MATERIAL TAKE OFF (MTO)

Contract No. 4650013964

Project No.
Document No. PRGI-00-A5-MT-001

REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT


LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD

0 09/09/2020 Issued For Construction


A 31/08/2020 Issued For Review
Rev. No Date Description

PT Elnusa Tbk shall ensure that documents have been fully checked and approved prior to submittal to PT Pertamina EP.

Prepared by SDY Checked by IPM Approved by MRF


Date 09/09/2020 Date 09/09/2020 Date 09/09/2020
PT PERTAMINA EP
Approved by Approved by
Date Date

MATERIAL TAKE OFF (MTO) FOR BOAT


LANDING
PT. Elnusa Tbk, Graha Elnusa, 11th Floor
Jl. TB Simatupang Kav, 1B, Jakarta PAGES 14 REV. NO 0

This document and the information contained in it is the property of PT Elnusa Tbk. It is not to be copied or communicated to other parties without the prior approval of
PT Elnusa Tbk. Any unauthorised use of this document and the information contained herein may expose the user and the provider of that information to legal action.
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 2 of 14

TABEL REVISI

REVISI REVISI REVISI


HALAMAN HALAMAN LAMPIRAN
A 0 1 2 3 A 0 1 2 3 A 0 1 2 3
1 x
2 x
3
4
5
6
7
8 x
9 x
10 x
11 x
12 x
13 x
14 x
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 3 of 14

CATATAN REVISI

Implementasi
Revisi Bagian Halaman Komentar Penjelasan
(Y/N)

A All All - - Terbitan Pertama

0 - 1 Nomer Kontrak Y

0 - 8-14 Total Jumlah Material Y


REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 4 of 14

DAFTAR ISI

1. PENDAHULUAN .............................................................................................................. 5
1.1 Latar Belakang ......................................................................................................... 5
1.2 Tujuan ...................................................................................................................... 5
1.3 Lingkup Pekerjaan ................................................................................................... 5

2. DEFINISI ........................................................................................................................... 6
3. KODE DAN STANDAR ..................................................................................................... 7
4. MATERIAL TAKE OFF FOR BOAT LANDING ................................................................ 8
4.1 Material Take Off for Pipe Fitting .............................................................................. 8
4.2 Material Take Off For Rubber Fender ..................................................................... 10
4.3 Material Take Off For Aksesoris ............................................................................. 13
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 5 of 14

1. PENDAHULUAN

1.1 Latar Belakang

PT Pertamina EP Asset 3 dalam rangka menunjang kelancaran peningkatan produksi


fasilitas offshore di area Subang Field diantaranya adalah akan melakukan pekerjaan
Reaktivasi Separator pada platform L-PRO dan juga akan mengganti boat landing pada
ketiga platform yaitu TLA, TLD dan TLE.

Gambar 1. Lokasi Proyek

1.2 Tujuan

Tujuan Dokumen ini digunakan sebagai panduan untuk merangkum jumlah Material Take
Off (MTO) pada Fabrikasi Landing Boat yang akan digunakan pada proyek Reaktivasi
Separator V-620 Di L-Pro, Penggantian Boat Landing Di TLA, TLD Dan TLE Di Area
Operasi Offshore L-Parigi PT Pertamina EP – Subang Field.

1.3 Lingkup Pekerjaan

Lingkup pekerjaan dalam PROYEK ini adalah:


- Survey, As built Drawing
- Detail Engineering Design, Drawing, Etc
- Fabrikasi spool pipe, Support, Vessel dll
- Repair Structure, Pipe, Manual atau Control Valve dll
- Instalasi Pipa, Valve, Instrumentasi dll
- Surface Preparation, Coating, Insulation Etc
- Inspeksi NDT, Hydrotest, Radiography Test,
- Install dan Dismantle Scaffoldding
- Tie In, Start Up dan Commissioning
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 6 of 14

2. DEFINISI

PEKERJAAN : Reaktivasi Separator pada platform L-PRO dan juga akan


mengganti boat landing pada ketiga platform yaitu TLA,
TLD dan TLE.
PERUSAHAAN : PT Pertamina EP selaku Pemilik dan Pengguna Fasilitas
Akhir.
KONTRAKTOR : PT Elnusa Tbk sebagai pelaksana pekerjaan Reaktivasi
Separator pada platform L-PRO dan juga akan mengganti
boat landing pada ketiga platform yaitu TLA, TLD dan TLE
dalam hal ini disebut KONTRAKTOR yang akan
bertanggung jawab kepada PERUSAHAAN sebagaimana
dirinci dalam kontrak, lingkup pekerjaan, atau work order.
SUB-KONTRAKTOR : Pihak yang menandatangani kontrak untuk melaksanakan
sebagian pekerjaan KONTRAKTOR.
KONSULTAN/PMC : Pihak yang oleh dan sebagai wakil dari PERUSAHAAN
untuk pengawasan proyek.
VENDOR/MANUFAKTUR : Pihak lain yang akan menyediakan sesuatu untuk
kebutuhan proyek selain yang disediakan oleh
PERUSAHAAN dan KONTRAKTOR disebut VENDOR,
dimana tanggung jawabnya langsung kepada
KONTRAKTOR baik terhadap PO atau bentuk perjanjian
lain antara VENDOR dan KONTRAKTOR.
DITJEN MIGAS : Perwakilan dari Pemerintah Indonesia yang bertanggung
jawab untuk memberikan ijin dan sertifikat kelayakan
operasi untuk fasilitas minyak dan gas.
INSPEKTOR : Perwakilan dari PERUSAHAAN dan atau seseorang yang
diberikan oleh PERUSAHAAN yang bertanggung jawab
sebagai INSPEKTOR atas pekerjaan yang dilakukan oleh
KONTRAKTOR.
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 7 of 14

3. KODE DAN STANDAR


Kode dan Standar yang digunakan untuk Structurel Installation procedure yang digunakan
menggunakan edisi terbaru dari Kode dan Standar saat ini.
Kode dan standar edisi terbaru berikut harus menjadi rujukan dan tidak terbatas pada Kode
dan Standar berikut ini, antara lain:
API 5L Specification For Line Pipe.
API RP 2A Recommended Practice For Planning; Designing
And Constructing Fixed Offshore Platforms.
API 2B Specification For Fabricated Structural Steel Pipe.
API 2H Specification For Carbon Manganese Steel Plate For
Offshore Platform Tubular Joints.
API 2W Specification For Steel Plates for Offshore
Structures, Produced by Thermo Mechanical Control
Processing (TMCP).
API 2Y Specification For Steel Plates, Quenched and
Tempered, for Offshore Structures.
AISC 13TH Manual Steel Construction
AWS D1.1 Structural Welding Code-Steel.
ASME B31.3 Process Piping.
ASME Section IX Welding, Brazing and Fusing Qualification.
ASME Section V Non Dectructive Examination.
ASME BPVC Section VIII Rule for Construction of Pressure Vessels.
API 1104 Welding of Pipeline and Related Facilities.
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 8 of 14

4. MATERIAL TAKE OFF FOR BOAT LANDING

4.1 Material Take Off for Pipe Fitting

DRAWING QTY.
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
TLA TLD TLE

LIMA PIPE SMLS, CS, SCH 40 BW,


1 20" 4 4 4 12 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA PIPE SMLS, CS, SCH 40 BW,
2 16" - 2 - 2 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA PIPE SMLS, CS, SCH 40 BW,
3 10" 2,75 2,75 1,5 7 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA PIPE SMLS, CS, SCH 40 BW,
4 8" 19 14 14 47 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA PIPE SMLS, CS, SCH 40 BW,
5 6" 20,5 10 11,5 42 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA PIPE SMLS, CS, SCH 40 BW,
6 2" 6,5 6,75 6,75 20 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA PIPE SMLS, CS, SCH 40 BW,
7 1-1/2" 11,75 14,25 14 40 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA
8 PLATE BAR 4" x 1/4" THK 1/4" THK 2 2,5 2,5 7 SHEET
PARIGI
LIMA PLATE THK 1/2" x 4 Ft x 8 Ft
9 1/2" THK 10,5 10,25 10,25 31 SHEET
PARIGI ASTM A36
LIMA PLATE THK 1" x 4 Ft x 8 ft
10 1" THK 1,5 1,25 1,25 4 SHEET
PARIGI ASTM A36
LIMA
11 GRATING GALVANIZED - 4 4 4 12 SHEET
PARIGI
LIMA CHANNEL C 8" x 3" x
12 - 1,5 2,75 2,75 7 LGTH
PARIGI 1/4"THK ASTM A36
LIMA H-BEAM 12" x 12" x 1/2"
13 - 3 - - 3 LGTH
PARIGI THK ASTM A36
LIMA FLANGE A105, SO-RF. 150,
14 20" 12 4 8 24 EA
PARIGI ASME B16.5
LIMA FLANGE A105, SO-RF. 150,
15 16" - 4 - 4 EA
PARIGI ASME B16.6
LIMA FLANGE A105, SO-RF. 150,
16 12" - - 4 4 EA
PARIGI ASME B16.4
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 9 of 14

QTY.
DRAWING
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
TLA TLD TLE

LIMA FLANGE A105, SO-RF. 150,


17 10" 6 6 2 14 EA
PARIGI ASME B16.5
LIMA FLANGE A105, SO-RF. 300,
18 8" 8 8 8 24 EA
PARIGI ASME B16.5
LIMA FLANGE A105, SO-RF. 300,
19 6" 2 - - 2 EA
PARIGI ASME B16.5
STUD BOLTS ASTM A193
LIMA GR B7, NUTS ASTM
20 3/4"x5" 16 - - 16 EA
PARIGI A194GR 2H
FLUORCARBON COATED
STUD BOLTS ASTM A193
LIMA GR B7, NUTS ASTM
21 7/8"x5" 47 46 47 140 EA
PARIGI A194GR 2H
FLUORCARBON COATED
STUD BOLTS ASTM A193
LIMA GR B7, NUTS ASTM 7/8"x5-
22 63 63 63 189 EA
PARIGI A194GR 2H 3/4"
FLUORCARBON COATED
STUD BOLTS ASTM A193
LIMA GR B7, NUTS ASTM 1-1/8"x6-
23 156 52 104 312 EA
PARIGI A194GR 2H 3/4"
FLUORCARBON COATED
STUD BOLTS ASTM A193
LIMA GR B7, NUTS ASTM 3/4"x3-
24 63 63 63 189 EA
PARIGI A194GR 2H 1/2"
FLUORCARBON COATED
LIMA PIPE SMLS, CS, SCH 40 BW,
25 4" 0,25 0,25 0,5 1 LGTH
PARIGI API 5L GR B ASME B 36.10
LIMA ANGLE IRON 2"x2"x1/4"
26 - 1 1 1 3 LGTH
PARIGI THK ASTM A36
STUD BOLTS ASTM A193
LIMA GR B7, NUTS ASTM
27 1-1/8"x6" 83 83 83 249 EA
PARIGI A194GR 2H
FLUORCARBON COATED

LIMA PLATE THK 3/4" x 4 Ft x 8


28 3/4" THK 2,5 3,25 3,25 9 SHEET
PARIGI Ft ASTM A36

LIMA H-BEAM 13-3/4" x 7" x


29 - - 2,5 2,5 5 LGTH
PARIGI 1/4" THK ASTM A36
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 10 of 14

QTY.
DRAWING
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
TLA TLD TLE

PIPE SMLS, CS, SCH 40


LIMA
30 BW, API 5L GR B ASME B 12" - - 2 2 LGTH
PARIGI
36.10

LIMA ANGLE IRON 3"x3"x1/4"


31 - - - 2 2 LGTH
PARIGI THK ASTM A36

STUD BOLTS ASTM


LIMA
A193 GR B7, 2NUT 7/8"x11
32 NUTS ASTM A194GR 2H 200 160 167 527 EA
PARIGI 1/2"
FLUORCARBON COATED
c/w Ring plate

4.2 Material Take Off For Rubber Fender

DRAWING
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
FENDER RBR VERTICAL
ELASTIMER NATURAL
a. FENDER TYPE : RUBBER
FENDER ( TYPE DD – S )
PEMASANGAN STUD & NUT
PADA SISI SAMPING
b. DIMENSION :
‐ TOP FENDER WIDTH : 7 7/8"
TLA‐LIMA
1 ‐ FENDER HEIGHT : 7 7/8" 6 SETS
PARIGI
‐ BACK PLATE : 7 7/8" WIDTH
: 1/2" THK
‐ SIDE PLATE 2 EA : 8 1/2"
WIDTH : 1/2" THK
- Stud & Nut 7/8" x 11 ½”
FLUORCARBON COATED c/w
Ring plate
c. LENGTH : 152 13/16"
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 11 of 14

DRAWING
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
FENDER RBR VERTICAL
ELASTIMER NATURAL
a. FENDER TYPE : RUBBER
FENDER ( TYPE DD – S )
PEMASANGAN STUD & NUT
PADA SISI SAMPING
b. DIMENSION :
‐ TOP FENDER WIDTH : 7 7/8"
TLA‐LIMA
2 ‐ FENDER HEIGHT : 7 7/8" 4 SETS
PARIGI
‐ BACK PLATE : 7 7/8" WIDTH
: 1/2" THK
‐ SIDE PLATE 2 EA : 8 1/2"
WIDTH : 1/2" THK
- Stud & Nut 7/8" x 11 ½”
FLUORCARBON COATED c/w
Ring plate
c. LENGTH : 116 13/16"
FENDER RBR VERTICAL
ELASTIMER NATURAL
a. FENDER TYPE : RUBBER
FENDER ( TYPE DD – S )
PEMASANGAN STUD & NUT
PADA SISI SAMPING
b. DIMENSION :
‐ TOP FENDER WIDTH : 7 7/8"
TLD‐LIMA
3 ‐ FENDER HEIGHT : 7 7/8" 5 SETS
PARIGI
‐ BACK PLATE : 7 7/8" WIDTH
: 1/2" THK
‐ SIDE PLATE 2 EA : 8 1/2"
WIDTH : 1/2" THK
- Stud & Nut 7/8" x 11 ½”
FLUORCARBON COATED c/w
Ring plate
c. LENGTH : 139 13/16"
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 12 of 14

DRAWING
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
FENDER RBR VERTICAL
ELASTIMER NATURAL
a. FENDER TYPE : RUBBER
FENDER ( TYPE DD – S )
PEMASANGAN STUD & NUT
PADA SISI SAMPING
b. DIMENSION :
‐ TOP FENDER WIDTH : 7
TLD‐LIMA 7/8"
4 4 SETS
PARIGI ‐ FENDER HEIGHT : 7 7/8"
‐ BACK PLATE : 7 7/8"
WIDTH : 1/2" THK
‐ SIDE PLATE 2 EA : 8 1/2"
WIDTH : 1/2" THK
- Stud & Nut 7/8" x 11 ½”
FLUORCARBON COATED
c/w Ring plate
c. LENGTH : 103 13/16"
FENDER RBR VERTICAL
ELASTIMER NATURAL
a. FENDER TYPE : RUBBER
FENDER ( TYPE DD – S )
PEMASANGAN STUD & NUT
PADA SISI SAMPING
b. DIMENSION :
‐ TOP FENDER WIDTH : 7
TLE‐LIMA 7/8"
5 5 SETS
PARIGI ‐ FENDER HEIGHT : 7 7/8"
‐ BACK PLATE : 7 7/8"
WIDTH : 1/2" THK
‐ SIDE PLATE 2 EA : 8 1/2"
WIDTH : 1/2" THK
- Stud & Nut 7/8" x 11 ½”
FLUORCARBON COATED
c/w Ring plate
c. LENGTH : 142 9/16"
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 13 of 14

DRAWING
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
FENDER RBR VERTICAL
ELASTIMER NATURAL
a. FENDER TYPE : RUBBER
FENDER ( TYPE DD – S )
PEMASANGAN STUD & NUT
PADA SISI SAMPING
b. DIMENSION :
‐ TOP FENDER WIDTH : 7
TLE‐LIMA 7/8"
6 4 SETS
PARIGI ‐ FENDER HEIGHT : 7 7/8"
‐ BACK PLATE : 7 7/8"
WIDTH : 1/2" THK
‐ SIDE PLATE 2 EA : 8 1/2"
WIDTH : 1/2" THK
- Stud & Nut 7/8" x 11 ½”
FLUORCARBON COATED
c/w Ring plate
c. LENGTH : 106 9/16"

4.3 Material Take Off For Aksesoris

DRAWING QTY.
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
TLA TLD TLE

1 LIMA PARIGI SHACKLE ANCHOR 5/8" CROSSBY 5/8" 40 40 40 120 EA

2 LIMA PARIGI CHAIN 5/8"x100mm GALVANIZED 5/8" 52 52 52 156 METER

3 LIMA PARIGI BAN PESAWAT BEKAS - 4 4 4 12 EA

ROPE MANILA DIA 1" C/W


4 LIMA PARIGI - 65 94 94 253 METER
TIMBLE

5 LIMA PARIGI CONNECTION LINK DIA 5/8" 5/8" 10 10 10 30 EA

TEFLON SHEET 1/4" THK ASTM 1/4"


6 LIMA PARIGI 6,5 9 9 24,5 SHT
A36 THK
REAKTIVASI SEPARATOR V-620 DI L-PRO, PENGGANTIAN BOAT
LANDING DI TLA, TLD DAN TLE DI AREA OPERASI OFFSHORE
L-PARIGI PT PERTAMINA EP – SUBANG FIELD
Document No.: 09/09/2020
Rev. 0 MATERIAL TAKE OFF FOR BOAT LANDING
PRGI-00-A5-MT-001 Page 14 of 14

DRAWING QTY.
NO. DESCRIPTION SIZE TOTAL UNIT
TITLE
TLA TLD TLE
ROLLER PLATE THK 1"x25" LGxID
7 LIMA PARIGI 30-1/2" FOR PIPE OD PIPE 30- - 4 2 4 10 SET
1/2"
ROLLER PLATE THK 1"x20" LGxID
8 LIMA PARIGI 30-1/2" FOR PIPE OD PIPE 30- - 2 2 2 6 SET
1/2"
ROLLER PLATE THK 1"x14" LGxID
9 LIMA PARIGI 30-1/2" FOR PIPE OD PIPE 30- - - 2 - 2 SET