MONOLITHIC VOLUMETRIC

PRECAST

by

change the paradigm


Manufacture & Install
1
Consult“ACT”ants
providing

Consultancy

Advisory

Implementation

Operational

. . . services
DOMAINS
New City Developments
Budget & Value Housing
Integrated Townships
Electronic Manufacturing Cluster
Industrial Parks
Special Economic Zones
Airports / Seaports Project Finance

International Financial Centre

New Energy

Digital Utility

Banking & Finance


Summary of Services

PROGRAM MANAGEMENT
Strategic Advisory

Conceptualization

Market Study

Financial Model

Business Model

Collaborations

Funding

Marketing

Implementation

Listing
Master Planning

Architecture

Water & Water Treatment

Energy

Solid Waste Management

Municipal Service

Transportation

Digital Infra

Cloud Computing

Partner Ecosystem Energy Services

Knowledge Partner for


Some of our

Clients…
Channeling
GLOBAL EXPERTISE
through its own
NATIONAL LEADERSHIP
MONOLITHIC VOLUMETRIC
PRECAST

by

change the paradigm


Manufacture & Install
8
Few Completed Projects in
Australia..

9
Few Completed Projects in
Australia..

10
Rabweh heights, Lebanon

other completed projects

11
Rabweh Heights, Lebanon

4 & 5 Storeys buiildings

Apartment Unit Size


2,150 – 2,910 sq. ft.

12
MONOLITHIC | LOAD-BEARING
PRECAST SOLUTION

Manufacture & Install


Indian housing

VILLAS
from Value to Luxury

APARTMENTS
from Value to Luxury
(upto to 12 fl oors)

13
power finished floor

1st & 2nd fix MEP


zero wastage

high seismic load


load bearing

blast proof
50+ years Structural Guarantee
5k – 100 k sq. ft. in 24 hours no scaffolding
3D embedded insulated wall no joints

3D MONOLITHIC PRECAST SYSTEM


monolithic 95% less gas emission on site casting

no timber

3D Volumetric Casting
no plastering
modular
no propping

5 panel in one
ongoing maintenance reduced by 95%
fair finish, inside/out
Computerized mould system

14
The Technology Main Ingredients
casting

welded mesh 1st fix MEP conduits window & door M40 RMC

• reduces steel • standardization of • precise dimensions • class ‘A’ finish inside


usage design • can be ordered & outside
• reduces wastage • reduces labor cost straight from the • no plastering
in steel • no cutting & drawing • power finished floor,
• precise dimensions chasing • better prices from no screeding
• accurate tapping vendors / bulk required
points wholesale prices • quicker setting time
• better strength

15
The Technology Plant & Machinery
casting + assembly

mould cranes transportation


• patented casting yard • prime movers
• mechanized gantry / all terrain • low bed trailers
• computerized assembly
• seamless all terrain / crawler

16
The Technology Process

casting main ingredients mould crane module

assembly module transportation crane superstructure

17
India Project
Tata New Haven Boisar 2

18
India Project
Tata New Haven Boisar 2

19
India Project
Tata New Haven Boisar 2

20
India Project
Tata New Haven Boisar 2

21
India Project
Tata New Haven Boisar 2

22
India Project
Tata New Haven Boisar 2

23
India Project
Tata New Haven Boisar 2

24
India Project
Tata New Haven Boisar 2

25
26
27
28
India Project
Tata New Haven Boisar 2

29
India Project
Tata New Haven Boisar 2

30
India Project
Tata New Haven Boisar 2

31
India Project
Tata New Haven Boisar 2

32
India Project
Tata New Haven Boisar 2

33
34
35
36
India Team

46
The Technology
can be

FASTER
upto 80 % than traditional construction methods
in factory like condition

by trained production crew

delivering better finish


upto 50 % STRONGER
monolithic module & faster monetization

enabling better project management


upto 50 % LESSER
material & labor costs & sustainable development

upto 90 % WASTE FREE


precision

note
47 depends on project design, size & time
Villas - high end, medium and affordable housing
Apartment buildings
Project / Corporate / Employee Housing
Anganwadi / NandGhar / Rural Structures
Aged persons accommodation
Schools
Hotels/motels
Hospitals/clinics
Student accommodation
Labour camps
Applications Military accommodation
Blast-proof structures for oil & gas /military applications

50
NO
Buying Formwork
Training Form-workers
Options of Engaging
Labour Management
Investment OPTION 1
Supervision Turnkey Master Contractor
Production Responsibilities Sub structure | Super structure | MEP Services |
Finishing

OPTION 2
with
Guaranteed
- quality
Sub - Contractor
Casting, Lifting & Assembling of super structure
- delivery schedule &
- cost (indexed to BM)

51
faster
Scalable, rapidly
stronger
provides
developers flexible
better
Efficient
Minimal Dependency on Labour
construction solution….

NOTE
Ideal for large and repetitious projects where
onsite manufacturing delivers optimum benefits

52
© hoMMission

Construction Systems Comparison


3DIMEMSIONAL MONOLITHIC
2D PRECAST ALUMINIUM FORMWORK BLOCK WORK / CONVENTIONAL
PRECAST
▪ Cast complete rooms as one ▪ Multiple elements cast on flat ▪ lightweight frame, clad with ▪ Requires multiple elements of
piece and install in a single lift tables with multiple individual gypsum. Many joints to flush fill. beams, columns and floor system
▪ Eliminates 8 out of the 12 joints elements & and require ▪ Requires top/bottom elements cast in-situ
in 2D Precast alignment, numerous joints, install first due to tolerances or ▪ Wall in-fills need more jointing
BUILD CONCEPT
▪ One Contract Package for all brackets and grouting structure complete for site detail
Trades measure. ▪ Must use separate floor system
for multi-level to be built with
labour
▪ Single cast of 4 wall units & ▪ Larger factory area for equivalent Labour & Skill intensive ▪ More number of on-site trades:
ceiling (equivalent of 5 - 14 flat production and more vertical Rapid Formwork deterioration Reinforcement, Block laying and
panels) joints Scaffolding required Plastering
FACTORY ▪ No brackets, props & no vertical ▪ Offsite Production & Concrete Grinding due to joints ▪ On-site & labour intensive
PRODUCTION joints. Transportation ▪ Manual reinforcement & wet
▪ Customized penetrations and ▪ Larger Capital Intensive work at site
openings ▪ Concrete pump, messy and
▪ Repeated machine made quality wastage
▪ Closed joints reducing locations ▪ Must be cast in foam, walls have ▪ Needs to be placed in wall cavity, ▪ N/A
for air transfer a perimeter border without or fixed post construction
▪ Mould internal foam layer insulation ▪ Additional Work, Cost & Time
INSULATION sandwich panel (200-210mm) ▪ Many vertical joints
▪ External UV reflective coating (up ▪ Cast in foam layer does not
to 100%), available extend to full area of panel
Page | 53
© hoMMission

Construction Systems Comparison


3DIMEMSIONAL MONOLITHIC
2D PRECAST ALUMINIUM FORMWORK BLOCK WORK / CONVENTIONAL
PRECAST
▪ Walls and roof act together ▪ Minimum 2 layers of ▪ Room sizes not always as per ▪ Excessive site wastage, clean-
structurally minimizing the reinforcement for insulated standard steel & cladding sheet up, disposal: cutting of bricks
WASTAGE volume of concrete, walls lengths. and blocks, pallets, mortar,
reinforcement leading to less ▪ Requires extra 12m of vertical sand piles, hoses and water
wastage jointing per room
▪ Internal and external paint can ▪ Factory painting not possible ▪ Much flushing and filling of ▪ Can be done only at site
be applied in the Casting Yard due to multiple joints joints on site. ▪ increased labour cost +
itself ▪ Colour variation as panels are ▪ Pre-painting not possible dependency on workmanship
FINISHES poured separately ▪ Coloured bricks available but
▪ More visible joints still needs another finish or
lining

▪ Primarily by Technicians & ▪ Each panel requires 2 man-days ▪ Labour intensive to assemble as ▪ Labour intensive
Engineers (10 man-days for 5 panels)Cast many pieces and several ▪ Requires more site amenities,
▪ Least Labour in foam layer does not extend different materials required to supervision, temporary services
LABOUR
▪ Hydraulic mould requires just 4 to full area of panel complete. and scaffolding
men per Mould ▪ Labour Law compliance
▪ Installation requires 3 people
▪ Modern lifting techniques ▪ Installation requires temporary ▪ Significant site labour with ▪ Excessive site labour with
▪ Safe working platforms phase (propping) with added potentially high injury risk potentially high injury risk
SAFETY ▪ Limited access to external safety requirement ▪ Loose power leads, hoses and ▪ Loose power leads, hoses and
surface required scaffolding creates safety risks scaffolding creates safety risks
Page | 54
© hoMMission

Construction Systems Comparison

3DIMEMSIONAL MONOLITHIC
2D PRECAST ALUMINIUM FORMWORK BLOCK WORK / CONVENTIONAL
PRECAST
INSTALLATION ▪ A single lift ▪ 5 crane moves to install 1 panel ▪ Multiple small lifts, ▪ Slow
▪ No propping or levelling ▪ Individual propping and ▪ Individual piece propping & ▪ Labour intensive
▪ Minimal brackets and dowels levelling leveling. ▪ Greater overhead costs
▪ Solid working platform ▪ Less accuracy with ▪ Post installation access is
immediately available for accumulating errors difficult until floors & other
subsequent levels ▪ No immediate working structural elements complete
▪ Greater accuracy platform until all jointing is
▪ reduces bracket and joint costs completed
▪ 1 crane to extract and place for ▪ Need multiple cranes on site ▪ Can be flat packed. Generally ▪ Extensive scaffolding, materials
yard and site lightweight. hoist and safety provisions
TRANSPORT AND
▪ Require site storage areas.
LIFTING
▪ Difficult to “load” building until
all bracing done.
▪ Windows and door frames, ▪ Impractical to factory install ▪ Impractical to factory install ▪ Must be progressively manually
electrical and plumbing windows windows. MEP coordination built in or chased in later
conduits built into mould ▪ Corner electrical joining extremely difficult and
SERVICES ▪ Can cast holes in roof slabs for impossible practically better to do on site
vertical plumbing service ▪ Plumbing service holes more
running from top to bottom of difficult
building
Page | 55
Thank You

56