Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES

LIST OF DRAWINGS ABBREVIATIONS


BSP BLACK STEEL PIPE
LEGENDS LEGENDS
LEGENDS WATER SUPPLYING SYSTEM FIREFIGHTING AND GAS SYSTEMS
C.D.P. CONDENSING DRAIN PIPE
C.G.P. GAS COPPER PIPE DRAINAGE SYSTEM C.W.S. PIPE B.S.P (FOR CABINETS)
C.P. COPPER PIPE UPVC DRAINAGE PIPE (BLACK WATER) H.W.S. PIPE B.S.P (FOR SPRINKLERS)
UPVC DRAINAGE PIPE (GRAY WATER)
GENERAL CV
CPVC
CONTROL VALVE
CHLORINATED POLYVINYL CHLORIDE POLYPROPYLENE DRAINAGE PIPE
H.W.R. PIPE
TREATED COLD WATER PIPE
UPVC DRAIN PIPE
SENSORS WIRING
C.W.S. COLD WATER SUPPLY UPVC RAINWATER DRAINAGE PIPE C.W.S. PIPE (FROM WATER SOFTNER) RISER
UPVC VENT PIPE WATER PIPE (SOLAR HEATING SYSTEM)
G000 GENERAL COVER SHEET D/D DROP DOWN HOOD SPRINKLER
D.P. DRAINAGE PIPE FLOOR TRAP XLPE C.W.S. PIPE SENSOR
G001 GENERAL LIST OF DRAWINGS, LEGENDS AND ABBREVIATIONS F/A FROM ABOVE WALL CLEANOUT XLPE H.W.S. PIPE FLOW DIRECTION ARROW
F AFC FROM ABOVE FALSE CEILING FLOOR CLEANOUT FLOW DIRECTION ARROW GATE VALVE
F/B FROM BELOW FIXTURE OUTLET ISOLATING VALVE FLUSHING VALVE
F.D. FLOOR DRAIN RISER WATER COLLECTOR TESTING VALVE
PLUMBING SERVICES G.P. GALVANIZED STEEL PIPE OPENING THROUGH WALL RISER
LANDING VALVE
G.S.P. GALVANIZED STEEL PIPE FIXTURE INLET
HL HIGH LEVEL HOSE BIB ZCV ZONE CONTROL VALVE
P000 SITE PLAN SITE PLAN FOR MECHANICAL SERVICES H.W.S. HOT WATER SUPPLY INTERSECTION POINT AIR VENT
H.W.R. HOT WATER RETURN LEGENDS NON-RETURN VALVE RISER
P101 & P102 DRAINAGE SYSTEM DRAINAGE SYSTEM FOR SECOND & FIRST BASEMENT FLOOR H.W.R. HOT WATER RETURN HVAC SYSTEM PRESSURE RELIEF VALVE INTERSECTION POINT
P103 & P104 DRAINAGE SYSTEM DRAINAGE SYSTEM FOR GROUND & FIRST FLOOR LL LOW LEVEL CONDENSING COLD WATER RETURN PIPE DRAIN PIPE MANUAL CLASS K FIRE EXTINGUISHER
P105 & P106 DRAINAGE SYSTEM DRAINAGE SYSTEM FOR SECOND & THIRD FLOOR L.V. LANDING VALVE CONDENSING COLD WATER SUPPLY PIPE STRAINER MANUAL ABC FIRE EXTINGUISHER
NC NORMALLY CLOSE MESH STRAINER
P107 & P108 DRAINAGE SYSTEM DRAINAGE SYSTEM FOR FOURTH & TOP ROOF FLOOR NO NORMALLY OPEN
UPVC DRAIN PIPE
STRAINER VALVE MANUAL CLASS D FIRE EXTINGUISHER
FLOW DIRECTION ARROW
P PRESSURE AUTOMATIC AIR VENT FIREFIGHTING SPRINKLER
DOUBLE RRGULATING VALVE
P201 & P202 WATER SYSTEM WATER SUPPLYING FOR SECOND & FIRST BASEMENT FLOOR P. PIPE MOTORIZED CONTROL VALVE
ISOLATING VALVE FM200 FIREFIGHTING EXTINGUISHER
P203 & P204 WATER SYSTEM WATER SUPPLYING FOR GROUND & FIRST FLOOR
R.P. RAINWATER DRAIN PIPE
SQUARE/RECTANGULAR DIFFUSER
PRESSURE REDUCING VALVE
PPR P. POLYPROPYLENE PIPE T TEMPERATURE SENSOR SIAMESE CONNECTION
P205 & P206 WATER SYSTEM WATER SUPPLYING FOR SECOND & THIRD FLOOR PS PRESSURE SWITCH
SQUARE / RECTANGULAR GRILLE P PRESSURE SENSOR
P207 & P208 WATER SYSTEM WATER SUPPLYING FOR FOURTH & TOP ROOF FLOOR PV PRESSURE VESSEL
WALL MOUNTED GRILL E / DIFFUSER T THERMOSTAT FIRE HYDRANT
PVC POLYVINYL CHLORIDE INDOOR AC UNIT PRESSURE GAUGE
P301 & P302 FIREFIGHTING SYSTEM FIREFIGHTING SYSTEM FOR SECOND & FIRST BASEMENT FLOOR R.W.P. RAINWATER DRAIN PIPE WATER METER
FIRE HOSE CABINET (RUBBER HOSE)
P303 & P304 FIREFIGHTING SYSTEM FIREFIGHTING SYSTEM FOR GROUND & FIRST FLOOR SU SPLIT UNIT WATER PUMP
T/A TO ABOVE SUBMERSIBLE PUMP
P305 & P306 FIREFIGHTING SYSTEM FIREFIGHTING SYSTEM FOR SECOND & THIRD FLOOR PRESSURIZATION FAN
T AFC TO ABOVE FALSE CEILING
P307 FIREFIGHTING SYSTEM FIREFIGHTING SYSTEM FOR FOURTH FLOOR T/B TO BELOW
TWO-WAY CONTROL VALVE
FIRE HOSE CABINET (RUBBER HOSE)
UG UNDERGROUND DOUBLE REGULATING VALVE WITH
P401 & P402 GAS SYSTEM GAS SYSTEM FOR SECOND & FIRST BASEMENT FLOOR UPVC UNPLASTISIZED POLYVINYL CHLORIDE MEASURING ORIFICE
UT UNDER TILE
SOLAR PANEL
UV ULTRAVIOLET GERMICIDAL IRRADIATION
HVAC SERVICES UVGI
XLPE
ULTRAVIOLET GERMICIDAL IRRADIATION
CROSS-LINKED POLYETHYLENE
PRESSURE VESSEL

ZCV ZONE CONTROL VALVE


WATER TANK
M101 & M102 VENTILATION SYSTEM VENTILATION SYSTEM FOR SECOND & FIRST BASEMENT FLOOR
M103 & M104 VENTILATION SYSTEM VENTILATION SYSTEM FOR GROUND & FIRST FLOOR
M105 & M106 VENTILATION SYSTEM VENTILATION SYSTEM FOR SECOND & THIRD FLOOR PARTICULAR NOTES ON WATER AND DRAINAGE SYSTEMS : PARTICULAR NOTES ON HVAC SERVICES, GENERAL NOTES:
M107 & M108 VENTILATION SYSTEM VENTILATION SYSTEM FOR FOURTH & TOP ROOF FLOOR INCLUDING CHILLED WATER PIPING :
1. ALL MANIFOLDS' OUTELET PIPES IN DRAWINGS ARE 16mm AND SHALL RUN ABOVE FALSE 1. ARRANGEMENT OF ALL PLANTS AND EQUIPMENT IS INDICATIVE ONLY.
CEILING (AFC) UNLESS OTHERWISE STATED. 2. NOT ALL DETAILS OF CONTROL & SAFETY VALVES HAVE BEEN SHOWN. SAFETY VALVES &
1. ALL PIPES RUN (AFC) UNLESS OTHERWISE STATED.
2. THE DIAMETER OF EACH MANIFOLD IN DRAWINGS SHALL BE THE SAME AS ITS SUPPLYING BURSTING DISCS SHAILL BE REQUIRED FOR THE SECONDARY SIDE OF HEAT
M201 & M202 HEATING & COOLING SYSTEM HEATING & COOLING SYSTEM FOR SECOND & FIRST BASEMENT PIPE UNLESS OTHERWISE STATED.
2. ALL CHILLED WATER PIPES DIAMETERS ARE IN mm UNLESS OTHERWISE STATED.
3. ALL DUCTS AND DIFFUSERS DIMENSIONS ARE IN mm. EXCHANGERS AND CALORIFIERS.
FLOOR 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL COORDINATION OF THE 3. CONNECT ALL COMPRESSED AIR BRANCHES TO MAIN PIPE BY A GOOSE NECK
4. ALL MECHANICAL SERVICES DRAWINGS TO BE READ IN CONJUNCTION WITH PROJECT
M203 & M204 HEATING SYSTEM HEATING SYSTEM FOR GROUND & FIRST FLOOR REQUIRED WALL, SLAB AND ROOF OPENINGS FOR PIPES AND CABLES WITH OTHER
ARCHIRTECTURAL, STRUCTURAL AND OTHER SERVICES DRAWINGS AND SPECIFICATIONS. CONNECTION.
TRADES AND PREPARE BULDER'S WORK DRAWINGS RELATED TO PLUMBING 4. SLOPE OF COMPRESSED AIR PIPES SHALL BE 1% TO THE DIRCETION OF THE FLOW.
M205 & M206 HEATING SYSTEM HEATING SYSTEM FOR SECOND & THIRD FLOOR 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL COORDINATE THE REQUIRED
INSTALLATIONS. 5. IF A MANIFOLD, FAN-COIL UNIT OR ANY EQUIVALENT OBJECTS EXISTED ABOVE GYPSUM
M207 HEATING SYSTEM HEATING SYSTEM FOR FOURTH FLOOR 4. IT IS THE REPONSIBILITY OF THE CONTRACTOR FOR THE FINAL COORDINATION OF ALL
WALL, SLAB AND ROOF OPENINGS FOR DUCTS, PIPES AND CABLES WITH OTHER TRADES.
FALSE CEILING, AN ACCESS DOOR SHALL BE NEEDED BENEATH THAT OBJECT.
PREPARATION OF BUILDER'S WORK DRAWINGS RELATED TO HVAC INSTALLATIONS SHALL
THE FITMENTS AT CEILING/FLOOR LEVEL AND WITHIN CELING/UNDER FLOOR WITH THE
BE THE RESPONSIBILITY OF THE CONTRACTOR.
ARCHITECT/INTERIOR DESIGNER AND STATE REQUIRED ACCESS PANELS FOR EQUIPMENT
6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR FOR THE FINAL COORDINATION FOR ALL 4-
MAINTENANCE AND FOR TESTING AND COMMISSIONING ACTIVITIES.
THE FITMENTS AT CEILING LEVEL AND WITHIN CEILING WITH THE INTERIOR DESIGNER
GENERAL STANDARD DETAILS 5. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH STRUCTURE
AND INTERIOR CONTRACTOR AND SPECIFIY REQUIRED ACCESS PANELS FOR 3-
AND OTHER TRADES AND IF NECESSARY MODIFY THE PIPEWORK ROUTE, ETC. TO SUIT
EQUIPMENTS MAINTENANCE AND FOR TESTING AND COMSSIONING ACTIVITIES.
THE EXISTING BUILDING CONDITIONS.
7. THE CONTRACTOR SHALL CARRY OUT A DETAILED ACOUSTIC ANALYSIS OF THE BUILDING
M401 STANDARD DETAILS DETAILS ONE 6. THE ELECTRICAL CONTRACTOR SHALL CARRY OUT THE POWER WIRING/CABLING UPTO
WITH RESPECT TO THE AHU AIR DISTRIBUTION SYSTEM AND SELECT/SIZE SUITABLE
2-
M402 STANDARD DETAILS DETAILS TWO AND INCLUDING THE LOCAL ISOLATORS. HOWEVER, ALL THE REST OF THE ELECTRICAL
SOUND ATTENUATOR TO ACHIEVE THE SPECIFIED NOISE LEVEL CRITERION INSIDE THE
WORKS ASSOCIATED WITH THE PLUMBING INSTALLATIONS SUCH AS CONTROL CABLING
M403 STANDARD DETAILS DETAILS THREE TO THE EQUIPMENT, CONDUTING/CONTAINMENT, TERMINATIONS, ETC. SHALL BE THE
CONDITIONED SPACES. THE ABSORPTION CO-EFFICIENTS OF DIFFERENT ROOMS SHALL 1-
BE ASCERTAINED BASED ON INTERIOR FURNISHINGS, WALL AND FLOOR FINISHES IN
M404 STANDARD DETAILS DETAILS FOUR RESPONSIBILITY OF THE PLUMBING CONTRACTOR.
CORORDINATION WITH THE INTERIOR DESIGNER AND THE HVAC EQUIPMENT SELECTION.
M405 STANDARD DETAILS DETAILS FIVE 7. TEST POINTS ON PIPING AND OTHER ASSOCIATED PLUMBING EQUIPMENT SHALL BE
8. THE CONTRACTOR SHALL COMPUTE AND VERIFY SPECIFIED AHU BLOWER STATIC
NO. REVISION Date
PROVIDED IN SUFFICIENT QUANTITY AND TO ENGINEER'S REQUIREMENTS TO FACILTATE
M406 STANDARD DETAILS DETAILS SIX PRESSURES AND SIZE THE BLOWER SPEED AND MOTOR POWER INPUT SUITABLY AFTER
ACCURATE TESTING AND COMMISSIONING ACTIVITIES.
M407 STANDARD DETAILS DETAILS SEVEN FINAL SELECTION OF EQUIPMENT AND SHOP DRAWING.
8. WEATHER PROOFING OF PIPE OPENINGS IN THE BUILDING STRUCTURE SHALL BE THE
9. THE A/C CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE AND IF NECESSARY
M408 STANDARD DETAILS DETAILS EIGHT RESPONSIBILITY OF THE CONTRACTOR. FOR EXACT DIMENSIONS AND LOCATIONS OF
MODIFY THE DUCTWORK ROUTING WITH THE STRUCTURE AND OTHER SERVICES TO SUIT
COLUMNS, BEAMS, DOORS, WINDOWS, FURNITURE, LAYOUT AND ANY OTHER
THE EXISTING BUILDING CONDITIONS.
ARCHITECTURAL FEATURES, PLUMBING CONTARCTOR SHALL REFER DRAWINGS OF THE
10. WHERE DUCTWORK PASSES THROUGH CONCRETE SLAB OR FIRE RATED STRUCTURE,
RESPECTIVE DISCIPLINES PRIOR TO STARTING OF THE INSTALLATIONS AS PER PLUMBING
THE CONTRACTOR SHALL PROVIDE FIRE DAMPERS COMPLETE WITH INSTALLATION
SERVICES DRAWINGS.
FRAME AND SUITABLE ACCESS PANEL.
SCHEDULES 9. ACCESS DOORS SHALL BE PROVIDED IN DUCTS ADJESCENT TO CLEAN-OUTS, RODDING
11. WHEREVER A/C DUCTS ARE PASSING THROUGH WALLS, OPENINGS SHALL BE MINIMUM
POINTS, ETC FOR MAINTENANCE.
100 mm BIGGER THAN THE DUCT SIZES AND 150 mm BIGGER IN HEIGHT AT PLACES WHERE
10. WHEREVER NOISE CRITERION IS SPECIFIED, APPROPRIATE PIPEWORK. SONIC LINER
FIRE DAMPERS ARE SHOWN.
SCH01 SCHEDULES SCHEDULES GROUP ONE SHALL BE APPLIED TO THE OUTSIDE OF THE PIPEWORK.
12. ALL AIR OUTLET S SHALL BE WITH INTEGRAL OPPOSED BLADE VOLUME CONTROL
SCH02 SCHEDULES SCHEDULES GROUP TWO 11. CONTRACTOR SHALL CARRY OUT DECORATIVE PAINTING ON EXPOSED PLUMBING
DAMPERS.
SERVICES.
13. ALL INTERNAL DUCTS OR PLENUIM BOX TO BE INSULATED WITH 19 mm THICK CLOSED
12. THE CONTRACTOR SHALL BE RESPONSIBLE OF THE FINAL SIZING AND SELECTION OF THE
CELL ELASTOMERIC FOAM RUBBER INSULATION IN ACCORDANCE WITH SPECIFICATIONS.
NUTRALIZATION CHAMPER.
14. CHILLED WATER PIPE ROUTES ARE INDICATIVE AND ALL ROUTES SHALL BE AGREED ON
13. DOMESTIC WATER PIPES SHALL RUN ABOVE FALSE CEILING (AFC) UNLESS OTHERWISE
SITE WITH THE ENGINEER PRIOR TO COMMENCING INSTALLTION WORK.
STATED.
15. NO OPENINGS THROUGH FLOORS OR WALLS SHALL BE CARRIED WITHOUT PRIOR
14. ALL THE EXISTING PLUMBING WORKS (IF ANY) RELATED TO THE EXISTING TOILETS
APPROVAL FROM STRUCTURAL ENGINEER.
LOCATED IN TEH BUILDING CORE WHICH WILL NOT BE CHANGED TO BE KEPT AS IS.
16. WHERE PIPE WORK IS PASSING THROGH CONCRETE SLABS AND MASONRY WALLS,
APPRORIATE SLEEVES SHALL BE PROVIDED.
Project :
17. THE CONTRACTOR SHALL ALLOW FOR DRAIN COCKS TO BE FITTED TO ALL LOWEST
POINTS IN THE PIPING NETWORK TO ENSURE ADEQUATE DRAINING OF THE SYSTEM OR
PARTICULAR NOTES ON FIREFIGHTING SYSTEM: FLASHING.

1.
2.
ALL DIAMETERS OF PIPES IN DRAWINGS ARE IN mm, UNLESS OTHERWISE STATED.
ALL PIPES ARE OF BLACK STEEL TYPE UNLESS OTHERWISE STATED.
18. THE A/C CONTRACTOR SHALL VERIFY AND COMPUTE ACTUAL CHILLED WATER PUMPING
HEAD BASED ON EQUIPMENT SELECTED AND SHOP DRAWINGS AND SIZE OF THE PUMP
AND MOTOR SUITABLY.
Students Dorms for Girls
3. ALL PIPES SHALL RUN ABOVE FALSE CEILING (AFC) UNLESS OTHERWISE STATED. 19. THE CABLING FOR THE AUTIMATIC MONITORING AND CONTROL SYSTEM INCLUDING
4. FIRE HOSE CABINET HAS THE FOLLOWING CHARACTERISTICS : COMMUNICATION TWISTED PAIR CABLES SHALL BE CARRIED OUT UNDER HVAC
DIMENSIONS: 120 x 80 x 30 cm.

6 kG ABC FIRE EXTINGUISHER.


OF
20.
CONTRACTOR SCOPE OF WORKS.
TEST POINTS ON DUCTING AND PIPING SHALL BE PROVIDED IN SUFFICIENT QUANTITY
AND TO ENGINEER'S REQUIREMENTS TO FACILITATE ACCURATE TESTING AND
COMMISSIONING ACTIVITIES.
BUILDING 1
4. ALL MECHANICAL SERVICES DRAWINGS TO BE READ IN CONJUNCTION WITH PROJECT 21. WEATHER PROOFING OF DUCT AND PIPE OPENINGS IN THE STRUCTURE SHALL BE
ARCHIRTECTURAL, STRUCTURAL AND OTHER SERVICES DRAWINGS AND SPECIFICATIONS. CARRIED OUT BY THE A/C CONTRACTOR TO ENGINEER'S APPROVAL.
5. THE CONTRACTOR SHALL COORDINATE THE REQUIRED WALL, SLAB AND ROOF OPENINGS 22. FOR PRECISE LOCATIONS OF COLUMNS, BEAMS, DOORS, WINDOWNS, FURNITURE
FOR DUCTS, PIPES AND CABLES WITH OTHER TRADES. PREPARATION OF BUILDER'S WORK LAYOUT AND ANY OTHER ARCHITECTURAL FEATURES, REFER TO ARCHITECTURAL FINAL
DRAWINGS RELATED TO HVAC INSTALLATIONS SHALL BE THE RESPONSIBILITY OF THE DRAWINGS RELATED TO RELEVANT AREAS PRIOR TO COMMENCING WORKS.
CONTRACTOR. 23. ALL CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH 19MM THICK ELASTOMERIC Funded By:
6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL THE FITMENTS AT FOAM.
CEILING LEVEL AND WITHIN CEILING WITH THE INTERIOR DESIGNER AND INTERIOR 24. ALUMINIUM CLADDING AS SPECIFIED SHALL BE PROVIDED ON DUCTWORK AND PIPEWORK
CONTRACTOR AND SPECIFIY REQUIRED ACCESS PANELS FOR EQUIPMENTS MAINTENANCE EXPOSED TO AMBIENT CONDITIONS AND LOCATED IN ROOF, SHAFTS AND OTHER AREAS
AND FOR TESTING AND COMSSIONING ACTIVITIES. SUSCEPTIBLE TO MECHANICAL DAMAGE.
7. ALL MECHANICAL SERVICES DRAWINGS TO BE READ IN CONJUNCTION WITH PROJECT 25. THE ELECTRICAL CONTRACTOR SHALL CARRY OUT POWER WIRING/CABLING UPTO AND
ARCHIRTECTURAL, STRUCTURAL AND OTHER SERVICES DRAWINGS AND SPECIFICATIONS. INCLUDING THE ISOLATORS. REST OF THE ELECTRICAL WORKS SUCH AS CONTROL
8. ALL FIREFIGHTING PIPES SHALL BE PROVIDED WITH FLEXIBLE JOINTS WHEREVER THESE
PIPES CROSS THE BUILDING EXPANSION JOINTS, AND WHEREVER NEEDED.
CABLING, CONDUITING, TERMINATIONS, ETC. SHALL BE THE RESPONSIBILITY OF A/C
CONTRACTOR.
The Turkish Government
9. THE DOOR OF THE MAIN SERVER ROOM SHALL BE GAS TIGHT. 26. ALL DUCT WORKS CROSSING STRUCTURAL EXPANSION JOINTS SHALL BE PROVIDED WITH
10. FIRE ZONING IS ACCORDING TO THE RISER AREA COVERAGE. FLEXIBLE CONNECTIONS AS SHOWN IN THE MECHANICAL DETAILS.
11. ALL CONCEALED FIRE SPRINKLERS COVERS SHALL HAVE MATCHING COLOR AS THE 27. THE A/C CONTRACTOR SHALL BE RESPONSIBLE OF COORDINATING AND CONNECTING
COLOR OF THE SURROUNDING FALSE CEILING. THE EXHAUST EXHAUST HOODS' MAKE UP AIR DUCTS ACCORDING TO THE HOODS
12. THE CONTRACTOR SHALL TAKE ALL THE APPROVALS ON THE WORKSHOP DRAWINGS SUPPLIERS RECOMMENDATIONS.
BEFORE THE INISTALLATION WORK. 28. ALL THE FCU DUCTS SHALL BE PRORVIDED WITH DUCT LINING ACCORDING TO THE
SPECIFICATIONS.
29. ALL THE HVAC INDOOR UNITS INSTALLED ABOVE GYPSON BOARD SHOULD HAVE ACCESS
DOORS.
30. EACH SUPPLY, RETURN AND EXHAUST AIR OUTLET SHALL COME WITH VOLUME DAMPER. DESIGNED BY:
31. ACTUAL LOCATIONS FOR AIR OUTLETS SHALL BE DETERMINED ON-SITE. IT'S A
CONTRACTOR'S RESPONSIBITLY TO COORDINATE WITH OTHER PARTIES.
32. DUCTS RELATED TO "CART WASH" AREAS SHALL BE OF STAINLESS STEELGUAGE 18 TYPE
304.
33. DIMENSION FOR ALL SUPPLY DIFFUSERS NAMED "SD.1" IS 45x45 cm. THE CONTRACTOR
SHALL TAKE THE RESPONSIBILITY OF ADJUSTING THE NECK AREA OF EACH DIFFUSER TO
MEET THE REQUIRED FLOW AS STATED ON EACH DIFFUSER OR SPACE.
34. DIMENSION OF SUPPLY DIFFUSER FOR LAB. AREA "SD.2" IS 45x45 cm; SWIRL TYPE. THE
CONTRACTOR SHALL TAKE THE RESPONSIBILITY OF ADJUSTING NECK AREA TO MEET
REQUIRED FLOW.
35. DIMENSION OF DIFFUSER FOR DOUBLE VOLUME "SD.3" IS 60x60 cm, DEFECTION CORE
TYPE FOR HIGH CEILING.
36. DIMENSION OF RETURN AIR GRILL ES ARE 60x60 cm. IT SHALL BE CONNECTED TO AC UNIT
THROUGH A DUCTWHERE IS REQUIRED & IT WILL SELECTED TO SATISFY
PRESSURIZATION AS NEEDED IN EACH ROOM OR ZONE.
37. FRESH AIR SUPPLY GRILL ES ARE OF WALL MOUNTED TYPE . IT SHALL BE SELECTED TO
MEET THE REQUIRED FLOW .

G001

You might also like