METHOD OF STATEMENT Document number

(MY MFR SOLUTION ENTERPRISE) MMSE/MOS/2020

PROPOSED REHABILITATION WOKS FOR Revision 0 Status


GROUND SOIL USING PUR DENSE

CLIENT: Date

Page 1/2

DRILLING/INJECTION

1.0 Drilling of hole for installing of packer shall be done using mechanical drill unit with drill bit of
16mm diameter. Depth of the holes range from 1000 mm and up to2500 mm from the asphalt
pavement surface.

2.0 Interval for injection hole shall be 1000 mm and up from 2500mm from centre to centre.

3.0 Depth shall be inspected by measuring the penetration of drill bit.

4.0 Depth shall be inspected by measuring the penetration of drill bit and length of steel tube.

5.0 Installation of 16 mm diameter and 100 mm length packers and mixing head with 1200mm steel
tube.

6.0 Installation of packer shall incorporate the mechanical packer for resin to flow in horizontal and
vertical directions

7.0 Dense PUR part A and part B shall be used with mix ratio of 1:1 by volume. Both parts must be
injected simultaneously to get the proper expansion and set properly.

8.0 Point injection of Dense PUR must be injected at surrounding area of sink hole interval of 2500mm
to create the barrier.

9.0 Area of sink hole injected after surrounding area is already fill with PUR.

10.0 Hydraulic or pneumatic two part pumping unit with proper ratio must be used for densification and
void filling.
METHOD OF STATEMENT Document number

(MY MFR SOLUTION ENTERPRISE) MMSE/MOS/2020

PROPOSED REHABILITATION WOKS FOR Revision 0 Status


GROUND SOIL USING PUR DENSE

CLIENT: Date

Page 2/2

11.0 Injection of PUR shall be started after all connection securely tighten and continuously pumped
up to 800 PSI of pressure.

12.0 Diffused PUR shall be removed after fully set.

13.0 Patching the top layer holes with cement.

WORKING HOUR

This work shall start at 9.00 a.m. and finish at 5.00 p.m. for day shift and start at 10.00 p.m. and finish at 5.00
a.m. for night shift. Working hour and day will based on the regulation and suitability.

LIST OF EQUIPMENT

1. Electrical /Mechanical Heavy Duty Drilling Set


2. PUR Two Part Pumping Machine
3. Vacuum
4. Lorry
5. Trowel
6. Grinder
TE CHNICA L DA TA

Rigid Polyurethane Foam


(RGF)

PRODUCT DESCRIPTION
RPF is a formulated polyol blend, with all the necessary additives and is used in combination with the Isocyanate .This
system is used in the production of rigid polyurethane foam as insulation for domestic, commercial refrigerators and sandwich
panels. Blowing agent used is HCFC 141B and is pre-blended into the system.

TYPICAL PHYSIC AL & C H E M I C AL PR O P E R T IE S


POLYOL ISOCYANATE
Appearance Amber liquid Dark brown liquid
Viscosity (mPa.s at 25°C) 260 ± 50 185 ± 35
Specific gravity (at 25°C) 1.15 ± 0.01 1.24 ± 0.01

RECOMMENDED PROCESSING CONDITION


1) Recommended mixing ratio
SYSTEM PARTS BY WEIGHT
Polyol blend 125
Isocyanate 140

2) Recommended Production
Chemical temperature (°C) 23.0 ± 2.0
Mold temperature (°C) >35.0

Demold time (min) > 30.0

*Depending upon mold temperature, size and iso/polyol mixing ratio

TYPICAL REACTIVITY PROFILE


Parameter Hand mix (20/25°C)
Cream time (s) 40.0 ± 3.0
Gel time (s) 250.0 ± 10.0
Free rise density (kgm³) 27.0 ± 3.0

M Y M F R S OL U TIO N EN TERP RIS E


TECHNICALDATA

RGF
TYPICAL FOAM PROPER TIES FOR OVER-PACKED PANELS
ITEM UNIT TEST METHOD PHYSICAL PROPERTIES
Core density Kgm³ JIS A9513 32.0 ± 3.0
Thermal conductivity Kcal/mh°C JIS A9514 0.0165
Dimensional stability % change (70°C) ASTM D756 < 3.0
Dimensional stability % change (-20°C) ASTM D756 > 3.0
Compression strength Kgfcm² JIS K9514 > 1.5

NOTE: Technical data are provided based on density 30kg/m³ blend - RPF can be customized to various densities based on requirement upon
request.

PACKING
CONTENTS DRUM
Polyol blend (net weight, kg) 210

Isocyanate (net weight, kg) 250

ST ORA GE & HANDLING


It is recommended to keep container tightly closed in a dry, cool (20 - 25°C) and well-ventilated place. Material is slightly
hygroscopic; avoid ingress of moisture by keeping containers properly sealed when not in use. If the above terms and conditions
applied, the product has a shelf life of six (6) months.

W ASTE DISPOSAL
Incineration or waste disposal should be in accordance with all applicable local and national regulations. Kindly check with your
local authorities on proper disposal method.

SAFETY PREC A UTIONS


• Ingestion: Do not induce vomiting. Treat symptomatically and get medical attention immediately.
• Inhalation: Remove from exposure, if there is any difficulty in breathing, medical attention is required.
• Skin contact: Preferably wash with cleanser that contains polyurethane glycol or plenty of water.
• Eye contact: Hold the eye open and immediately flood the eye with plenty of water for at least 15 minutes.

O THER INFORMA TION


The information contained herein was obtained from sources, which we believe to be accurate and reliable. However, it is
provided without any warranty, expressed or implied, regarding its correctness. The information is solely for the customer’s
consideration, investigation and verification. The statements in this information sheet are based on our present technical
knowledge and experience. For this and other reasons, MY MFR SOLUTION ENTERPRISE do not assume responsibility and
expressly disclaim liability for loss, damage or expense arising out of or in any way connected with the handling, storage, use or
disposal of the material.

For detailed information on product safety handling and emergency procedures, kindly consult the Chemical Safety Data Sheet.

Note: Information in this data sheet is, to the best of our knowledge. However, we have no control over the method of application and the amount of care taken
when using this product and therefore, the liability of MY MFR SOLUTION ENTERPRISE is limited to the quality of the delivered material.