 350.00 DI K9 140 3919.00
8) Life of elec. motors P.Yrs 15 yr. 400.00 DI K9 140 4558.00
9) Energy charges P/KWH 700.0 paise 450.00 DI K9 140 5560.00
10) Pumping hours for discharge PUMPING- 16 hrs
the end of 15 years HOURS
======= ========== ======= ======== =========== ======= ======= ========== ======= ======= ====== ===========
CALCULATIONS: 1st 15 years 2nd 15 years
1) Discharge at Start OF PERIOD #REF! mld #REF! mld
2) Discharge at the end of 15 yrs #REF! mld #REF! mld
3) Average Discharge #REF! mld #REF! mld
4) Ave.pumping hours during the period #REF! hrs #REF! hrs
5) KW required at combined #REF! * H1 #REF! * H2
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
1st stage flow of 2nd stage flow of Cost Cost
#REF! illion liters/day #REF!n liters/day of of
pipe 1520
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ R unit pipe
Sr. in PIPE head plus % 30000 head plus % 30000 length line
No. mm in 100 per kw in 100 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1 100 K9 #REF! #REF! #REF! #REF! #REF! #REF! 952 1447.04
TOTAL
of
Cost Annual Capitalised Capitalised Cost Annual Capitalised Capitalise Capitalis PIPE
of Energy Energy Total of Energy Energy Total cost SIZE
Sr. pump Charges Charges Cost pump Charges Charges Cost for in
No. sets sets 30 yrs (mm)
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 100.00
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 150.00
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 200.00
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 250.00
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 300.00
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 350.00
7 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 400.00
8 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 450.00
#REF! mm costing CAPITALISED Rs. #REF! thousands Hence 200 mm dia DI K-9 Pipes are proposed.
Err:509
Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
WATER HAMMER CALCULATIONS OF DI PIPES (K-9)
A
100 6.1 #REF! #REF! #REF! 640 1301.05 #REF! #REF! 770.00 #REF!
150 6.3 #REF! #REF! #REF! 640 1254.68 #REF! #REF! 770.00 #REF!
200 6.4 #REF! #REF! #REF! 640 1212.81 #REF! #REF! 740.00 #REF!
250 6.8 #REF! #REF! #REF! 620 1184.35 #REF! #REF! 650.00 #REF!
300 7.2 #REF! #REF! #REF! 540 1160.67 #REF! #REF! 590.00 #REF!
350 7.7 #REF! #REF! #REF! 490 1143.31 #REF! #REF! 540.00 #REF!
400 8.1 #REF! #REF! #REF! 450 1126.10 #REF! #REF! 510.00 #REF!
450 8.5 #REF! #REF! #REF! 420 1111.17 #REF! #REF! 480.00 #REF!
D.I. PIPETHICKNESS NORMAL RATE OF WORKING ALLO. VELOCITY OF WATER TOTAL ALLOWABLE
SUITABILITY
500 9 #REF! #REF! #REF! 400 1100.57 #REF! #REF! 460.00 #REF!
Err:509
Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
Design of Pure Water Pumping Machinery For Shiv Nagar MBR
Sr.
Discription #REF! #REF! Unit
No.
1 Demand at stage #REF! #REF! ML
Sr.
Discription #REF! #REF! Unit
No.
Hence, Proposed 30 HP (1W+1S) #REF! #REF! BHP
8 284.5 0.02 0.02 0.07 0.07 0.01 0.00 23.01 0.01 0.00 23.01
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1st stage flow 0.24 mld 2nd stage flow 0.24 mld
GRAND
TOTAL
of
Cost Annual Capitalised Capitalised Cost Annual Capitalised Capitalise Capitalis PIPE
of Energy Energy Total of Energy Energy Total cost SIZE
Sr. pump Charges Charges Cost pump Charges Charges Cost for in
No. sets sets 30 yrs (mm)
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1 16350 7166 48807 65254 16350 7166 48807 11904 77158 99.30
2 15650 6859 46716 62532 15650 6859 46716 11394 73926 126.30
3 15650 6859 46716 62581 15650 6859 46716 11394 73975 144.40
4 15650 6859 46716 62637 15650 6859 46716 11394 74031 162.50
5 15650 6859 46716 62684 15650 6859 46716 11394 74078 180.60
6 15650 6859 46716 62775 15650 6859 46716 11394 74169 225.80
7 15650 6859 46716 62869 15650 6859 46716 11394 74263 252.90
8 15650 6859 46716 62996 15650 6859 46716 11394 74390 284.50
*** TABLE 3 shows that the most economical size of MA
=
Hence 140 mm OD HDPE Pipes with 6 kg/cm2 are
126.3 mm costing CAPITALISED Rs. 73926 thousands
proposed.
==== ======= ======== =============================
Err:509
Err:509
Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
WATER HAMMER CALCULATIONS OF HDPE Pipes
4.38 LPS
Submersible
4 Type of Pump Monoblock
Pump
5 Efficiency of pump 60.00% %
Err:509
8 450 0.00 0.00 0.03 0.03 0.00 0.00 10.50 0.00 0.00 10.50
======= ========== ======= =============== ========== ======= ======= ========== ======= ======= ====== ===========
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
------------ ----------------- ------------ -------------------------- ----------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1st stage flow of 2nd stage flow of Cost Cost
0.06 lion liters/day 0.06 n liters/day of of
pipe 50
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ R unit pipe
Sr. in PIPE head plus % 35000 head plus % 35000 length line
No. mm in 100 per kw in 100 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
------------ ----------------- ------------ -------------------------- ----------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1 100 K9 11.00 1 35 11.00 1 35 934 46.7
2 150 K9 11.00 1 35 11.00 1 35 1232 61.6
3 200 K9 11.00 1 35 11.00 1 35 1674 83.7
4 250 K9 11.00 1 35 11.00 1 35 2254 112.7
5 300 K9 11.00 1 35 11.00 1 35 2792 139.6
6 350 K9 11.00 1 35 11.00 1 35 3441 172.05
7 400 K9 11.00 1 35 11.00 1 35 4124 206.2
8 450 K9 11.00 1 35 11.00 1 35 5019 250.95
======= ========== ======= =============== ========== ======= ======= ========== ======= ======= ====== ===========
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
------------ ----------------- ------------ -------------------------- ----------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1st stage flow 0.06 mld 2nd stage flow 0.06 mld
GRAND
TOTAL
of
Cost Annual Capitalised Capitalised Cost Annual Capitalised Capitalise Capitalis PIPE
of Energy Energy Total of Energy Energy Total cost SIZE
Sr. pump Charges Charges Cost pump Charges Charges Cost for in
No. sets sets 30 yrs (mm)
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
------------ ----------------- ------------ -------------------------- ----------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1 35 4 27 109 35 4 27 11 120 100.00
2 35 4 27 124 35 4 27 11 135 150.00
3 35 4 27 146 35 4 27 11 157 200.00
4 35 4 27 175 35 4 27 11 186 250.00
5 35 4 27 202 35 4 27 11 213 300.00
6 35 4 27 234 35 4 27 11 245 350.00
7 35 4 27 268 35 4 27 11 279 400.00
8 35 4 27 313 35 4 27 11 324 450.00
*** TABLE 3 shows that the most economical size of MAIN is =
100 mm costing CAPITALISED Rs. 120 thousands 100 mm dia DI K-9 Pipes are proposed.
==== ======= =============== =============================
Err:509
======= ========== ======= =============== ========== ======= ======= ========== ======= ======= ====== ===========
TABLE 2 - KILOWATTS & COST OF PUMP SETS REQUIRED FOR DIFFERENT PIPE SIZES AND PIPE COST
------------ ----------------- ------------ -------------------------- ----------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1st stage flow of 2nd stage flow of Cost Cost
0.02 lion liters/day 0.02 n liters/day of of
pipe 50
PIPE Class H1 Kw Pump H2 Kw Pump per meter
Size of Total req'd Cost @ Rs Total req'd Cost @ R unit pipe
Sr. in PIPE head plus % 35000 head plus % 35000 length line
No. mm in 100 per kw in 100 per kw THS
meters standby Rs THS meters standby Rs THS ( Rs ) ( Rs )
------------ ----------------- ------------ -------------------------- ----------------- ------------ ------------- ------------------ ------------- ------------ ----------- -------------------
1 100 K9 11.00 1 35 11.00 1 35 934 46.7
2 150 K9 11.00 1 35 11.00 1 35 1232 61.6
3 200 K9 11.00 1 35 11.00 1 35 1674 83.7
4 250 K9 11.00 1 35 11.00 1 35 2254 112.7
5 300 K9 11.00 1 35 11.00 1 35 2792 139.6
6 350 K9 11.00 1 35 11.00 1 35 3441 172.05
7 400 K9 11.00 1 35 11.00 1 35 4124 206.2
8 450 K9 11.00 1 35 11.00 1 35 5019 250.95
======= ========== ======= =============== ========== ======= ======= ========== ======= ======= ====== ===========
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
Annexure 11
Err:509
DESIGN OF WASTEWATER PUMPING MACHINERFor DI K9
(i) - For Proposed R/main Pipe
Centrifugal 70 %
Submerssible 65 %
Annexure 11
Err:509
DESIGN OF WASTEWATER PUMPING MACHINERFor DI K9
(i) - For Proposed R/main Pipe
V. T. 75 %
Centrifugal 70 %
Submerssible 65 %
8 284.5 0.01 0.01 0.05 0.05 0.02 0.00 40.02 0.02 0.00 40.02
TABLE 3 - COMPARATIVE STATEMENT OF OVERALL COST OF PUMPING MAIN FOR DIFFERENT PIPE SIZES
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ -------------- ------------- -------------- -------------------
1st stage flow 0.17 mld 2nd stage flow 0.17 mld
GRAND
TOTAL
of
Cost Annual Capitalised Capitalised Cost Annual Capitalised Capitalised Capitalise PIPE
of Energy Energy Total of Energy Energy Total cost SIZE
Sr. pump Charges Charges Cost pump Charges Charges Cost for in
No. sets sets 30 yrs (mm)
THS THS THS THS THS THS THS THS THS
( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs ) ( Rs )
------------ ----------------- ------------ --------------- ------------------- ------------ ------------- ------------------ -------------- ------------- -------------- -------------------
1 200 88 599 1213 200 88 599 146 1359 99.30
Err:509
Err:509
Name of Scheme - kelgaon and 2 Villages R.R.W.S.Scheme
WATER HAMMER CALCULATIONS OF HDPE Pipes
A
99.3 5.35 0.39 1.85 39.05 60 203.52 8.04 47.10 90.00 YES
126.3 6.85 0.24 0.57 36.95 60 204.18 4.99 41.94 90.00 YES
144.4 7.8 0.18 0.30 36.49 60 203.78 3.81 40.30 90.00 YES
162.5 8.75 0.14 0.17 36.28 60 203.46 3.00 39.28 90.00 YES
180.6 9.7 0.12 0.10 36.17 60 203.21 2.43 38.59 90.00 YES
225.8 12.1 0.07 0.03 36.06 60 202.98 1.55 37.61 90.00 YES
252.9 13.55 0.06 0.02 36.03 60 202.96 1.24 37.27 90.00 YES
284.5 15.25 0.05 0.01 36.02 60 203.01 0.98 37.00 90.00 YES
#REF!
#REF!
#REF!
#REF!
Pipe Table
By pass
Inlet Outlet Overflow arrangement Wash out
pipe
Sr. Capacity in
Label GL LSL FSL
N. Lac Liters
Vertical Horizontal Total Outlet Vertical Horizontal Total Overflow Vertical Horizontal Total Total Total
Inlet Dia Dia Dia
Length Length Length Dia Length Length Length Dia Length Length Length Length Length
1 Prop. ESR 1.82 LL 1.82 617 629 632 110 16 15 31 250 13 15 28 150 16 15 31 110 15 100 10
Deoni Nagar Panchayat Annexure
#REF!
#REF!
#REF!
#REF!
Distribution System ( 54.827 KM)
Abstract
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Providing and supplying in standard lengths Polyethelene
Pipes , confirming to I.S. 4984 / 14151 / 12786 / 13488
with necessary jointing material like mechanical
connectors i.e. thread / insert joint / quick release coupler
joint / compression fitting joint or flanged joint excluding
coupler/specials, including transportation and freight
charges , inspection charges , loading / unloading charges
, conveyance to the departmental stores & stacking the
same in closed shade duly protecting from sunrays & rains
,excluding GST levied by GOI & GOM in all respect
1 etc.complete.
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Providing & Supply of Electro Fusion Fittings in
accordance with BS EN12201:Part-3 suitable for drinking
water with in black/ blue colour manufactured from
compounded PE80/ PE100 virgin polymer and compatible
with PE80/PE100 pipes, in pressure rating SDR11 with
min PN12.5 rated for water application and shall be 1 LS 1502908.90 1502908.90 1502908.90
2 inclusive of all cost such as testing, inspection charges,
transportation upto store, transit insurance, loading,
unloading, stacking excluding GST levied by GOI & GOM
in all respect, etc.complete.
DI K 7
250 mm dia 1110 RMT 1811.00 1811.00 2010210.00
MJP SSR 2021-22 I.N.3 P.N.71
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Providing & Supplying ISI Standard D.I. specials & fitting
with sealing rubber gasket of S.B.R. complete with Cast
iron follower gland & M.S. nut bolts coated or otherwise
protected from rusting and suitable for D.I. Pipes including
cost of labour, materials and transportation to stores ,
4 loading and unloading excluding GST levied by GOI and
GOM in all respect etc. complete as per IS- 9523.
%
Sr.
6 Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
150 mm dia. Sluice valve PN-1 11 Nos. 10251.00 10251.00 112761.00
200 mm dia Sluice Valve PN-1 1 Nos. 18581.00 18581.00 18581.00
MJP SSR 2021-22 I.N.2 P.N.132
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Excavation for foundation / pipe trenches in soft rock and
old cement and lime masonry foundation asphalt road by
all means including removing the excavated material upto
a distance of 50 M beyond the area and lifts as below,
stacking as directed by Engineer-in-charge, normal
9 dewatering, preparing the bed for foundation and
excluding backfilling, etc. complete.( Bd -A-4/259)
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Lowering laying and jointing H.D.P.E. /M.D.P.E. pipes in
proper position including all specials by Compression
fitting /electrofusion and Butt fusion jointing procedure as
per relevent IS Code complete with all materials for
jointing procedure like Electrofusion machine, Electric
heater /butt fusion welding machine with hydraulic jack,
top loading clamp etc. and all labours as directe by
engineer in charge as per IS - 7634 Part II
12 PE 100 6 Kg/sq.m
90 mm dia. 21050 Rmt 67.00 67.00 1410350.00
110 mm dia. 25764 Rmt 70.00 70.00 1803480.00
140mm dia. 4793 Rmt 107.00 107.00 512851.00
160 mm dia. 796 Rmt 116.00 116.00 92336.00
180 mm dia. 303 Rmt 116.00 116.00 35148.00
200 mm dia. 1011 Rmt 129.00 129.00 130419.00
MJP SSR 2021-22 I.N.2 P.N.115
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Hydraulic testing of H.D.P.E./M.D.P.E. pipe line to
specified pressure including cost of all materials and
labour and water for testing for specified length including
cutting,placing end cap making arrangement for filling safe
water using reciprocating type pumps which should be
able to provide specified test pressure gauges and other
necessary equipments,labour,operation
charges,etc.required for testing.The rate under this item
shall also include cost of retesting,if necessary and
14 reinstating to original position.
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Lowering, laying, jointing in position following C.I.D/F
Reflex valves, Butterfly valves and Sluice valves including
16 cost of all labour jointing material including nut bolts and
giving satisfactory hydraulic testing etc complete ( Rates
for all class of valves )
100 mm dia. Sluice valve PN-1 6 No 2272.00 2272.00 13632.00
150 mm dia. Sluice valve PN-1 11 No 3570.00 3570.00 39270.00
200 mm dia Sluice Valve PN-1 1 No 3714.00 3714.00 3714.00
MJP SSR 2021-22 I.N.4 P.N.135
%
Sr. Basic Rate
Description quantity Unit Lead Increa Final Rate (Rs) Amount (Rs.)
No. (Rs.)
se
Total Quantity of PCC for Pipe Encasing on River or Nalla 135.03 Cum 5646.00 #REF! #REF! #REF!
MJP SSR 2021-22 I.N.1(b) P.N.49
#REF!
#REF!
#REF!
#REF!
Distribution System ( 54.827 KM)
Measurement
Sr. E
Description Qty. Unit
No. No. L B D
Providing and supplying in standard lengths Polyethelene
Pipes , confirming to I.S. 4984 / 14151 / 12786 / 13488
with necessary jointing material like mechanical
connectors i.e. thread / insert joint / quick release coupler
joint / compression fitting joint or flanged joint excluding
coupler/specials, including transportation and freight
charges , inspection charges , loading / unloading
charges , conveyance to the departmental stores &
stacking the same in closed shade duly protecting from
1 sunrays & rains ,excluding GST levied by GOI & GOM in
all respect etc.complete.
HDPE P.E.-100 6Kg/cm
90 mm dia. 1 21,050 21050 RM
110 mm dia. 1 25,764 25764 RM
140mm dia. 1 4,793 4793 RM
160 mm dia. 1 796 796 RM
180 mm dia. 1 303 303 RM
200 mm dia. 1 1,011 1011 RM
53717
Sr. E
Description Qty. Unit
No. No. L B D
Providing & Supply of Electro Fusion Fittings in
accordance with BS EN12201:Part-3 suitable for drinking
water with in black/ blue colour manufactured from
2 compounded PE80/ PE100 virgin polymer and compatible
with PE80/PE100 pipes, in pressure rating SDR11 with
min PN12.5 rated for water application and shall be
inclusive of all cost such as testing, inspection charges,
transportation upto store, transit insurance, loading, 1 LS
Providing
unloading,D.I. pipes
stacking (push on
excluding joints
GST pressure
levied by GOIpipes of
& GOM
D.I.of followingetc.complete.
in all respect, class and Diameters confirming to the I.S.
specification inclusive cost of jointing materials (Rubber
gasket of EPDM Quality) excluding GST levied by GOI &
GOM in all respect,including Third party inspection
charges of TPI Agency approved by MJP includingTransit
3 insurance, Railway Freight unloading from railway
wagon, Loading into Truck, Transportation to
departmental store, unloading ,stacking etc. completed as
directed by Engineer in charge(IS 1536/2001 for pipes
and IS 158/1969 and IS 12820/1989 or latest edition/
revision with amendments for Rubber Gasskets.
250 mm dia 1 1,110 1110 RM
1110
Sr. E
Description Qty. Unit
No. No. L B D
Providing & Supplying ISI Standard D.I. specials & fitting
with sealing rubber gasket of S.B.R. complete with Cast
iron follower gland & M.S. nut bolts coated or otherwise
protected from rusting and suitable for D.I. Pipes
4
including cost of labour, materials and transportation to
stores , loading and unloading excluding GST levied by
GOI and GOM in all respect etc. complete as per IS-
9523.
1 1250.00 Kg
Providing and supplying D.I. fittings with ISI mark
Mechanical joint confirming to tables 12 to table 31 of IS
9523/2000 upto latest amendments including cost of
SBR/ EDPM gaskets, Nuts, Bolts, Washers and Ductile
iron follower glands. Fittings should be with internally
Ordinary portland cement mortor lined and externally
5 metallic zinc coating/zinc rich paint with finishing layer of
black bitumen coating including transportation and
excluding all statutary duties and taxes such as GST
levied by Gol and GoM in all respect etc. complete.
MJ Collar/Coupling
250 mm dia 2 2 No.
Sr.
6 E
Description Qty. Unit
No. No. L B D
100 mm dia. Sluice valve PN-1 6 6 Nos.
150 mm dia. Sluice valve PN-1 11 11 Nos.
200 mm dia Sluice Valve PN-1 1 1 Nos.
`
Excavation for foundation / pipe trenches in earth, soils of
all types, sand, gravel and soft murum, including
removing the excavated material upto a distance of 50
metres and lifts as below, stacking and spreading as
directed, normal dewatering, preparing the bed for
foundation and excluding backfilling, etc. complete. (Bd-
A-1/259)
Lift 0 to 1.5m
90 mm dia. 21050 0.7 1.24 18271.4
7
110 mm dia. 25764 0.7 1.26 22723.85
140mm dia. 4793 0.75 1.29 4637.23
160 mm dia. 796 0.75 1.31 782.07
180 mm dia. 303 0.8 1.33 322.39
200 mm dia. 1011 0.8 1.35 1091.88
250 mm dia 1110 0.8 1.4 1243.2
49072.02 Cum
Sr. E
Description Qty. Unit
No. No. L B D
#REF!
21050 0.70 0.43 6303.63
25764 0.70 0.43 7839.73
4793 0.75 0.45 1599.84
796 0.75 0.45 269.81
Soft Rock 303 0.80 0.46 111.23
1011 0.80 0.47 376.70
1110 0.80 0.48 428.90
16929.85 Cum
Sr. E
Description Qty. Unit
No. No. L B D
180 mm dia. 0.303 0.303 Km
200 mm dia. 1.011 1.011 Km
Sr. E
Description Qty. Unit
No. No. L B D
Providing and constructing B.B. masonry valve chamber
with 15 cm thick 1:2:4 proportion PCC bedding, excluding
excavation, B.B. masonry in CM 1:5 Proportion precast
17 S.F.R.C. frame and cover, etc. complete as directed by
Engineer-in-charge.
Valve Chamber with Precast steel fibre reinforced
concrete ( S.F.R.C.) frame & covers.
As above of 90x90cm internal size and depth upto 1.2 M
D) with S.F.R.C. frame and cover. 18 18 No.
Sr. E
Description Qty. Unit
No. No. L B D
Net volume of refilling 42539.39 Cum
Sr. E
Description Qty. Unit
No. No. L B D
Total Quantity of PCC for Pipe Encasing on River or Nalla 135.03
Sr Increase
Item Reference Qty Unit Rate Final Rate Amount
No. 5%
5 Item No. 3 : Power Analyser - Designing, Supplying,
Installing, MJP Mech/Elect
commissioning & testing of Power Analyser interfacing to SSR 21-22 I.N. SA 3 Nos 31278 31278 93834
PLC Panel with modbus communicatuion port , as per IEC 1.3 P.N.69
62053 and in the prescribed format including mounting
arrangement. (Suitable for pump capacity listed in
6 Item No. 4 : PLC Panel suitable for Wireless
communication- Designing.supplying, Installing MJP Mech/Elect
commissioning & testing of following equipments with SSR 21-22 I.N. SA 1 Nos 154619 154619 154619
satisfactory test and trial of PLC Panel control, monitoring 7.2 P.N.78
and communication system along with PLC Panel at
Central monitoring system.
7 Item No. 5 : PLC based control monitoring and
communication software - Designing, Supplying,
Installing, commissioning & testing of PLC based control
MJP Mech/Elect
monitoring and communication software as per IEC 61131
SSR 21-22 I.N. SA 1 Nos 48883 48883 48883
at Raw water Jackwell / Sump suitable for monitoring and
1.5 P.N.69
control of Raw water Pumps, Pressure Transmitters, Level
Transmitter, Flow Transmitter complete.
Sr Increase
Item Reference Qty Unit Rate Final Rate Amount
No. 5%
10 Item No. 1 : Ultrasonic level transmitter - Designing,
Supplying, Installing, commissioning & testing of
Ultrasonic Raddar type level transmitter CE marked with
following technical parameters at Raw
Water Pump House and Interfacing with PLC panel
including mounting arrangement.
Output-4-20 mA MJP Mech/Elect
Power supply - 24V DC ext. SSR 21-22 I.N. SA 1 Nos 49399 49399 49399
Display - 4" LED 7.1P.N.78
Range- 0 to 5 mtrs
Accuracy - +/- 0.25% of Full Scale or better
Enclosure- IP 67
Mounting - On PLC panel
Sr Increase
Item Reference Qty Unit Rate Final Rate Amount
No. 5%
13 Item No. 4 : PLC Panel suitable for Wireless
communication- Designing.supplying, Installing
commissioning & testing of following equipments with MJP Mech/Elect
satisfactory test and trial of PLC Panel control, monitoring SSR 21-22 I.N. SA 2 Nos 154619 154619 309238
and communication system along with PLC Panel at 7.2 P.N.78
Central monitoring system.
Sr Increase
Item Reference Qty Unit Rate Final Rate Amount
No. 5%
29 Item No. F : Signal Cable : Designing, Supplying,
Installing, MJP Mech/Elect
commissioning & testing with Terminating & Interfacing of SSR 21-22 I.N. SA 100 Mtrs 574 574 57400
8 Pairs x 1.0 sq.mm as per IS 694 copper shielded, 1.8.4 P.N.70
twisted, multi stranded armoured cable on wall in GI tray
30 Item
or on No. 11 : EARTHING - Providing earthing with copper
ground.
earth plate size 30 x 30 x 0.315 cm complete with all PWD Ele.DSR
materials, testing & recording the results as per 2021-22, 9-1-2 , 2 Nos 5872 5% 6165.6 12331
specification no. EA-EP(5872+5%) Page No. 160
Sr Increase
Item Reference Qty Unit Rate Final Rate Amount
No. 5%
Total 414572.69
Total Rs 0.00
Taluka Deoni
District Latur
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 Raw Water Rising Main( 150 mm dia DI K-9 ,L= 7250 m ) #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!
14 #REF! #REF!
Net Cost Excluding GST #REF!
Add for GST (12%) #REF!
Net Cost Including GST #REF!
Add Charges for ETPA (9%) #REF!
Total Gross Cost #REF!
MAHARASHTRA JEEVAN PRADHIKARAN JAL JEEVAN MISSION YIS LLP FORTRESS INFRACON LTD JV
#REF!
#REF!
#REF!
#REF!
Raw Water Rising Main( 150 mm dia DI K-9 ,L= 7250 m )
Abstract
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
Providing D.I. pipes (push on joints pressure
pipes of D.I.of following class and Diameters
confirming to the I.S. specification inclusive cost of
jointing materials (Rubber gasket of EPDM
Quality) excluding GST levied by GOI & GOM in
all respect,including Third party inspection
charges of TPI Agency approved by MJP
includingTransit insurance, Railway Freight
1 unloading from railway wagon, Loading into Truck,
Transportation to departmental store,
unloading ,stacking etc. completed as directed by
Engineer in charge(IS 1536/2001 for pipes and IS
158/1969 and IS 12820/1989 or latest edition/
revision with amendments for Rubber Gasskets.
2
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
80to 300mm dia 2262.16 111.00 111.00 Kg 251100
MJP SSR 2021-22 I.N.10(i) P.N.73
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
Excavation for foundation / pipe trenches in earth,
soils of all types, sand, gravel and soft murum,
including removing the excavated material upto a
distance of 50 metres and lifts as below, stacking
and spreading as directed, normal dewatering,
5 preparing the bed for foundation and excluding
backfilling, etc. complete. (Bd-A-1/259)
Soft Strata
MJP SSR 2021-22 I.N.1 P.N.42
Lift 0 to 1.5 m #REF! 150.00 10.00% 165.00 Cum #REF!
hards Murum
MJP SSR 2021-22 I.N.2 P.N.42
Lift 0 to 1.5 m #REF! 170.00 10.00% 187.00 Cum #REF!
7
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
Lift 0 to 1.5m
MJP SSR 2021-22 I.N.5 P.N.42
10
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
MJP SSR 2021-22 I.N.2(a-vi) P.N.70
200 MM Dia. Without rubber rings 3000.00 113.00 113.00 RM 339000
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
Providing and constructing B.B. masonry valve
chamber with 15 cm thick 1:2:4 proportion PCC
bedding, excluding excavation, B.B. masonry in
CM 1:5 Proportion precast S.F.R.C. frame and
cover, etc. complete as directed by Engineer-in-
charge.
13 As above of 90x90 cm internal size and depth
upto 1.2 M with S.F.R.C. frame and cover. 2.00 17404.00 17404.00 Nos 34808
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
Providing and fixing in position air valve shaft
including providing and fixing GI Medium Class or
6 mm thick M.S. pipe shaft 2.70 M long over
branch flange of air valve tee, providing PCC
block of M-150 concrete, 150 mm thick around the
air valve tee including encasing of vertical shaft in
PCC M-150 as shown in type design together with
providing and making flanged joints wherever
16 required and fixing of air valve tee etc.
complete ,as per type design and as directed by
Engineer-in-charge for following diameters of pipe
lines (type design attached.)
%
Sr. Basic Final Rate
Description Qty. Lead Increas Unit Amount (Rs)
No Rate (Rs) (Rs)
e
Total Net Cost #REF!
MAHARASHTRA JEEVAN PRADHIKARAN JAL JEEVAN MISSION YIS LLP FORTRESS INFRACON LTD JV
Providing & Supplying ISI Standard D.I. specials & fitting with
sealing rubber gasket of S.B.R. complete with Cast iron
follower gland & M.S. nut bolts coated or otherwise protected
from rusting and suitable for D.I. Pipes including cost of
labour, materials and transportation to stores , loading and
2 unloading excluding GST levied by GOI and GOM in all
respect etc. complete as per IS- 9523.
Measurements
Sr. No. Description Qty. Unit
No. L B D
Providing double flange sluice valve confirming for IS- 14846
including worn gear arrangements as per test
pressure,stainless steel spindle, caps, including inspection
charges, transportation upto departmental store,
unloading,stacking excluding GST levied by GOI & GOM in
all respect etc. complete.
3
For Rating Class 150 (Working Pressure 20 kg/cm² & Test
Pressure 30 kg/cm²)
MJP SSR 2021-22 I.N.2a P.N.132
150 mm diameter sluice valve PN-1 2 2.00 Nos
100 mm diameter (scour valve) PN-1 2 2.00 Nos
5 Measurements
Sr. No. Description Qty. Unit
No. L B D
MJP SSR 2021-22 I.N.1 P.N.42
Lift 0 to 1.5m
Soft Soil and Soft Murum Strata 1 3000 0.75 #REF! #REF! Cum
Measurements
Sr. No. Description Qty. Unit
No. L B D
Excavation for foundation / pipe trenches in hard rock and
concrete road by chiselling, wedging, line drilling by
mechanical means or by all means other than blasting
including trimming and levelling the bed, removing the
excavated material upto a distance of 50 metres beyond the
area and lifts as below, stacking as directed by Engineer-
8 incharge, normal dewatering, excluding backfilling, etc.
complete by all means.
Lowering laying and jointing with SBR ruber gaskets C.I. S/S
pipes of various classes with CI / MS specials of following
diameter in proper position, grade and alignment as directed
by Engineer-in-charge including conveyance of material from
stores to site of work, including cost of jointing materials and
rubber rings,labour, etc. complete.
10
Note : Only SBR. Rubber gasket to be used as per IS- 5382
and IS -12820
C.I.'L.A.' Class / Mortar inlined DI K-9/K-7
MJP SSR 2021-22 I.N.2(a-vi) P.N.70
200 MM Dia. Without rubber rings 1 3000 3000.00 RM
MAHARASHTRA JEEVAN PRADHIKARAN JAL JEEVAN MISSION YIS LLP FORTRESS INFRACON LTD JV
Measurements
Sr. No. Description Qty. Unit
No. L B D
Measurements
Sr. No. Description Qty. Unit
No. L B D
MJP SSR 2021-22 I.N.3 (D,E) P.N.222
Thrust blocks for the pipeline by encasing the pipe with RCC
M -20 including all material, labour, mechanical mixing,
compaction, curing etc. complete as directed by Engineer in-
15 charge
Measurements
Sr. No. Description Qty. Unit
No. L B D
#REF!
#REF!
Thurst Block Details
Units Inputs
mm 1 Internal Diameter of pipe 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00 200.00
mm 2 Thickness of pipe 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30
External Diameter of
mm 3 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60 212.60
pipe
m 4 Length of Pipeline 6570 6570 6570 6570 6570 6570 6570 6570 6570 6570 6570 6570 6570 6570 6570
m 5 HGL at Source #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
m/km 6 Rate of friction #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
m 7 Ch 60.00 125.42 358.52 526.69 995.57 1046.35 1274.48 1429.74 1496.43 1749.09 3917.77 3974.63 5260.05 5865.95 6450.96
degree 8 Angular 45.00 11.25 90.00 90.00 45.00 45.00 90.00 22.50 22.50 22.50 45.00 90.00 90.00 11.25 45.00
m 9 GL 453.49 453.76 456.12 459.61 457.71 458.26 457.59 457.41 457.70 459.21 467.61 466.68 468.85 457.79 480.39
m 10 Width 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
m 11 Height 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
m 12 HGL at Deviation #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
m 13 Pressure at Deviation #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
m 14 Water hammer 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76 91.76
kg/
15 Total internal Pressure #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
sqcm Co-efficient of friction
16 between block & strata 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
'µ'
17 Factor of safety against 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
sliding
18 Factor of safety against 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40
Overturning
Safe bearing capacity of
T/Sqm 19 soil 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
degree 20 Angle of internal friction 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
kg/cum 21 Density of Soil 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00 1600.00
Density of Concrete in
kg/cum 22 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00 2400.00
kg / cum
kg/cum 23 Density of pipe material 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27 9138.27
24 Depth of cutting 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60
m 25 Minimum Cover of earth 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
Lever arm for horizontal
m 26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26
thrust from base
Horizontal Thurst
27
Calculations
Cross sectional area of
sqcm 28 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16 314.16
pipe
29 sin(angle of deviation/2) 0.38 0.10 0.71 0.71 0.38 0.38 0.71 0.20 0.20 0.20 0.38 0.71 0.71 0.10 0.38
2 x P x Area of
Ton 30 pipe(internal dia.) x Sin #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
(0/2)
Calculation of Net
Passive Resistance of
soil
Coefficient for net
35 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42
passive resistance
Net passive resistance
Ton/m 36 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54
of Soil
Final Results
m 46 Width of Block 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
m 47 Height of Block 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
m 48 Length of Block #REF! #REF! #REF! 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
49 Grade of Concrete M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20 M-20
50 #REF! #REF! #REF! 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Provide 10 mm bars at
51 200 c/c which is more
than 5 kg/sq.m.
Calculation of Net
Passive Resistance of
soil
Coefficient for net
35 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42
passive resistance
Net passive resistance
Ton/m 36 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.27 4.54 4.54 4.54
of Soil
45 Suitability SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
Final Results
m 46 Width of Block 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.90 1.60 1.60 1.60
m 47 Height of Block 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 1.00 0.90 0.90 0.90
m 48 Length of Block 3.00 0.90 0.90 1.60 1.60 1.60 0.90 0.90 1.60 0.90 0.40 0.80 0.80 0.40
49 Grade of Concrete M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15
50 4.07 1.22 1.22 2.17 2.17 2.17 1.22 1.22 2.17 1.22 0.73 1.09 1.09 0.54
Provide 10 mm bars at
51 200 c/c which is more
than 5 kg/sq.m.
Calculation of Net
Passive Resistance of
soil
Coefficient for net
35 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42 3.42
passive resistance
Net passive resistance
Ton/m 36 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.54 4.40
of Soil
45 Suitability SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE SAFE
Final Results
m 46 Width of Block 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.80
m 47 Height of Block 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.95
m 48 Length of Block 0.80 0.80 1.50 0.80 1.50 0.40 0.40 0.90 0.80 0.80 0.80 0.70 0.40 0.40
49 Grade of Concrete M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15 M-15
50 1.09 1.09 2.03 1.09 2.03 0.54 0.54 1.22 1.09 1.09 1.09 0.95 0.54 0.65
Provide 10 mm bars at
51 200 c/c which is more
than 5 kg/sq.m.
Inputs
mm 1 Internal Diameter of pipe 300.00 300.00 300.00 300.00 300.00
mm 2 Thickness of pipe 7.20 7.20 7.20 7.20 7.20
External Diameter of
mm 3 326.00 326.00 326.00 326.00 326.00
pipe
m 4 Length of Pipeline 12093 12093 12093 12093 12093
m 5 HGL at Source 423.26 423.26 423.26 423.26 423.26
m/km 6 Rate of friction 3.41 3.41 3.41 3.41 3.41
m 7 Ch ### ### ### ### ###
degree 8 Angular 22.50 22.50 11.25 90.00 90.00
m 9 GL 374.67 373.66 374.23 381.40 374.24
m 10 Width 1.6 1.6 2.1 1.6 1.6
m 11 Height 0.9 0.9 0.9 0.9 0.9
m 12 HGL at Deviation 387.83 387.61 386.44 384.69 382.24
m 13 Pressure at Deviation 13.16 13.95 12.21 3.29 8.00
m 14 Water hammer 108.63 108.63 108.63 108.63 108.63
kg/
15 Total internal Pressure 12.18 12.26 12.08 11.19 11.66
sqcm Co-efficient of friction
16 between block & strata 0.40 0.40 0.40 0.40 0.40
Factor
'µ' of safety against
17 sliding 1.50 1.50 1.50 1.50 1.50
Factor of safety against
18 Overturning 1.40 1.40 1.40 1.40 1.40
Safe bearing capacity of
T/Sqm 19 soil 15.00 15.00 15.00 15.00 15.00
degree 20 Angle of internal friction 35.00 35.00 35.00 35.00 35.00
kg/cum 21 Density of Soil 1600.00 1600.00 1600.00 1600.00 1600.00
Density of Concrete in
kg/cum 22 2400.00 2400.00 2400.00 2400.00 2400.00
kg / cum
kg/cum 23 Density of pipe material 9138.27 9138.27 9138.27 9138.27 9138.27
24 Depth of cutting 1.60 1.60 1.60 1.60 1.60
m 25 Minimum Cover of earth 0.70 0.70 0.70 0.70 0.70
Lever arm for horizontal
m 26 0.31 0.31 0.31 0.31 0.31
thrust from base
Calculation of Net
Passive Resistance of
soil
Coefficient for net
35 3.42 3.42 3.42 3.42 3.42
passive resistance
Net passive resistance
Ton/m 36 4.54 4.54 4.54 4.54 4.54
of Soil
Final Results
m 46 Width of Block 1.60 1.60 2.10 1.60 1.60
m 47 Height of Block 0.90 0.90 0.90 0.90 0.90
m 48 Length of Block 0.70 0.70 0.30 2.10 2.20
49 Grade of Concrete M-15 M-15 M-15 M-15 M-15
50 0.95 0.95 0.54 2.85 2.98
Provide 10 mm bars at
51 200 c/c which is more
than 5 kg/sq.m.
#REF!
#REF!
Rate analysis for Item No.3 :
Isolating Panel Board in Sub Station TO JW
1 2 3 4 5
Item No.3 : Panel board 150 X 2 PUMP
Providing, Erecting, commissioning and
testing cubical L. T. Panel board comprising
and suitable for as per detailed
specification attached. PWD CSR 2020-21
& MJP E/M CSR 2020-21
#REF!
#REF!
Rate Analysis for Sludge Pump at
Jackwell
2 3 4 5 6
Item No- 1. SUBMERSIBL MONOBLOCK PUMPS
Submersible monoblock Pump set (with Bronze / Stainless
steel(CF8M) Impeller) Horizontal / Vertical - up to 3 stages
(Motor with water lubricated bearing to accept entire
hydraulic thrust). With TCTC Mechanical seal.
Duty head 12 m
Discharge of Pump 4.2 LPS
HP - 3HP x 2 No
As per Design
MJP SSR E/M 21-22 I.N. PM 1-5-1 P.N 3 2 27687.00 Nos 55374.00
B)Mud Pump
C.S.R. for Sewage pump set is not prepared due to wide
variation in rates per H.P. as per duty conditions, speed,
length of transmission shaft, type etc. The rates required
shall be worked out on the basis of quotations / offers from
manufacturers / authorised distributors in each individual
Item No.:-3
Sluice Valves - PN - 1.0
Providing double flange sluice valve confirming for IS- 14846
including worn gear arrangements as per test
pressure,stainless steel spindle, caps, including inspection
charges, transportation upto departmental store,
unloading,stacking excluding GST levied by GOI & GOM in
all respect etc. complete. P.N 1
PWD Ele CSR 2020-21 Item No.9-1-1 pg. 161 4 4262.44 No. 17050.00
#REF!
#REF!
Rate analysis for Pure Water Pumping Machinery
Panel for 03 HP 4 No
Quantity Particular Rate Unit Amount
1 2 3 4 5
Item No.1 : Panel board
Providing, Erecting, commissioning and testing cubical L.
T. Panel board comprising and suitable for as per detailed
specification attached.
6 I) CRCA Sheet (6-1-1/114 B&C Elect. CSR 2020-21) 243.95 Sqm 1463.69
II)Supplying and erecting Iron, sheet metal work consisting
of CRCA Sheets, Various sections of iron, Plates,
Chequered Plates, Rods, Bars, MS pipes, etc. for panel
board or any other purposes complete with bending,
40 cutting,drilling and welding complete erected at the position 141.15 Kg 5646.03
with necessary materials duly painted with one coat of red
oxide and two coats of enamel paint to match the
switchgears or as per directions by the authority (6-1-
19/115 B&C Elect. CSR 2020-21)
III) Supplying and erecting Bus bar chamber triple pole with
1 neutral with four aluminium bars, 500V 100A complete as 5458.06 Rmt 5458.06
per specification no. CP-BB(6-2-1/115 B&C Elect. CSR
2020-21)
IV) Providing & erecting 4 Pole MCCB of 100A, 415V
capacity with short circuit rating 36 kA (Ics=100% of Icu),
adjustable thermal (overload) setting and fixed magnetic
setting with provided leads, provision for installation of
1 shunt/ UV/ trip alarm contact and MCCB should have 4780.27 Each 4780.27
phase barriers both sides, in provided enclosure on iron /GI
frame as per specification no. SW-
SWR/MCCB(5-5-1/101 & add 20% for 4 pole as per foot
Note B&C Elect. CSR 2020-21 ) Main incommer.
TOTAL 70354.33
Say Total Rs 70354.00