Alyousefi Group SDN BHD

Quotation N ° . 21-1004-R2 (Rearing) 21-1005-R2 (Layer)


21-1003-R2 (Egg packing) 22-0027-R2 (Corridor)

Quotation for
Alyousefi Group SDN BHD

l x 47 328 Rearing building


&
3x 45 440 pullet buildings
&
l x Egg packing buiiding
&
l x Linking corridor

Big Dutchman International GmbH


Alyousefi Group SDN BHD

Building specifications

Rearing house

Production length: 70 m
Bays length: 6m
Width (A): 12 m
Available side height (B): 3,2 m
Concrete wall height: 0,5 m (at the customer charge)
Roof slope (C): 20 % (11,31°)

Control room (Front gable): 4 m (w) x 12 m (I); 1 additional bay


Dog house (at beginning of sidewalls): 2 m (w) x 24 m (I) (total: 2 pcs)
Manure room: 3 m (w) x 5,5 m (I)

Number of identical house:

Total production area of the project: 852 m2


Total area of the project (including all rooms & dog houses): 1 000 m2

Pictures are not contractual

Big Dutchman International GmbH 3


Alyousefi Group SDN BHD

Layer house

Production length: 97 m
Bays length: 6m
Width (A): 12 m
Available side height (B): 4m
Concrete wall height: 0,5 m (at the customer charge)
Roof slope (C): 20 % (11,31°)

Control room (Front gable): 4m (w) x 12 m (I); 1 additional bay


Dog house (at beginning of sidewalls): 2 m (w) x 30 m (I) (total: 2 pcs)
Manure room: 3 m (w) x 5,5 m (I)

Production area per house: 1 164m2


Total area per house (including all rooms & dog houses): 1 288 m
2

Number of identical house: 3

Total production area of the project: 3 492 m2


Total area of the project (including all rooms & dog houses): 3 865 m2

Q.

Pictures are not contractual

Big Dutchman International GmbH 4


Alyousefi Group SDN BHD

Egg packing

Production length: 30 m
Available inside width (A): 25m
Bays of: 5m
Available inside flat ceiling height (B): 3m
Concrete wall height: 0,50 m (at the customer charge)
Roof slope (C): 10%

Number of identical houses:

Total area: 750 m2

CARTON
EGG COLLECTION ROOM STORAGE

3
5000 5000

ROOM

ADMIN.
OFFICE

3 00

Pictures are not contractual

Big Dutchman International GmbH 5


Alyousefi Group SDN BHD

Linking corridor between layer houses

Length: 20 m
Bays length: around 4 m
Available inside width (A): 3m
Available inside height (B): 2,5 m (at the minimum side)
Concrete wall height: 0,5 m (at the customer charge)
Roof slope (C): 10%

Number of identical houses: 2

Total area: 120 m2

Linking corridor between layer houses and egg packing

Length: 20 m
Bays length: around 4 m
Available inside width (A): 3m
Available inside height (B): 2,5 m (at the minimum side)
Concrete wall height: 0,5 m (at the customer charge)
Roof slope (C): 10%

Number of identical house:

Total area: 60 m2

Total corridors area: 180 m2

B
C

Pictures are not contractual

Big Dutchman International GmbH 6


Alyousefi Group SDN BHD

-
-
-

-
-
-
-
Alyousefi Group SDN BHD

-
-
-
-
-

-
-
-

-
-
-
-

-
-
-
Alyousefi Group SDN BHD

-
-
-

-
-
-

-
-
-
Alyousefi Group SDN BHD

-
-
-
-

-
-
-
-
-
Alyousefi Group SDN BHD

-
-
-
-
-
-

-
-
-
-
-
-

-
-

-
-
-
Alyousefi Group SDN BHD

-
-

-
-

-
-
-

-
Alyousefi Group SDN BHD

Customized tool box

Hand tools can be sourced locally by the customer; Big Dutchman will provide a list of required tools
upon order confirmation.

If sourcing tools is an issue, customer may purchase a customized tool box containing the hand tools
necessary for safe and efficient erection of the building. Customer is still responsible for procuring
equipment and other machinery needed for uploading the materials and erecting the building.

Engineering drawings and documentation

If complete engineering documentation is required, such as for government permitting process, a non­
refundable payment of 10% of the contract value shal I be paid prior to release of the documents. This
payment shall then be counted towards the value of the down payment upon execution of the
contract.

If basic presentation drawings are required, such as for bank financing, Big Dutchman can provide
these drawings free of charge. However, if greater detail is required than what is provided in the basic
drawings, the release of the drawings will be subject to a fee.

Installation supervision

One (1) Big Dutchman supervisor will be provided for the installation of the house(s). Our supervisor will
manage 15 to 20 skilled workers provided by the customer.

Customer shall provide our supervisor with suitable accommodation, meals and ground transport
during the installation period. In case of any supervision extension requested by the customer, charge
per day will be applied, as well as additional accommodation, transportation and air fare of the
supervisor for this period.

Big Dutchman International GmbH 13


Alyousefi Group SDN BHD

Customer responsibilities

Customer appointed engineer shall be responsible for the foundation design based on BD Buildings
provided loads. Soils investigation report, site surveying works or pegging of markers, soil compaction
test etc. shall also be carried out by customer appointed specialist consultant/engineer.

All civil works on site are to be carried out by customer appointed contractor based on BD Buildings
foundation layout including site clearance, leveling, excavation, stabilization, compaction, drainage,
sewerage etc. and other scope of works not specified by BD Buildings.

Customer shall be responsible for all related fees and approvals from local government authorities
including submission of drawings for construction with endorsement.

All insurance coverage related to scope of works and all activities carried out on site shall be
undertaken by the customer.

Customer shall be responsible for custom clearance of building materials, duties and transportation of
goods to site.

Manuscopic, forklift, cranes, scaffoldings, tools and other machinery and equipment necessary to
unload materials as well as carry out installation works on site shall be prepared by the customer.
BD Buildings will be providing the relevant tool list necessary upon order confirmation.

The site shall be equipped with temporary electricity supply, lighting and water. The customer is
required to prepare proper access road including covered storage facilities on site for the building
materials.

Big Dutchman International GmbH 14


Alyousefi Group SDN BHD

Quotation summary

House
Pos no. Description Quantity Total price
1.1.1 Rearing 70+4 m x 12 m x 3,2 m house 1
1.1.2 Layer 97+4 m x 12 m x 4 m house 3
1.1.3 Egg packing: 30 m x 25 m x 3 m 1
1.1.4 Corridor: 20 m x 3 m x 2,5 m 3
Sum Ex-works
Price after discount 618 000 €

Services
Pos no. Description Quantity Total price
1.2.1 Freight and handling 24 126 400
1.2.2 Supervisor - 30 500
1.2.3 Tool box 1 5 000
Sum Services 161 900

Quotation CFR Kuala Lumpur Terms 779 900 €

of payment: By UC

Terms of delivery: CFR Kuala Lumpur


This offer represents roughly: 21 containers 40'HC from Mersin port in Turkey
3 containers 40'OT from Mersin port in Turkey

Customer will be responsible for: Unloading the trucks/containers and provides a forklift and
manpower Not included in this offer:

- All civil and concrete work


- Commissioning and Import Duties
- Transport from harbor to building site
- Unloading containers
- Conducts and supply of main power and main water to and inside the houses
- Crane, generators, welders, dumpers, ladders and scaffoldings etc. . . to be supplied by the customer
- Diesel, water and electricity should be provided by the customer
- Everything which is not specified or mentioned in this quotation