Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
I PREPARATION FOR WORK
1. Ensure that all required materials
and adequate resources are in place.
2. All approved relevant
All documentation and pertinent
Poor personne Fatality/ major information shall be available Project Manager
1 Planning l at the injury/minor (Method Statement, Job Safety 2 1 2-L Project Engineer
project injury /asset / 3 4 12-H Analysis, etc.).
including damage/accident 3. Conduct required meeting with
visitors / environmental stakeholders and other parties in
and stake pollution/spill advance. All information with
holders respect to relevant legal and
contractual requirement shall be
obtained
4. Job planning shall take into
consideration all HSE aspects and
preventive measures during the joint
site visit prior to planning.
5. Conduct site visit in advance and
conduct consultation with relevant
parties
1. Prior to start of the work, the
following facilities must be provided:
rest shelter, convenient and hygienic Project Manager
Personnel 3 2 6-M toilet, water drinking stations, eye 2 1 2-L Project Engineer
2 Welfare working Personnel Injury/ wash, prayer area, washing area.
facilities and Health Impact 2. Rest shelter shall have enough space
visiting for all personnel in the area.
site 3. Ensure proper grounding and
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
anchoring to with stand with adverse
weather conditions
4. Regular inspections shall be carried
out and evidence shall be displayed
5. Drinking water shall be renewed
every morning before commencing
the activities, and shall be kept cold
by using ice and insulating
materials ,provide electrolytes
during high temperature hours
6. The workers are to be provided all
mandatory PPEs as per required
standard and life supporting devises
including rescue arrangements if
applicable
1. Adequate permit shall be obtained 2 2 L Construction
from GS Inima and other relevant Manager
3 4 12- H authorities (Fisheries department, Site Engineer
3 Unaware of Personnel Fatality / major Municipality, Coast guard and ROP) Site Supervisor
permit / involved / injury / minor or whatever required
Permit others injury /asset 2. The permit to work shall be applied
compliance damage / by competent and GS Inima
accident / approved applicant. The work shall
environmental be executed by competent and GS
pollution / spill / Inima approved holder
legal action 3. Permit holder shall ensure that all
control measures are in place as per
RA/JSA before the work commence
4. PTW shall be displayed at the work
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
front
5. Ensure all requirement as per
permit in line with approved
procedure are in place
6. Permit holder shall be available
throughout the duration of the
activity.
7. The permit shall be attached with all
required documents
II During Execution
1. All personnel involved in the task
shall be completed GS Inima HSE
induction
2. All personnel at site shall wear all
mandatory PPEs all the time Site Supervisor
01 Slip, Trip, Slip, Trip, Survey Team / 3. Proper drawings and information 1 2 2-L Senior Surveyor
Fall Hazard Fall work force / other 3 2 6-M shall be obtained about area and
Hazard personnel terrain by surveyor
including visitors 4. Pre-task tool box shall be conducted
and team shall be informed about
the task and associated
hazards ,risks and control measures
5. The area of task shall be inspected by
Site supervisor and surveyor and all
identified hazards shall be eliminated
or barricaded and adequate signage
shall be in place
6. Always ensure proper housekeeping
or arrangement at the area of the
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
task
7. All marking rods and stands shall be
protected for sharp edges with
protection like mushroom caps and
high lightened by warning tapes .
8. The area of survey shall be restricted
only for personnel involved in the
task. No equipment/vehicles/ other
personnel movement shall be
allowed while survey works going on
9. Never walk backward during survey
work.
02 Moving All Fatality / major 1. Conduct tool box talk and
equipment / personne injury / minor disseminate all control measures to
vehicles l involved injury be taken to avoid hitting to moving
with hit in survey 3 4 12-H equipment, vehicles and structures. 1 3 3-L Site Supervisor
hazard activities 2. The area of survey shall be Senior Surveyor
(man- segregated from other activities like
machine equipment vehicles movement
interface / 3. All moving equipment shall be
structures) provided with trained flagman
4. All structures at the area shall be
protected by barricade with
adequate signage
1. Imparts awareness about all
Occupationa All Ergonomically occupational Illness to the team and Site engineer
03 l Illness personne issues / Manual 3 2 6-H address the subject in the tool box 1 3 3-L Site Supervisor
l involved Handling Issues / talk Senior Surveyor
in the health impacts 2. All personnel shall wear mandatory
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
survey PPEs at site
activities 3. Always exercise proper movement
and keep proper posture
4. Always ensure job rotation during
work .do not deploy personnel
during work for long period
5. Observe intermittent breaks during
the survey work activities
6. Always adhere to manual handling
techniques during weight handling
7. Approved heat stress managing plan
shall in place and to be implemented
during summer periods
1. The Crane shall have certified
04 Humidity Personnel Accident, anemometer installed on the boom 1 2 2-L Site Engineer
/Adverse working Property Damage, 4 3 12-H tip of the Crane Site Supervisor
climate and and Personnel injury / 2. Lifting supervisor shall monitor wind Lifting
atmospheric personne fatality / air speed continuously Supervisor
conditions l around pollution / spill 3. Lifting operations shall be Operator
the area / suspended if wind speed crosses 10
other M/S square
personne 4. Lifting supervisor need to get
l/ visitors. weather data from environmental
coordinator and plan the lifting
operations accordingly.
5. All crane accessories like boom.
slings and like lifting hooks shall be
secured properly when parking
Rev DATE
Project No.
No
PROJECT: BARKA V IWP RO DESALINATION PLANT PROJECT
Document BA-LAM-PN-CW-02900- 24/05/2023
00001
00A
No./Title:-
Construction Activity: Blockwork and concrete
Location: Electrical and Admin Building Residual Risks
breaking .
Risk Risk Risk Risk Responsible
Sr. Consequences/
Hazard Persons Evaluation Level Control Measures Evaluation Level
No Impact
P S H/M/L P S H/M/L
/securing
6. Proper stoppers/breaks shall be in
place during parking/securing
7. Supervisor shall carefully monitor
the visibility of the area and inform
line management act accordingly.
8. All activities should be in conformity
with approved procedure
9. All personnel are to wear to
adequate PPE.
10. Work shall be stopped when
Supervisor assesses the situation to
be dangerous for the life or health of
workers.
11. Lifting operations shall be
suspended in case any adverse
weather starts
12. Line management shall update
weather forecast and plan the work
accordingly.
13. Do not work at low visibility
Approved By EPC: