Materials 2022.xlsx and Hauling Distance
Materials 2022.xlsx and Hauling Distance
Materials 2022.xlsx and Hauling Distance
Poblacion
Beginning of Site City Hall
End of Site Lumbia
K Hauling Distance
total adjusted
Free up to (km.) bag
Cost per Km. (P) 10.00 P0.281
1 Carmen 7.70 (2.30) -0.6463
2 Balulang 8.10 (1.90) -0.5339
3 Lumbia 16.00 6.00 1.686
4 Bayanga 21.00 11.00 3.091
5 Mambuaya 24.00 14.00 3.934
6 Dansolihon 39.00 29.00 8.149
7 Tignapoloan 39.40 29.40 8.2614
8 Besigan 62.30 52.30 14.6963
9 Canitoan 8.50 (1.50) -0.4215
10 Baikingon 14.50 4.50 1.2645
11 Pagatpat 16.30 6.30 1.7703
12 San Simon 18.40 8.40 2.3604
13 Pagalungan 22.50 12.50 3.5125
14 Taglimao 28.10 18.10 5.0861
15 Tuburan 28.80 18.80 5.2828
16 Tagpangi 32.00 22.00 6.182
17 Pigsag-an 37.80 27.80 7.8118
18 Tumpagon 40.70 30.70 8.6267
19 Patag 7.50 (2.50) -0.7025
20 Bulua 8.70 (1.30) -0.3653
21 Iponan 9.20 (0.80) -0.2248
22 Kauswagan 4.50 (5.50) -1.5455
23 Bonbon 5.00 (5.00) -1.405
24 Bayabas 6.00 (4.00) -1.124
25 Nazareth 2.00 (8.00) -2.248
26 Camaman-an 6.10 (3.90) -1.0959
27 Macasandig 4.80 (5.20) -1.4612
28 Indahag 8.50 (1.50) -0.4215
29 F.S. Catanico 15.00 5.00 1.405
30 Balubal 26.00 16.00 4.496
31 Lapasan 4.30 (5.70) -1.6017
32 Gusa 8.10 (1.90) -0.5339
33 Cugman 14.90 4.90 1.3769
34 Tablon 15.10 5.10 1.4331
35 Agusan 16.40 6.40 1.7984
36 Bugo 17.00 7.00 1.967
37 Puerto 26.70 16.70 4.6927
38 Consolacion 2.90 (7.10) -1.9951
39 Puntod 4.20 (5.80) -1.6298
40 Macabalan 5.10 (4.90) -1.3769
Agg
RSB Asphalt Rock G1 & Fine
200&300
Km.
Add-On Price (Hauling)
247.96 cu.m.
P10.622 bag
0.44 kg.
437.57 m-ton
275.50 cu.m.