Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

S

PLOT 15 IND PLOT 16 IND

W
77.00m. 2.00 m. HEIGHT PROPOSED COMPOUND WALL 4
3

5.00

5.00
3.00 KERB STONE
RAMP UP 100 x 200 mm
21.25 KERB STONE
100 x 200 mm UP
3.00

2.00
CONCRETE PAD (TYP.) 2.00 4.00
2.00
ROAD(20m.WIDE)

1.00 M WIDE PLINTH PROTECTION (Typ)


ACID MIXING
FRAC TANK - 1 TANK
11.20 x 3.60

.76

13.50
+ 0. 35 M

9.65

1.00 M WIDE PLINTH PROTECTION (Typ)

PARKING
SCRUBBER
PUMPS
FRAC TANK - 2

SKID
11.20 x 3.60
.76

38x580mm GRP GRATING PANNEL


PARKING

580mm

40mm
200mm
Slope 1:200

FRAC TANK - 3
GRP GRATING COVERED CHANNEL 250mm
PROPOSED STORE
11.20 x 3.60
6.00
.76

31.62m.
4.00
2.00

50.00m.
UP
30.28

FRAC TANK - 4 ENTRY


+0.20.lvl

11.20 x 3.60
50.00m.

.76

3.88

1.00 m. HEIGHT BLOCK WALL


FRAC TANK - 5
11.20 x 3.60
UP
.76

1.95
150mm THK.
9.30

4.50
31.62m.
3.00
ENTRY
2.00

TANK SLOPE TOWARD THIS LIFT SUMP


500x500x250
500X500X500
ASPHALT / INTERLOCK PAVEMENT RAMP UP
PROPOSED ACID PLANT SUMP ( SUBJECT TO APPROVAL)
+0.20.lvl

4.00
2.00

UNDERGROUND BALL VALVE UP


6 ' GRP UNDERGROUND PIPE
15.20
KERB STONE +0.20.lvl
KERB STONE

13.38
100 x 200 mm 100 x 200 mm
UNDERGROUND COLLECTION
TANK

11.00
15.2x2.4x2.4m. (Length 15.2 could be reduced )
COVER WITH GRP GRATING SUMP
OPEN STOCK
R

LIFT STATION
80 mm THK INTERLOCK PAVEMENT
PILE AREAS
3.
00

7.00

HOLDING TANK
11.2x2.40x3.00m.

2.00 3.00
7.00 GUARD POST
2.00

+ 0. 35 lvl
+ 0. 35 lvl
PORTA
PB
CABINE

2
7.00m. PROPOSED
M.S.SLIDING GATE 77.00m. TO MAIN ELECTRICAL SUPPLY LINE
TRAILER LOADING AREA 1
GATE NO.1 GATE NO.2 25.00m. PROPOSED
M.S.SLIDING GATE
(FOLDING TYPE)

PARKING

ROAD(20m.WIDE)

You might also like