PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
I PREPARATION FOR WORK
1. Ensure that all required materials
and adequate resources are in place.
2. All approved relevant
All documentation and pertinent
Poor personne Fatality/ major information shall be available Project Manager
1 Planning l at the injury/minor (Method Statement, Job Safety 2 1 2-L Project Engineer
project injury /asset / 3 4 12-H Analysis, etc.).
including damage/accident 3. Conduct required meeting with
visitors / environmental stakeholders and other parties in
and stake pollution/spill advance. All information with
holders respect to relevant legal and
contractual requirement shall be
obtained
4. Job planning shall take into
consideration all HSE aspects and
preventive measures during the joint
site visit prior to planning.
5. Conduct site visit in advance and
conduct consultation with relevant
parties
1. Prior to start of the work, the
following facilities must be provided:
rest shelter, convenient and hygienic Project Manager
Personnel 3 2 6-M toilet, water drinking stations, eye 2 1 2-L Project Engineer
2 Welfare working Personnel Injury/ wash, prayer area, washing area.
facilities and Health Impact 2. Rest shelter shall have enough space
visiting for all personnel in the area.
site 3. Ensure proper grounding and
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
anchoring to with stand with adverse
weather conditions
4. Regular inspections shall be carried
out and evidence shall be displayed
5. Drinking water shall be renewed
every morning before commencing
the activities, and shall be kept cold
by using ice and insulating
materials ,provide electrolytes
during high temperature hours
6. The workers are to be provided all
mandatory PPEs as per required
standard and life supporting devises
including rescue arrangements if
applicable
1. Adequate permit shall be obtained 2 2 L Construction
from GS Inima and other relevant Manager
3 4 12- H authorities (Fisheries department, Site Engineer
3 Unaware of Personnel Fatality / major Municipality, Coast guard and ROP) Site Supervisor
permit / involved / injury / minor or whatever required
Permit others injury /asset 2. The permit to work shall be applied
compliance damage / by competent and GS Inima
accident / approved applicant. The work shall
environmental be executed by competent and GS
pollution / spill / Inima approved holder
legal action 3. Permit holder shall ensure that all
control measures are in place as per
RA/JSA before the work commence
4. PTW shall be displayed at the work
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
front
5. Ensure all requirement as per
permit in line with approved
procedure are in place
6. Permit holder shall be available
throughout the duration of the
activity.
7. The permit shall be attached with all
required documents
II During Execution
1. All personnel involved in the task
shall be completed GS Inima HSE
induction
2. All personnel at site shall wear all
mandatory PPEs all the time Site Supervisor
01 Slip, Trip, Slip, Trip, Survey Team / 3. Proper drawings and information 1 2 2-L Senior Surveyor
Fall Hazard Fall work force / other 3 2 6-M shall be obtained about area and
Hazard personnel terrain by surveyor
including visitors 4. Pre-task tool box shall be conducted
and team shall be informed about
the task and associated
hazards ,risks and control measures
5. The area of task shall be inspected by
Site supervisor and surveyor and all
identified hazards shall be eliminated
or barricaded and adequate signage
shall be in place
6. Always ensure proper housekeeping
or arrangement at the area of the
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
task
7. All marking rods and stands shall be
protected for sharp edges with
protection like mushroom caps and
high lightened by warning tapes .
8. The area of survey shall be restricted
only for personnel involved in the
task. No equipment/vehicles/ other
personnel movement shall be
allowed while survey works going on
9. Never walk backward during survey
work.
02 Moving All Fatality / major 1. Conduct tool box talk and
equipment / personne injury / minor disseminate all control measures to
vehicles l involved injury be taken to avoid hitting to moving
with hit in survey 3 4 12-H equipment, vehicles and structures. 1 3 3-L Site Supervisor
hazard activities 2. The area of survey shall be Senior Surveyor
(man- segregated from other activities like
machine equipment vehicles movement
interface / 3. All moving equipment shall be
structures) provided with trained flagman
4. All structures at the area shall be
protected by barricade with
adequate signage
1. Imparts awareness about all
Occupationa All Ergonomically occupational Illness to the team and Site engineer
03 l Illness personne issues / Manual 3 2 6-H address the subject in the tool box 1 3 3-L Site Supervisor
l involved Handling Issues / talk Senior Surveyor
in the health impacts 2. All personnel shall wear mandatory
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
survey PPEs at site
activities 3. Always exercise proper movement
and keep proper posture
4. Always ensure job rotation during
work .do not deploy personnel
during work for long period
5. Observe intermittent breaks during
the survey work activities
6. Always adhere to manual handling
techniques during weight handling
7. Approved heat stress managing plan
shall in place and to be implemented
during summer periods
1. The Crane shall have certified
04 Humidity Personnel Accident, anemometer installed on the boom 1 2 2-L Site Engineer
/Adverse  working Property Damage, 4 3 12-H tip of the Crane Site Supervisor
climate  and  and Personnel injury / 2. Lifting supervisor shall monitor wind Lifting
atmospheric personne fatality / air speed continuously Supervisor
conditions   l around pollution / spill 3. Lifting operations shall be Operator
the area / suspended if wind speed crosses 10
other M/S square
personne 4. Lifting supervisor need to get
l/ visitors. weather data from environmental
coordinator and plan the lifting
operations accordingly.
5. All crane accessories like boom.
slings and like lifting hooks shall be
secured properly when parking
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
/securing
6. Proper stoppers/breaks shall be in
place during parking/securing
7. Supervisor shall carefully monitor
the visibility of the area and inform
line management act accordingly.
8. All activities should be in conformity
with approved procedure
9. All personnel are to wear to
adequate PPE.
10. Work shall be stopped when
Supervisor assesses the situation to
be dangerous for the life or health of
workers.
11. Lifting operations shall be
suspended in case any adverse
weather starts
12. Line management shall update
weather forecast and plan the work
accordingly.
13. Do not work at low visibility

X EXTENDED HOURS /NIGHT WORKS


1 Extended Personnel Accident, 1. Obtain required approval and
hours / working Property Damage, adequate permit from GS inima for Site Engineer
Night Works and Personnel injury / 3 4 12-H extended hours/night works 1 3 3-L Site Supervisor
personne health issues / 2. Ensure that hour of work is not
l around fatigue / fatality / crossing the allowed limit and
the area/ air pollution / spill fatigue of employees shall be
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
visitors. monitored/ sought after
3. Ensure adequate intermittent breaks
and job rotation
4. Ensure adequate rest shelter and
drinking water
5. Implement buddy system if required
6. Ensure awareness program with
respect to the subject
7. Ensure ERP is in place and required
HSE supervision
8. Ensure availability of first aider and
emergency vehicle
9. Conduct medical surveillance on the
subject
10. Ensure the availability of work
package like TBT signed by all
attendee copy available at site.
11. Tool box talk to include emergency
response procedures and
emergency response
equipment/numbers.
12. Follow rest break system and ensure
adequate drinking water provided.
13. Lights shall be tested and fuel filled
in the generator prior sunset
14. Ensure availability of spare tower
light(if requires)
15. Tower Lights shall be available at
material dumping area,
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
16. One emergency torch shall be
present at site in case of tower light
broke down
17. Vehicle movements controlled by
dedicated flagman with night band
18. Area behind vehicle to be kept clear
during reversing operations
19. Vehicles travelling at night shall
ensure headlights are switched on
and having first aid box ,suitable fire
extinguisher and driving less than
the maximum speed limit
20. All PPE like safety shoes, coverall,
helmet, eye protection (white clear
glass) reflective jacket and safety
shoes to be used throughout the
task.
21. No lone work to be carried
22. Close supervision to be carried out
throughout the operation.
23. Ensure good housekeeping is
maintained at all times.
II ADVERSE WEATHER CONDITION
1. Monitor heat stress index and act as
1 Extremely Personnel Personnel Injury / 3 4 12-H per heat stress management plan 2 1 2-L Project
Heat - Heat at Sites Health Impacts / 2. Conduct awareness program for Manager
Stress Fatality workers and educate the team how Site Engineer
to manage heat stress Site Supervisor
3. Drinking water will be provided in
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
the site all the time with electrolyte
4. Heat Stress prevention Program
shall be implemented.
5. Proper rest shelters shall be
provided in adequate number
6. Work on scaffolds and elevated
areas shall be stopped when
temperature crosses the allowed
limit
7. The work schedule shall be made in
line with Oman law
8. All workers will be advised to take
short break if feel fatigue
9. Direct sun light works will be
suspended during the high
temperature and humid in line with
approved index
1. Lifting activities shall be stopped if
2 High Wind Personnel Accident, 3 4 12-H the wind speed crosses the allowed 1 3 3-L Site Engineer
at site Property Damage, limit Site Supervisor
Personnel injury / 2. All crane shall be fitted with
fatality / air anemometer on the boom
pollution / spill 3. The crane operator shall always
monitor the wind speed and inform
the lifting supervisor
4. The lifting supervisor shall suspend
the lifting activities when the wind
speed crosses the allowed limit
5. Daily weather forecast shall be
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
obtained and plan the work
accordingly
6. All equipment and shelters shall be
secured to withstand high wind
7. The shelters shall be inspected
periodically
8. Work on scaffolds and elevated
areas shall be stopped wind speed is
more than allowed limit
9. While working on elevated
platforms helmet strips shall be put
on
10. Proper PPE according to the weather
conditions shall be used
11. Daily pre-task TBT shall be
conducted and hazards, risks and
control measures related to the task
shall be communicated to the team
and evidence shall be documented
1. If vicinity is very low (Less than 100
Dust and Personnel Accident, 3 2 6-M M) all activities shall be suspended 1 2 2-L Site Engineer
3 Poor at Site/ Property Damage, including vehicles movement Site Supervisor
Visibility Travelling Personnel injury / 2. All personnel are to wear adequate
/ Moving fatality / air PPEs including face masks
vehicles / pollution / spill 3. Weather forecast shall be updated
machiner and plan the work accordingly . Fog
y fall shall be effectively
communicated and movement of
vehicles and equipment shall be
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
controlled
4. Do continuous dust suppression on
roads and stock piles shall be done
5. Site supervisor shall assess the
situation and act accordingly
Name Position Signature: Date

Prepared By: 26-Feb-2022

Reviewed By: 26-Feb-2022

Approved By EPC:

You might also like