Logo CONSTRUCTION COMPANY Logo

JOB SAFETY ANALYSIS


CLIENT: JOB TITLE: Piling & Concrete Work For the CONSULTANT:
Construction of Foundation & Building
Project No. Task Order No. Date. 01/12/2020
Project Name.
Prepared By. Mr. Manish Kumar
Approved By.
Participants. 1.

2.
3.
4.

JOB STEPS:
1. Mobilization Of People, Equipment & Materials
2. Piling
3. Lowering of Steel cage Structure
4. Concreting

Equipment/Tools to be Used: Piling Machine & Hand Tools.

Contingency Plans. Standard PPE’s: First aid kit must be present at work site, Emergency contact
numbers to be in placed at job location

JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were
identified in the original JSA? In case of any new hazard indentified by any of the working team member
during the job, JSA review process should be carried on.

Approved By…………………………….. Signature …………………………….

(CLIENT: ...............................................) Date & Time…………………………


[Type text]

JSA JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
No:
S.N JOB STEP HAZARDS CONSEQUENCES CONTROL
O MEASURES
1 Mobilization  Involvement of  Personal  Trained &
of equipment unskilled injury/Accident skilled staff to
& Materials personnel be authorized
for working
 Ensure JSA
briefing &
Daily TBT to
all workforce
prior to
commence
activity

 Unauthorised/  Failure of  Only inspected


uninspected equipments & Equipments/To
equipment/tool tools. ols must be
s at site allowed at
work site
 Use right tools
for right job
 Slip, Trip &  Slip and trip can  Take care of
fall result overhead
musculoskeletal structure/pipe
injuries & racks
Fractures.  Keep
access/walk
ways always
clear from any
obstruction
 Inclement  Workers can hit  Stop work in
weather by Piling case of any
condition machine, inclement
equipment and weather
get injured due to conditions
fog. ( fog etc.)
 Restrict
movement of
heavy
vehicles/equip
ments in fog
2 Piling  Uncertified  Piling  Pile machine &
piling Machine equipment/machi its operator
& Operator, ne failure. should be
 Collapse of  Workers can certified
[Type text]

JSA JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
No:
S.N JOB STEP HAZARDS CONSEQUENCES CONTROL
O MEASURES
tripod, injure by tripod.  Stand the
tripod properly,
tripod to be
fixed on
ground
properly.
 Keep away all
unauthorized
people during
movement of
heavy
vehicle/equipm
ents
 Be careful of
nearby live
areas
 Ensure Close
HSE
monitoring
/supervision
 Improper  Entry of  Barricade the
barricade unauthorised working area
person. properly
 Fall of person in
Pile.
 Sling broken,  Fatal/injury due  Ensure proper
load drop to load drop. & inspected
accessories
being used for
drilling
 Ensure that
drilling bit is
properly fixed
with locking
pins
 Keep away
during drilling
operation
 working area
should
properly
barricaded
[Type text]

JSA JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
No:
S.N JOB STEP HAZARDS CONSEQUENCES CONTROL
O MEASURES
 Noise  Can cause  Provide Ear
deafness & Plug
psychological
imbalance.

 Slip, Trip &  Slip and trip can  Ensure proper


fall result stacking of all
musculoskeletal materials at site
injuries &  Keep
Fractures access/walk
ways always
clear from any
obstruction
 Ensure proper
housekeeping
of workplace
all the time
 Inclement  Workers can hit  Stop work in
weather by Piling case of any
condition machine, inclement
equipment and weather
get injured due to conditions
fog. (Rain, storm,
fog etc.)
 Restrict
movement of
heavy
vehicles/equip
ments in
rain/fog
 Fire &  Loss of life &  Ensure
explosion Burn due to fire. availability of
inspected fire
extinguishers
at site
3 Lowering of  Personnel hand  Personal injury.  Ensure
Steel Cage injury while  Hit by suspended Involvement of
structure handling with load which can skilled labour
steel result in injury.  Ensure use of
 People under proper PPE’s
suspended load  Area should be
 Unbalancing of properly
[Type text]

JSA JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
No:
S.N JOB STEP HAZARDS CONSEQUENCES CONTROL
O MEASURES
load barricaded
during lifting
operations
 Poor  Poor  Ensure proper
Housekeeping. housekeeping can stacking of all
create unhygienic materials at
work place which work site
can leads to  Maintain good
growth of insects. housekeeping
all the time
4 Concreting of  Inappropriate  Slip of tools can  Use of
Piling PPE’s/Tools injure workmen appropriate
during concrete due to PPE’s during
work inappropriate ppe concrete
and tools.  Ensure use of
 Skin contact  Skin contact with inspected tools
with concrete concrete can for the right
or other cause blisters, job
chemicals dead or hardened  Availability of
skin. fresh water at
site
 First aid box
should be in
place at site
5 Working at  Poor visibility  Tripping of  Ensure proper
night shift at night hours workers due to lighting.
hours Poor visibility