ENGINEERING UTILITIES 2
Civil Engineering Department
KENNETH P. JAVIER
Cooling Load Analysis Worksheet (Summer Months)
DESIGN CONDITIONS:
WINDOW/GLASS
AREA:
SOUTH-WINDOWS=2(1050)(1200)+600(1200)+1400(1600)=5480000mm2 or 58.99ft2
NORTH-WINDOWS = 600(1200)+300(300)= 810000mm2 or 8.72ft2
WEST-WINDOWS=1050(1200)+300(300)+600(1200)+825(1600)=3390000mm2 or 36.49ft2
EAST-WINDOWS =1050(1200)=1260000mm2 or 13.56ft2
SUBTOTAL:
qSOUTH-WINDOW= 58.99ft2 × 59.1 Btu/hr·ft2= 3486.309Btu/hr
qNORTH-WINDOW= 8.72ft2 × 40.1 Btu/hr·ft2= 349.672Btu/hr
qWEST-WINDOW= 36.49ft2 × 94.1 Btu/hr·ft2= 3433.709Btu/hr
qEAST-WINDOW= 13.56ft2 × 94.1 Btu/hr·ft2= 1275.996Btu/hr
SUBTOTAL= 2137.372509Btu/hr + 6806.32556Btu/hr = 8943.69807Btu/hr
CENG329/ SECTION/ 2ND Semester SY2020-2021
ENGINEERING UTILITIES 2
Civil Engineering Department
TRANSMISSION
DAILY RANGE = 41.54°F(BASED FROM ASHRAE HANDBOOK)
AREA:
CEILING= 768.7316ft2
SOUTH-DOOR=900(2100)=1890000mm2 or 20.34ft2
EAST-DOOR=800(2100)=1680000mm2 or 18.08ft2
NORTH-WALL=9500(3000)-[600(1200) + 300(300)]= 27690000mm2 or 247.78ft2
SOUTH-WALL= 9500(3000)-[2(1050)(1200)+600(1200)+1400(1600)]=23020000mm2 or
293.2ft2
EAST-WALL=9000(3000)[1050(1200)]= 25740000mm2 or 277.07ft2
WEST-WALL=9000(3000)[1050(1200)+300(300)+600(1200)+825(1600)]=23610000mm2
or 254.14ft2
R-VALUE:
FOR WALL:
L 3.14961
R = thermal conductivity = =1.574 hr · °F · ft2/Btu (CONCRETE FILLING)
2
L 1
R = thermal conductivity = 2 × 2 =1 hr · °F · ft2/Btu (CONCRETE FINISH)
RTOTAL=1.574+0.94+1=3.514 hr · °F · ft2/Btu
FOR DOOR(HARD WOOD):
R=0.16 hr · °F · ft2/Btu
FOR WINDOW(GLASS):
R=0.96 hr · °F · ft2/Btu
FOR CIELING(SLAB):
R=0.32 hr · °F · ft2/Btu
U-FACTOR:
FOR WALL:
1 1
U=𝑅 = 3.514 = 0.28457 Btu/hr - ft2· °F
𝑇
FOR DOOR(HARD WOOD):
1 1
U=𝑅 = 0.16 = 6.25 Btu/hr - ft2· °F
𝑇
FOR WINDOW(GLASS):
1 1
U=𝑅 = 0.96 = 1.041666667 Btu/hr - ft2· °F
𝑇
CENG329/ SECTION/ 2ND Semester SY2020-2021
ENGINEERING UTILITIES 2
Civil Engineering Department
FOR CIELING(SLAB):
1 1
U=𝑅 = 0.32 = 3.125 Btu/hr - ft2· °F
𝑇
SUBTOTAL:(q=U×A×CLTD)
qCIELING-1= 3.125 ×768.7316× 8.1 = 19458.1Btu/hr
qDOORsouth= 6.25×20.34× 10.1 = 1283.96 Btu/hr
qDOOReast= 6.25×18.08× 17.1 = 1932.3 Btu/hr
qNORTH-WALL= 0.28457 × 298.05× 7.1 =602.194 Btu/hr
qSOUTH-WALL= 0.28457 ×247.44× 10.1 = 711.181Btu/hr
qEAST-WALL= 0.28457 × 240.5734× 17.1 =1170.67 Btu/hr
qWEST-WALL= 0.28457 ×254.1359 × 17.1 =1236.66 Btu/hr
qTOTAL= qCIELING-1 + qCIELING-2 + qDOOR + qNORTH-WALL + qSOUTH-WALL + qEAST-WALL + qWEST-
WALL= 26395Btu/hr
INFILTRATION:(q=1.1×ACH×V/60×ΔT)
VOLUME= 7566.256 ft3
ΔT= OUTSIDE TEMP- INSIDE TEMP= 94.1℉-90.5℉=3.6℉
qINFIL=1.1×0.05×126.1042667×3.6=249.686Btu/hr
INTERNAL (SENSIBLE) HEAT GAIN
internal heat gains are based on the assumption of three occupants and an appliance and
lighting load of 400 Btu/hr: = (3 persons ×230 Btu/hr per person) +400 Btu/hr
TOTAL SENSIBLE LOAD= (3 persons ×230 Btu/hr per person) +400 Btu/hr = 1090Btu/hr
LATENT LOADS
latent load factor(LF) = 0.58+42(0.018)-1 = 0.336
CENG329/ SECTION/ 2ND Semester SY2020-2021
ENGINEERING UTILITIES 2
Civil Engineering Department