3 Prepare documents for SMDC Vine TTC RFA and endorsement letter for fttu back checking and ceiling en
2.5 prepare request letter for smdc Vine barracks power supply.
4 project updates, and review and submit weekly accomplishment report and next week site schedule, pre
14 CCTV scs testing with arknet. meeting with arknet and Ab regarding fttu and scs testing, RFA for fttu and
4 prepare testing form for unit owner copy for smdc trees phase 3aA tower 18&19 and gpmc cctv ca form.
1.5 review plans and documents for smdc air and red cctv and fttu
1.5 Inspection and Supervision on CCTV activation and instllation for smdc air, coordinate with smdc, smdc a
3 Prepare RFA for central box and endorsement letter for ceiling enclosure for sdmc air.
9 coordinate with smdc, cm and hitachi regarding Installation of devices at pe 8 cartop, activity and next w
50
wr, gpmc acceptance form and endorsement letter for Smdc Vine tower 3&4 and Smdc Trees tower 16&21 and parking bldg. Coordinate w
d next week site schedule, prepare smdc red cctv testing form
or sdmc air.