Site # level Name of Site

1 State YOBE State Central Medical Store complex

2 State Oyo State Cold Store

3 State Gombe State Cold store

4 State Kebbi State Central Medical Store

5 State Imo State Cold Store


Site Deta

Site Address (include facility name, street name,


street number and city)

Name of SCCO/ SCCO/ wharehouse


call + OIC wharehouse manager manager Phone No

Central Medical store complex one million road


Onyebuchi Onyemuche 08065459985
Damaturu, Yobe state

Oyo State Cold Store, 56, Magazine Road, Jericho Mrs. Badmus O.R 08055939319
Ibadan
State Medical Store, kasuwan katako, behind railway
Ibrahim Inuwa Lano 08080440504
station, Liji road, Gombe town

State Cold Store, Haliru Abdu Road, 088320788 - 9,


Birnin Kebbi, Kebbi State. Umar Bala G 07067548873

By Wethral Roundabout, Government House, Owerri Lilian Oguezuonu 08037964654


Site Details
Electricity

Type of Electricity
SCCO/wharehouse manager e- Available (Single / Phase to Phase Phase to Neutral
mail Voltage (V) Voltage (V)
Two / Three-Phase)

buchionyenuche@yodma.yb.gov.ng Three Phase 400 230

rashidamibadmus@gmail.com Three Phase 400 237

ibrahimlano78@gmail.com Three Phase 415 220

umarbalagwadangaji@gmail.com Three Phase 400 237

nenye4great@gmail.com Three Phase 415 220


If the country has a cold winter (-
5C or below), only the MonoblockWalk-in Cold/Freezer/Combo Room
type cooling unit can be selected. (by default, the cold rooms are delivered with Voltage Stabilizer)

Standard Type and Size


Electricity Type of Cooling
Frequency Grounding / (cubic meters) Unit Manufacturer UNICEF Material
Earthing Number
(Hz) remove custom (Mono/Split*)

50 Hz Grounding 30 cbm Mono Foster S0005178

50 Hz Grounding 30 cbm Mono Foster S0005178

50 Hz Grounding 30 cbm Mono Foster S0005178

50 Hz Grounding 30 cbm Mono Foster S0005178

50 Hz Earthing 30 cbm Mono Foster S0005178


om Remote Temperature Monitoring System (RTMS)
r)

If applicable, please provide please provide


Quantity (per RTMS Needed UNICEF Material Number or other details on
site) (Yes/No)
specific RTMS needed

1 Yes

1 Yes

1 Yes

1 Yes

1 Yes
Please ensure that sites are ready for installation before arrival of the cold room shipment. Please ensure that cold rooms will be housed in
house the cold rooms. Please refer to WHO guideline for building selection and preparation for establishing or improving primary and inte
http://apps.who.int/iris/bitstream/10665/67807/1/WHO_V-B_02.34_eng.pdf
Physical space/Ventilation

Does the building have enough


space to accommodate the
WIC/F/Combo Room?
Is a completed building that will house the Considering physical equipment
WIC/F/Combo Room available?
size and space required around
the equipment for air
circulation

Yes Yes

Yes Yes

Yes Yes

Yes Yes

Yes Yes
Site Readiness
ent. Please ensure that cold rooms will be housed in permanent buildings. The building should be designed and constructed to a good standard to suit
ation for establishing or improving primary and intermediate vaccine stores through the link:

Physical space/Ventilation

Does the building have Are the door entrances to Does the site have/intend
adequate ventilation the installation area at least to have a levelled concrete
and/or windows which can 900 mm wide to allow platform with adequate
be opened for adequate access for the prefabricated size, upon which the
ventilation and air panels and other WIC/F/Combo Room will be
circulation? components? installed?

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes


ess
ned and constructed to a good standard to suit local climatic conditions. It must have suitable finishes, adequate ventilation, correct electricity supply an

Power supply

Does site have a levelled


concrete floor where the Does the building have Does the building have
an installed transformer
levelling/base evenness and electrical a back-up generator
specifications are Adequate to run the
maximum +/-5 mm per connection to national new equipment?
5m? electrical grid?

Yes Yes Yes

Yes Yes No

Yes Yes No

No Yes Yes

Yes Yes Yes


finishes, adequate ventilation, correct electricity supply and sufficient space to
Suppli
It is recommended that the local cold chain technicians of the MoH h
cold/freezer/combo rooms. However, if local capacity is not availabl
local agent to do the installation. Therefore, please let us know if ins
Power supply WIC Installation

Does the building have a


change over switch from
Does the supplier need to conduct
national electrical grid to Voltage regulator requered installation of the equipment at the
generator for the
WIC/F/Combo Room site?
operation?

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

No Yes Yes
Supplier-led Services
chain technicians of the MoH handle the installation and maintenance of cold chain equipment, including
, if local capacity is not available to do the installation of the equipment, suppliers can send their technicians or a
refore, please let us know if installation services of the cold rooms are requested to be arranged by SD.
WIC Training

Does the supplier need to train local Does the supplier need to train local staff
technicians on installation at the site? on usage & preventative maintenance at
If yes, please provide number of local the site? If yes, please provide number of
technicians to be trained. local staff to be trained.

1 5

2 5

4 10

2 10

2 5