Professional Documents
Culture Documents
A. Severity: Risk Atm: E1 RF 100% RF Sev 100% RF Rep 100%
A. Severity: Risk Atm: E1 RF 100% RF Sev 100% RF Rep 100%
AA4 A4 B4 C4 E4 D4
B. REPEATABILITY
4a. Systemic issues Systemic/contributing factors
Procedures DESIGN 12
Procedures IMPLEMENTATION 8
Procedures LACK OF 8 8
Equipment DESIGN 12
Equipment IMPLEMENTATION 8
Equipment LACK OF 8 8
Human resources management (staff planning, staff
assignment, training) DESIGN 12
Human resources management IMPLEMENTATION 8
Human resources management LACK OF 8 8
5. Window of Opportunity
Situation
Daily routine Workload Unusual
Methods peak situations
normal 7 5 3
degraded mode 6 4 2
contingency 3 2 1
Total (5) 2
TOTAL REPEATABILITY :
ATM Ground =(4)+(5) 38
Edition 1.0 (No aircraft involved / ATM Specific Occurence) Released Issue Page 1 of 1