PROGRESS REPORT SUMMARY REPAIR Update 04/07/2023

CONVERSION PRIMA NUSANTARA


Start Contract 13/12/2022 Akumulasi Hari Kerja 150 Realisasi
Total Contract Deadline 11/05/2023 Sisa Hari dari Deadline -54 Delivery
Start Docking 25/12/2022 Durasi Docking Realisasi 192 Docking 25/12/2022
Undocking Deadline 24/05/2023 Sisa Durasi Docking -41 Undocking

ITEM PROGRESS PROYEK Sub Total Done WIP Cancel Not Yet % Kini % Lalu
TOTAL ITEM

Item Kerja Original Ori 441 120 38 0 283 31.5% 30.8%


Item Kerja Additional Add 117 40 28 1 48 47.0% 47.0%
Total Item Kerja 558 160 66 1 331 34.8% 34.2%

ITEM PROGRESS UNDER WATER Sub Total Done WIP Cancel Not Yet % Kini % Lalu
UNDOCKING

Underwater Item Original Ori 0 0 0 0 0 0.0% 0.0%


Underwater Item Additional Add 0 0 0 0 0 0.0% 0.0%
Total Item Kerja Under Water 0 0 0 0 0 0.0% 0.0%

DETAIL ITEM PEKERJAAN PER DEPARTEMEN & PIC


No Departemen / PIC Deadline Sub Total Done WIP Cancel Not Yet Progress
Progress Kini
Lalu
A. General 7/30/2023 33 0 0 0 33 0.0% 0.0%
B. Hull
condro 3/19/2023 9 8 0 1 0 100.0% 100.0%
PJMS 7/30/2023 77 38 5 0 34 52.6% 49.4%
Kahono 3/19/2023 1 1 0 0 0 100.0% 100.0%
BLJ 6/20/2023 9 8 1 0 0 94.4% 88.9%
GTM 3/19/2023 1 1 0 0 0 100.0% 100.0%
MKB 7/30/2023 1 0 1 0 0 50.0% 50.0%
C. Outfitting
Andi Daeng 3/19/2023 15 15 0 0 0 100.0% 100.0%
Bambang S 7/30/2023 106 7 18 0 81 15.1% 15.1%
D. Piping
Erizon 7/30/2023 30 12 7 0 11 51.7% 51.7%
Masri 7/30/2023 28 16 9 0 3 73.2% 73.2%
E. Mechanic
Dodi 7/30/2023 42 4 4 0 34 14.3% 14.3%
F. Electric
Hazky 7/30/2023 90 1 10 0 79 6.7% 6.7%
CODE DESCRIPTION OF WORK Ori/Add Group PIC

CONVERSION PRIMA NUSANTARA


STEEL WORK
S001 FABRICATE AND INSTALL MAIN CABLE TANK CAP. 2900 TON
1 Fabricate and install Main Cable Tank as drawing included with scantling structure. Dia 16.8 m
2 To crop and renewed maindeck plate iwo Fr. 46/47 - 78/79. Size 18430mm x 8100 mm x 20 mm
3 To fabricate and install new section Fr. 51,54,57,60,63,66,69,72,75 as drawing (DB and Main deck)
4 To fabricate and install new long section (STBD) 600 mm of CL iwo Fr.42 - 80 as drawing
5 To fabricate and install new long section (PS) 1200 mm of CL iwo Fr.48 - 80 as drawing
6 To fabricate and install new long section (PS) 1400 mm of CL iwo Fr.42 - 80 as drawing. STBD Similar
7 To fabricate and install new long section (PS) 2050 mm of CL, Fr. 48 - 78 as drawing. STBD Similar
8 To fabricate and install new long section (PS) 2550 mm of CL, Fr. 48 - 78 as drawing. STBD Similar
9 To fabricate and install new combined long section (PS) 3000 mm of CL, Fr. 50 - 76 as drawing. STBD Similar
10 To fabricate and install new long section (PS) 4800 mm of CL, Fr. 50 - 76 as drawing. STBD Similar
11 To fabricate and install new long section (PS) 5400 mm of CL, Fr. 48 - 77 as drawing. STBD Similar
12 To fabricate and install new long section (PS) 6600 mm of CL, Fr. 54 - 73 as drawing. STBD Similar
13 To fabricate and install new long section (PS) 8400 mm of CL, Fr. 57 - 69 as drawing. STBD Similar
14 To crop and renewed second deck plate iwo Fr. 41/42 - 49/750 with angle bar & checker plate as drawing
15 To crop and renewed second deck plate iwo Fr. 76/77 - 87/88 with angle bar & checker plate as drawing
16 To crop and renewed tank top plate iwo Fr. 47/48 - 77/78. Size 18600 x 5400 x 14 mm
Access Work :
8 Remove all exixting piping, pump, and electrical panel for mud tank Ori Piping Erizon
S002 FABRICATE AND INSTALL SPARE CABLE TANK, CAP. 2 x 120 TON
2 To cut and refit back maindeck plate iwo Fr. 78/79 - 86/87 PS & STBD. Size Dia. 5000 x 5400 x 9 mm
4 To cut and renewed tank top plate iwo Fr.77/78 - 96/97. Size 10800 x 5500 x 14 mm (PS & STBD)
6 To fabricate and install inner bottom side long. PS & STBD Iwo Fr 77/78 - 96/97 as drawing
7 To fabricate and install new brackets iwo inner bottom long PS & STBD iwo Fr. 78 - 96 as drawing
8 To fabricate and install new floor in DB iwo Fr.81, 84,87,90,93
Access Work :
S003 REMOVED CARGO RAIL STRUCTURE P/S & FABRICATE AND INSTALL ROPE TANK - 3 UNIT Ori
2 To cut and refit back maindeck plate iwo Fr. 80 - 85/86 Center. Size 3500 x 9 mm
3 To cut and refit back maindeck plate iwo Fr. 87/88 - 92/93 PS & STBD. Size 3500 x 9 mm - 2 sheet
Access Work :
S004 REMOVED BULWARK STRUCTURE PS & SUPERSTRUCTURE DECKHOUSE
1 To fabricate and install new deckhouse superstructure as drawing, with include room in below :
Access Work :
1 Shifted Air Vent Head Ballast Tank Ori Piping Erizon
S005 REMOVED LOCKING PLATE FOR WOODEN DECK & CRANE PEDESTAL AND BOOM REST
1 To fabricate and install Crane Pedestal as drawing (Roll Plate)
2 To fabricate and install Boom Rest Foundation as drawing
Access Work :
S006 REMOVE AND RELOCATED TUGGER WINCH PS & WHISKER STRUCTURE
1 To fabricate and install whisker structure as drawing
Access Work :
S007 REMOVE AND RELOCATED RESCUE BOAT,CRANE & PLOUGH A-FRAME
1 To fabricate and install Plough A-Frame Foundation as drawing
Access Work :
S008 REMOVE AND RELOCATED PROVISION CRANE & PLOUGH UNIT
1 To fabricate and install Plough Platform Foundation as drawing
Access Work :
S009 REMOVING OBSTACLE FOR MAIN CABLE TANK SURVEY & TUUGER WINCH
1 To remove piping system for Mud Tank and Dry Bulk Tank as instruction Ori Piping Erizon
To remove valve for mud piping system as instruction iwo dry bulk tank Ori Piping Erizon
2 To fabricate and install new strengtening structure for tugger winch PS & STBD
Access Work :
S010 JETTING UMBILICAL WINCH
1 To fabricate and install jetting umbilical winch foundation as drawing
2 To fabricate and install new strengtening structure as drawing
Access Work :
S011 DIVERTER SHEAVE
1 To fabricate and install foundation diverter sheave as drawing
Access Work :
S012 PLOUGH UMBILICAL WINCH
1 To fabricate and install umbilical winch foundation as drawing
2 To fabricate and install new strengtening structure as drawing
Access Work :
S013 CABLE STOPPER
1 To fabricate and install umbilical winch foundation as drawing
2 To fabricate and install new strengtening structure as drawing
Access Work :
S014 LCE FOUNDATION
1 To fabricate and install LCE foundation as drawing
2 To fabricate and install new strengtening structure as drawing
Access Work :
S015 DIVERTER FOUNDATION
1 To fabricate and install Diverter foundation as drawing
2 To fabricate and install new strengtening structure as drawing
Access Work :
S016 CDE FOUNDATION
1 To fabricate and install CDE foundation as drawing
2 To fabricate and install new strengtening structure as drawing
Access Work :
S017 DOHB FOUNDATION
1 To fabricate and install DOHB foundation as drawing
2 To fabricate and install new strengtening structure as drawing
7 Fab & Install Piping DOHB Ori Piping Erizon
8 Test Piping DOHB Ori Piping Erizon
Access Work :
S018 LCE/CDE CONTROL ROOM
1 To fabricate and install Control Unit LCE and CDE foundation as drawing
2 To fabricate and install new strengtening structure as drawing
12 Fab & Install Piping LCE & CDE Control Ori Piping Erizon
13 Test Piping LCE & CDE Control Ori Piping Erizon
Access Work :
S019 HPU CABLE ENGINE
3 To fabricate and install new strengtening structure as drawing
Access Work :
S020 CABLE TRACKWAY FOUNDATION
1 To fabricate and install cable trackway foundation as drawing
Access Work :
S021 OVERHEAD HOIST CRANE
1 To fabricate and install H-beam for trackway and support for Hoist Crane as drawing
Access Work :
S022 CABLE MARKER BOUY
1 To fabricate and install Cable Marker Bouy Foundation as drawing
Access Work :
S023 PLOUGH/A-FRAME WORKSHOP
Access Work :
S024 HPU PLOUGH A-FRAME
1 To fabricate and install HPU Plough A-frame Foundation as drawing
Access Work :
S025 PLOUGH/AFRAME CONTROL CABIN
1 To fabricate and install Plough/A-frame Control Room Foundation as drawing
S026 TOWING WINCH
1 To fabricate and install Towing Winch Foundation as drawing
Access Work :
S027 HPU TOWING WINCH
1 To fabricate and install HPU Towing Winch Foundation as drawing
3 Fab & Install Piping HPU Tow Winch Ori Piping Erizon
4 Test Piping HPU Tow Winch Ori Piping Erizon
Access Work :
S028 ROV CONTROL ROOM
1 To fabricate and install ROV Control Room Container Foundation as drawing
2 Install ROV Control Room as owner/maker instruction. Material supply by Owner
Access Work :
S029 LARS ROV
1 To fabricate and install LARS ROV Foundation as drawing
Access Work :
S030 ROV
1 To fabricate and install craddle ROV as dawing
Access Work :
S031 HPU LARS ROV
1 To fabricate and install HPU LARS ROV Foundation as dawing
6 Fab & Install Piping HPU LARS ROV Ori Piping Erizon
7 Test Piping HPU LARS ROV Ori Piping Erizon
Access Work :
S032 KIOSK ROV
1 To fabricate and install HPU LARS ROV Foundation as dawing
Access Work :
S033 CONTAINER 20 Feet ROV SPARES AND WORKSHOP
1 To fabricate and install Container 20 feet Foundation as dawing
3 Install electrical source for lighting and etc
Access Work :
S034 LIFEBOAT AND DAVIT
1 To fabricate and install davit foundation as drawing
3 Install electrical source etc
Access Work :
S035 PROVISION CRANE
3 Install electrical source etc
Access Work :
S036 RESCUE BOAT AND CRANE
3 Install electrical source etc
Access Work :
S037 JOINTING ROOM
3 To install accessoris room such as ceiling, curtain, and etc
4 To install electrical source such as cooling room, lighting, and etc
Access Work :
S038 TESTING ROOM
2 To install accessoris room such as ceiling, rolling door, and etc
3 To install electrical source such as cooling room, lighting, and etc
Access Work :
S039 FIX BOOM CRANE
Access Work :
MECHANICAL + ELECTRICAL
ME001 WHISKER ROLLER STRUCTURE
1 To fabricate and install 3 unit roller as drawing
2 To fabricate and install new OB sheave for tow winch
ME002 PLOUGH A-FRAME
7 Fab & Install Piping Plough A-Frame Ori Piping Erizon
8 Test Piping Plough A-Frame Ori Piping Erizon
ME003 PLOUGH UNIT
2 Install Plough accessoris as owner/maker instruction. Material supply by Owner
Fab & Install Piping Plough Ori Piping Erizon
Test Piping Plough Ori Piping Erizon
ME004 TUUGER WINCH
ME005 JETTING UMBILICAL WINCH
5 Fab & Install Piping Jetting Umbilical winch Material supply Ori Piping Erizon
6 Test Piping Jetting Umbilical winch Material supply Ori Piping Erizon
ME006 DIVERTER SHEAVE
1 To fabricate and install diverter sheave as drawing
ME007 PLOUGH UMBILICAL WINCH
5 Fab & Install Piping Plough Umbilical winch Ori Piping Erizon
6 Test Piping Plough Umbilical winch Ori Piping Erizon
ME008 CABLE STOPPER
ME009 LCE FOUNDATION
ME010 DIVERTER FOUNDATION
ME011 CDE FOUNDATION
5 Fab & Install Piping CDE Machine Unit Ori Piping Erizon
6 Test Piping CDE Machine Unit Ori Piping Erizon
BLASTING AND PAINTING
BP001 MAIN CABLE TANK
BP002 WHISKER AND ROLLER STRUCURE
BP003 CRANE PEDESTAL STRUCURE
BP004 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (OUTSIDE AREA) PS & STBD
BP005 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA) PS & STBD
BP006 PLATFORM 1 DECK OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA)
BP007 PLATFORM 1 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA)
BP008 PLATFORM 2 DECK OF NEW DECKHOUSE SUPERSTRUCTURE (OUTSIDE AREA)
BP009 PLATFORM 2 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA)
H - 7 HULL PAINTING
H - 7a WASH DOWN
H - 7b HARD SCRAPE
H - 7c GRIT BLASTING
H - 7d HULL PAINTING
H - 7e WATER JET
H - 7f X
H - 7g REMOVE AND CHANGE LOGO "SOECHI"
Progres

90.53%

100%
83.61%

73.33%

6.67%
100%
22.22%

60.00%

33.33%

28.33%

57.08%
100%
100%

0.25%

0.00%

0.45%

0.64%

0.56%
0.56%

0.78%

0.38%

20%
0%

0.20%

19%
0%

0.44%

0.00%

0.00%

0.00%

0.70%

0.60%
0.18%

0.00%

0.40%

0%
0%

0.00%

0.00%

0.00%

0.00%

0%
0%

0.00%

0.00%

0.00%

0.00%
0.00%

0.00%

0.00%

0.00%

0.40%

0.04%
20%
0%
0.06%

19%
0%
0.64%
0.06%
19%
0%
0.00%

0.06%
18%
0%
0.00%
0.00%
0.00%
0.07%
20%
0%

You might also like