HOMM E-Brochure
HOMM E-Brochure
PRECAST
by
Consultancy
Advisory
Implementation
Operational
. . . services
DOMAINS
New City Developments
Budget & Value Housing
Integrated Townships
Electronic Manufacturing Cluster
Industrial Parks
Special Economic Zones
Airports / Seaports Project Finance
New Energy
Digital Utility
PROGRAM MANAGEMENT
Strategic Advisory
Conceptualization
Market Study
Financial Model
Business Model
Collaborations
Funding
Marketing
Implementation
Listing
Master Planning
Architecture
Energy
Municipal Service
Transportation
Digital Infra
Cloud Computing
Clients…
Channeling
GLOBAL EXPERTISE
through its own
NATIONAL LEADERSHIP
MONOLITHIC VOLUMETRIC
PRECAST
by
9
Few Completed Projects in
Australia..
10
Rabweh heights, Lebanon
11
Rabweh Heights, Lebanon
12
MONOLITHIC | LOAD-BEARING
PRECAST SOLUTION
VILLAS
from Value to Luxury
APARTMENTS
from Value to Luxury
(upto to 12 fl oors)
13
power finished floor
blast proof
50+ years Structural Guarantee
5k – 100 k sq. ft. in 24 hours no scaffolding
3D embedded insulated wall no joints
no timber
3D Volumetric Casting
no plastering
modular
no propping
5 panel in one
ongoing maintenance reduced by 95%
fair finish, inside/out
Computerized mould system
14
The Technology Main Ingredients
casting
welded mesh 1st fix MEP conduits window & door M40 RMC
15
The Technology Plant & Machinery
casting + assembly
16
The Technology Process
17
India Project
Tata New Haven Boisar 2
18
India Project
Tata New Haven Boisar 2
19
India Project
Tata New Haven Boisar 2
20
India Project
Tata New Haven Boisar 2
21
India Project
Tata New Haven Boisar 2
22
India Project
Tata New Haven Boisar 2
23
India Project
Tata New Haven Boisar 2
24
India Project
Tata New Haven Boisar 2
25
26
27
28
India Project
Tata New Haven Boisar 2
29
India Project
Tata New Haven Boisar 2
30
India Project
Tata New Haven Boisar 2
31
India Project
Tata New Haven Boisar 2
32
India Project
Tata New Haven Boisar 2
33
34
35
36
India Team
46
The Technology
can be
FASTER
upto 80 % than traditional construction methods
in factory like condition
note
47 depends on project design, size & time
Villas - high end, medium and affordable housing
Apartment buildings
Project / Corporate / Employee Housing
Anganwadi / NandGhar / Rural Structures
Aged persons accommodation
Schools
Hotels/motels
Hospitals/clinics
Student accommodation
Labour camps
Applications Military accommodation
Blast-proof structures for oil & gas /military applications
50
NO
Buying Formwork
Training Form-workers
Options of Engaging
Labour Management
Investment OPTION 1
Supervision Turnkey Master Contractor
Production Responsibilities Sub structure | Super structure | MEP Services |
Finishing
OPTION 2
with
Guaranteed
- quality
Sub - Contractor
Casting, Lifting & Assembling of super structure
- delivery schedule &
- cost (indexed to BM)
51
faster
Scalable, rapidly
stronger
provides
developers flexible
better
Efficient
Minimal Dependency on Labour
construction solution….
NOTE
Ideal for large and repetitious projects where
onsite manufacturing delivers optimum benefits
52
© hoMMission
▪ Primarily by Technicians & ▪ Each panel requires 2 man-days ▪ Labour intensive to assemble as ▪ Labour intensive
Engineers (10 man-days for 5 panels)Cast many pieces and several ▪ Requires more site amenities,
▪ Least Labour in foam layer does not extend different materials required to supervision, temporary services
LABOUR
▪ Hydraulic mould requires just 4 to full area of panel complete. and scaffolding
men per Mould ▪ Labour Law compliance
▪ Installation requires 3 people
▪ Modern lifting techniques ▪ Installation requires temporary ▪ Significant site labour with ▪ Excessive site labour with
▪ Safe working platforms phase (propping) with added potentially high injury risk potentially high injury risk
SAFETY ▪ Limited access to external safety requirement ▪ Loose power leads, hoses and ▪ Loose power leads, hoses and
surface required scaffolding creates safety risks scaffolding creates safety risks
Page | 54
© hoMMission
3DIMEMSIONAL MONOLITHIC
2D PRECAST ALUMINIUM FORMWORK BLOCK WORK / CONVENTIONAL
PRECAST
INSTALLATION ▪ A single lift ▪ 5 crane moves to install 1 panel ▪ Multiple small lifts, ▪ Slow
▪ No propping or levelling ▪ Individual propping and ▪ Individual piece propping & ▪ Labour intensive
▪ Minimal brackets and dowels levelling leveling. ▪ Greater overhead costs
▪ Solid working platform ▪ Less accuracy with ▪ Post installation access is
immediately available for accumulating errors difficult until floors & other
subsequent levels ▪ No immediate working structural elements complete
▪ Greater accuracy platform until all jointing is
▪ reduces bracket and joint costs completed
▪ 1 crane to extract and place for ▪ Need multiple cranes on site ▪ Can be flat packed. Generally ▪ Extensive scaffolding, materials
yard and site lightweight. hoist and safety provisions
TRANSPORT AND
▪ Require site storage areas.
LIFTING
▪ Difficult to “load” building until
all bracing done.
▪ Windows and door frames, ▪ Impractical to factory install ▪ Impractical to factory install ▪ Must be progressively manually
electrical and plumbing windows windows. MEP coordination built in or chased in later
conduits built into mould ▪ Corner electrical joining extremely difficult and
SERVICES ▪ Can cast holes in roof slabs for impossible practically better to do on site
vertical plumbing service ▪ Plumbing service holes more
running from top to bottom of difficult
building
Page | 55