estimation estimation estimation

rate rate rate


backfiling material graider roller
18m3 rate @ duration graider RO roller RO
qty (m3) duration
Area (typer) 50/tiper (day) 160/day 80/day
area Plant 314.6 20 1000 2 320 3 240 done
make new road 1330 74 3700 2 320 4 320
Total 4700 640 560

Amount (RO)
plan A backfilling area plant only 2200
done
+existing road access only
compaction

Plan B Backfilling and compaction Area 5900


Plant and road access