c50 - Standard

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GRID LOCATION 17/8

BOTTOM ELEVATION 21/8 33/4 1/8 3'-97/8 101/8

EL13'-9 5/8
1/8
3-4/D -5"1/4
B B
+13'-10 1/8
1/2

411/16
11/16
4

13'-9 9/16
3'-9
P2
3'-7 13/16

17/8

+10'-11/8

4
B-B
3'-65/8

14'-3 3/8

1 1/16"Ø

41/16

81/16
10'-2 3/8

3/4"Ø

41/16
BP5
6'-7 1/8

41/16 41/16
ONE - COLUMN - C50
81/16

A-A

BILL OF MATERIAL
MARK QTY DESCRIPTION LENGTH WEIGHT REMARKS
REV DESCRIPTION DATE
C50 1 COLUMN SQ-2

C50 1 HSS4X4X1/4 14'-2 1/4" 163 A500-GR.B


FAB-NAME
BP5 1 FL5/8"X12" 1'-0" 26 A36 FAB-ADDRESS
FAB-CITY/STATE
P2 1 FL1/2"X3 3/4" 0'-3 3/4" 2 A500-GR.B

STANDARD
EL-5 1/4

hs89 1 HSS4X4X1/4 5'-2 5/8" 60 A500-GR.B DESCRIPTION


RD

hs90 2 L6X3-1/2X5/16 0'-4" 7 A500-GR.B PROJECT NAME PROJ-NAME


hs93 1 HSS4X4X1/4 4'-8" 54 A500-GR.B DRAWN BY JOB No. DRG No.
A A
5/8

TOTAL WEIGHT THIS DRAWING 310 DATE DRAWN 03/05/2014 PROJ-NUM C50

You might also like