BOQ:

SL
Item Description Unit Qty Rate (Rs) Amount (Rs)
No
Laying of 250 NB fire hydrant line above ground including
01 Mtr 200
3coat painting and supply of paint
Laying of 250 NB fire hydrant line under ground including
02 Mtr 50
with supply & laying of 350 NB concrete hume pipe.
Laying of 300 NB fire hydrant line above ground including
03 Mtr 100
3coat paint and supply of paint.
Laying of 300 NB fire hydrant line under ground including
04 Mtr 25
supply & laying of 450 NB concrete hume pipe.
Laying of150 NB fire hydrant line above ground including 3
05 Mtr 70
coat paint and supply of paint
Fabrication and erection of structural support including
06 MT 0.3
materials
07 Excavation and hooking up with existing fire hydrant line Nos 1
Construction of foundation ( M25 grade, Raft -
08 1400mmX900mm X 250mm, Column – 1400mm X 750mm X Nos 15
300mm with embedded insert plate with supply of materials.
Total(A)
Supply of 250NB x 6.35 mm thick MS pipe and fittings-Pipe
09 Mtr 250
Make:SAIL/Tata/Jindal
Supply of 300NBx6.35 mm thick MS pipe and fittings-Pipe
10 Mtr 125
Make:SAIL/Tata/Jindal
Supply of 150NBx6.35 mm thick MS pipe and fittings-Pipe
11 Mtr 70
Make:SAIL/Tata/Jindal
Total
G.Total(A+B)