LAPORAN GANGGUAN (REPORT OF INTERRUPTION)

PLTMG BAU-BAU
Tanggal Temuan 4 Juli 2023
Equipment/Part Generator
Sub Equipment Automatic Voltage Regulator (AVR)
Fungsi Proteksi Kerusakan Surge Voltage
Running Hours 18111 Hrs
Jenis Gangguan Alarm AVR diode protection
Kronologi • Tanggal 04 Juli 2023. Pukul 11:36:40

➢ Muncul Alarm AVR Excitation limiter active


➢ Muncul Alarm AVR Generator level limiter active
➢ Kemudian trip AVR Diode protecton active
➢ Kemudian trip AVR Generator Circuit breaker
➢ Beban (load) menjadi 0 kw

• Tanggal 04 Juli 2023. Pukul 11:39:13


➢ Kemudian sinkronisasi engine 2 selesai dan masuk ke jaringan

Analisis RCFA • Excitation current mencapai maximum setpoint limiter


• Generator current mencapai maximum setpoint limiter
• Kemungkinan tegangan output AVR surge yaitu phasa R L1-2 dengan nilai 11.14 kv

Foto Temuan Terlampir lampiran

Dampak Gangguan - Engine#2 mengalami Trip/Pemadaman parsial

- ENS (Energy Not Serve) = 489 kW

Rekomendasi 1. Pengecekan Setting RDM Diode Protection Engine 2


2. Menaikkan Settingan Trip Diode Protection sebanyak 5% sesuai arahan pada Portal
Wartsila

Dilaporkan oleh,
MECHANICAL ENGINEER

GIDEON SEBASTIAN T.T


LAPORAN GANGGUAN (REPORT OF INTERRUPTION)

Lampiran (Attachment)
INDIKASI
KERUSAKAN
NO DOKUMENTASI GANGGUAN ( DOCUMENTATION OF INTERRUPTION)
(INDICATION OF
INTERRUPTION)

SESUDAH
1 SINKRONISASI (AFTER
SYNCHRONIZATION)

SEBELUM
SINKRONISASI - AWAL
TRIP SAMPAI AWAL
SINKRONISASI
(BEFORE
2
SYNCHRONIZATION -
BEGINNING OF TRIP
UNTIL THE
BEGINNING OF
SYNCHRONIZATION)
LAPORAN GANGGUAN (REPORT OF INTERRUPTION)

SEBELUM
GENERATOR BREAKER
3 TRIP (BEFORE THE
GENERATOR BREAKER
TRIP)

4 HISTORY ALARM