GTI VorOrtFieldTests 1HC0007012ADEn
GTI VorOrtFieldTests 1HC0007012ADEn
GTI VorOrtFieldTests 1HC0007012ADEn
Content
1. Introduction
7. References
Field tests are performed on the completely assembled GIS For circuit-breakers these tests consist of:
or subassemblies thereof to check the correct operation and –– Check of pump control
the dielectric strength of the equipment before putting into –– Check of blocking mechanisms
service. –– Check of switching times
–– Check of position indicator
Test methods and procedures are defined in internal ABB
testing instruction manuals. The test sequence is appropriate For disconnector and earthing switches these consist of:
and adequately defined. –– Check of correct adjustment and indicator position
–– CO-operations of drive motors
After successful field testing an acceptance certificate will be
issued. Results will be used as reference in future maintenance work.
3. Measurement of the resistance of the main circuit 5.3 Verifying of current transformers
Resistance checks are performed during installation of the Current transformers are checked by current impulses for cor-
GIS according to the progress of assembly. The purpose of rect polarity. If agreed upon, also measurement of ratio and
these measurements is to verify proper alignment of the main magnetic characteristic may be performed.
circuit contacts.
This test is done in mounted position using the insulated
The resistance readings do not show individual components, earthing switches for current injection. A special testing facility
but several components connected in series. has to be provided.
5.2 Proper function of the local control [2] ANSI C 37.122, IEEE Guide for gas-insulated substations
Each bay is checked for all the functions the local control cu-
bicle is intended for. This includes testing of alarms, metering [3] ABB publication, 1HC0007011 E01, High-voltage on-site
equipment, switching operations, mechanical and electrical Testing of GIS Type ELK
blockings, as well as verifying correct supply with auxiliary and
control voltage. [4] IEC 60376, Specification of technical grade sulfur hexa-
flouride (SF6) for use in electrical equipment
The interlocking is checked according to the interlocking list
provided.