MACOVS LIMITED

P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Table 1.

ARON-SOWA ROAD PROJECT 2023


Time Sheet For Employees
Date & No. of Days worked (hrs)
No Names Description
From: 24/1/2023 (Tuesday) – 8/2/2023 (Wednesday)
NON CAUSAL EMPLOYEE
1 Talio Adel Senior Mechanic 8 8 10 10 7 8 9 10 10 8 9 8 9 8 122
2 Peter Buli Supervisor 8 8 10 10 7 8 9 10 10 8 9 8 8 113
3 Gibson Alice Fuel Boy 8 8 10 10 7 8 9 10 10 8 9 8 9 8 122
4 Jerry James Driver (2.5ton Truck) 8 8 10 10 7 8 9 10 10 10 Suspended 90
5 Davis James Excavator Operator) 8 8 10 10 7 8 9 10 10 8 9 8 9 8 122
6 Paulson Wiru 4-Man 8 8 10 10 7 8 9 10 10 8 9 8 9 8 122
CAUSAL LABOUR
7 Kelly Hember PRO 8 8 9 9 6 7 8 9 9 7 8 8 8 7 111
8 Edward Former PRO 8 8 10 10 7 8 9 10 10 8 9 8 9 8 122
9 Enoch Kurap Pulim 2 Community Rep 8 8 10 10 - 8 9 10 10 8 - 8 9 8 106
10 John Wong Spotter (excavator 1) - - - - 7 8 9 10 10 9 10 8 9 10 90
11 Junior Wonil Spotter (excavator 2) 8 8 - 10 7 8 9 10 10 9 8 9 - 10 106
12 Solo Joshua Security 10 10 10 10 10 10 10 10 10 10 10 10 10 10 140
13 Alex Wong Security 10 10 10 10 10 10 10 10 10 10 10 10 10 10 140
14 Jonah Lun Security - - 10 10 10 10 10 10 10 10 10 10 10 10 120
15 Joseph Wong Security - - 10 10 10 10 10 10 10 10 10 10 10 10 120
16 Robin Boli Grease Boy 8 8 - - - 8 8 8 8 8 8 8 8 8 88
17 Olpa Ess House Rent
18 John Apunan House Keeper
19 John Hembe Lay Down Area (Pulim 3)
20 Mainly John Laydown Area (pulimm 2)

................................................................................................................By: Project Engineer


MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

21 Israel Pope Prj. Engineer

Table 2.

FUEL CARRIERS
Names Tally `Amount (Rate @ K5/20L container)
James Global 3 K 15.00
Norman Ronald 7 K 35.00
Danny Kux 9 K 45.00
Andrew Oropa 10 K 50.00
John Wong 9 K 45.00
Junior Wong 10 K 50.00
Alex Wong 9 K 45.00
Sen Sengil 1 K 5.00
Francis Kong 16 K 80.00

Note:
1) As of Wednesday 8/2/2023, (time: 4:00) Quarry Landowners threaten our boys on-site and stopped them from continuing work until Quarry
payments is made, reported by Peter Buli.
2) Table 2 consists of fuel carriers at the rate of K5 per 20L container.
3) Current Work Status/progress:
 Approximately 1.4km from Wip Ipa (river) to Somar Ipa (river)
 After clearing and grubbing for the last 2 weeks, preparation for pavement is made by stabilization of subgrade and over-excavation of
poor subgrade.
 Still waiting for any feedback on Culverts.
 Used fuel: 5 drums (1000L). Remaining, 4 drums in Nipa & 1 Drum in Mosup.