Resume Unit Se

Mining Real Unit Produksi


Contr. Tipe/model jumlah Jam kerja Overbourden Batubara

D-85ss 1 436
D155-2A 1 436
D-375 1 436
CV KIT PC-200 1 325 267.662 Bcm 26.766 Ton
PC-400 5 1,744
ZX-850 0 -
DT Mercy 4 1,744
DT CWB520/Convoy 17 7,412
DT Scania 0 -
DT Patria 0 -

Mining Real Unit Produksi


Contr. Tipe/model jumlah Jam kerja Overbourden Batubara

D-85ss 2 872
D155-2A 1 298
D-375 2 872
DARS PC-200 1 289 430.010 Bcm 43.001 Ton
CORP. PC-400 7 2,024
ZX-850 1 311
DT Mercy 5 2,180
DT CWB520/Convoy 8 3,488
DT Scania 11 4,796
DT Patria 6 2,616

Mining Real Unit Produksi


Contr. Tipe/model jumlah Jam kerja Overbourden Batubara

D-85ss 2 786
D155-2A 1 436
D-375 1 436
JAMES PC-200 1 350 364.640 Bcm 36.464Ton
CORP. PC-400 3 1,308
ZX-850 1 436
DT Mercy 5 625
DT CWB520/Convoy 17 7,305
DT Scania 10 4,350
DT Patria 0 -

Target Total./ bulan 1.062.312 Bcm106.231 Ton


Resume Unit Setting

Ideal Unit Produksi Unit Jam


jumlah Jam kerja Overbourden Batubara Kurang Kurang

2 878 -1 -442
1 436
1 436
1 325 419.538 Bcm 41.954 Ton
5 2,184 -440
0 -
4 1,744
17 7,242 170
11 4,686 -11 -4686
0 0

Ideal Unit Produksi Unit Jam


jumlah Jam kerja Overbourden Batubara Kurang Kurang

3 1,308 -1 -436
2 872 -1 -574
2 872
1 436 644.762 Bcm 64.476 Ton -147
7 3,052 -1028
1 436 -125
5 2,180
13 5,668 -5 -2180
23 10,028 -12 -5232
6 2,616

Ideal Unit Produksi Unit Jam


jumlah Jam kerja Overbourden Batubara Kurang Kurang

3 1,164 -1 -378
1 401 35
1 436
1 430 444.118 Bcm 44.412 Ton -80
4 1,744 -1 -436
1 436
5 2,140 -1515
17 7,412 -107
11 4,796 -1 -446
0 -

06.231 Ton 1.508.428 Bcm 150.842Ton


Unit
Tipe/model

D-85ss
D155-2A
D-375
PC-200
PC-400
ZX-850
DT Mercy
DT CWB520/Convoy
DT Scania

Unit
Tipe/model

D-85ss
D155-2A
D-375
PC-200
PC-400
ZX-850
DT Mercy
DT CWB520/Convoy
DT Scania
DT Patria

Unit
Tipe/model

D-85ss
D155-2A
D-375
PC-200
PC-400
ZX-850
DT Mercy
DT CWB520/Convoy
DT Scania
DT Patria
GENERAL ASSUMPTIONS
BARA JAYA UTAMA COAL MINING
Talluk 2 dan 3

MATERIAL PROPERTIES

Over Burden :

Topsoil natural density (tonnes/bcm)


swell factor
loose density (tonnes/lcm)
unripping material % Total volume

Commonsoil natural density (tonnes/bcm)


swell factor
loose density (tonnes/lcm)
Ripping material % Total volume

Coal natural density (tonnes/bcm)


swell factor
loose density (tonnes/lcm)

YEARLY WORKING HOURS Overbourden removal

Days per year 365


National Holyday 7
Holyday 52
Available days per year 306
day Coeficien 95%
Effective days per year 290.7
Shifts per day 2
Hours per shift 9
SCHEDULED HRS PER YEAR 5,233
SCHEDULED HRS PER MONTH 436

Rain Fall
Rain Volume per year 1956.6
Total day 222.0
average 8.8
Maximum Rain Volume 78.4
Average Rain Volume on September 15

FINANCIAL PARAMETER

US$ rate (rupiah)

longterm loan interest rate (per year)


shortterm loan interest rate (per year)
deposit interest (per year)
(per year) (per year)
D E R Debt
Equity

Fuel price (Rp/lt)


Lubricant price :
- Engine\Trans\Final Drive (Rp/lt)
- Hydraulic oil (Rp/lt)
- Grease (Rp/kg)
Blasting OB cost (us$/bcm)

Escalation rate per year :


- equipment price
- Fuel price
- spareparts

Inclaring Charge
1.85
1.54
1.20
10%

2.25
1.55
1.45
90%

1.30
1.53
0.85

Coal getting

365
7
52
306
95%
290.7
2
9
5,233
436
milliliter
day
milliliter/day
milliliter/day
milliliter/day

10,250
9.00%
9.50%
3.00%

80.00%
20.00%

6,000

15,000
15,000
25,000
0.20

0.00%
0.00%
4.00%

0.00%
CV. KIT
REAL SETTING SR 1 : 10
Pit 2 Talluk 2 Target 400,161 Bcm/bulan
Luas Tambang ( Ha) 12.000
Jarak Houling Overbourden 500 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 2 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil Jumlah unit Volume OB

Clearing
D-85ss 149 M^2/jam 62 9,212 1 9,212

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 192 40,090 3 120,269

Commonsoil
PC-400 ( C) 209 Bcm/jam 342 71,410 1 71,410
PC-400 (A) 209 Bcm/jam 244 50,947 3 152,842
PC-400 (B) 209 Bcm/jam 268 55,958 1 55,958

Ripping
D-375 465 Bcm/jam 436 202,545 1 202,545
D-155 337 Bcm/jam 230 77,616 1 77,616

Spreading
D-85ss 431 Bcm/jam 374 161,287 2 322,574
D-155 447 Bcm/jam 206 92,056 1 92,056

Hauling
CGB/Mercy 55 Bcm/jam 268 14,739 4 58,955
Convoy 45 Bcm/jam 436 19,620 17 333,540

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil Jumlah unit Volume BB
Cleaning
PC-200 42 m^2/jam 325 13,601 1 13,601

Loading
PC-400 (B) 275 Ton/jam 168 46,267 1 46,267

Hauling BB
CGB/Mercy 59 Ton/jam 168 9,856 4 39,424

Resume
Model/Type Capasitas Jam Banyak Jumlah
unit unit kerja unit Jam kerja Realisasi

CGB/Mercy 55 Bcm/jam 436 4 1,744 Over Bourden


Convoy 34 Bcm/jam 436 17 7,412 392,495

D-155 447 Bcm/jam 436 1 436 Batu Bara


D-375 917 Bcm/jam 436 1 436
D-85ss 149 M^2/jam 436 2 872 39,250

PC-200 84 Ton/jam 325 1 325 Striping Ratio


PC-400 (A) 209 Bcm/jam 436 3 1,308
PC-400 (B) 209 Bcm/jam 436 1 436 10
PC-401 ( C) 209 Bcm/jam 342 1 342
Note :
D-85 ss Spreading 1 unit operasional KIT dan 1 unit Main Road Operasional PT BJU sebagai Disposal Pit 2 Talluk 2

Setting unit dan Target Bulan 3 - 5


CV. KIT SR 1 : 10
REAL SETTING Target 267,662 Bcm/bulan
Pit 2 Talluk 2 Luas Tambang ( Ha) 12.000
Jarak Houling Overbourden 1000 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 2 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil Jumlah unit Volume OB

Clearing
D-85ss 149 M^2/jam 135 20,058 1 20,058

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 160 33,408 3 100,224

Commonsoil
PC-400 (A) 209 Bcm/jam 276 57,629 3 172,886
PC-400 (B) 209 Bcm/jam 321 67,025 1 67,025
PC-400 ( C) 209 Bcm/jam 0 - 1 -

Ripping
D-375 465 Bcm/jam 436 202,545 1 202,545
D-155 337 Bcm/jam 92 31,046 1 31,046

Spreading
D-85ss 431 Bcm/jam 301 129,806 1 129,806
D-155 447 Bcm/jam 344 153,725 1 153,725
Hauling
CGB/Mercy 45 Bcm/jam 321 14,486 4 57,945
Convoy 28 Bcm/jam 436 12,336 17 209,718

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil Jumlah unit Volume BB
Cleaning
PC-200 42 m^2/jam 325 13,601 1 13,601

Loading
PC-400 (B) 275 Ton/jam 115 31,671 1 31,671

Hauling BB
CGB/Mercy 59 Ton/jam 115 6,747 4 26,987

Resume
Model/Type Capasitas Jam Banyak Jumlah
unit unit kerja unit Jam kerja Realisasi
CGB/Mercy 47 Bcm/jam 436 4 1,744 Over Bourden
Convoy 25 Bcm/jam 436 17 7,412 267,662
D-155 337 Bcm/jam 436 1 436 Batu Bara
D-375 465 Bcm/jam 436 1 436 26,766
D-85ss 431 Bcm/jam 436 1 436

PC-200 84 Ton/jam 325 1 325


PC-400 (A) 209 Bcm/jam 436 3 1,308 Striping Ratio
PC-400 (B) 209 Bcm/jam 436 1 436 10.0
PC-401 ( C) 209 Bcm/jam - 1 -

Note
Jarak Hauling OB bertambah sehingga kekurangan unit DT
Kekurangan ini menyebabkan jumlah OB terangkut menjadi sedikit dan berakibat jumlah BB terexpose kurang.

JAMES CORP. Setting unit dan Target Bulan 1 - 2


Real Setting SR 1 : 10
Pit 1 talluk 3 Target 365,765 Bcm/bulan
Luas Tambang ( Ha) 18.000
Jarak Houling Overbourden 500 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 5 x 2.5 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil Jumlah unit Volume OB

Clearing
D-85ss 149 M^2/jam 76 11,292 2 22,584

Loading
Topsoil
PC-400 (A C) 209 Bcm/jam 270 56,376 2 112,752

Commonsoil
PC-400 (A C) 209 Bcm/jam 166 34,661 2 69,322
PC-200 64 Bcm/jam 86 5,504 1 5,504
ZX 850 261 Bcm/jam 436 113,796 1 113,796
PC-400 (B) 209 Bcm/jam 303 63,266 1 63,266

Ripping
D-375 465 Bcm/jam 436 202,545 1 202,545
D-155 337 Bcm/jam 230 77,616 1 77,616

Spreading
D-85ss 431 Bcm/jam 317 136,706 2 273,411
D-155 447 Bcm/jam 206 92,056 1 92,056

Hauling
CGB/Mercy 55 Bcm/jam 0 - 5 -
Scania 45 Bcm/jam 436 19,620 10 196,200
Patria 46 Bcm/jam 0 - - -
Convoy 34 Bcm/jam 292 9,974 17 169,565

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil Jumlah unit Volume BB
Cleaning
PC-200 42 m^2/jam 350 14,648 1 14,648

Loading
PC-400 (B) 275 Ton/jam 133 36,628 1 36,628

Hauling BB
CGB/Mercy 59 Ton/jam 125 7,333 5 36,667

Resume
Model/Type Capasitas Jam Banyak Jumlah
unit unit kerja unit Jam kerja Realisasi

CGB/Mercy 55 Bcm/jam 125 5 625


CGB/Scania 45 Bcm/jam 436 10 4,360 Over Bourden
Convoy 34 Bcm/jam 292 17 4,964 364,640

D-155 Non Ripper 447 Bcm/jam 436 1 436 Batu Bara


D-375 917 Bcm/jam 436 1 436
D-85ss 149 M^2/jam 393 2 786 36,464

PC-200 84 Ton/jam 350 1 350 Striping Ratio


PC-400 (A) 209 Bcm/jam 436 2 872
PC-400 (B) 209 Bcm/jam 436 1 436 10.00
ZX-850 261 Bcm/jam 436 1 436

JAMES CORP. Setting unit dan Target Bulan 3 - 8


Real Setting SR 1 : 10
Pit 1 talluk 3 Target 365,412 Bcm/bulan
Luas Tambang ( Ha) 18.000
Jarak Houling Overbourden 1000.000
Jarak Houling Batubara 4000 meter
Tebal seam BB 1 x 2.5 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil Jumlah unit Volume OB

Clearing
D-85ss 149 M^2/jam 76 11,292 2 22,584

Loading
Topsoil
PC-400 (A C) 209 Bcm/jam 270 56,376 2 112,752

Commonsoil
PC-400 (A C) 209 Bcm/jam 166 34,661 2 69,322
PC-200 64 Bcm/jam 86 5,504 1 5,504
ZX 850 261 Bcm/jam 436 113,796 1 113,796
PC-400 (B) 209 Bcm/jam 303 63,266 1 63,266

Ripping
D-375 465 Bcm/jam 436 202,545 1 202,545
D-155 337 Bcm/jam 230 77,616 1 77,616

Spreading
D-85ss 431 Bcm/jam 317 136,706 2 273,411
D-155 447 Bcm/jam 206 92,056 1 92,056

Hauling
CGB/Mercy 45 Bcm/jam 0 - 5 -
Scania 36 Bcm/jam 435 15,618 10 156,175
Patria 36 Bcm/jam 0 - - -
Convoy/CWB 520 28 Bcm/jam 435 12,308 17 209,237

Coal Getting 86

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil Jumlah unit Volume BB
Cleaning
PC-200 42 m^2/jam 350 14,648 1 14,648

Loading
PC-400 (B) 275 Ton/jam 133 36,628 1 36,628

Hauling BB
CGB/Mercy 59 Ton/jam 125 7,333 5 36,667

Resume
Model/Type Capasitas Jam Banyak Jumlah
unit unit kerja unit Jam kerja Realisasi

CGB/Mercy 45 Bcm/jam 125 5 625


CGB/Scania 36 Bcm/jam 435 10 4,350 Over Bourden
Convoy 28 Bcm/jam 435 17 7,395 364,640

D-155 447 Bcm/jam 436 1 436 Batu Bara


D-375 917 Bcm/jam 436 1 436
D-85ss 149 M^2/jam 393 2 786 36,464

PC-200 84 Ton/jam 350 1 350 Striping Ratio


PC-400 (A) 209 Bcm/jam 436 2 872
PC-400 (B) 209 Bcm/jam 436 1 436 10.00
ZX-850 261 Bcm/jam 436 1 436

DARS CORP. Setting unit dan Target Bulan 1 - 2


Real Setting SR 1 : 10
Pit 3 talluk 2 Target 470,426 Bcm/bulan
Luas Tambang ( Ha) 18.200
Jarak Houling Overbourden 500 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 5 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil Jumlah unit Volume OB

Clearing
D-85ss 149 M^2/jam 45 6,686 2 13,372

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 312 65,146 1 65,146

Commonsoil
PC-400 (A) 209 Bcm/jam 0 - 1 -
PC-400 209 Bcm/jam 311 64,937 5 324,684
ZX 850 261 Bcm/jam 311 81,171 1 81,171
PC-400 (B) 209 Bcm/jam 0 - 1 -

Ripping
D-375 465 Bcm/jam 436 202,545 2 405,089
D-155 337 Bcm/jam 0 - 1 -

Spreading
D-85ss 431 Bcm/jam 391 168,618 2 337,236
D-155 447 Bcm/jam 298 133,169 1 133,169

Hauling
CGB/Mercy 55 Bcm/jam 55 3,025 5 15,124
Scania 45 Bcm/jam 436 19,620 11 215,820
Patria 46 Bcm/jam 436 20,056 6 120,336
Convoy 34 Bcm/jam 436 14,893 8 119,147

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil Jumlah unit Volume BB
Cleaning
PC-200 42 m^2/jam 322 13,476 1 13,476

Loading
PC-400 (B) 275 Ton/jam 172 47,369 1 47,369

Hauling BB
CGB/Mercy 59 Ton/jam 161 9,445 5 47,227

Resume
Model/Type Capasitas Jam Banyak Jumlah
unit unit kerja unit Jam kerja Realisasi

CGB/Mercy 55 Bcm/jam 216 5 1,080


CGB/Scania 45 Bcm/jam 436 11 4,796 Over Bourden
Patria 46 Bcm/jam 436 6 2,616
Convoy 34 Bcm/jam 436 8 3,488 470,426

D-155 Non Ripper 447 Bcm/jam 298 1 298 Batu Bara


D-375 917 Bcm/jam 436 2 872
D-85ss 149 M^2/jam 436 2 872 47,043

PC-200 84 Ton/jam 322 1 322 Striping Ratio


PC-400 (A) 209 Bcm/jam 312 1 312
PC-400 (B) 209 Bcm/jam 172 1 172 10.00
PC-400 209 Bcm/jam 311 5 1,555
ZX-850 261 Bcm/jam 311 1 311

DARS CORP. Setting unit dan Target Bulan 3 - 14


Real Setting SR 1 : 10
Pit 3 talluk 2 Target 470,089 Bcm/bulan
Luas Tambang ( Ha) 18.200
Jarak Houling Overbourden 1000 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 5 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil Jumlah unit Volume OB
Clearing
D-85ss 149 M^2/jam 45 6,686 2 13,372

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 312 65,146 1 65,146

Commonsoil
PC-400 (A) 209 Bcm/jam 0 - 1 -
PC-400 209 Bcm/jam 311 64,937 5 324,684
ZX 850 261 Bcm/jam 311 81,171 1 81,171
PC-400 (B) 209 Bcm/jam 0 - 1 -

Ripping
D-375 465 Bcm/jam 436 202,545 2 405,089
D-155 337 Bcm/jam 0 - 1 -

Spreading
D-85ss 431 Bcm/jam 391 168,618 2 337,236
D-155 447 Bcm/jam 298 133,169 1 133,169

Hauling
CGB/Mercy 45 Bcm/jam 289 13,042 5 65,210
Scania 36 Bcm/jam 436 15,653 11 172,188
Patria 36 Bcm/jam 436 15,653 6 93,921
Convoy/CWB 520 28 Bcm/jam 436 12,336 8 98,691

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil Jumlah unit Volume BB
Cleaning
PC-200 42 m^2/jam 289 12,095 1 12,095

Loading
PC-400 (B) 275 Ton/jam 157 43,238 1 43,238

Hauling BB
CGB/Mercy 59 Ton/jam 147 8,624 5 43,120

Resume
Model/Type Capasitas Jam Banyak Jumlah
unit unit kerja unit Jam kerja Realisasi

CGB/Mercy 45 Bcm/jam 436 5 2,180


CGB/Scania 36 Bcm/jam 436 11 4,796 Over Bourden
Patria 36 Bcm/jam 436 6 2,616
Convoy 28 Bcm/jam 436 8 3,488 430,010

D-155 447 Bcm/jam 298 1 298 Batu Bara


D-375 917 Bcm/jam 436 2 872
D-85ss 149 M^2/jam 436 2 872 43,001

PC-200 84 Ton/jam 289 1 289 Striping Ratio


PC-400 (A) 209 Bcm/jam 312 1 312
PC-400 (B) 209 Bcm/jam 157 1 157 10.00
PC-400 209 Bcm/jam 311 5 1,555
ZX-850 261 Bcm/jam 311 1 311
Support Work

Pumping

Curah hujan terbesar di areal tambang PT BJU adalah pada bulan September (Meteorologi Berau 2001-2004)
Pemilihan pompa digunakan assumsi curah hujan rata-rata pada bulan September, yakni sebesar 15

Dars Corp Luas Tambang 18.2 Ha


Jenis/Type Kapasitas Volume Jumlah Waktu
pompa Air Hujan Pompa Operasional

Niagara 85 Ltr/menit 642.915 m^3 3 42.02

James Corp Luas Tambang 18 Ha


Jenis/Type Kapasitas Volume Jumlah Waktu
pompa Air Hujan Pompa Operasional

Niagara 85 Ltr/menit 635.85 m^3 3 41.56

CV KIT Luas Tambang 12 Ha


Jenis/Type Kapasitas Volume Jumlah Waktu
pompa Air Hujan Pompa Operasional

Niagara 85 Ltr/menit 423.9 m^3 2 41.56

Grading

Grading Houl main road 7.5 Km diassumsikan setiap 2 hari sekali


Grading Ramp 3 Km untuk tiga Pit, diassumsikan 2 kali sehari.

Model/Type Capasitas Jam Banyak Jumlah Target


unit unit kerja unit Jam kerja Hasil

GD 705 3,798 m^2/jam 160 3 480 1,800,000


1,822,800

2,340,000
GD 705 3,798 m^2/jam 306 3 918 3,486,105
Compacting 3214.2857142857

Grading Houl main road 7.5 Km diassumsikan setiap 2 bulan sekali


Grading Ramp 3 Km untuk tiga Pit, diassumsikan 6 kali sebulan

Model/Type Capasitas Jam Banyak Jumlah Target


unit unit kerja unit Jam kerja Hasil

BW 211D-3 1,506 m^2/jam 200 1 200 300,000


301,200

270,000
BW 211D-3 1,056 m^2/jam 266 1 266 280,896

Water Spraying

Model/Type Capasitas Jam Banyak Jumlah


unit unit kerja unit Jam kerja Hasil

CWB 520 WT 06 9,000 Liter/jam 218 1 218 1,962,000

CWB 520 WT 01 8,000 Liter.jam 250 1 250 2,000,000

Lighting

Dengan assumsi penerangan dilakukan ditiap Loading point dan Waste Disposal , tiap lampu adalah sebesar 1000 watts
dengan jarak pancar kurang dari 50 meter. Tiap Tower Lamp berkemampuan 2000 watts

Contr Jumlah Jumlah Jumlah


Pelaksana Loading Poin Disposal Daya Tower lamp

James Corp 5 2 10000 4

Dars Corp 8 3 24000 6

CV KIT 5 2 10000 4
target Stock
hasil Material

24,000 120,000 m^2


9,212 m^2

120,000 600,000 Bcm


120,269 Bcm

280,161 Bcm
280,210 1,400,803 Bcm

280,161 Bcm
280,161 1,400,803 Bcm

400,161 Bcm
414,630 1,400,803 Bcm

400,161 1,400,803 Bcm


392,495 Bcm

target Stock
hasil Material

13,333 66,667 M^2


13,601 M^2

39,250 200,000 Ton


46,267 Ton

39,250 200,000 Ton


39,424 Ton
target Stock
hasil Material

20,000 120,000 m^2


20,058 m^2

100,000 600,000 Bcm


100,224 Bcm
Bcm

233,333
239,911 1,400,000
Bcm

233,333
233,591 1,400,000 Bcm

333,333
283,531 1,400,000 Bcm

333,333
267,662 1,400,000 Bcm

target Stock
hasil Material

13,333 66,667 M^2


13,601

26,766 200,000 Ton


31,671

26,766 200,000 Ton


26,987
target Stock
hasil Material

22,500 180,000 m^2


22,584 m^2

112,500
112,752 900,000 Bcm
Bcm

280,161
251,888 2,700,000 Bcm

337,500
280,161 2,700,000 Bcm

364,640
365,467 3,600,000 Bcm

364,640
365,765 3,600,000 Bcm

target Stock
hasil Material

14,586 144,000 M^2


14,648
36,464 360,000 Ton
36,628

36,464 360,000 Ton


36,667

target Stock
hasil Material

22,500 180,000 m^2


22,584 m^2

112,500
112,752 900,000 Bcm
Bcm

280,161
251,888 2,700,000 Bcm

337,500
280,161 2,700,000 Bcm

364,640
365,467 3,600,000 Bcm
364,640
365,412 3,600,000 Bcm

target Stock
hasil Material

14,586 144,000 M^2


14,648

36,464 360,000 Ton


36,628

36,464 360,000 Ton


36,667

target Stock
hasil Material

13,000 182,000 m^2


13,372 m^2

65,000
65,146 910,000 Bcm
Bcm

405,089
405,855 5,860,000 Bcm

418,571
405,089 5,860,000 Bcm

470,089
470,405 6,770,000 Bcm

470,089
470,426 6,770,000 Bcm

target Stock
hasil Material

13,441 193,429 M^2


13,476

47,043 677,000 Ton


47,369

47,043 677,000 Ton


47,227

target Stock
hasil Material
13,000 182,000 m^2
13,372 m^2

65,000
65,146 910,000 Bcm
Bcm

405,089
405,855 5,860,000 Bcm

418,571
405,089 5,860,000 Bcm

470,089
470,405 6,770,000 Bcm

470,089
430,010 6,770,000 Bcm

target Stock
hasil Material

12,286 193,429 M^2


12,095

43,001 677,000 Ton


43,238

43,001 677,000 Ton


43,120
mml/hari

Waktu
Operasional

jam/bulan

Waktu
Operasional

jam/bulan

Waktu
Operasional

jam/bulan

Volume
Pekerjaan
Main Houl Road
1,800,000

Ramp
2,340,000
Volume
Pekerjaan
Main Houl Road
300,000

Ramp
270,000

Volume
Target

3,900,000

3,962,000
CV. KIT Setting unit dan Target Bulan 1 - 2
IDEAL SETTING SR 1 : 10
Pit 2 Talluk 2 Target 400,000 Bcm/bulan
Luas Tambang ( Ha) 12.000
Jarak Houling Overbourden 500 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 2 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil

Clearing
D-85ss 149 M^2/jam 81 12,035

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 230 48,024

Commonsoil
PC-400 ( C) 209 Bcm/jam 436 91,037
PC-400 (A) 209 Bcm/jam 206 43,013
PC-400 (B) 209 Bcm/jam 290 60,552

Ripping
D-375 465 Bcm/jam 436 202,545
D-155 337 Bcm/jam 230 77,616

Spreading
D-85ss 431 Bcm/jam 358 154,387
D-155 447 Bcm/jam 206 92,056

Hauling
CGB/Mercy 55 Bcm/jam 264 14,519
Scania 45 Bcm/jam 425 19,086
Convoy 34 Bcm/jam 425 14,518
Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil
Cleaning
PC-200 42 m^2/jam 325 13,601

Loading
PC-400 (B) 275 Ton/jam 146 40,208

Hauling BB
CGB/Mercy 59 Ton/jam 172 10,091

Resume
Model/Type Capasitas Jam Banyak
unit unit kerja unit

CGB/Mercy 55 Bcm/jam 436 4


Scania 45 Bcm/jam 425 5
Convoy 34 Bcm/jam 425 17

D-155 447 Bcm/jam 436 1


D-375 917 Bcm/jam 436 1
D-85ss 149 M^2/jam 439 2

PC-200 84 Ton/jam 325 1


PC-400 (A) 209 Bcm/jam 436 3
PC-400 (B) 209 Bcm/jam 436 1
PC-401 ( C) 209 Bcm/jam 436 1

Setting unit dan Target Bulan 3 - 5


CV. KIT SR 1 : 10
IDEAL SETTING Target 400,000 Bcm/bulan
Pit 2 Talluk Luas Tambang ( Ha) 12.000
Jarak Houling Overbourden 1000 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 2 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil

Clearing
D-85ss 149 M^2/jam 81 12,035

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 230 48,024

Commonsoil
PC-400 (A) 209 Bcm/jam 206 43,013
PC-400 (B) 209 Bcm/jam 287 59,926
PC-400 ( C) 209 Bcm/jam 436 91,037

Ripping
D-375 465 Bcm/jam 436 202,545
D-155 337 Bcm/jam 230 77,616

Spreading
D-85ss 431 Bcm/jam 358 154,387
D-155 447 Bcm/jam 206 92,056
Hauling
CGB/Mercy 45 Bcm/jam 257 11,598
Scania 36 Bcm/jam 426 15,294
Convoy 28 Bcm/jam 426 12,053

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil
Cleaning
PC-200 42 m^2/jam 325 13,601

Loading
PC-400 (B) 275 Ton/jam 153 42,136

Hauling BB
CGB/Mercy 59 Ton/jam 179 10,501

Resume
Model/Type Capasitas Jam Banyak
unit unit kerja unit
CGB/Mercy 47 Bcm/jam 436 4
Scania 25 Bcm/jam 426 11
Convoy 25 Bcm/jam 426 17

D-155 337 Bcm/jam 436 1


D-375 465 Bcm/jam 436 1
D-85ss 431 Bcm/jam 439 2

PC-200 84 Ton/jam 325 1


PC-400 (A) 209 Bcm/jam 436 3
PC-400 (B) 209 Bcm/jam 440 1
PC-401 ( C) 209 Bcm/jam 436 1

JAMES CORP. Setting unit dan Target Bulan 1 - 2


Ideal Setting SR 1 : 10
Pit 1 Talluk 3 Target 444,118 Bcm/bulan
Luas Tambang ( Ha) 18.000
Jarak Houling Overbourden 500 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 5 x 2.5 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


Hasil
unit unit Hasil

Clearing
D-85ss 149 M^2/jam 51 7,578

Loading
Topsoil
PC-400 (A D) 209 Bcm/jam 270 56,376

Commonsoil
PC-400 (A D) 209 Bcm/jam 166 34,661
PC-400 ( C) 209 Bcm/jam 436 91,037
ZX 850 261 Bcm/jam 436 113,796
PC-400 (B) 209 Bcm/jam 274 57,211

Ripping
D-375 465 Bcm/jam 436 202,545
D-155 337 Bcm/jam 382 128,910

Spreading
D-85ss 431 Bcm/jam 337 145,331
D-155 447 Bcm/jam 19 8,491

Hauling
CGB/Mercy 55 Bcm/jam 195 10,724
Scania 45 Bcm/jam 436 19,620
Convoy 34 Bcm/jam 436 14,893

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil
Cleaning
PC-200 42 m^2/jam 430 18,001

Loading
PC-400 (B) 275 Ton/jam 162 44,615

Hauling BB
CGB/Mercy 59 Ton/jam 152 8,917

Resume
Model/Type Capasitas Jam Banyak
unit unit kerja unit

CGB/Mercy 55 Bcm/jam 347 5


CGB/Scania 45 Bcm/jam 436 7
Convoy 34 Bcm/jam 436 17

D-155 Full Ripper 447 Bcm/jam 401 1


D-375 917 Bcm/jam 436 1
D-85ss 149 M^2/jam 388 3

PC-200 84 Ton/jam 430 1


PC-400 (A) 209 Bcm/jam 436 2
PC-400 (B) 209 Bcm/jam 436 1
ZX-850 261 Bcm/jam 436 1

JAMES CORP. Setting unit dan Target Bulan 3 - 8


Ideal Setting SR 1 : 10
Pit1 Talluk 3 Target 444,118 Bcm/bulan
Luas Tambang ( Ha) 18.000
Jarak Houling Overbourden 1000.000
Jarak Houling Batubara 4000 meter
Tebal seam BB 1 x 2.5 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit Hasil

Clearing
D-85ss 149 M^2/jam 51 7,578

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 270 56,376

Commonsoil
PC-400 (A) 209 Bcm/jam 166 34,661
PC-400 ( C) 209 Bcm/jam 436 91,037
ZX 850 261 Bcm/jam 436 113,796
PC-400 (B) 209 Bcm/jam 274 57,211

Ripping
D-375 465 Bcm/jam 436 202,545
D-155 337 Bcm/jam 382 128,910

Spreading
D-85ss 431 Bcm/jam 337 145,331
D-155 447 Bcm/jam 19 8,491

Hauling
CGB/Mercy 45 Bcm/jam 276 12,455
Scania 36 Bcm/jam 436 15,653
Convoy/CWB 520 28 Bcm/jam 436 12,336

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil
Cleaning
PC-200 42 m^2/jam 430 18,001

Loading
PC-400 (B) 275 Ton/jam 162 44,615

Hauling BB
CGB/Mercy 59 Ton/jam 152 8,917
Resume
Model/Type Capasitas Jam Banyak
unit unit kerja unit

CGB/Mercy 45 Bcm/jam 428 5


CGB/Scania 36 Bcm/jam 436 11
Convoy 28 Bcm/jam 436 17

D-155 447 Bcm/jam 401 1


D-375 917 Bcm/jam 436 1
D-85ss 149 M^2/jam 388 3

PC-200 84 Ton/jam 430 1


PC-400 (A) 209 Bcm/jam 436 2
PC-400 (B) 209 Bcm/jam 436 1
ZX-850 261 Bcm/jam 436 1

DARS CORP.
Ideal Setting Setting unit dan Target Bulan 1 - 2
Flat Target SR 1 : 10
Target 648,024 Bcm/bulan
Luas Tambang ( Ha) 18.200
Jarak Houling Overbourden 500 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 5 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil

Clearing
D-85ss 149 M^2/jam 40 5,943

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 416 86,861

Commonsoil
PC-400 (A) 209 Bcm/jam 20 4,176
PC-400 209 Bcm/jam 436 91,037
ZX 850 261 Bcm/jam 436 113,796
PC-400 (B) 209 Bcm/jam 201 41,969

Ripping
D-375 465 Bcm/jam 436 202,545
D-155 337 Bcm/jam 227 76,604

Spreading
D-85ss 431 Bcm/jam 396 170,774
D-155 447 Bcm/jam 209 93,397

Hauling
CGB/Mercy 55 Bcm/jam 216 11,879
Scania 45 Bcm/jam 436 19,620
Patria 46 Bcm/jam 436 20,056
Convoy/CWB 520 34 Bcm/jam 436 14,893

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil
Cleaning
PC-200 42 m^2/jam 436 18,247

Loading
PC-400 (B) 275 Ton/jam 235 64,719

Hauling BB
CGB/Mercy 59 Ton/jam 220 12,907

Resume
Model/Type Capasitas Jam Banyak
unit unit kerja unit

CGB/Mercy 55 Bcm/jam 436 5


CGB/Scania 45 Bcm/jam 436 14
Patria 46 Bcm/jam 436 6
Convoy 34 Bcm/jam 436 13

D-155 447 Bcm/jam 436 2


D-375 917 Bcm/jam 436 2
D-85ss 149 M^2/jam 436 3

PC-200 84 Ton/jam 436 1


PC-400 (A) 209 Bcm/jam 436 1
PC-400 (B) 209 Bcm/jam 436 1
PC-400 209 Bcm/jam 436 5
ZX-850 261 Bcm/jam 436 1

DARS CORP.
Ideal Setting Setting unit dan Target Bulan 3 - 11
Flat Target SR 1 : 10
Target 663,061 Bcm/bulan
Luas Tambang ( Ha) 18.200
Jarak Houling Overbourden 1000 meter
Jarak Houling Batubara 4000 meter
Tebal seam BB 5 x 3 meter
Setting berdasar pada alokasi unit alat muat Overbourden
Target berdasar pada kemampuan maksimum alat muat Overbourden

Overbourden Removal

Aktivitas Kemampuan Jam kerja


unit unit perbulan Hasil

Clearing
D-85ss 149 M^2/jam 40 5,943

Loading
Topsoil
PC-400 (A) 209 Bcm/jam 416 86,861

Commonsoil
PC-400 (A) 209 Bcm/jam 20 4,176
PC-400 209 Bcm/jam 436 91,037
ZX 850 261 Bcm/jam 436 113,796
PC-400 (B) 209 Bcm/jam 201 41,969

Ripping
D-375 465 Bcm/jam 436 202,545
D-155 337 Bcm/jam 227 76,604

Spreading
D-85ss 431 Bcm/jam 396 170,774
D-155 447 Bcm/jam 209 93,397

Hauling
CGB/Mercy 45 Bcm/jam 216 9,748
Scania 36 Bcm/jam 436 15,653
Patria 36 Bcm/jam 436 15,653
Convoy/CWB 520 28 Bcm/jam 436 12,336

Coal Getting

Aktivitas Kemampuan Jam kerja


unit perbulan Hasil
Cleaning
PC-200 42 m^2/jam 436 18,247

Loading
PC-400 (B) 275 Ton/jam 235 64,719

Hauling BB
CGB/Mercy 59 Ton/jam 220 12,907

Resume
Model/Type Capasitas Jam Banyak
unit unit kerja unit

CGB/Mercy 45 Bcm/jam 436 5


CGB/Scania 36 Bcm/jam 436 23
Patria 36 Bcm/jam 436 6
Convoy 28 Bcm/jam 436 13

D-155 447 Bcm/jam 436 2


D-375 917 Bcm/jam 436 2
D-85ss 149 M^2/jam 436 3

PC-200 84 Ton/jam 436 1


PC-400 (A) 209 Bcm/jam 436 1
PC-400 (B) 209 Bcm/jam 436 1
PC-400 209 Bcm/jam 436 5
ZX-850 261 Bcm/jam 436 1
uat Overbourden

target
Jumlah unit Volume OB hasil

2 24,070 24,000 m^2


24,070 m^2

3 144,072 120,000 Bcm


144,072 Bcm

1 91,037
3 129,038 280,000
1 60,552 280,627 Bcm

1 202,545 280,000
1 77,616 280,161 Bcm

2 308,774 400,000
1 92,056 400,830 Bcm

4 58,075
5 95,432 400,000 Bcm
17 246,799 400,306 Bcm
target
Jumlah unit Volume BB hasil

1 13,601 13,333 M^2


13,601

1 40,208 40,031 Ton


40,208

4 40,363 40,031 Ton


40,363

Jumlah
Jam kerja Realisasi

1,744
2,125 Over Bourden
7,225 400,306

436 Batu Bara


436
878 40,031

325 Striping Ratio


1,308
436 10
436
x 3 meter
Overbourden
muat Overbourden

target
Jumlah unit Volume OB hasil

2 24,070 24,000 m^2


24,070 m^2

3 144,072 120,000 Bcm


144,072 Bcm
Bcm
3 129,038
1 59,926 280,000
1 91,037 280,001 Bcm

1 202,545 280,000
1 77,616 280,161 Bcm

2 308,774 400,000
1 92,056 400,830 Bcm

4 46,392
11 168,239 400,000
17 204,908 419,538 Bcm
Bcm

target
Jumlah unit Volume BB hasil

1 13,601 13,333 M^2


13,601

41,954
1 42,136 42,136
Ton

41,954
4 42,005 42,005
Ton

Jumlah
Jam kerja Realisasi
1,744 Over Bourden
4,686 419,538
7,242

436 Batu Bara


436 41,954
878

325
1,308 Striping Ratio
440 10.0
436

2.5 meter

uat Overbourden

target
Jumlah unit Volume OB
Jumlah unit Volume OB hasil

3 22,733 22,500 m^2


22,733 m^2

112,500 Bcm
2 112,752 112,752 Bcm

2 69,322
1 91,037
1 113,796 337,500
1 57,211 331,366 Bcm

1 202,545 331,366
1 128,910 331,455 Bcm

3 435,992 444,118
1 8,491 444,482 Bcm

5 53,621
7 137,340 444,118
17 253,187 444,147
Bcm

target
Jumlah unit Volume BB hasil

1 18,001 18,000 M^2


18,001

1 44,615 44,412 Ton


44,615
5 44,587 44,412 Ton
44,587

Jumlah
Jam kerja Realisasi

1,735
3,052 Over Bourden
7,412 444,118

401 Batu Bara


436
1,164 44,412

430 Striping Ratio


872
436 10.00
436

uat Overbourden

target
Jumlah unit Volume OB hasil
3 22,733 22,500 m^2
22,733 m^2

112,500 Bcm
2 112,752 112,752 Bcm

2 69,322
1 91,037
1 113,796 337,500 Bcm
1 57,211 331,366 Bcm

1 202,545 331,366 Bcm


1 128,910 331,455 Bcm

3 435,992 444,118 Bcm


1 8,491 444,482 Bcm

5 62,277
11 172,188 444,118 Bcm
17 209,718 444,183 Bcm

target
Jumlah unit Volume BB hasil

1 18,001 18,000 M^2


18,001 M^2

1 44,615 44,412 Ton


44,615 Ton

5 44,587 44,412 Ton


44,587 Ton
Jumlah
Jam kerja Realisasi

2,140
4,796 Over Bourden
7,412 444,118

401 Batu Bara


436
1,164 44,412

430 Striping Ratio


872
436 10.00
436

uat Overbourden

target
Jumlah unit Volume OB hasil

3 17,830 17,333 m^2


17,830 m^2

86,667
1 86,861 86,861 Bcm
Bcm

1 4,176
5 455,184
1 113,796 558,095
1 41,969 615,125 Bcm

2 405,089 558,095
2 153,207 558,296 Bcm

3 512,323 644,762
2 186,794 699,116 Bcm

5 59,395
14 274,680
6 120,336 644,762
13 193,613 648,024 Bcm

target
Jumlah unit Volume BB hasil

1 18,247 18,422 M^2


18,247

1 64,719 64,476 Ton


64,719

5 64,533 64,476 Ton


64,533

Jumlah
Realisasi
Jam kerja Realisasi

2,180
6,104 Over Bourden
2,616
5,668 644,762

872 Batu Bara


872
1,308 64,476

436 Striping Ratio


436
436 10.00
2,180
436

uat Overbourden

target
Jumlah unit Volume OB hasil

3 17,830 17,333 m^2


17,830 m^2

86,667
1 86,861 86,861 Bcm
Bcm

1 4,176
5 455,184
1 113,796 558,095
1 41,969 615,125 Bcm

2 405,089 558,095
2 153,207 558,296 Bcm

3 512,323 644,762
2 186,794 699,116 Bcm

5 48,738
23 360,029
6 93,921 644,762
13 160,373 663,061 Bcm

target
Jumlah unit Volume BB hasil

1 18,247 18,422 M^2


18,247

1 64,719 64,476 Ton


64,719

5 64,533 64,476 Ton


64,533

Jumlah
Realisasi
Jam kerja Realisasi

2,180
10,028 Over Bourden
2,616
5,668 644,762

872 Batu Bara


872
1,308 64,476

436 Striping Ratio


436
436 10.00
2,180
436
UNIT PERFORMANCE

A Land Clearing
Merupakan tahap awal penambangan
Kemampuan Land clearing adalah
Kemampuan D 85 ss adalah sebesar :

Clearing (KB x bf x 60 x E)
(J/F + J/R+Z)

Teoritical
Dozing = 97

J Jarak 15
E Efisiensi kerja 54%
Z Fixed Time 0.05
CT Cicle Time 0.29
F Kecepatan maju 90
R Kecepatan Mundur 190
KB Kapasitas Blade 3.4
Top soil Swell Factor 1.54

Kemampuan D155 2A adalah sebesar :


Dozing 103

J Jarak 20
E Efisiensi kerja 54%
Z Fixed Time 0.05
CT Cicle Time 0.5
F Kecepatan maju 113
R Kecepatan Mundur 137
KB Kapasitas Blade 4.6
Comon soil Swell Factor 1.55

B OVER BOURDEN REMOVAL


Overbourden removal dibagi dalam beberapa tahap
1 Ripping dan Dozing
Kemampuan D 375 adalah sebesar :

Dozing (KB x bf x 60 x E)
(J/F + J/R+Z)

Ripping ( 0.5 ( P x pf )^2 x J x 60 x E )


(J/F + J/R+Z)
Teoritical
Dozing 438

Ripping 442

dimana :
P Penetration depth 1.44
J Jarak ripping 20
jarak dozing 20
E Efisiensi kerja 54%
Z Fixed Time 0.05
CT Cicle Time 0.79
F Kecepatan maju 42
R Kecepatan Mundur 75
KB Kapasitas Blade 18.5
Common soil Swell Factor 1.55

Kemampuan D 155 adalah sebesar :


Dozing 166

Riping = 304

P Penetration depth 0.965


J Jarak ripping 20
Jarak Dozing 20
E Efisiensi kerja 54%
Z Fixed Time 0.05
CT Cicle Time 0.5
F Kecepatan maju 62
R Kecepatan Mundur 137
KB Kapasitas Blade 4.6
Comon soil Swell Factor 1.55
Kemampuan D 85 ss adalah sebesar :
Teoritical
Dozing = 216

J Jarak 15
E Efisiensi kerja 54
Z Fixed Time 0.05
CT Cicle Time 0.29
F Kecepatan maju 90
R Kecepatan Mundur 190
KB Kapasitas Blade 3.4
Common soil Swell Factor 1.55

2 Loading Overbourden
Kemampuan Loading

Loading OB = (KB x bf x 3600 x E)


Ct

Kemampuan PC 400-7 adalah Teoritical

Loading PC 400-7 180

Teoritical
KB Kapasitas Bucket PC 400-7 3.2
E Efiensi kerja 54%
Ct Cicle time 20
Common soil Swell Factor 1.55

Kemampuan ZX 850 adalah

Loading ZX 850 226

KB Kapasitas Bucket HI 850 4.3


E Efiensi kerja 54%
Ct Cicle time 21.5
Common soil Swell Factor 1.55

3 Hauling Overbourden
Kemampuan Hauling untuk unit DT adalah :

Hauling OB (CV x 60 x E)
((n x Ct) + J/V1 + J/V2 + t1 + t2)

Unit Loading ZX 850 CWB520/Convoy


Hauling 28

CV Kapasitas Vessel 20
E Efisiensi Kerja 60%
n banyaknya muatan(bucket) 3
Ct Cicle time alat muat 0.33
J Jarak front ke disposal 1000
V1 Kecepatan DT berangkat 533
V2 Kecepatan DT Balik 633
t1 Waktu untuk Dumping 1
t2 Waktu untuk manuver 2
Common soil Natural Density 2.25
Common soil Swell Factor 1.55
4 Spreading dan dozing

Lihat Kemampuan Ripping dan Dozing

C. Coal Getting

Tahapan untuk Coal Getting adalah sebagai berikut


1 Cleaning
Kemampuan Cleaning Batubara

Cleaning = (KB x bf x 3600 x E)


Ct

Teoritical
Kemampuan Loading PC 200 36

KB Kapasitas Bucket PC 200 0.93


E Efiensi kerja 54%
Ct Cicle time 5

2 Loading
Kemampuan Loading Batubara

Kemampun Loading PC 400-7 238

Teoritical
KB Kapasitas Bucket PC 400-7 3.2
E Efiensi kerja 54%
Ct Cicle time 20
Batubara Swell factor 1.53
Batubara Natural Density 1.30

Loading = (KB x bf x 3600 x E)


Ct

Teoritical
Kemampuan Loading PC 200 73

KB Kapasitas Bucket PC 200 0.93


E Efiensi kerja 54%
Ct Cicle time 19
Batubara Swell factor 1.53
Batubara Natural Density 1.30

3 Hauling

Hauling BB = (CV x 60 x E)
((n x Ct) + J/V1 + J/V2 + t1 + t2)

CWB520/Convoy
Hauling 25

CV Kapasitas Vessel 20
E Efisiensi Kerja 80%
n Banyaknya muatan (bucket) 7
Ct Cicle time alat muat 0.33
J Jarak front ke disposal 4000
V1 Kecepatan DT berangkat 533
V2 Kecepatan DT Balik 633
t1 Waktu untuk Dumping 1
t2 Waktu untuk manuver 2
Batubara Natural Density 1.30
Batubara Swell factor 1.53

D. Suport Work

1 Grading

Grading = V x Ew x 1000 x E
n
Teoritical
Grading 3797.5

Kecepatan 2.5
Effective width 2.17
Effisiensi Kerja 70%
Passes/ trip 1

2 Compacting

3 Water Spaying

4 Pumping
Volume curah hujan

Curah hujan/hari 15 mm/hari 0.00012 M^3/hari

Catchment 18.2 Ha 21.4305 M^3

Kapasitas Pompa 85 Liter/menit 1.42 liter/detik


5.1 M^3/jam

Pompa yang diperlukan untuk mengeringkan dalam waktu 1 jam 4.20


Waktu yang diperlukan untuk mengeringkan oleh 1 pompa 4.20
5 Ligthing

Convers

Kecepatan 38 Km/jam 633

Waktu 20 detik 0.33

Top soil 3.2 Lcm 2.08

Common soil 3.2 Lcm 2.06

Batubara 3.2 Lcm 2.09

Batubara 1.0 Bcm 1.30

Kecepatan 533 m/menit 32

Top soil 1 Bcm 1.54

Common soil 1 Bcm 1.55

Batubara 1 Bcm 1.53

Batubara 1.3 Tonne 1.00

Swell Factor Top soil 1.54


Swell Factor Common soil 1.55

Swell Factor Batubara 1.53


Historical (Data Juli 2005)
149 m^2/jam

10 m
60% %
0.05 menit
0.29 menit
90 m/menit
190 m/menit
40% 3.4 40% m^3
1.54

201 Bcm/jam

10 m
60% %
0.05 menit
0.5 menit
113 m/menit
137 m/menit
40% 4.6 40% m^3
1.55
Historical (Data Juli 2005)
917 Bcm/jam

465 Bcm/jam

90% 1.4 90% m


20 m
10
60% %
0.05 menit
0.79 menit
42 m/menit
75 m/menit
90% 18.5 90% m^3
1.55

447 Bcm/jam

337 Bcm/jam

90% 0.965 90% m


20 m
7
60% %
0.05 menit
0.5 menit
62 m/menit
137 m/menit
90% 4.6 90% m^3
1.55
Historical (Data Juli 2005)
431 Bcm/jam

7 m
60 %
0.05 menit
0.29 menit
90 m/menit
190 m/menit
90% 3.4 90% m^3
1.55

Historical

209 Bcm/jam

Historical (Data Juli 2005)


90% 3.2 90% Lcm
63% %
20 detik
1.55

261 Bcm/jam

90% 4.3 90% Lcm


63% %
21.5 detik
1.55
CGB/Patria/Scania Mercy
36 45 Bcm/jam

30 37 Ton
60% 60% %
6 6 bucket
0.36 0.333 menit
1000 1000 meter
533 533 m/menit
633 633 m/menit
1 1 menit
2 2 menit
2.25 2.25
1.55 1.55

Historical (Data Juli 2005)


42 m^2 /jam

10% 0.93 10% Lcm


63% %
5 detik
275 Ton /jam

Historical (Data Juli 2005)


90% 3.2 90% Lcm
63% %
20 detik
1.53
1.30

Historical (Data Juli 2005)


84 Ton /jam

90% 0.93 90% Lcm


63% %
19 detik
1.53
1.30

CGB/Patria/Scania Mercy
34 42 Ton/jam

30 37 Ton
80% 80% %
13 13 bucket
0.33 0.33 menit
4000 4000 meter
533 533 m/menit
633 633 m/menit
1 1 menit
2 2 menit
1.30 1.30
1.53 1.53

Historical (Data Juli 2005)

km/jam
m
%
6 -

buah
Jam
m/menit

menit

Bcm 3.84 Tonne 1.541667

Bcm 4.64 Tonne 1.551724

Bcm 2.72 Tonne 1.529412

Tonne

Km/jam

Lcm 1.84 Tonne

Lcm 2.25 Tonne

Lcm 1.30 Tonne

Bcm