No Task Venue

1 Office Disinfection (On Demand due to Positive Case of Covid- NMUC


19)

2 Opening of Dentallagacy Kota Masai Clinic Dentallagacy


3 Renovation of NMR Office (Phase 1) Menara Ansar

a) Site Marking

b) Installation of Gypsum Board Partition

c) Installation of Carpet tile

d) Repaint suspended ceiling

e) Repaint Wall
f) Replace light bulb
g) Rewiring Electrical Switch
h) Wiring new point for Electrical supply for Surau, Meeting
Room and Workstation
i) Supply and Install Workstation Table, Discussion Table,
Meeting Table, Pantry Table & Chairs
j) Supply and Install Build in cabinet for Pantry
k) Supply and install Wooden Door and Glass Wall
l) Setup Networking System (Internet)
4 Renovation of NMR Office (Phase 2) Menara Ansar
a) Repaint Wall & Ceiling
b) Installation of Insulation (rockwool) for sound proof purpose
at training Room
c) Installation of tile at reception Area
d) Installation of Plaster ceiling at Rception area, Conference
Room, Directoor Room & Training Room
e) Installation of Carpet Roll
f) Door Access, CCTV
g) PA System and Projector, Glass Whiteboar
h) Installation Glass Wall & Door
i) Workstation and Build in Cabinet
5 Opening of MedCare Taman Bukit Dahlia MedCare
6 Setting up New Unit at Level 8 as New Classroom:
a) Rewiring for Electricity supply
b) Replace light bulb
c) Installation of Roller blind
6

d) feed with new Table and Chair c/w Arrange


e) Replace broken ceiling
f) Touch up paint
g) Conversion to Executive Classroom - Proposal Stage
(Consept and detail drawing c/w 3D modelling)
h) Installation of Projector Bracket c/w wiring point for
projector
i) Installation of Projector Screen
j) Installation new set of Whiteboard for classes at Level 8

7 Maintenance & repair: NMUC


a) Replacement of broken door knob for Exam Unit Office
b) Supply metal cabinet for Student Personal Folder
c) Replace door closer at HR Office
d) AC not cold at Chief of Staff Room
e) Replace faulty Downlight at Board Room/Waiting Area Level
14
f) repair water leak at ceiling Cansellor Room
g) Replacement of lockset for Lecturer Room Level 14
h) Fix detached Door Frame at classroom 12.02
8 NMUC Radia Campus (Layout Refine) NMUC
- Awaiting input from All HoD and management
9 East Ledang NMUC

a) Full Renovation - Proposal stage (Consept and Detaiing c/w


3D Modelling)
b) Current Issue - Leaking etc
10 Enhancement level 14 - NMUC Kotaraya NMUC
a) Dismantle Carrel, Wrapping and transport to store
b) Repainting Wall
c) repainting Ceiling
d) Replacement light fitting to LED Downlight
e) Replacement of carpet tile
f) Dismantle and reassemble Workstation for new Lecturer
Workbase c/w wiring for power point
Reintstae Classroo 13.02 to normal classroom layout
11 Setup Venue/Event
NMUC
a)Setup venue for Outcome based education Training at
Classroom -
b) Setup venue for Student Orientation day NMUC

Overall Progress (%)


Venue Task progress
Task Weightage
(Days) Overall Progress (%)
NMUC Kotaraya / Marina
100%
3 2.449
Kota Masai 100% 10 8.163
Menara Ansar Level 21

100%
0.5 0.408
100%
7 5.714
100%
5 4.082
100%
3 2.449
100% 3 2.449
100% 2 1.633
100% 1 0.816
100%
5 4.082
100%
5 4.082
100% 1 0.816
100% 1 0.816
100% 2 1.633
Menara Ansar Level 21

95% 6 4.653
100%
1 0.816
100% 1 0.816
100%
4 3.265
100% 2 1.633
100% 2 1.633
100% 2 1.633
100% 2 1.633
80% 4 2.612
Taman Bukit Dahlia 95% 10 7.755
Menara Kotaraya,
100% 2 1.633
100% 0.5 0.408
100% 0.5 0.408
Menara Kotaraya,

100% 0.5 0.408


100% 0.5 0.408
100% 0.5 0.408
100%
2 1.633
100%
0.5 0.408
100% 0.5 0.408
100%
0.5 0.408

Exam Unit 100% 0.5 0.408


STAAR Office 100% 0.5 0.408
100% 0.5 0.408
100% 0.5 0.408
100%
0.5 0.408
100% 1 0.816
100% 0.5 0.408
100% 0.5 0.408
Radia Bukit Jelutong
95%
4 3.102
East Ledang

100%
3 2.449
65% 6 3.184
Classroom 14.01,
marketing Office, 100%
Marketing HoD Room 1 0.816
100% 2 1.633
100% 2 1.633
100% 1 0.816
100% 2 1.633
100%
3 2.449
100% 1 0.816

100%
2 1.633
100% 0.5 0.408
rogress (%) 84.980
Task Progress (%)
Office Disinfection (On Demand due 3 2.4489796
to Positive Case of Covid-19)
100
Opening of Dentallagacy Kota Masai C 10 8.1632653 100
Renovation of NMR Office (Phase 1) 35.5 28.979592
100
Renovation of NMR Office (Phase 2) 24 19.591837

Task Progress (%)


95.4
Opening of MedCare Taman Bukit 10 8.1632653
Dahlia
95
Setting up New Unit at Level 8 as 8 6.5306122
New Classroom:
100
Maintenance & repair: 4.5 3.6734694
92.2
NMUC Radia Campus (Layout Refine) 4 3.2653061 95
East Ledang 9 7.3469388 76.7
Enhancement level 14 - NMUC Kotar 12 9.7959184 100
2.0408163
Setup Venue/Event 2.5 100

122.5 100
Task Progress
120
100
80
60
40
20
0

Task
No Task Venue

1 Office Disinfection (On Demand due to Positive Case of Covid- NMUC


19)

2 Opening of Dentallagacy Kota Masai Clinic Dentallagacy


3 Renovation of NMR Office (Phase 1) Menara Ansar

a) Site Marking

b) Installation of Gypsum Board Partition

c) Installation of Carpet tile

d) Repaint suspended ceiling

e) Repaint Wall
f) Replace light bulb
g) Rewiring Electrical Switch
h) Wiring new point for Electrical supply for Surau, Meeting
Room and Workstation
i) Supply and Install Workstation Table, Discussion Table,
Meeting Table, Pantry Table & Chairs
j) Supply and Install Build in cabinet for Pantry
k) Supply and install Wooden Door and Glass Wall
l) Setup Networking System (Internet)
4 Renovation of NMR Office (Phase 2) Menara Ansar
a) Repaint Wall & Ceiling
b) Installation of Insulation (rockwool) for sound proof purpose
at training Room
c) Installation of tile at reception Area
d) Installation of Plaster ceiling at Rception area, Conference
Room, Directoor Room & Training Room
e) Installation of Carpet Roll
f) Door Access, CCTV
g) PA System and Projector, Glass Whiteboar
h) Installation Glass Wall & Door
i) Workstation and Build in Cabinet
5 Opening of MedCare Taman Bukit Dahlia MedCare
6 Setting up New Unit at Level 8 as New Classroom:
a) Rewiring for Electricity supply
b) Replace light bulb
c) Installation of Roller blind
6

d) feed with new Table and Chair c/w Arrange


e) Replace broken ceiling
f) Touch up paint
g) Conversion to Executive Classroom - Proposal Stage
(Consept and detail drawing c/w 3D modelling)
7 Maintenance & repair: NMUC
a) Replacement of broken door knob for Exam Unit Office
b) Supply metal cabinet for Student Personal Folder
8 NMUC Radia Campus (Layout Refine) NMUC
- Awaiting input from All HoD and management
9 East Ledang NMUC

a) Full Renovation - Proposal stage (Consept and Detaiing c/w


s 3D Modelling)
b) Current Issue - Leaking etc
10 Enhancement level 14 - NMUC Kotaraya NMUC
a) Dismantle Carrel, Wrapping and transport to store
b) Repainting Wall
c) repainting Ceiling
d) Replacement light fitting to LED Downlight
Overall Progress (%)
Venue Task progress
Task Weightage
(Days) Overall Progress (%)
NMUC Kotaraya / Marina
100%
2 1.852
Kota Masai 100% 10 9.259
Menara Ansar Level 21
0.000

100%
0.5 0.463
100%
7 6.481
100%
5 4.630
100%
3 2.778
100% 3 2.778
100% 2 1.852
100% 1 0.926
100%
5 4.630
100%
5 4.630
100% 1 0.926
100% 1 0.926
100% 2 1.852
Menara Ansar Level 21
0.000
95% 6 5.278
100%
1 0.926
100% 1 0.926
95%
4 3.519
100% 2 1.852
90% 2 1.667
50% 2 0.926
100% 2 1.852
60% 4 2.222
Taman Bukit Dahlia 95% 10 8.796
Menara Kotaraya,
100% 2 1.852
100% 0.5 0.463
100% 0.5 0.463
Menara Kotaraya,

100% 0.5 0.463


100% 0.5 0.463
100% 0.5 0.463
100%
2 1.852

Exam Unit 100% 0.5 0.463


STAAR Office 100% 0.5 0.463
Radia Bukit Jelutong
95%
4 3.519
East Ledang

100%
3 2.778
65% 6 3.611
Classroom 14.01,
marketing Office, 50%
Marketing HoD Room 1 0.463
0% 2 0.000
0% 2 0.000
70% 1 0.648
rogress (%) 88.796
Task Progress (%)
Office Disinfection (On Demand due 2 1.8518519
to Positive Case of Covid-19)
100
Opening of Dentallagacy Kota Masai 1C0 9.2592593 100
Renovation of NMR Office (Phase 1) 35.5 32.87037
100
Renovation of NMR Office (Phase 2) 24 22.222222

Task Progress (%)


52.5
Opening of MedCare Taman Bukit 10 9.2592593
Dahlia
85
Setting up New Unit at Level 8 as 6.5 6.0185185
New Classroom:
100
Maintenance & repair: 1 0.9259259
100
NMUC Radia Campus (Layout Refine) 4 3.7037037 40
East Ledang 9 8.3333333 33.3
Enhancement level 14 - NMUC Kotar 6 5.5555556
100
108
Task Progress
120
80
40
Task Progress (%)

Task
No Task Venue

1 Office Disinfection (On Demand due to Positive Case of Covid- NMUC


19)

2 Opening of Dentallagacy Kota Masai Clinic Dentallagacy


3 Renovation of NMR Office (Phase 1) Menara Ansar
a) Site Marking

b) Installation of Gypsum Board Partition

c) Installation of Carpet tile

d) Repaint suspended ceiling

e) Repaint Wall
f) Replace light bulb
g) Rewiring Electrical Switch
h) Wiring new point for Electrical supply for Surau, Meeting
Room and Workstation
i) Supply and Install Workstation Table, Discussion Table,
Meeting Table, Pantry Table & Chairs
j) Supply and Install Build in cabinet for Pantry
k) Supply and install Wooden Door and Glass Wall
l) Setup Networking System (Internet)
4 Renovation of NMR Office (Phase 2) Menara Ansar
a) Repaint Wall & Ceiling
b) Installation of Insulation (rockwool) for sound proof purpose
at training Room
c) Installation of tile at reception Area
d) Installation of Plaster ceiling at Rception area, Conference
Room, Directoor Room & Training Room
e) Installation of Carpet Roll
f) Door Access, CCTV
g) PA System and Projector, Glass Whiteboar
h) Installation Glass Wall & Door
i) Workstation and Build in Cabinet
5 Opening of MedCare Taman Bukit Dahlia MedCare
6 Setting up New Unit at Level 8 as New Classroom:
a) Rewiring for Electricity supply
b) Replace light bulb
6

c) Installation of Roller blind


d) feed with new Table and Chair c/w Arrange
e) Replace broken ceiling
f) Touch up paint
g) Conversion to Executive Classroom
7 Maintenance & repair: NMUC
a) Replacement of broken door knob for Exam Unit Office
b) Supply metal cabinet for Student Personal Folder
8 NMUC Radia Campus (Layout Refine) NMUC
- Awaiting input from All HoD and management
9 East Ledang NMUC

a) Full Renovation - Proposal stage (Consept and Detaiing c/w


3D Modelling)
b) Current Issue - Leaking etc
Overall Progress (%)
Venue Task progress
Task Weightage Overall Progress
(Days) (%) Progress (%)
NMUC Kotaraya / Marina
100%
2 2 2 2
Kota Masai 100% 10 10 10 10
Menara Ansar Level 21
0

100%
0.5 0.5
100%
7 7
100%
5 5

100%
3 3
100% 3 3
100% 2 2
100% 1 1
100%
5 5
100%
5 5
100% 1 1
100% 1 1
100% 2 2 35.5 100
Menara Ansar Level 21
0
50% 6 3
100%
1 1
100% 1 1
85%
4 3.4
10% 2 0.2
60% 2 1.2
20% 2 0.4
20% 2 0.4
50% 4 2 12.6 52.5
Taman Bukit Dahlia 85% 10 8.5 8.5 8.5
Menara Kotaraya, 0
100% 2 2
100% 0.5 0.5
Menara Kotaraya,

100% 0.5 0.5


100% 0.5 0.5
100% 0.5 0.5
100% 0.5 0.5
In Planing 4.5 100

Exam Unit 100% 0.5 0.5


STAAR Office 100% 0.5 0.5 1 100
Radia Bukit Jelutong
40%
4 1.6 40
East Ledang

100%
3 3
65% 6 3.9 6.9 33.3
rogress (%) 82.6
Task Progress (%)
Office Disinfection (On Demand due
to Positive Case of Covid-19)
100
Opening of Dentallagacy Kota Masai C 100
Renovation of NMR Office (Phase 1)
100
Renovation of NMR Office (Phase 2)

Task Progress (%)


52.5
Opening of MedCare Taman Bukit
Dahlia
85
Setting up New Unit at Level 8 as
New Classroom:
100
Maintenance & repair:

100
NMUC Radia Campus (Layout Refine) 40
East Ledang 33.3
Task Progress
120
100
80
60
40
Task Progress (%)

20
0

Task
No Task Venue

1 Office Disinfection (On Demand due to Positive Case of Covid- NMUC


19)
2 Opening of Dentallagacy Kota Masai Clinic Dentallagacy
3 Renovation of NMR Office (Phase 1) Menara Ansar
a) Site Marking
b) Installation of Gypsum Board Partition
c) Installation of Carpet tile
d) Repaint suspended ceiling
e) Repaint Wall
f) Replace light bulb
g) Rewiring Electrical Switch
h) Wiring new point for Electrical supply for Surau, Meeting
Room and Workstation
i) Supply and Install Workstation Table, Discussion Table,
Meeting Table, Pantry Table & Chairs
j) Supply and Install Build in cabinet for Pantry
k) Supply and install Wooden Door and Glass Wall
l) Setup Networking System (Internet)
4 Renovation of NMR Office (Phase 2) Menara Ansar
a) Repaint Wall & Ceiling
b) Installation of Insulation (rockwool) for sound proof purpose
at training Room
c) Installation of tile at reception Area
d) Installation of Plaster ceiling at Rception area, Conference
Room, Directoor Room & Training Room
e) Installation of Carpet Roll
f) Door Access, CCTV
g) PA System and Projector, Glass Whiteboar
h) Installation Glass Wall & Door
i) Workstation and Build in Cabinet
5 Opening of MedCare Taman Bukit Dahlia MedCare
6 Setting up New Unit at Level 8 as New Classroom:
a) Rewiring for Electricity supply
b) Replace light bulb
c) Installation of Roller blind
d) feed with new Table and Chair c/w Arrange
e) Replace broken ceiling
f) Touch up paint
g) Conversion to Executive Classroom
7 Maintenance & repair: NMUC
a) Replacement of broken door knob for Exam Unit Office
7 NMUC

b) Supply metal cabinet for Student Personal Folder


8 NMUC Radia Campus (Layout Refine) NMUC
- Awaiting input from All HoD and management
9 East Ledang NMUC

a) Full Renovation - Proposal stage (Consept and Detaiing c/w


3D Modelling)
b) Current Issue - Leaking etc
Overall Progress (%)
Venue Task progress
Task Weightage Overall Progress
(Days) (%)
NMUC Kotaraya / Marina
100%
2 2
Kota Masai 100% 10 10
Menara Ansar Level 21
0
100% 0.5 0.5
100% 7 7
100% 5 5
100% 3 3
100% 3 3
100% 2 2
100% 1 1
100%
5 5
100%
5 5
100% 1 1
100% 1 1
100% 2 2
Menara Ansar Level 21
0
50% 6 3
100%
1 1
100% 1 1
85%
4 3.4
10% 2 0.2
60% 2 1.2
20% 2 0.4
20% 2 0.4
50% 4 2
Taman Bukit Dahlia 85% 10 8.5
Menara Kotaraya, 0
100% 2 2
100% 0.5 0.5
100% 0.5 0.5
100% 0.5 0.5
100% 0.5 0.5
100% 0.5 0.5
In Planing

Exam Unit 100% 0.5 0.5


STAAR Office 100% 0.5 0.5
Radia Bukit Jelutong
in Progress
4
East Ledang

80%
3 2.4
10% 6 0.6
rogress (%) 77.1
No Task Venue
1 Office Disinfection (On Demand due to Positive Case of Covid- NMUC
19)
2 Opening of Dentallagacy Kota Masai Clinic Dentallagacy
3 Renovation of NMR Office (Phase 1) Menara Ansar
a) Site Marking
b) Installation of Gypsum Board Partition
c) Installation of Carpet tile
d) Repaint suspended ceiling
e) Repaint Wall
f) Replace light bulb
g) Rewiring Electrical Switch
h) Wiring new point for Electrical supply for Surau, Meeting
Room and Workstation
i) Supply and Install Workstation Table, Discussion Table,
Meeting Table, Pantry Table & Chairs
j) Supply and Install Build in cabinet for Pantry
k) Supply and install Wooden Door and Glass Wall
l) Setup Networking System (Internet)

4 Renovation of NMR Office (Phase 2) Menara Ansar


a) Repaint Wall & Ceiling
b) Installation of Insulation (rockwool) for sound proof purpose
at training Room
c) Installation of tile at recepton Area
d) Installation of Plaster ceiling at Rception area, Conference
Room, Directoor Room & Training Room
e) Installation of Carpet Roll
f) Door Access, CCTV
g) PA System and Projector, Glass Whiteboar
h) Installation Glass Wall & Door
i) Workstation and Build in Cabinet

5 Opening of MedCare Taman Bukit Dahlia MedCare


6 Setting up New Unit at Level 8 as New Classroom: NMUC
a) Rewiring for Electricity supply
b) Replace light bulb
c) Installation of Roller blind
d) feed with new Table and Chair c/w Arrange
e) Replace broken ceiling
f) Touch up paint
g) Conversion to Executive Classroom

7 Maintenance & repair: NMUC


a) Replacement of broken door knob for Exam Unit Office
b) Supply metal cabinet for Student Personal Folder
9 NMUC Radia Campus (Layout Refine) NMUC
- Awaiting input from All HoD and management
10 East Ledang NMUC
a) Full Renovation - Proposal stage (Consept and Detaiing c/w
3D Modelling)
b) Current Issue - Leaking etc
Venue Status
NMUC Kotaraya / Marina Completed

Kota Masai Completed


Menara Ansar Level 21
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

Menara Ansar Level 21


50% Completed
Completed

Completed
85% Completed

10% Completed
60% Completed
20% Completed
20% Completed
50% Completed

Taman Bukit Dahlia 85% Completed


Menara Kotaraya,
Level 8 Completed
Completed
60% Completed
Completed
Completed
Completed
Planning

Exam Unit Completed


'STAAR Office Completed
Radia Bukit Jelutong in Progress

East Ledang