Professional Documents
Culture Documents
Turn-Over of - Punchlist
Turn-Over of - Punchlist
PUNCH LIST
PASSENGER ELEVATOR REMARKS
1 Concrete wall painting
3 Tiles rectification
Prepared By:
Rodel S. Lising
Project Engineer
Checked/Inspected By:
________________________
Owner Representative