The document is a cost estimate from Cadre Architects & Engineers for an office interior redesign project for Tekrovel. It provides itemized costs for various construction and design elements totaling over 3.5 million rupees. Items included dismantling existing structures, new toilet fixtures, tiles, doors, flooring, walls, work stations, cabinets, ceilings, benches, counters, paint work, tables, chairs and electrical work.
The document is a cost estimate from Cadre Architects & Engineers for an office interior redesign project for Tekrovel. It provides itemized costs for various construction and design elements totaling over 3.5 million rupees. Items included dismantling existing structures, new toilet fixtures, tiles, doors, flooring, walls, work stations, cabinets, ceilings, benches, counters, paint work, tables, chairs and electrical work.
The document is a cost estimate from Cadre Architects & Engineers for an office interior redesign project for Tekrovel. It provides itemized costs for various construction and design elements totaling over 3.5 million rupees. Items included dismantling existing structures, new toilet fixtures, tiles, doors, flooring, walls, work stations, cabinets, ceilings, benches, counters, paint work, tables, chairs and electrical work.
The document is a cost estimate from Cadre Architects & Engineers for an office interior redesign project for Tekrovel. It provides itemized costs for various construction and design elements totaling over 3.5 million rupees. Items included dismantling existing structures, new toilet fixtures, tiles, doors, flooring, walls, work stations, cabinets, ceilings, benches, counters, paint work, tables, chairs and electrical work.
S. NO ITEM DESCRIPTION AMOUNT ITEM DESCRIPTION COST Dismantling of existing Toilet and kitchen walls DISMANTLING and flooring, taking care of existing plumbing and 30,000 wiring. BLOCK MASONRY WORK Toilets, kitchen 4" thick block
PLASTER WORK Toilets, kitchen 1/2" plaster on both sides 60,000
lintels Toilets and kitchen door lintels
PLUMBING MATERIAL Pipes, elbow joints, solution and etc. 30,000
PLUMBING LABOUR Toilets and kitchen plumbing 50,000
DOORS FRAMES Toilets and kitchen door frames in golden teak wood 16,000 DOOR SHUTTERS Toilets and kitchen doors shutters 12,000 HINGES AND FIXING DOORS Toilets and kitchen doors 4,000 5 Commodes, 3 vanities, 5 muslim showers and 13 T TOILET FIXTURES 80,000 cocks TOILET TILES 1500 square meter tiles with fixing in toilets 100,000 3 nos. 12mm temperd galss with complete hardwear GLASS DOORS 63,000 and fixing FIX GLASS Fix glass with aluminium frame and frosted paper 20,000 Providing and fixing highgloss sheet with complete HIGHGLOSS SHEET 40,000 fixing Providing and fixing vinly floor in office complete with VINLY FLOOR 30,000 all aspect TO: TEKROVEL ATTN: MR. ASIM VER: INTERIOR DESIGN FROM: CADRE ARCHITECTS & ENGINEERS DATED: 15/03/2019
COSTING FOR OFFICE INTERIOR
S. NO ITEM DESCRIPTION AMOUNT Providing and fixing marble strip in corridor complete COST MARBEL STRIP FLOOR 10,000 with all aspect CARPET FLOOR Providing and fixing carpet floor 10,000 3" Thick MDF wall with wooden frame complete with WOODEN WALL 200,000 all respect 2002 Lasani lamination with PVC lipping along with WORK STATIONS two drawers with lock with 8" high table partiotion 500,000 softboard with fabric complete with all respect 2002 Lasani lamination with PVC lipping along with CABINETS AND STORAGE 150,000 shutters and lock complete with all respect 4'X8' elephant sheet laying and fixing complete with all GYPSUM CEILING 120,000 respect 2'X2'gypsum sheet laying and fixing complete with all GYPSUM CEILING 2'X2' 45,000 respect Providing and fixing variation handcraft concrete wall FEATURE WALL tiles along with 3/4" th. MDF wall and frame with LED 240,000 strio lights complete with all respect Providing and fixing wooden strips benches complete WOODEN BENCHES 25,000 with all respect 2002 Lasani lamination with PVC lipping along with RECEPTION COUNTER 25,000 drawers and lock complete with all respect Providing and fixing two customized beanbags BEANBAGS 16,000 complete with all respect Providing and fixing PVC folding shutters complete FOLDING DOOR 40,000 with all respect Providing and fixing 1" th. Black marble on counter top MARBLE COUNTER 18,000 complete with all respect Providing and fixing 3/4" thick MDF wall with LED lights CONFERENCE FEATURE WALL 136,000 complete with all respect TO: TEKROVEL ATTN: MR. ASIM VER: INTERIOR DESIGN FROM: CADRE ARCHITECTS & ENGINEERS DATED: 15/03/2019
COSTING FOR OFFICE INTERIOR
S. NO ITEM DESCRIPTION AMOUNT Providing and laying three coats of matt finish paint COST PAINT WORK 200,000 complete with all respect 2002 Lasani lamination with PVC lipping two tables ED TABLES along with side credenza with drawers complete with all respect
providing and laying wooden frame with high gloss top
CONFERENCE TABLE 60,000 finish complete with all respect
CHAIRS AND STOOLS Master chairs 699,000
voice / data / ceiling fans / LED lights / AC wiring and
ELECTRICAL WORK 500,000 pakistan cable
providing and laying wooden frame with high gloss top
HURDLE TABLE 25,000 finish complete with all respect