Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

PROJECT MANAGEMENT CONTRACTOR WELLNESS REPORT

Contractors Name / BI: (Br. C.A.T. International Co. Ltd.) SA-4 HUGRS

Date: July 02 to 08, 2023 (Week # 27)

Total Number of Workforce 521

Overall Number of Employees classified as “Higher


00
Risk”

Higher Risk Employees (Assessed by Contractor Qualified Personnel)

Number of Potential Emotional / Mental “Higher Risk” Number of Potential Health based
00 00
Employees “Higher Risk” employees

Medical Leave Information

Number of Personnel on Medical leave for Emotional / Number of Personnel on Medical


00 00
Mental Issues leave for Physical Health Issues

Clinic Information

Number of Clinic Visits for the Reporting Period 20

Number of Clinic Visits YTD 640

Number of Personnel Refereed to the Local Hospital /


00
Clinic

Number of Entries into the online SA Medical Log 00

Wellness Information

Number of Wellness checks conducted for the


20
reporting period

Number of Wellness checks conducted YTD 640

Number of Employees enrolled in Approved Emotional


00
/ Mental Health program (AHCP)

Last Wellness survey conducted (Date) July 06,2023

Weekly Site Wellness

Weekly Wellness Topic The important role of plenty water drink in prevention disease.

Drinking water can prevent dehydration, a condition that can cause


Brief Outline of Topic unclear thinking, result in mood change, cause your body to overheat,
and lead to constipation and kidney stones.

This form must be retained at the contractor clinic and issued to Project Management as part of the
Weekly Safety Documents Submission.

Saudi Aramco: Company General Use


PROJECT MANAGEMENT CONTRACTOR WELLNESS REPORT
Contractor HR Representative Name:

Signature:

Date:

Saudi Aramco: Company General Use

You might also like