TO: TEKROVEL

ATTN: MR. ASIM


VER: INTERIOR DESIGN
FROM: CADRE ARCHITECTS & ENGINEERS
DATED: 15/03/2019

COSTING FOR OFFICE INTERIOR


S. NO ITEM DESCRIPTION AMOUNT
ITEM DESCRIPTION COST
Dismantling of existing Toilet and kitchen walls
DISMANTLING and flooring, taking care of existing plumbing and 30,000
wiring.
BLOCK MASONRY WORK Toilets, kitchen 4" thick block

PLASTER WORK Toilets, kitchen 1/2" plaster on both sides 60,000

lintels Toilets and kitchen door lintels

PLUMBING MATERIAL Pipes, elbow joints, solution and etc. 30,000

PLUMBING LABOUR Toilets and kitchen plumbing 50,000


DOORS FRAMES Toilets and kitchen door frames in golden teak wood 16,000
DOOR SHUTTERS Toilets and kitchen doors shutters 12,000
HINGES AND FIXING DOORS Toilets and kitchen doors 4,000
5 Commodes, 3 vanities, 5 muslim showers and 13 T
TOILET FIXTURES 80,000
cocks
TOILET TILES 1500 square meter tiles with fixing in toilets 100,000
3 nos. 12mm temperd galss with complete hardwear
GLASS DOORS 63,000
and fixing
FIX GLASS Fix glass with aluminium frame and frosted paper 20,000
Providing and fixing highgloss sheet with complete
HIGHGLOSS SHEET 40,000
fixing
Providing and fixing vinly floor in office complete with
VINLY FLOOR 30,000
all aspect
TO: TEKROVEL
ATTN: MR. ASIM
VER: INTERIOR DESIGN
FROM: CADRE ARCHITECTS & ENGINEERS
DATED: 15/03/2019

COSTING FOR OFFICE INTERIOR


S. NO ITEM DESCRIPTION AMOUNT
Providing and fixing marble strip in corridor complete COST
MARBEL STRIP FLOOR 10,000
with all aspect
CARPET FLOOR Providing and fixing carpet floor 10,000
3" Thick MDF wall with wooden frame complete with
WOODEN WALL 200,000
all respect
2002 Lasani lamination with PVC lipping along with
WORK STATIONS two drawers with lock with 8" high table partiotion 500,000
softboard with fabric complete with all respect
2002 Lasani lamination with PVC lipping along with
CABINETS AND STORAGE 150,000
shutters and lock complete with all respect
4'X8' elephant sheet laying and fixing complete with all
GYPSUM CEILING 120,000
respect
2'X2'gypsum sheet laying and fixing complete with all
GYPSUM CEILING 2'X2' 45,000
respect
Providing and fixing variation handcraft concrete wall
FEATURE WALL tiles along with 3/4" th. MDF wall and frame with LED 240,000
strio lights complete with all respect
Providing and fixing wooden strips benches complete
WOODEN BENCHES 25,000
with all respect
2002 Lasani lamination with PVC lipping along with
RECEPTION COUNTER 25,000
drawers and lock complete with all respect
Providing and fixing two customized beanbags
BEANBAGS 16,000
complete with all respect
Providing and fixing PVC folding shutters complete
FOLDING DOOR 40,000
with all respect
Providing and fixing 1" th. Black marble on counter top
MARBLE COUNTER 18,000
complete with all respect
Providing and fixing 3/4" thick MDF wall with LED lights
CONFERENCE FEATURE WALL 136,000
complete with all respect
TO: TEKROVEL
ATTN: MR. ASIM
VER: INTERIOR DESIGN
FROM: CADRE ARCHITECTS & ENGINEERS
DATED: 15/03/2019

COSTING FOR OFFICE INTERIOR


S. NO ITEM DESCRIPTION AMOUNT
Providing and laying three coats of matt finish paint COST
PAINT WORK 200,000
complete with all respect
2002 Lasani lamination with PVC lipping two tables
ED TABLES along with side credenza with drawers complete with
all respect

providing and laying wooden frame with high gloss top


CONFERENCE TABLE 60,000
finish complete with all respect

CHAIRS AND STOOLS Master chairs 699,000

voice / data / ceiling fans / LED lights / AC wiring and


ELECTRICAL WORK 500,000
pakistan cable

providing and laying wooden frame with high gloss top


HURDLE TABLE 25,000
finish complete with all respect

TOTAL COST OF PROJECT

3,554,000