Daily Monitoring Gas Activity

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

JAWA‐1 

COMBINED CYCLE GAS TURBINE POWER PLANT 
(1760 MW)
Daily Monitoring Activity Gas Offloading Platform and Onshore Receiving Facility

Client : Jawa Satu Power Date :


Contractor : Meindo Elang Indah

Launcher  Cold Vent  Gas Metering


Receiver ORF  Receiver ORF  PLDS Press. 
Time  GOP Press.  FlowRate  Press. (barg) Flow (mmSCFD) Energy (mmBtu)
Press. (barg) Temp. (0C) (barg)
(barg) (SCFD) Skid‐1 Skid‐2 Skid‐1 Skid‐2 Skid‐1 Skid‐2
00.00 AM
01.00 AM
02.00 AM
03.00 AM
04.00 AM
05.00 AM
06.00 AM
07.00 AM
08.00 AM

Total Cummulative Volume Consumption (mmSCFD) Skid‐1 = Skid‐2 =


Total Cummulative Energy Consumption (mmBtu) Skid‐1 = Skid‐2 =

09.00 AM
10.00 AM
11.00 AM
12.00 AM
01.00 PM
02.00 PM
03.00 PM
04.00 PM
05.00 PM
06.00 PM
07.00 PM
08.00 PM

Total Cummulative Volume Consumption (mmSCF) Skid‐1 = Skid‐2 =


Total Cummulative Energy Consumption (mmBtu) Skid‐1 = Skid‐2 =

09.00 PM
10.00 PM
11.00 PM

Note: (record any abnormal events during day and night shift monitoring)
1)
2)
3)
4)
5)

Prepared by, Checked by,
Shift Technician Shift Supervisor

You might also like