This document is a piping inspection test report for a fuel oil piping system at Bashundhara LPG -04. It details a hydrostatic test of the piping from an HFO transfer pump unit to two fuel oil storage tanks. The test was conducted at 15 bar pressure and inspected 95 pipe butt joints of 150mm diameter schedule 40 pipe. The test instruments were calibrated and temporary fixtures were installed for the test, which was of sufficient duration. The test was successful and verified the integrity of the piping system.
This document is a piping inspection test report for a fuel oil piping system at Bashundhara LPG -04. It details a hydrostatic test of the piping from an HFO transfer pump unit to two fuel oil storage tanks. The test was conducted at 15 bar pressure and inspected 95 pipe butt joints of 150mm diameter schedule 40 pipe. The test instruments were calibrated and temporary fixtures were installed for the test, which was of sufficient duration. The test was successful and verified the integrity of the piping system.
This document is a piping inspection test report for a fuel oil piping system at Bashundhara LPG -04. It details a hydrostatic test of the piping from an HFO transfer pump unit to two fuel oil storage tanks. The test was conducted at 15 bar pressure and inspected 95 pipe butt joints of 150mm diameter schedule 40 pipe. The test instruments were calibrated and temporary fixtures were installed for the test, which was of sufficient duration. The test was successful and verified the integrity of the piping system.
PIPING INSPECTION TEST REPORT Report No : MIS-U2-LT-HFO-001
Title : PRESSURE TEST CERTIFICATE Sheet : 1 of 1 System Name: Fuel Oil Piping System (HFO) P & ID No: Layout drawing (HFO Intake From HFO Tanks to FS) Location: From HFO Transfer Pump Unit-1 to Tank Test Pack No: AISL-HFO-001 farm area unit-2 (5000 m3 and 1500 m3 tank 1 & 2) Design Pressure: 10 Bar Test Pressure: 15 Bar Date of Test: 22/01/2020 Test Medium: Water
Description of Inspection Item:
Hydro Test Inspection for the Fuel Oil (HFO) piping system from HFO Transfer Pump unit-3 to tank farm area unit-2 (1500 m3 HFO Buffer Tank-1 & 2 and 5000 m3 HFO Storage tank). Total: 01 Line. (Partial) Total Butt Joints: 95 Nos (DN 150 Sch 40)
Item Description of Check Y PL NA
1 Pressure/ Temperature charts verified and attached. N 2 Calibration Cert. attached. 3 Pre/Post test flushing complete. 4 Instruments removed. 5 Test temporaries installed Duration of test: Recorder Serial No: Gauge Serial No: TTTC/ME/371 & 373 Calibration/Dates of Test: Calibration/Dates of Test: 30/12/2019 Line Number Line Number Line Number TBA
Remarks:
1) As per line check punch list report (AISL-HFO-PL-001)