Download as pdf or txt
Download as pdf or txt
You are on page 1of 110

Project: DS 208/1

‫ربط مشاريع المطورين العاجلة على نظام الصرف الصحي التابع‬


‫ منطقة بر دبي‬- ‫لبلدية دبي‬
Interconnecting Urgent Development to DM
Sewerage System

Bur Dubai Area

Tender Documents

Volume 4 Part-2
Project Drawings

December 2022

Employer:
Sewerage and Recycled water Projects Department
P.O. Box 67, Dubai, UAE
Tel: 04-8815555
Fax: 04-2246666.

Consultant

ITALCONSULT ⚫ P.O. Box 23461 ⚫ Dubai ⚫ Tel: 04-3330605 ⚫ Fax: 04-2952020


DS-208/1 Volume 4 Part-2

DUBAI MUNICIPALITY
SEWERAGE AND RECYCLED WATER PROJECTS DEPARTMENT
PROJECT: DS 208/1

INTERCONNECTING URGENT DEVELOPMENTS TO DM SEWERAGE SYSTEM

BUR DUBAI AREA

TENDER DOCUMENTS

GENERAL INDEX

VOLUME 1 : TENDER AND CONTRACT CONDITIONS

VOLUME 2 : PROJECT SPECIFICATIONS

PART 1: STANDARD SPECIFICATIONS

PART 2: PARTICULAR SPECIFICATION

VOLUME 3 : BILL OF QUANTITIES

VOLUME 4 : DRAWINGS

PART 1: STANDARD DRAWINGS

PART 2: PROJECT DRAWINGS

VOLUME 5: INFORMATION TO TENDERER

December 2022 Page 1 of 1


DUBAI MUNICIPALITY

INTERCONNECTING URGENT DEVELOPMENTS


TO DM SEWERAGE SYSTEM

REVISED TENDER DOCUMENTS


VOLUME-IV (PART-II) DRAWINGS
CONTRACT DS208/1
BUR DUBAI AREA

DECEMBER 2022

P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198


CONTRACT DS208/1
LISIT OF DRAWINGS

DRAWING No. DRAWING TITLE Rev. DRAWING No. DRAWING TITLE Rev.

GENERAL CIVIL

DS208-ITL-PSSN-G-100 COVER SHEET T4 DS208-ITL-PSSN-CI-301 SITE LAYOUT (SHEET 01) T5

DS208-ITL-PSSN-G-101 LIST OF DRAWINGS (SHEET 1 OF 2) T7 DS208-ITL-PSSN-CI-302 NOT USED

DS208-ITL-PSSN-G-102 LIST OF DRAWINGS (SHEET 2 OF 2) T7 DS208-ITL-PSSN-CI-303 NOT USED

DS208-ITL-PSSN-G-103 PROJECT LOCATION PLAN T3 DS208-ITL-PSSN-CI-304 NOT USED

DS208-ITL-PSSN-G-104 LINK SEWER LOCATION PLAN T3 DS208-ITL-PSSN-CI-401 INTERFACE LAYOUT (SHEET 01) T4

DS208-ITL-PSSN-G-105 GENERAL NOTES AND ABBREVIATION T4 DS208-ITL-PSSN-CI-501 SPECIAL SEWER MANHOLE (SHEET 01) T2

DS208-ITL-PSSN-G-106 PROJECT GENERAL LAYOUT PLAN T4 DS208-ITL-PSSN-CI-502 SPECIAL MANHOLE TYPE-C1 (SHEET 02) T2

DS208-ITL-PSSN-CI-503 SPECIAL MANHOLE TYPE-D1 (SHEET 03) T2


CIVIL
DS208-ITL-PSSN-CI-504 SPECIAL MANHOLE TYPE-D2 (SHEET 04) T2

DS208-ITL-PSSN-CI-100 PROPOSED SEWERAGE KEY PLAN T3 DS208-ITL-PSSN-CI-505 SPECIAL MANHOLE TYPE-S1 (SHEET 05) T2

DS208-ITL-PSSN-CI-101 PROPOSED SEWERAGE LAYOUT (SHEET 01) T5 DS208-ITL-PSSN-CI-506 SPECIAL MANHOLE TYPE-S2 (SHEET 06) T2

DS208-ITL-PSSN-CI-102 PROPOSED SEWERAGE LAYOUT (SHEET 02) T4 DS208-ITL-PSSN-CI-507 SPECIAL MANHOLE TYPE-T1 (SHEET 07) T3

DS208-ITL-PSSN-CI-103 PROPOSED SEWERAGE LAYOUT (SHEET 03) T4 DS208-ITL-PSSN-CI-508 SPECIAL MANHOLE TYPE-T2 (SHEET 08) T3

DS208-ITL-PSSN-CI-104 PROPOSED SEWERAGE LAYOUT (SHEET 04) T3 DS208-ITL-PSSN-CI-509 DETAIL FOR VORTEX DROP SHAFT MH-SN-63 (SHEET 1 OF 2) T1

DS208-ITL-PSSN-CI-105 NOT USED DS208-ITL-PSSN-CI-510 DETAIL FOR VORTEX DROP SHAFT MH-SN-63 (SHEET 2 OF 2) T1

DS208-ITL-PSSN-CI-106 PROPOSED SEWERAGE LAYOUT (SHEET 06) T3 DS208-ITL-PSSN-CI-511 NOT USED

DS208-ITL-PSSN-CI-107 PROPOSED SEWERAGE LAYOUT (SHEET 07) T3 DS208-ITL-PSSN-CI-512 STOP LOG DETAIL MH-SN-76 T1

DS208-ITL-PSSN-CI-108 NOT USED


MECHANICAL
DS208-ITL-PSSN-CI-109 PROPOSED SEWERAGE LAYOUT (SHEET 09) T3

DS208-ITL-PSSN-CI-110 PROPOSED SEWERAGE LAYOUT (SHEET 10) T3 DS208-ITL-PSSN-ME-100 GENERAL NOTES AND LEGENDS T1

DS208-ITL-PSSN-CI-111 PROPOSED SEWERAGE LAYOUT (SHEET 11) T3 DS208-ITL-PSSN-ME-101 LAYOUT PLAN FOR SITE WORKS AT PS-SN PLOT T1

DS208-ITL-PSSN-CI-112 PROPOSED SEWERAGE LAYOUT (SHEET 12) T3 DS208-ITL-PSSN-ME-102 LAYOUT PLAN FOR SITE WORKS AT PS-SN PLOT T1

DS208-ITL-PSSN-CI-113 PROPOSED SEWERAGE LAYOUT (SHEET 13) T4 DS208-ITL-PSSN-ME-201 PROPOSED LPS-SN INTEGRATED LAYOUT PLAN (SHEET 01) T3

DS208-ITL-PSSN-CI-114 NOT USED DS208-ITL-PSSN-ME-202 LIFTING PUMP STATION LP-SN GENERAL LAYOUT PLAN T3

DS208-ITL-PSSN-CI-115 PROPOSED SEWERAGE LAYOUT (SHEET 15) T3 DS208-ITL-PSSN-ME-203 LIFTING PUMP STATION LPS-SN WET WELL TOP PLAN T1

DS208-ITL-PSSN-CI-115A PROPOSED SEWERAGE LAYOUT (SHEET 15A) T3 DS208-ITL-PSSN-ME-204 LIFTING PUMP STATION LPS-SN PLAN AT-22.00 LEVEL T1

DS208-ITL-PSSN-CI-115B PROPOSED SEWERAGE LAYOUT (SHEET 15B) T3 DS208-ITL-PSSN-ME-301 LIFTING PUMP STATION LPS-SN SECTION A-A T2

DS208-ITL-PSSN-CI-116 PROPOSED SEWERAGE LAYOUT (SHEET 16) T4 DS208-ITL-PSSN-ME-302 LIFTING PUMP STATION LPS-SN SECTION B-B T2

DS208-ITL-PSSN-CI-117 PROPOSED SEWERAGE LAYOUT (SHEET 17) T3 DS208-ITL-PSSN-ME-401 LIFTING PUMP STATION LPS-SN ODOR CONTROL SCHEMATIC T3 DRAWING STATUS:-
T7 26-12-22 MS AM DA REVISED TENDER DRAWING
DS208-ITL-PSSN-CI-118 PROPOSED SEWERAGE LAYOUT (SHEET 18) T3 DS208-ITL-PSSN-ME-501 LIFTING PUMP STATION LPS-SN FIRE FIGHTING LAYOUT PLAN T3
T6 15-11-22 MS AM DA REVISED TENDER DRAWING
T5 07-11-22 MS AM DA REVISED TENDER DRAWING
DS208-ITL-PSSN-CI-119 PROPOSED SEWERAGE LAYOUT (SHEET 19) T3
ELECTRICAL T4 20-10-22 MS AM DA REVISED TENDER DRAWING

DS208-ITL-PSSN-CI-120 PROPOSED SEWERAGE LAYOUT (SHEET 20) T4 T3 03-10-22 MS AM DA REVISED TENDER DRAWING
T2 16-09-22 MS AM DA REVISED TENDER DRAWING
DS208-ITL-PSSN-CI-201 PROPOSED PROFILE (SHEET 01) T4 DS208-ITL-PSSN-EL-101 PROPOSED LIFTING PUMP STATION LPS-SN-GENERAL LEGEND AND NOTES T4 T1 29-08-22 MS AM DA REVISED TENDER DRAWING
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
DS208-ITL-PSSN-CI-202 PROPOSED PROFILE (SHEET 02) T4 DS208-ITL-PSSN-EL-102 PROPOSED LIFTING PUMP STATION LPS-SN-SINGLE LINE DIAGRAM T4 REV. DATE DR'N CH'D AP'D DESCRIPTION

DS208-ITL-PSSN-CI-203 PROPOSED PROFILE (SHEET 03) T3 DS208-ITL-PSSN-EL-103 PROPOSED LIFTING PUMP STATION LPS-SN-ELECTRICAL LOAD SCHEDULE T4 TENDER DRAWING
Client:
DS208-ITL-PSSN-CI-204 PROPOSED PROFILE (SHEET 04) T3 DS208-ITL-PSSN-EL-201 PROPOSED LIFTING PUMP STATION LPS-SN-LIGHTING LAYOUT T5

DS208-ITL-PSSN-CI-205 PROPOSED PROFILE (SHEET 05) T3 DS208-ITL-PSSN-EL-202 PROPOSED LIFTING PUMP STATION LPS-SN-LIGHTING DETAIL T4

DS208-ITL-PSSN-CI-206 PROPOSED PROFILE (SHEET 06) T3 DS208-ITL-PSSN-EL-301 PROPOSED LIFTING PUMP STATION LPS-SN-LIGHTNING PROTECTION LAYOUT T5

DS208-ITL-PSSN-CI-207 PROPOSED PROFILE (SHEET 07) T3 DS208-ITL-PSSN-EL-302 PROPOSED LIFTING PUMP STATION LPS-SN-LIGHTNING PROTECTION DETAIL T4

DS208-ITL-PSSN-CI-208 PROPOSED PROFILE (SHEET 08) DS208-ITL-PSSN-EL-401 PROPOSED LIFTING PUMP STATION LPS-SN-CABLE ROUTE LAYOUT T5

DS208-ITL-PSSN-CI-209 PROPOSED PROFILE (SHEET 09) DS208-ITL-PSSN-EL-402 PROPOSED LIFTING PUMP STATION LPS-SN-CABLE LAYING SECTION DETAIL T4
PROPOSED LIFTING PUMP STATION LPS-Sn - TRANSFORMER BUILDING AND LV PANEL ROOM Consultant:
DS208-ITL-PSSN-CI-210 PROPOSED PROFILE (SHEET 10) T3 DS208-ITL-PSSN-EL-501 ELECTRICAL SYSTEMS LAYOUT T3
PROPOSED LIFTING PUMP STATION LPS-Sn - TRANSFORMER BUILDING AND LV PANEL ROOM
DS208-ITL-PSSN-CI-211 PROPOSED PROFILE (SHEET 11) T3 DS208-ITL-PSSN-EL-502 ELECTRICAL CONDUIT LAYOUT T3
PROPOSED LIFTING PUMP STATION LPS-Sn - TRANSFORMER BUILDING AND LV PANEL ROOM
DS208-ITL-PSSN-CI-212 PROPOSED PROFILE (SHEET 12) T3 DS208-ITL-PSSN-EL-503 GROUND FLOOR FIRE ALARM & EMERGENCY LIGHTING SYSTEMS T3 P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
Project Name: Project Number:
DS208-ITL-PSSN-CI-213 NOT USED DS208-ITL-PSSN-EL-601 NOT USED
INTERCONNECTING URGENT
DS208-ITL-PSSN-CI-214 PROPOSED PROFILE (SHEET 14) T3 DS208-ITL-PSSN-EL-602 NOT USED DEVELOPMENTS TO DM SEWERAGE DS-208/1
DS208-ITL-PSSN-CI-215 NOT USED T3 DS208-ITL-PSSN-EL-603 NOT USED SYSTEM
Drawing Title:
DS208-ITL-PSSN-CI-216 NOT USED T3

BUR DUBAI AREA


LIST OF DRAWINGS
Drawing Number: Date: Sheet: Scale: Rev

DS208-ITL-PSSN - G -101 04-07-2022 1 of 2 NTS T7


CONTRACT DS208/1
LISIT OF DRAWING

DRAWING No. DRAWING TITLE Rev. DRAWING No. DRAWING TITLE Rev.

INSTRUMENT CONTROL AUTOMATION (ICA)

DS208-ITL-PSSN-ICA-101 PROPOSED LIFTING PUMP STATION LPS-SN-PROCESS & INSTRUMENTATION DIAGRAM T2

DS208-ITL-PSSN-ICA-102 PROPOSED LIFTING PUMP STATION LPS-SN-PROCESS & INSTRUMENTATION DIAGRAM T2

DS208-ITL-PSSN-ICA-103 PROPOSED LIFTING PUMP STATION LPS - Sn - TYPICAL P & ID FOR ODOR CONTROL UNIT T1

DS208-ITL-PSSN-ICA-104 PROPOSED LIFTING PUMP STATION LPS - Sn - CONTROL SYSTEM ARCHITECTURE T1

DS208-ITL-PSSN-ICA-105 PROPOSED LIFTING PUMP STATION LPS - Sn - INPUT OUTPUT LIST (1 OF 5) T1

DS208-ITL-PSSN-ICA-106 PROPOSED LIFTING PUMP STATION LPS - Sn - INPUT OUTPUT LIST (2 OF 5) T1

DS208-ITL-PSSN-ICA-107 PROPOSED LIFTING PUMP STATION LPS - Sn - INPUT OUTPUT LIST (3 OF 5) T1

DS208-ITL-PSSN-ICA-108 PROPOSED LIFTING PUMP STATION LPS - Sn - INPUT OUTPUT LIST (4 OF 5) T1

DS208-ITL-PSSN-ICA-109 PROPOSED LIFTING PUMP STATION LPS - Sn - INPUT OUTPUT LIST (5 OF 5) T1

ARCHITECTURAL

DS208-ITL-PSSN-AR-201 NOT USED

DS208-ITL-PSSN-AR-202 NOT USED

DS208-ITL-PSSN-AR-203 NOT USED


PROPOSED LIFTING PUMP STATION TRANSFORMER MV & LV PANEL ROOM
DS208-ITL-PSSN-AR-301 T3
LAYOUT PLAN & ELEVATION
PROPOSED LIFTING PUMP STATION TRANSFORMER MV & LV PANEL ROOM
DS208-ITL-PSSN-AR-302 T3
ROOF LAYOUT PLAN & ELEVATION
DS208-ITL-PSSN-AR-303 PROPOSED LIFTING PUMP STATION TRANSFORMER MV & LV PANEL
ROOM LONGITUDINAL AND CROSS SECTION T3

DS208-ITL-PSSN-AR-304 PROPOSED LIFTING PUMP STATION TRANSFORMER MV & LV PANEL ROOM


ELEVATIONS AND LONGITUDINAL SECTION T0

DS208-ITL-PSSN-AR-305 PROPOSED LIFTING PUMP STATION TRANSFORMER MV & LV PANEL ROOM


CROSS SECTION AND DETAILS T0

STRUCTURE

DS208-ITL-PSSN-ST-100 GENERAL NOTES FOR STRUCTURES T1

DS208-ITL-PSSN-ST-201 CONSTRUCTION SHAFT FOR NDM WORKS T1

DS208-ITL-PSSN-ST-202 CONSTRUCTION SHAFT FOR LIFTING PUMP STATION LPS-SN T1

DS208-ITL-PSSN-ST-301 PROPOSED LIFTING PUMP STATION


LIFTING CHAMBER REINFORCEMENT (SHEET 1 OF 5) T1

DS208-ITL-PSSN-ST-302 PROPOSED LIFTING PUMP STATION


LIFTING CHAMBER REINFORCEMENT (SHEET 2 OF 5) T1

DS208-ITL-PSSN-ST-303 PROPOSED LIFTING PUMP STATION


LIFTING CHAMBER REINFORCEMENT (SHEET 3 OF 5) T1

DS208-ITL-PSSN-ST-304 PROPOSED LIFTING PUMP STATION


LIFTING CHAMBER REINFORCEMENT (SHEET 4 OF 5) T1

DS208-ITL-PSSN-ST-305 PROPOSED LIFTING PUMP STATION


LIFTING CHAMBER REINFORCEMENT (SHEET 5 OF 5) T1 DRAWING STATUS:-
T7 26-12-22 MS AM DA REVISED TENDER DRAWING
DS208-ITL-PSSN-ST-401
T1 SPECIAL MANHOLE TYPE-C1 STRUCTURAL DETAIL T1
T6 15-11-22 MS AM DA REVISED TENDER DRAWING
T5 07-11-22 MS AM DA REVISED TENDER DRAWING
DS208-ITL-PSSN-ST-402 SPECIAL MANHOLE TYPE-D1 STRUCTURAL DETAIL T1
T4 20-10-22 MS AM DA REVISED TENDER DRAWING

DS208-ITL-PSSN-ST-403 SPECIAL MANHOLE TYPE-D2 STRUCTURAL DETAIL T1 T3 03-10-22 MS AM DA REVISED TENDER DRAWING
T2 16-09-22 MS AM DA REVISED TENDER DRAWING
DS208-ITL-PSSN-ST-404 SPECIAL MANHOLE TYPE-S1 STRUCTURAL DETAIL T1 T1 29-08-22 MS AM DA REVISED TENDER DRAWING
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
DS208-ITL-PSSN-ST-405 SPECIAL MANHOLE TYPE-S2 STRUCTURAL DETAIL T1 REV. DATE DR'N CH'D AP'D DESCRIPTION

DS208-ITL-PSSN-ST-406 SPECIAL MANHOLE TYPE-T1 STRUCTURAL DETAIL T1 TENDER DRAWING


Client:
DS208-ITL-PSSN-ST-407 SPECIAL MANHOLE TYPE-T2 STRUCTURAL DETAIL T1

DS208-ITL-PSSN-ST-408 NOT USED

DS208-ITL-PSSN-ST-409 NOT USED

DS208-ITL-PSSN-ST-501 NOT USED


PROPOSED LIFTING PUMP STATION
DS208-ITL-PSSN-ST-601 TRANSFORMER & LV PANEL ROOM FOUNDATION & ROOF FARMING PLAN T3
PROPOSED LIFTING PUMP STATION
DS208-ITL-PSSN-ST-602 TRANSFORMER & LV PANEL ROOM REINFORCEMENT DETAILS (1) T3
PROPOSED LIFTING PUMP STATION Consultant:
DS208-ITL-PSSN-ST-603 TRANSFORMER & LV PANEL ROOM REINFORCEMENT DETAILS (2) T3
PROPOSED LIFTING PUMP STATION
DS208-ITL-PSSN-ST-604 T3
TRANSFORMER & LV PANEL ROOM REINFORCEMENT DETAILS (3)
PROPOSED LIFTING PUMP STATION
DS208-ITL-PSSN-ST-605 T3
TRANSFORMER & LV PANEL ROOM REINFORCEMENT DETAILS (4) P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
Project Name: Project Number:
INTERCONNECTING URGENT
DEVELOPMENTS TO DM SEWERAGE DS-208/1
SYSTEM
Drawing Title:

BURDUBAI AREA
LIST OF DRAWINGS
Drawing Number: Date: Sheet: Scale: Rev

DS208-ITL-PSSN - G -102 04-07-2022 2 of 2 NTS T7


KEY PLAN

DEIRA
BUR
DUBAI

PROJECT LOCATION
JUMEIRAH
DEIRA

JEBEL ALI
321
AL MINAA

DUBAI AIRPORT

A D
RO
316

A
IN
AL RAFFA

M
AL
317
AL MANKHOOL

BUR DUBAI AREA


BUR DUBAI PROJECT LOCATION

322
AL HUDAIBA

36TH
SH
.RA

ST.
323
SH
AL JAFILIYA ID
RO
A D

34TH
324

ST.
AL KIFAF

d
Zay ed R
Shk.

325
ZAABEEL FIRST

332
334
JUMEIRA FIRST
333 AL SATWA 336
TRADE CENTER
2n

Rd
AL BADAA d
SECOND Za

al
be

qb
326
el
335 sta R
d. AL JADDAF DRAWING STATUS:-
Mu

TRADE CENTER FIRST


Al

T3 26-12-22 MS AM DA REVISED TENDER DRAWING


T2 16-09-22 MS AM DA REVISED TENDER DRAWING
T1 29-08-22 MS AM DA REVISED TENDER DRAWING
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
bal Rd

REV. DATE DR'N CH'D AP'D DESCRIPTION

TENDER DRAWING
Al Mustaq

Client:

337
ZAABEEL SECOND
342
JUMEIRA SECOND

R d
h ail Consultant:
343 Fin lK
AL WASL .C A
en
tre
Rd
345
. P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
Project Name: Project Number:
BURJ KHALIFA
INTERCONNECTING URGENT
DEVELOPMENTS TO DM SEWERAGE DS-208/1
SYSTEM
Drawing Title:

BUR DUBAI AREA


JUMEIRA THIRD PROJECT LOCATION PLAN
Rd
h ail Drawing Number: Date: Sheet: Scale: Rev

A lK Ras al K
hor Rd.
DS208-ITL-PSSN-G-103 04-07-2022 01 OF 01 NTS T3
321
LEGEND:
AL MINAA
EXISTING SUBSIDIARY PUMP STATION
TO BE DECOMMISSIONED

EXISTING MAIN PUMPING STATION

PROPOSED LIFTING STATION LPS-SN(DS208)


DUBAI AIRPORT
PROPOSED LINK SEWER (DS 208)

AD
316

RO
AL RAFFA

A
IN
CC-SN-01

M
(STUB-MARITIME CITY)

AL
317
AL MANKHOOL
BUR DUBAI AREA
BUR DUBAI PROJECT LOCATION

322
AL HUDAIBA

36TH
SH
.RA

ST.
323
SH
AL JAFILIYA ID
RO
PS-S23 AD

34TH
324

ST.
AL KIFAF

(STUB PS-E20) yed Rd


k . Z a
Sh
(STUB PS-Z1)
325
ZAABEEL FIRST

332
334
JUMEIRA FIRST
333 AL SATWA 336
TRADE CENTER
2n

d
AL BADAA d

lR
SECOND Za

ba
be 326
el

q
sta
335 R AL JADDAF
d.

Mu
TRADE CENTER FIRST

Al
DRAWING STATUS:-
bal Rd

T3 26-12-22 MS AM DA REVISED TENDER DRAWING


Al Mustaq

T2 16-09-22 MS AM DA REVISED TENDER DRAWING


T1 29-08-22 MS AM DA REVISED TENDER DRAWING
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
REV. DATE DR'N CH'D AP'D DESCRIPTION
337
ZAABEEL SECOND
TENDER DRAWING
Client:
342
JUMEIRA SECOND (STUB-RL) d
i l R
a
Kh
Fin Al
.C
343 en MH-SN1-01
AL WASL tre
Rd (STUB-LS-E)
. Consultant:

345
BURJ KHALIFA
P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
Project Name: Project Number:
INTERCONNECTING URGENT
DEVELOPMENTS TO DM SEWERAGE DS-208/1
SYSTEM
Drawing Title:

JUMEIRA THIRD PS "SN" BUR DUBAI AREA


l Rd (STUB-PS-V) LINK SEWERS LOCATION PLAN
a i (STUB-BD)
Kh Ras al K
Al hor Rd. Drawing Number: Date: Sheet: Scale: Rev

DS208-ITL-PSSN-G-104 04-07-2022 01 OF 01 NTS T3


GENERAL NOTES: LEGEND:
PROPOSED
1 ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE SPECIFIED.
PROPOSED SEWER LINE
2 ALL LEVELS ARE BASED ON DUBAI TRANSVERSE MERCATOR (DLTM). PROPOSED MANHOLE

3 THE CONTRACTOR SHALL VERIFY THE ACTUAL LOCATION, ELEVATION, DIMENSIONS AND CONDITION OF PROPOSED MANHOLE W/ BACKDROP LEVEL
(BD.IL)
ALL POINTS OF CONNECTION TO EXISTING OR NEW IMPROVEMENTS OR FACILITIES. PERFORM SEWER LINE TO BE ABANDONED
VERIFICATIONS AS REQUIRED TO AVOID DELAY. ACTUAL POINT OF CONNECTION ELEVATIONS AND
SUBSIDIARY SEWAGE PUMP STATION TO BE ABANDONED
COORDINATES SHALL BE NOTED IN THE AS-BUILT DRAWINGS.
TRENCHLESS/NON-DESTRUCTIVE METHOD (NDM) PIPELINE CONSTRUCTION
4 ALL PIPELINE WITH DEPTH TO PIPE INVERT EQUAL TO OR GREATER THEN 8.0mm SHALL BE CONSTRUCT BY NDM
STUB-OUT/PLUG FOR FUTURE CONNECTION
5 ALL THE SHOWN PIPE DIAMETERS, FOR GRP JACKING PIPE ARE WITH INTERNAL DIAMETER AND uPVC PIPES ARE WITH INDICATIVE LIMITS OF NDM CONSTRUCTION SHAFT
OUTER DIAMETERS.

6 THE PROPOSED PIPES OF DIAMETER < = 315mm WILL BE uPVC MATERIAL, AND ALL ABOVE 315 DIA. WILL BE GRP FOR OPEN
CUT CONSTRUCTION. FOR DEEP NDM LINK SEWERS REINFORCED CONCRETE ENCASED GRP PIPE MATERIAL SHALL BE USED AS SPECIFIED. EXISTING
SEW SEW
EXISTING SEWER LINE
7 THE SERVICES (EXISTING UTILITIES) INFORMATION SHOWN ON THE DRAWINGS ARE INDICATIVE ONLY AND SEW SEW
EXISTING MANHOLE
MAY NOT BE COMPREHENSIVE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND AVOIDING SEW SEW EXISTING HOUSE CONNECTION CHAMBER
OR RE-LOCATING ALL SERVICES PRIOR TO EXCAVATION. SEW SEW
EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
8 THE DEEP LINK SEWERS SHALL BE CONSTRUCTED BY MEANS OF MICRO TUNNELLING / PIPEJACKING EXCEPT SEW
EXISTING MANHOLE W/ FUTURE CONNECTION
AT CERTAIN LOCATIONS FOR SITE PIPING AT EXISTING PUMPING STATION AND OTHER FACILITY SITES IN SEW
EXISTING MANHOLE W/ FC ON BD (FC)
ORDER TO MAKE CONNECTION TO THE EXISTING SEWAGE COLLECTION SYSTEM, AND/OR AS APPROVED SEW
EXISTING PRIVATE INSPECTION CHAMBER
BY THE ENGINEER. EXISTING SOAKAWAY

9 FINAL LOCATION OF THE MANHOLE SHAFTS SHALL BE FINALIZED AS PER CONSTRUCTION NOC TO BE OBTAINED BY
SEW SEW
EXISTING ABANDONED LINE

CONTRACTOR AND AS PER ENGINEER's APPROVAL.


SWD SWD
EXISTING STORM WATER LINE

10 FOR STANDARD MANHOLE & PIPE BEDDING DETAILS REFER DM LATEST STANDARD DRAWINGS, AND STANDARD
WD WD
EXISTING WATER LINE
SPECIFICATIONS. IRR IRR
EXISTING IRRIGATION LINE
EHV EHV
EXISTING EHV LINE
11 REFER TO NOC DRAWINGS FOR EXISTING UTILITIES. CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING
HV HV
EXISTING HV LINE
THE EXISTING UTILITIES AT SITE.
ETI ETI
EXISTING ETISALAT LINE
12 DROP IN PIPELINES INVERT AT MANHOLE(S) EQUAL TO 800 MM OR LESSER SHALL BE ADJUSTED USING UNIFORM ITS ITS
EXISTING ITS LINE
SLOPED BENCHING WITHIN THE MANHOLE STRUCTURE. DU DU
EXISTING DU LINE

13 THE CONTRACTOR SHALL SURVEY THE AREA / ROUTE OE THE PIPE LINES. THE FINAL LOCATION, COVER
EMP EMP
EXISTING EMPOWER LINE

AND INVERT LEVELS OF ALL PROPOSED MANHOLES SHALL BE PREPARED BY THE CONTRACTOR
MET MET
EXISTING RAIL AGENCY

FOR APPROVAL BY THE ENGINEER PRIOR TO CONSTRUCTION.

14 CONTRACTOR SHALL OBTAIN ALL CONSTRUCTION PERMITS / NOC’S FROM ALL CONCERNED
AUTHORITIES AND SUBMIT TO ENGINEER PRIOR TO EXECUTION AT SITE.
GENERAL
15 FOR CONNECTION OF PROPOSED WORKS WITH EXISTING STRUCTURE OR DIVERSION/BYPASS OF FLOWS CONTRACTOR
RIGHT OF WAY (R.O.W)
SHALL SUBMIT THE PROPOSAL /METHOD STATEMENT TO CARRY OUT SUCH WORK FOR THE ENGINEERS APPROVAL.
EXISTING ROADS
16 ABANDONMENT AND DIVERSION OE EXISTING SEWERS FLOWS SHALL REQUIRE CLOSE COORDINATION WITH
ENGINEER AND DM OPERATION’S DEPARTMENT. IF ANY SHUT DOWN OR TEMPORARY WORKS REQUIRED
BY CONTRACTOR, PRIOR NOTICE AND APPROVAL SHALL BE OBTAINED TO UNDERTAKE SUCH WORK AT SITE.
DUBAI BASE(PLANNING)
17 MINIMUM CLEARANCE AND PROTECTION OF EXISTING/PROPOSED SERVICES IS REQUIRED AS PER AUTHORITIES APPROVAL.

18 THE COORDINATES SHOWN IN THE NETWORK PLAN ARE ONLY INDICATIVE. CONTRACTOR TO GET THE FINAL
COORDINATES FROM THE ELECTRONIC COPY OF THE CONSTRUCTION DRAWINGS AND OBTAIN APPROVAL
FROM THE ENGINEER PRIOR TO START OF WORKS.
19 PROPOSED COVER LEVELS SHOWN IN THE LAYOUTS AND PROFILES ARE BASED ON THE FINISHED ROAD
LEVELS CONTRACTOR SHALL VERIFY THE COVER LEVEL AS PER ACTUAL SITE CONDITIONS FOR
ABBREVIATION
PREPARATION OF SHOP DRAWINGS AND OBTAIN ALL NECESSARY APPROVALS. DRAWING STATUS:-
AV AIR RELIEF VALVE M METER
20 THE INVERT LEVELS SHOWN IN THE LAYOUTS AND PROFILES ARE AT THE CENTER OF THE MANHOLE.
CL COVER LEVEL MM MILLIMETERS
T4 26-12-22 MS AM DA REVISED TENDER DRAWING
21 CONTRACTOR SHALL CARRY SURVEY AND TRIAL TRENCHES TO IDENTIFY THE EXACT LOCATION OF EXISTING
UTILITIES AND INFORM ENGINEER IF ANY CONFLICTS OR DISCREPANCIES WITH AS-BUILT DATA PRIOR TO START C/C CENTER TO CENTER m² SQUARE METER T3 03-10-22 MS AM DA REVISED TENDER DRAWING
T2 16-09-22 MS AM DA REVISED TENDER DRAWING
OF WORKS, TO PROVIDE NECESSARY TEMPORARY AND PERMANENT PROTECTIONS AS REQUIRED BY MAX MAXIMUM
CC CONNECTION CHAMBER T1 29-08-22 MS AM DA REVISED TENDER DRAWING
DIFFERENT AUTHORITIES. T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
DN NOMINAL DIA MIN MINIMUM REV. DATE DR'N CH'D AP'D DESCRIPTION
22 THE EXISTING GROUND LEVEL SHOWN IN THE PROFILE FOR INFORMATION ONLY AND GRADING LEVELS
SHOWN IN THE PROFILE ARE INDICATIVE CONTRACTOR SHALL REFER TO AS-BUILT GRADING PROFILE TO DC DISCHARGE CHAMBER N NORTH TENDER DRAWING
PREPARE SHOP DRAWINGS AND SUBMIT FOR APPROVAL. Client:
DWG DRAWING NTS NOT TO SCALE
23 ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH THE AUTHORITY STANDARDS AND
SPECIFICATIONS AND AS DIRECTED BY ENGINEER AT SITE. E EAST, ELECTRIC NON-DESTRUCTIVE/TRENCHLESS
NDM
24 CONTRACTOR SHALL PROTECT EXISTING UTILITIES DURING CONSTRUCTION OF PROPOSED METHOD OF PIPELINE CONSTRUCTION
EL ELEVATION
CIVIL WORKS. FURTHER, RELOCATIONS / DIVERSION WORKS SHOWN ON DRAWINGS SHALL BE
GRP GLASS REINFORCED PLASTIC PIPE OCU ODOUR CONTROL NUIT
VERIFIED AT SITE IN COORDINATION WITH other ONGOING WORKS ON SITE PRIOR TO CONSTRUCTION WORKS.
25 LOCATION AND ARRANGEMENTS OF ALL FUTURE STUB-OUTS SHALL BE AGREED WITH DUBAI GL GROUND LEVEL OD OUTSIDE DIAMETER
MUNICIPALITY AND ENGINEER.
HDPE HIGH DENSITY POLYETHYLENE R RADIUS
26 THE COVER ELEVATION OF UN-PAVED/GREEN AREAS SHALL BE RAISED BY 500 MM AS COMPARED TO FINISHED Consultant:
GROUND ELEVATION. HC HOUSE CONNECTION CHAMBER ROW RIGHT OF WAY

27 CONTRACTOR TO INSTALL A PERMANENT MARKER POST FOR ALL FUTURE STUB-OUT CONSTRUCTED WITHIN NDM SHAFTS. H HEIGHT RCP REINFORCED CONCRETE PIPE
MARKER POST SHALL CLEARLY SHOW THE PIPE DIAMETER, INVERT ELEVATION AND COORDINATES OF STUB-OUT END CAP/PLUG.
I.L INVERT LEVEL SPS SUBSIDIARY PUMPING STATION
28 THE LENGTH OF THE PIPE SHOWN IN THE LAYOUT DRAWINGS, ARE MEASURED FROM MANHOLE CENTER. P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
IC INSPECTION CHAMBER S SLOPE Project Name: Project Number:
29 ALL IMPACTED STORM WATER GULLY/INLET SHALL BE RECONSTRUCTED AT LOW POINTS ALONG THE ROAD AFTER
INTERCONNECTING URGENT
COMPLETION OF CONSTRUCTION WORK. ID INSIDE DIAMETER TYP TYPICAL
DEVELOPMENTS TO DM SEWERAGE DS-208/1
30 CONTRACTOR TO PROTECT ALL THE PILES, FOUNDATION, RETAINING WALLS AND OTHER STRUCTURES RELATED TO BRIDGES,
L LENGTH uPVC UNPLASTICISED POLY VINYL CHLORIDE PIPE SYSTEM
RAMPS, UNDERPASSES, METRO-LINES ETC. DURING CONSTRUCTION. Drawing Title:
31 PIPELINE DOWNSTREAM INVERT (DS.IL) ARE INVERT ELEVATION OF INCOMING PIPE AT THE CONNECTION TO THE MANHOLE. LS LINK SEWER VDS VORTEX DROP SHAFT

32 LOCATION OF FUTURE STUB-RL SHALL BE DECIDED BASED ON THE SELECTION OF FINAL PIPELINE ROUTE. LPS LIFTING PUMP STATION Ø PIPE DIAMETER BUR DUBAI AREA
33 ALL FUTURE STUB-OUT PIPELINE SHALL BE PROVIDED WITH WATER TIGHT CONCRETE SURROUND AS SPECIFIED. THIS CONCRETE
SURROUND SHALL JOIN WITH THE WALL OF DRIVING/RECEIVING SHAFT WITH WATER TIGHT ARRANGEMENT.
MH MANHOLE GENERAL NOTES AND ABBREVIATION
Drawing Number: Date: Sheet: Scale: Rev

DS208-ITL-PSSN-G-105 04-07-2022 01 OF 01 N.T.S T4


KEY PLAN
316

AD
AL RAFFA

RO
A
IN
M
AL MANKHOOL

AL
317 BUR DUBAI AREA
PROJECT LOCATION

CC-SN-01 (STUB-MARITIME CITY) AL MANKHOOL SH


.RA
SH
MH-SN-02 ID
RO
AD

d Rd
Zaye
MH-SN-03 Shk.

BUR DUBAI AL BADAA


AL SATWA
ZAABEEL FIRST

2n
d AL JADDAF
Za
be
MH-SN-04 el
R
d.
Line SN JUMEIRA

al Rd
322 MH-SN-05 ZAABEEL SECOND

Al Mustaqb
AL WASL

AL HUDAIBA MH-SN-06
Rd
ail
Kh
Al
Fin
MH-SN-08 . Ce

323
MH-SN-07 SH ntr
eR
d.
.RA BURJ KHALIFA

AL JAFILIYA SH
MH-SN-09 ID

36T
Rd
CC-SN4-01 RO lK
h ail

AD A

H
PS-S23N

ST.
MH-SN-10
MH-SN-13
Line SN4 324 LEGEND:
MH-SN-12 MH-SN-14 AL KIFAF
Line SN MH-SN-19

MH-SN-16 MH-SN-21 EXISTING SUBSIDIARY PUMP STATION


TO BE DECOMMISSIONED
MH-SN-17
MH-SN-23
EXISTING MAIN PUMPING STATION
MH-SN-20
ed Rd
STUB PS-Z1 Zay
Shk. PROPOSED LIFTING STATION LPS-SN(DS208)
STUB PS-E20

MH-SN-24 PROPOSED LINK SEWER (DS 208)


MH-SN-25 325
MH-SN-26 FUTURE STUB-OUT/PLUG
ZAABEEL FIRST
MH-SN-27
MH-SN-28

d
lR
332 MH-SN-28A
334

ba
JUMEIRA FIRST MH-SN-29

aq
AL SATWA
333 336

st
2n

Mu
AL BADAA TRADE CENTER MH-SN-30
d
SECOND Za

Al
be 326
335 MH-SN-31 el
R AL JADDAF
TRADE CENTER FIRST d.
Line SN MH-SN-32

MH-SN-34

MH-SN-36

MH-SN-38
bal Rd

MH-SN-46

MH-SN-48
Al Mustaq

MH-SN-50
DRAWING STATUS:-
MH-SN-52

T4 26-12-22 MS AM DA REVISED TENDER DRAWING


Line SN
337 T3 07-11-22 MS AM DA REVISED TENDER DRAWING
MH-SN-55 MH-SN-56-A T2 16-09-22 MS AM DA REVISED TENDER DRAWING
ZAABEEL SECOND
MH-SN-57-A T1 29-08-22 MS AM DA REVISED TENDER DRAWING
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
342 STUB PS-RL MH-SN-58-A REV. DATE DR'N CH'D AP'D DESCRIPTION
MH-SN-59-A
JUMEIRA SECOND Fin TENDER DRAWING
.C MH-SN-60-A
en Client:
tre MH-SN-61-A

Rd Rd
. MH-SN-62-A
h a i l
343 K
AL WASL
MH-SN-63
(VDS)
Al
Line SN STUB PS-E

345 MH-SN-64 Line SN1


Line SN Consultant:
BURJ KHALIFA
MH-SN-67

MH-SN-68 P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
Project Name: Project Number:
INTERCONNECTING URGENT
Line SN DEVELOPMENTS TO DM SEWERAGE DS-208/1
MH-SN-78
SYSTEM
Drawing Title:
MH-SN-72 MH-SN-76

PS "SN"
BUR DUBAI AREA
MH-SN-73
MH-SN-75 STUB-PS-V PROPOSED
STUB-BD
Rd MH-SN-77 GENERAL LAYOUT PLAN
h ail
K Ras al K
Al h or Rd.
Drawing Number: Date: Sheet: Scale: Rev
A1@15000
DS-208-ITL-PSSN-G-0106 04-07-2022 01 OF 01 T4
A3@30000
UMM HURAIR FIRST

KEY PLAN
01

AL MANKHOOL
BUR DUBAI AREA
PROJECT LOCATION

317
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-102

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-101


MANKHOOL
02

Line SN
318 AL BADAA
AL SATWA
ZAABEEL FIRST

AL KARAMA AL JADDAF

JUMEIRA

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-103

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-102

ZAABEEL SECOND
322 AL WASL
03
AL HUDAIBA
Line SN4
323
BURJ KHALIFA
AL JAFILIYA 319
PS-S23
OUD METHA
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-104

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-103

04 05 315
UMM HURAIR SECOND NOTES:
324

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-105

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-104


AL KIFAF
NOT USED 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL
TRANSVERSE MERCATOR (DLTM).
3. FOR GENERAL LEGEND AND NOTES REFER TO
DRAWING NO. DS208-ITL-PSSN-G-105.
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-106

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-104 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-105

07 06 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.


DS208-ITL-PSSN-CI-201 TO DS208-ITL-PSSN-CI-214.

332

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-106

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107


JUMEIRA FIRST
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-108 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-106

08 09
333 325
AL BADA' ZAA'BEEL FIRST

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-108


NOT USED

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-110 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-110

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-108 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109

10
334
AL SATWA
336
TRADE CENTER SECOND

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-111

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-110

11
326
AL JADAF

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-112

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-111

12

DRAWING STATUS:-

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-113

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-112

T3 26-12-22 MS AM DA REVISED TENDER DRAWING


13 T2 16-09-22 MS AM DA REVISED TENDER DRAWING
T1 29-08-22 MS AM DA REVISED TENDER DRAWING

337 T0 04-07-22 MS AM DA DRAFT TENDER DRAWING

15A ZAA'BEEL SECOND REV. DATE DR'N CH'D AP'D DESCRIPTION

Line SN TENDER DRAWING


FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115A

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-113

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115B

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115A

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-114


15B Client:
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-113

14
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115A

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-114

343
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115A

NOT USED
15
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115B

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115

AL WASL
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-114

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-116

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115B

16 413
345
RAS AL KHOR
BURJ KHALIFA
Consultant:
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-116

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-115

Line SN1

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-117

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-116

P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198


17 Project Name: Project Number:

Line SN
INTERCONNECTING URGENT
DEVELOPMENTS TO DM SEWERAGE DS-208/1
SYSTEM
Drawing Title:
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-118

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-117

18 19 20
BUR DUBAI AREA
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-119

PS "SN" PROPOSED LINK SEWER


FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-120

KEY PLAN
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-119

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-118

346 Drawing Number: Date: Sheet: Scale: Rev


BUSINESS BAY A1@16000
DS-208-ITL-PSSN-CI-0100 04-07-2022 01 OF 01 T3
A3@32000
ET KEY PLAN

I
I

ET

ET
S

I
IT
ET

I
TI I
I
I

ET
I
ET

DU

AD
ET

ET
ET

EET
I

RO
I

DU
I

I
ET

ET

A
ET

IN
IE 01

M
ET TI AL MANKHOOL

AL
I ET
I ET

S
I

I
FUTURE CONSTRUCTION

ET
IT
ET 02

ET
ET

I
TI I
ETI IE

ET
I
TI

EET
SHAFT BY OTHERS

DU
2794000 N

DU
SH

I
ET

I
ET
.RA

ET
I 03

ET
SH

I
ET ID

ET
I
I ET ET RO
I

I
AD

ITI ET
I

TI I
S
ET

EET
ET
IT
I 04 05

ETE

I
ET
I
ET
NOT USED
ET d Rd
ET Zaye

DU
ET I I Shk.

TI I
07 06

I
I

ET
EET

I
ET

ET
I
ITI ET
EETT

TI I
08 09 ZAABEEL FIRST

IT
II E

EET
AL SATWA
TI ET

ETE
IE AL BADAA NOT USED
2n

I
ET TI

ET
d AL JADDAF

DU
I ET 10 Za
TI I IEET

I
TI I ET be

ET
EET

ITI
I el

ETE
R
d.
11

I
ITI ET

TI I
ET ET JUMEIRA

EET
I IE
TI

ETE

al Rd
ET
12

I
ET
ITS
ZAABEEL SECOND

Al Mustaqb
TII

I
ET
EET

AL WASL

ET
ET
I 13

EITI
DU
ET 15A

I
d

ET
I R
15B ail
14 Kh

I
ET
Al
ET 15
ET NOT USED

ITS
ETI EETT Fin

I
ET I

ET
I II .C 16

I
I
ET

ET
ET

ET
I I en
tre

Line SN
I ET Rd
ET

ETI
I BURJ KHALIFA .

DU
ETET 17

I
I

ET
E
ET ETTI ET
I EETT
I I
I II
ETI

TI
I ET d 18 19 20

IE
I
ITS
R
ET

ET
I ET ail

I
ETI

ET

ET

ET
I
ET h

ET
I I lK
TI E EETT A
E ETTI II
ETI

DU
I
I

I
ET
ETI ETI ET ET NOTES:
2793900 N ET ET
I

I
ETI I I

ET
ITS
I 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

I
I
ET

ET
ET
ET

I
ET

ET
I
DU
ET
I ET ET
I 2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL

I
ET
I
ET
TRANSVERSE MERCATOR (DLTM).
I TI

ET I
ET E

I
I 3. FOR GENERAL LEGEND AND NOTES REFER TO

ETI ET
ET I

ET
ET

S
I
ITS

ET DU
IT
EETT

I
ET
II
DRAWING NO. DS-208-ITL-PSSN-G-105.

I
I
ET

ET

I
I
DU

ET ETI 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.


I

I
ET

I
ET
DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

ETI

I
ET

I
I

ET
ET
ET
I
ET

I
ITS

TI
LEGEND:

IE
ETI

ET
DU

PROPOSED
I
ET

ETI
ETI

I
ET
PROPOSED SEWER LINE

TI I
ETEI TI

EET
I
ET

ITS

PROPOSED MANHOLE

I
ET
ETI
PROPOSED MANHOLE W/ BACKDROP LEVEL
DU

(BD.IL)
ET

I
I

ET
ET
SEWER LINE TO BE ABANDONED

ETI

EE

I
I

TT

ET
ET

ITS

II
SUBSIDIARY SEWAGE PUMP STATION TO BE

ETI
DU
ABANDONED

I
DU

ETI

ET
I
ET
I

TRENCHLESS/NON-DESTRUCTIVE METHOD

T
ET

NDM PIPELINE CONSTRUCTION

ETI ET

I
ET

I
ET
EET
I
ET

TI I
ITS

STUB-OUT/PLUG FOR FUTURE CONNECTION

I
I
2793800 N ET

ETI
INDICATIVE LIMITS OF NDM CONSTRUCTION
DU

ET
I
ET

ETI
SHAFT

I
ET

I
ET
EXISTING

ETI
DU
ET
EXISTING SEWER LINE

I
ET
I
ET
EXISTING MANHOLE
S

I
IT

ETI

ETI

I
ET
EXISTING HOUSE CONNECTION CHAMBER
DU

ET
I

ETI
EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)

I
ET

ETI
ET
S

I
ET
I EXISTING MANHOLE W/ FUTURE CONNECTION
IT

DU

ET
ET
I I

I
ET

ETI
EXISTING MANHOLE W/ FC ON BD (FC)
DU

ET

I
ET
I
DU

ET
I
ETI

ET EXISTING PRIVATE INSPECTION CHAMBER

ETIETI

I
ETI

ET
I

ET
ETI

ET
I
ET

I
IT EXISTING ABANDONED LINE

I
S ET

I
I

ET
ITS
DU

EXISTING STORM WATER LINE


ETI
ITITSS

ET
ETEI

I
T I

ET
ETI EXISTING WATER LINE

TI I
I
ETI

I
ET

EET
ET
I EXISTING IRRIGATION LINE
ETI ET

ET
ET I
ITS

I
ET I

ET US
EXISTING EHV LINE

IDT
I

I
I
ET

I
I

ET
ET

ET
EXISTING HV LINE

ETI
ITS I

I
ETE ET ET I

ET
ITI I I ET
ET EXISTING ETISALAT LINE

US
I

IDT
I
ET
ET
2793700 N I EE EXISTING ITS LINE

I
ET DU

ET
I TIT
I

I
ET
ET I EXISTING DU LINE

I
ITS EIT

ET
I
I

ET
ET ET
I

US
ET

EXISTING EMPOWER LINE

IDT
ET

I
ET
DU I

I
ET
ET IT S EXISTING RAIL AGENCY

ETI ET
I
ET

I
DRAWING STATUS:-

ET
I
DU ET

US
I
ET
I

IETI

IDT
I

I
ET

ET
ET

ET
ET
ET
I

ETI I T5 26-12-22 MS AM DA REVISED TENDER DRAWING


ET

I
I
ET
DU EIT
ET I T4 07-11-22 MS AM DA REVISED TENDER DRAWING
I ET

US
IE

IDT
ET TI T3 03-10-22 MS AM DA REVISED TENDER DRAWING

I
I
ET

ET
ET
I I

I
ET
DU T2 16-09-22 MS AM DA REVISED TENDER DRAWING
ET
I

ET
ET

ET I IE T1 29-08-22 MS AM DA REVISED TENDER DRAWING


DITU ET TI

US
ITS

I S I

IDT
I

ITI
ET

T0 04-07-22 MS AM DA DRAFT TENDER DRAWING

EET
ETI

I
ET
ET REV. DATE DR'N CH'D AP'D DESCRIPTION
ET
I

I
ET

ET DU I
I ET ET
TENDER DRAWING
I

I
ET

ET
I I

ET TUS
I

ITS
ET

ID
ITI
ET

I
ITS

EET
I
ETI

IT

I
I
I

ET
ET
ET

ET
I DU
Lin Client:
ET ET

D
I

U
I

e I
ET

ITETI

ET
ETI ETI S
SN

I E IDTUS
ETI

TI
IT
I

ETI ET
ET

ETI I ET S
I

ET
ETI ETI
I

ET
ET

D
I

U
ETI
2793600 N DU IT
ITS S
I

ET
ET

I
EETTI

I
ET
DU I ITS DU
ITS ET ITS DU ETI
I ETI ETI
ETI ETI
ET E
I ETTI

IT
D
U

S
I

ET
I
IT
SD I
ET

U
ET Consultant:
I

ET ITS
I
DU

I
ET

DU

IT
D I
ET U
ET

S
I ET
ET

I
DU
I
I DU
I
EIT

ITS P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
ET

ET ET
I

ET
ET
ET

I I I
ET DU Project Name: Project Number:
I
DU INTERCONNECTING URGENT
ET

I
ET ET ET
DS-208/1
I

I IE ET I
ET

S
I DU

I
TI
DEVELOPMENTS TO DM SEWERAGE

IT
ITS
I

E
ET

TI
ET

U
DU
SYSTEM

D
EET ET ET
TII IE ET I
TE
IE ITS
I
ITS ET
ET TIT
I
I
DU ITS
DU
ET
I Drawing Title:
I DU ITS
ITS
DU
BUR DUBAI AREA
I

EET
ET

TII
I
ET

ET

D
2793500 N ET ITDS

U
ET U I ETI

I
I

ET
I
PROPOSED LINK SEWER PIPELINE

I
ET
ITS

ET
I
ET ET ET
I
LAYOUT PLAN

U
I
DU

I I

D
ET ET

I
ET
IE
T I
494700 E

494800 E

494900 E

495000 E

495100 E

495200 E

495300 E
ET
I Drawing Number: Date: Sheet: Scale: Rev
ITS
ET

ET

I
ET

ET
I

I
I

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-102 A1 @ 1000


IT

DU

DS-208-ITL-PSSN-CI-0101 04-07-2022 01 OF 20 T5

I
S

ET
A3 @ 2000
4950

4951

4952

4953
IT

DU

I
S

ET
I FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-101 KEY PLAN

I
I
ET
ET

ET
ET

ET
I
ET
ITS
I

I
ET

AD
ET

RO
DU
I

I
ETI TI

A
IT

IN
EIET
I

I
I

ET
01

SI

ET
ET

M
TS

ET
I
AL MANKHOOL

ET
ET

AL
EI T
I
DU
02

ITS

I
ET
ET

ET
I
ET

I
SH

I
I I

TI
ET
ET .RA

EIET
IT
ET
I ET 03 SH

ET
I
S

DU

ET
ID
I

ETI
ETI RO

Lin

I
AD

ET
I
ET 04 05

I
ET
eS
ET

ET
I NOT USED

I
d Rd

I
ET

I
ET
Zaye

I
DU

ET
ITS
Shk.

ETI
07 06

I
ET

ET
I I
EI T
2793400 N ET

DU
08 09 ZAABEEL FIRST

II
AL SATWA

ETIT
EET
AL BADAA NOT USED

I
ET
2n

ET TI
ITS
d AL JADDAF
10

E
Za

I
be

ET
I
ET
I el

ETI
ET R
d.
11

I
JUMEIRA

ET

al Rd
12

ET

I
ZAABEEL SECOND

ET
I
ET
I

Al Mustaqb
ITS

IT
AL WASL

S
13

D
U

ETI
15A d
ETI

R
15B ail
ETI

14 Kh
Al

ET
NOT USED 15

I
ETI

Fin 16
I .C
en
ET
ITS

BURJ KHALIFA tre


Rd
. 17

IT

ETI
ETI
S
ETI

ET
ETI

R d 18 19 20

I
I ail

DU

ET
ET lK
h

I
I
ETI

A
ET
ITS

NOTES:

ET
ETI
ETI
ETI

I
ET

I 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.


ETI

ET
I
ET
I

TI 2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL


I

E
ET

DU
TRANSVERSE MERCATOR (DLTM).

ET
IT
ETI

IET
3. FOR GENERAL LEGEND AND NOTES REFER TO

I
ETI
I
2793300 N ET DRAWING NO. DS-208-ITL-PSSN-G-105.
I

I
ET

ET
I
ET

ETI

I
ET 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.
DU
I

EET
ET
ITTSI

ET
IT

TI IE
IE

S
DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

I
TI
ETI
ET

ETI
I
ET ET
I

LEGEND:
TIT

I I
I ET
EE

ET ET
ET I

EEE
PROPOSED

TTIT
I
IS

IEI T
EITT

PROPOSED SEWER LINE

I
I

I ET
IET

ET ET
I IT I PROPOSED MANHOLE
I

S
ET

ET

ET
I
DU PROPOSED MANHOLE W/ BACKDROP LEVEL
ETI (BD.IL)
IS

ETI ETI
ETIT

ETI ETI SEWER LINE TO BE ABANDONED


ET
I

ET
SUBSIDIARY SEWAGE PUMP STATION TO BE
EE

I
I
I

TIT
ET
ET

I
ET
ABANDONED
I

I
ET
ITII

TRENCHLESS/NON-DESTRUCTIVE METHOD
TET
EE
ETITS

NDM PIPELINE CONSTRUCTION


ET
DU
I

IT
I

ET
S

I
STUB-OUT/PLUG FOR FUTURE CONNECTION
ET
I
ET

INDICATIVE LIMITS OF NDM CONSTRUCTION


ITII
TET

SHAFT
EE

ET

ET
EXISTING
ETITS

DU
I

EI T

I
ET
I

ETI
I
ET

EXISTING SEWER LINE


I
I

I
ET

ET
EXISTING MANHOLE

I
ET

ET
ITII

ET

EIET
TET

EXISTING HOUSE CONNECTION CHAMBER


EE

ETIT
2793200 N II
ITS

I
ET
ET

EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)


I
I

I
ET

ET
ET

I
EXISTING MANHOLE W/ FUTURE CONNECTION

ET
IEEET
ET

I
ET
TITI
I
II

I
EETT
I
ET

EXISTING MANHOLE W/ FC ON BD (FC)


ET
I

EXISTING PRIVATE INSPECTION CHAMBER


DU ET
ET

I
DU

EXISTING ABANDONED LINE

ET
I

DU

I
ET

ET
I
IT
I
ET

EXISTING STORM WATER LINE


ET
I

ET
I
IT
I

ET EXISTING WATER LINE


ET

SD

I DU ET
ET
I
ET

I
U
I
ET

DU
I

I
EXISTING IRRIGATION LINE

ET
I
ET
S
ET

ETE IT ET EXISTING EHV LINE


I

ITI I
EXISTING HV LINE
I

I
ET

ET
ET

DU
ET

ET
I

ET
IT
I

I
ET

EIT
I

I
EXISTING ETISALAT LINE

ET
I
ET
DU

II
EETT
I

DU

ET
I EXISTING ITS LINE
ET
ITS

I
ET

ITS ET EXISTING DU LINE


I

ET
ET

I
I

ET
I
ET

D I
ET U EXISTING EMPOWER LINE
I
I

ET

I
ET

II
EETT
ET
I EXISTING RAIL AGENCY
ET
ET

DRAWING STATUS:-
I

IT
I

2793100 N S
ET
ET

EIT
I
I
ET

DU
ETI

I
ET

ET
ETI

I
ET

IT
I

T4 26-12-22 MS AM DA REVISED TENDER DRAWING


ET

S
ET
DU

T3 07-11-22 MS AM DA REVISED TENDER DRAWING


I
ET

ET
I
ET

I T2 16-09-22 MS AM DA REVISED TENDER DRAWING


ET
I
ETI

ET DU T1 29-08-22 MS AM DA REVISED TENDER DRAWING


I

I
EI T

ET

I
ET

ET IT
ETI

ET I S T0 04-07-22 MS AM DA DRAFT TENDER DRAWING


DU

I ET
I
ET REV. DATE DR'N CH'D AP'D DESCRIPTION
I
ET
ET I
TENDER DRAWING
I

ET
ET

IET
ET

I ET I IT
ETI

I S
ET DU
EIT ET
I
Client:
ETI

ET I
I EETT
ET ET II ET
I I I
E
ETTEIITI

EETT
ET II
I

I EE ITS
N
ET

TI
eS

ET DU ET
I
Lin

ET ET ET I
I I I
ET
I ETI
I
ET
I

ETI ET ET
ET

ET
UI

I I
EDT

ET ET I
I I
I
ET
I
I

ET
ET

2793000 N ET ET
I
ETI ET I
ITS

EI T
I
ET Consultant:
ETI ET I
I

ET I
ET

EI T
II

I
I
TEEITT

ET
ET

I
I

DU
ET

ET
II E

I
ET
EETT

ET ET I
I
DU

ITI S
ET ET ET
I I I
ET ET DU
I
I
ET

I EDT P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
II

I
EETT

ET

UI
ET ET ET
I I I ET
Project Name: Project Number:
ET I
I ITESTI
INTERCONNECTING URGENT
I

EEET
ET

TTI II
EETT
EIIT ET ET
DS-208/1
TI I

I I I
DEVELOPMENTS TO DM SEWERAGE
EET

ETI DU
I
ET

EETT ITEST ET DU
II EE I I
TT
EIIT
I ET ITS
ITS SYSTEM
I

ETI I
ET

ETI ETI ET
ET I ET
I
ITS ET
I
Drawing Title:
I EE
TTEII
TI
ITESTI BUR DUBAI AREA
I
ET

ET DU
E TI I
EETT DU
PROPOSED LINK SEWER PIPELINE
I

EETI
ET

TI I
ET
IT
ETI SIIT
ETI ETI ETI S ET
I
LAYOUT PLAN
I
ET

I
ETI ETI EETTI ET
IT
EET SIIT DU
TI I ET S ET
I
I

EETTI
495000 E

495100 E

495200 E

495300 E

495400 E

495500 E

495600 E
ET

I I
2792900 N ETI I TI I
TET
EE
ETI ETI Drawing Number: Date: Sheet: Scale: Rev
I

IE
ET

TI
TS ITS
DU
ETI ETI ET
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-103 ET
I
ETI ETI DU I A1 @ 1000
EET

E TI DS-208-ITL-PSSN-CI-0102 04-07-2022 02 OF 20 T4
I

TII
EI T

ETI
IE TII A3 @ 2000
ET

TS
TS
I
EETTI

ETI
4950

4951

4952

4953

4954

4955

4956
I
ET ETI DU

EET
ETI

TII
EI T
ETI
IE TI

ET
TS ITS

I
EETTI
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-102 ETI
ETI
KEY PLAN

II
EETT

ETI
IE
TTSIIT
S

ETEI
DU
ETI
ET

AD
E TI
I

RO
TI

A
ETI

IN
01

ETI
ETI

ETI

M
AL MANKHOOL
II

AL
EETT

ETI
ETI

ETI
ETI
ETI
02
I
ET

SH

ETI
ETI .RA

ETI
03 SH
ID
RO
AD

ETI
II

ETI
EETT

04 05

I
ET
ET

TI
I

E
NOT USED
d Rd

ETI
ETI Zaye
07 06 Shk.

ET

ET I
ET

ETI
I

I
08 09 ZAABEEL FIRST
AL SATWA

ET I
ETI

I
ET
DU AL BADAA NOT USED
2n
ETTI d AL JADDAF
E I 10 Za
be
el
R
d.

E TI
11

ETI
ETI
ETI JUMEIRA
ETI

ETI

TI I

al Rd
I
12

EET

ET
2792800 N

I
ZAABEEL SECOND

ETI

ET

Al Mustaqb
ETI

I
ETIE

ET
AL WASL

I
13

ET

TI
TI

IE
ETI 15A d

ET
E

DU
ETEIT

TI I
ETTI
E R
TI 15B ail

EET
Kh

I
14

II
Al

EETT
I

ET ETI
15

ETI
ETI NOT USED

I
EI T
16

ETI
E Fin

I
ETTII .C

ET
ETI

ETI
en

I
ETI

ET
ETI BURJ KHALIFA tre

TI
Rd
17

IE
.

ET
DU
ETI

I
ETEIT

ET
ETI
ETI

II
ETI

EETT
I TE TI
d 18 19 20

ET TI EETI
ETI R
ail

ETI

I
ETI

IT
h
lK

ETI
A

Line
ETI

EI
E
ET
I
ET
ET
ETI
ETI NOTES:

DI U
ETI

I
ETI

ET

ET
SN

ETI
ETI

I
ETI

ET
EI T TI
1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

ET EETI

ET
EE

I
EETTI

EI T

I
TITI
I
2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL

I
ETI

ET
E
ETTE

I
ETI

ET
TRANSVERSE MERCATOR (DLTM).

II TI
ETI

I
TI

EETTI

DU
ETIE

ETI
ETI
3. FOR GENERAL LEGEND AND NOTES REFER TO

ETI

I
ETIET
E TI

EI T EETTI
ET
ET IET DRAWING NO. DS-208-ITL-PSSN-G-105.
ETI

I I
ETI

I
I

I
ET
4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.

ET
ETI
ETI

I
ET
ET
I
DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

ETI
ETI

ETI
LEGEND:
ETI

ETI

ETI
ETI ET

ETI
I
2792700ETN PROPOSED
EITI
E ETI
TI

ETI
PROPOSED SEWER LINE

TII
ET
E
ETI ETI
ETI PROPOSED MANHOLE

I
ETI

ET
ETEITI
ETI

PROPOSED MANHOLE W/ BACKDROP LEVEL


ETI (BD.IL)
ETI SEWER LINE TO BE ABANDONED
SN

ETI
ETI
ETI

E
ET
EE
Line
TT

TII
II SUBSIDIARY SEWAGE PUMP STATION TO BE
ETI TI ETI E ABANDONED
ETIE

ETI

ETI
ETI T
ETI I
ETI

ETI
ETI ETI TRENCHLESS/NON-DESTRUCTIVE METHOD

ET
ETI

I E
ETI NDM PIPELINE CONSTRUCTION
ET I ETI

TI E
ETI
ETI

ETI
STUB-OUT/PLUG FOR FUTURE CONNECTION

E
EET
TEI TE
ETI

TTIII ET
ETI I
ET

I TEI T
ETEIT
I INDICATIVE LIMITS OF NDM CONSTRUCTION

ETI

I
ETI
ETI SHAFT

I
ETI

ET
ETI

ETI
I
ETI

ET
I ETI
EXISTING
ET

ETI
EE
TT TI I ET
EXISTING SEWER LINE

ETI
I EI T I I TEIET

ETI
EIT

ETI
I E

ETEI
TI ET
ETE I
ETI ETI

ETI ET
ETI

TEI TEI
EE
TT TI EXISTING MANHOLE
TIE

ETI
II
ETI TI EI ETI

T
ET

ETEI T
EET EXISTING HOUSE CONNECTION CHAMBER

IET
I

ETI
I
ET

ETI

I
ETI DU

I
EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)

ETI
I
ETI ET

EETTII

ETI
ETI

ETI
ETI ET
I EXISTING MANHOLE W/ FUTURE CONNECTION

ETEI T
ETI ET
I
ET

ETI DU

EI TI
I
EXISTING MANHOLE W/ FC ON BD (FC)

ETEI

ETI

ETI
DU
I
ET

TI
DU
2792600 N EXISTING PRIVATE INSPECTION CHAMBER

ETI
DU EXISTING ABANDONED LINE

ETI
ETI ET

ETEI T
EXISTING STORM WATER LINE

I
I ET

ETEI

ETI
ETI

DU
I
EXISTING WATER LINE

TI
ETI
EXISTING IRRIGATION LINE

ETI

ETI
EE

ETEI T
DU

TTI EI T
ETI EXISTING EHV LINE

I
I

ETEI
DU EXISTING HV LINE
ETI

DU

TI
ETI
E TI ETI EXISTING ETISALAT LINE
ETI

ETEI T
ETI DU EETTI I EXISTING ITS LINE
ETI

I
EE

ET
I
TT

ET

I
ETI
II

EXISTING DU LINE
EE
ETI

TET

ETI
ETI

I TI I

ETI
I

EETTI
ET I TI
ETE EXISTING EMPOWER LINE
ETI

ETI
EXISTING RAIL AGENCY

ETEI T
REFER DWG NO. DS208-ITL-PSSN-CI-0301
ETI
ETI

EE

ETI
ETI DRAWING STATUS:-
TT

I
FOR SITE PLAN
II

EE

I
EETTI
TET

ETI
ETI

ETI
I TI I

ETI
EETTI

ETI
ETI

I
ETI
EETTII

ETI
ETI
T4 26-12-22 MS AM DA REVISED TENDER DRAWING

ETEI T

I
ET
ETI

ETI
T3 07-11-22 MS AM DA REVISED TENDER DRAWING
ETI

I EETT
TI

ETI
EE
ETEI

ETI
TEITTI

I I EET
T2 16-09-22 MS AM DA REVISED TENDER DRAWING

ETI
ETI

ETI
2792500 N
I EETTI

TII
ETI

ETI
T1 29-08-22 MS AM DA REVISED TENDER DRAWING

ETI
EETTI E
I

I TI
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
ETI

ETI

ET
ETI

ETI REV. DATE DR'N CH'D AP'D DESCRIPTION

I
EE
ETI

TEITI

ETI
TENDER DRAWING

ETI
TI EEEE

ETI ETI
ETI

ET
ETT

ET
ETI

ETI
ETI
TTTII I

ETI

I
ETI E

I
ETI
I
ETI

ETI ET
ETI I
ET Client:
ETI I

TI
ET

E
I

ETTII
ETI
ETI

ETI

ETI
PS_S23N ETI
ETI

ETI
I
ETI

ET

ETI
ETI
E
ETTII

ETI
EETTI
ETI

ETI
I

ETI
ETI

Line
SN
ETI

ETI
4

ETI
ETI

Consultant:
ETI

E
ETI ETTI I
TI

ETI
ETI
ET ETI EETI
ETI

I
EE
TTII
ETI

E TI

2792400 N

ETI
ETI
Line S

EE
I I ET
ET ET ETI

TT
I
ETI

II
ET
I
ETI

ETI
P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
ETI

ET Project Name: Project Number:


N

ETI ETI
ETI

INTERCONNECTING URGENT

EETTII
ETI
ET
I
DEVELOPMENTS TO DM SEWERAGE DS-208/1
ETI
ETI
ETI

ETI
DU
SYSTEM
ETI

ETI ETI
Drawing Title:

EETTII
DU
ETI

BUR DUBAI AREA


ETI
ETI

ETI

ETI
ETI

DU
PROPOSED LINK SEWER PIPELINE
ETI
ETI

ETIETI

LAYOUT PLAN

EETTII
ETI

ETI
ETI

ETI

ETI
ETI
495000 E

495100 E

495200 E

495300 E

495400 E

495500 E

495600 E
Drawing Number: Date: Sheet: Scale: Rev
ETI
ETI

ETIETI

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-104 A1 @ 1000

ETI
ETI

DS-208-ITL-PSSN-CI-0103 04-07-2022 03 OF 20 T4
ETI

A3 @ 2000
ETI
ETI

ETI
4953

4954

4955

4956
ETI
ETI

ET I
ETI

ET I
KEY PLAN

ETI

ETI
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-103

I
ET

ET
ETI
ET

ITI
2792300 N I 2792300 N

ETE
ETI ETI

AD
ETI
ETI

RO
ET

ETI

IDTUS

A
ETI
I

IN
01

M
AL MANKHOOL

AL
ETI

I
ET
ETI
02

I
ET
ET

ETI ETI
I SH
.RA

ETI E

ETI
03 SH

IDTUS
ID

ETI
RO

ET I
ET AD
I

TIETI

I
ET
04 05

I
ET
NOT USED
d Rd

ETI
Zaye

ETI
ET 07 06 Shk.

EETTII ETI
I
ETI

ETI EE

ETI
08 09 ZAABEEL FIRST

ETI

Line S
AL SATWA

T
ET
AL BADAA NOT USED
ET

IT
EIIT
2n

I
I d AL JADDAF

ET
EITI
10

I
Za

I
ET

ET
ETI
be
ETI ET el
I R

N
d.
11

I
ETI

ET
ET ETI JUMEIRA

ETI

IDTUS
I ETI ETI

al Rd
ETI ETI ET

I
12

ET
I I
ET

I
ZAABEEL SECOND

ET
ETI

Al Mustaqb
I
ETI ET

ET
I AL WASL
E TI

ETI

ETI
ETI ETI ETI ETI ET 13

I
ET
I 15A d

I
ET
R
15B ail

IDTUS
14 Kh

ETI
Al
15

I
ET
NOT USED

ETI
ETI
ETI ETI 16
ETI Fin

I
ETI
ETI

ET
ETI
ETIETI .C
TI E I I I
ETET ETI en
2792200
ET N ETI ET ETI ET
I 2792200 N BURJ KHALIFA tre

ETI
I ETI Rd
. 17
ETI ETI

I
ETI

ET
ET
EITI ETI

I IDTUS
ETII
ET
ET d 18 19 20
I R

ET
ail

Line SN
h
lK

I
ET
A
I
ET

ET

ETI
I
NOTES:

ETI
ETI

T I
IDTUS

I E
ET
ET 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

I
ET
I
ETE
I TI 2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL

ETI
ET I

ETI
TRANSVERSE MERCATOR (DLTM).

I
ET

I
ET
ETI

ET ETI ETI 3. FOR GENERAL LEGEND AND NOTES REFER TO

TS

I
ET
DIU
I
DRAWING NO. DS-208-ITL-PSSN-G-105.
ETI

ETI ETI 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.

ETI
ETI

ETI
ETI DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

I
ETI

ET

I
ET
EETTII ETI ETI
ETI

TS

I
ETI LEGEND:

ETI

ET
DIU
ETI ETI
ETI ETTI I ETI
E ETI
ET I ETITI
E
EE E PROPOSED
TTT
II I ETI
I ET ETI
ET
ETI

I
I

ETI ETI
EETTI

PROPOSED SEWER LINE


ET
I

ETI

I
I
ETI

ET
ET

I
I

ET
EETTI ET I
ET

I
E TI ET PROPOSED MANHOLE

TS

I
I

ITS
ET
ETI

DIU
ETI ETI

ETI
EETTII PROPOSED MANHOLE W/ BACKDROP LEVEL
ET
I (BD.IL)
II

I
EETT

ETI
ET
I
I

I
ET
ET

SEWER LINE TO BE ABANDONED

ET
ETI
TI I

ETI ETE
I EET

2792100 N 2792100 N

I
ET
I

SUBSIDIARY SEWAGE PUMP STATION TO BE


ET

ET
I

I
ET

ET

ITS

ITS
ETI ETI

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-105

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-104


ABANDONED

ET
ETI

ETI
I TI
ET
TRENCHLESS/NON-DESTRUCTIVE METHOD
II I

NDM PIPELINE CONSTRUCTION


TTT

I
EEE

I
ITS

ET
DU

I
STUB-OUT/PLUG FOR FUTURE CONNECTION
ETI

ET
I
ET

DU
I

ET
ITS

I
ET

ITS
ET
TI INDICATIVE LIMITS OF NDM CONSTRUCTION
ETI EETI

E
EETTI I

ETI
SHAFT
EXISTING
III

ET
TI
TTT

I
ITS
I
EEE

I
ET

ET
DU
ETI EXISTING SEWER LINE

I
ET
II TI

ETI
EETTE

I
ITS

ITS
ET

ET
I EXISTING MANHOLE

I
ET
ETI ETII
ET
ETI ETI EXISTING HOUSE CONNECTION CHAMBER

ETI
ETI
ETI ETI

ETI ETI

I
ETI

ET

ET
I

DU
ETEI
TI ET ETI DU EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)

I
ITS

ET
ETI

I
ITS

ITS
EXISTING MANHOLE W/ FUTURE CONNECTION

ET
ETI

I
ET

I
ETI

ET
ETI ITS

I
EXISTING MANHOLE W/ FC ON BD (FC)

ET
ETI DU
ETEITI ET I ETI

I
ET
ETI

ET
ETI

ETEITI EXISTING PRIVATE INSPECTION CHAMBER

DU

I
ETI

ET
ETI
EE

I
ETI EXISTING ABANDONED LINE

ITS

ITS
ET
ETI
TITI

ETI

I
EXISTING STORM WATER LINE

ET
ETI

ET

ET ET EXISTING WATER LINE

DU
I
I

I
ET

ITS I
ET
I

ET
I TI
EXISTING IRRIGATION LINE

I
ITS

ET
ETI

2792000 N 2792000 N

EIT E
I

ET
ET

ET

ET
I
I EXISTING EHV LINE

I
ET
ETD
ETI

IU

I
ET
EXISTING HV LINE

DU
ET
I

I
ET
ET

I TI
ET EXISTING ETISALAT LINE

ITS

ITS
ET

ET E
I
I
ET

ET
I
I
ET

I
EXISTING ITS LINE

I
ET

I
ET
ETI TI DU EXISTING DU LINE
ETI E

IU
I
ETI

ET

D
EXISTING EMPOWER LINE

EDTU
ETI
ITS

ITS
ETI

ET

I
II

ET
EETT

I
I

ET
EETTI
I

EXISTING RAIL AGENCY

I
ET

I
ET
ETI

ET ET

ET
I I
EI T

ETI DRAWING STATUS:-

I
DTU
ETI
I

E
ETI

U
I
TI

ET
ET ET

TUDI
E S
IDTU
ET

I I

ITS

I ED
ETI

I
ET

ET
I
II

ET
I EETT

ET

I
ET
ET
I

I
ET

I
DTU
T3 26-12-22 MS AM DA REVISED TENDER DRAWING

E
S
ITU
I

I
D
ET

TIT

IU
ETI

EE
T2 16-09-22 MS AM DA REVISED TENDER DRAWING

D
I
ET

ET
ITS
I
ET
T1 29-08-22 MS AM DA REVISED TENDER DRAWING
I
ET

I
ET
T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
I
ET

I
DTU
E
REV. DATE DR'N CH'D AP'D DESCRIPTION
IDTUS

DI U
I
ITI

ET
I
ETE

ET
ET

TENDER DRAWING

ITS
I
Lin

ET
2791900 N eS 2791900 N

I
ET
ET
I ET
I N Client:
I

I
DTU
ET

E
ETUS
I
IT
D

I
ET

ET
I ETI ET
I
I

ITS
ET

I
ET
ET
I ET

I
I

ET
ET

I
I

ETU
I
ET

EETT

D
ET II
ITUS

I
EDTI

I
ET

ET
I

ITS
I
ET

I
ET

ET
ET I
I

I
ET

ET
I
ET

I
ETU
I

TI

D
I E
ITUS
TI

ETE
ED

ET

ET
I TI
I

I
ET

ITS
I
ET

I
ET
I
ETE ET
I

I TI
ET

Consultant:

I
ET

ET
I

I
I

ETTUI
I T

I ET

ED
ITTUSE

DU
I
ET
D
E

ET

ETI
I
ET

ITS
ET
I

I
I

ET
ET
ET
I

I
ET

EE
TTII ETI

I
ETTUI
ED
ET
I P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198

DU
I
ET

ET
I
Project Name: Project Number:
I
I

ET

ITS
ET

ET
IET

I
I

ET
ET
I INTERCONNECTING URGENT
ET
I E
DEVELOPMENTS TO DM SEWERAGE DS-208/1
I

2791800 N 2791800 N
ET

ET TI ETE
I

EIT DI TU
ET

I
Lin

I
ET I

ET
I
eS SYSTEM
I

ET
IET

ET

ITS

I E
IDTUS
I

TI
ET

ET
N
ET

EIT

I
ETE

ET
I DI TU
ET
I Drawing Title:
I ET
EETEE I
BUR DUBAI AREA
I

TIT
ET

E
ITIT
II
I
ET

EETE
TEDIDT
I

ITUU
ET

II
I

I
ET

ET

ITS

PROPOSED LINK SEWER PIPELINE


IDTUS

TI
I
ET

ET
I
IE

I
ET
ET

LAYOUT PLAN
I

ET
ET

I
I
ET
I

ET
ET

ITS

ET ET I I
TI
495400 E

495500 E

495600 E

495700 E

495800 E

495900 E
495300ETEI

I
IE

DEUT
EI T

Drawing Number: Date: Sheet: Scale: Rev


ET

ET

I
ET ET
I
ET

I I ET ET
ET FOR
ET CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107 A1 @ 1000
I

I I I
ET

I
DS-208-ITL-PSSN-CI-0104 04-07-2022 04 OF 20 T3
I
ET
ETI

A3 @ 2000
I
ET

ET ETEIT
ITS
I
TI

ET

IE ET
ET TI I
IE

I I
I
ET
ET
4959

4960

4961

4962

4963

4964

4965
I
ET

DU
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-105 KEY PLAN

DEUT

I
I

ET
ET

ETI
I

I
ET
IT
ETI E

ETI

AD
I
UI

ET
DT
E

RO
DT
E UI ETI

A
IN
DDE DU 01

M
UUE
TIT ET
D UI AL MANKHOOL
ETI

AL
I
DT
E UI

I
ET
DUETI 02
DE ET
D UI

I
ET
UT
DUETI

ETI
I P DT
E UI SH
2791700 N ET EM 03
.RA
SH
I ID
RO
AD
EDTU DE
UT PP ETI
I I PPM
M PPP
PPM 04 05

I
EM
M EMM

ET
M
DTUI
E PP EEEEEEEM ETI
M P
EEMMMMPP
NOT USED
d Rd
DU Zaye
EDTU DE DTUI
E EEE
ETI 07 06 Shk.
I UT U ETI ETI

ET
I ETD D
ETI ITS

I
DTUI PP ETI ITS

ITS
IU I E PPM PPP
DU ET EMEM
M MM PPM DU
08 09 ZAABEEL FIRST
PP EEEEEMEEM ETI ETI AL SATWA
ETI

EDTU M P ITS ITS


Line S

I
EEDMM PP

ET
I U AL BADAA NOT USED
EEEM
M

DU
ETI TI 2n
ET ETI E ETI 10 d AL JADDAF
ID DU ITS Za
be

ETI
U ED ETI PP TI ETI ETI

ITS
PPM
M PPPE el
TUI PPM

ETI
ET
EM
M R
DU EE
EEEMM
M
E M
E ITS d.
ETI P
I M PP E 11

I
T
N

ETI E PP ETI JUMEIRA


EEMM
EEEM
M

I
ETI ITS

ET
ETI

al Rd
ETI
ETI

STUB-PS_Z1 DU 12
PPMPP ZAABEEL SECOND
M PPP
PPM

Al Mustaqb
EM
MEMM ITS
IL=-7.723 ETIETI E
PP EE
EEM
E M
E ETI ET
I AL WASL
DU

EETTIE

ETI
M
EEMM PPP 13

ET
EEEM

ITS
ETIETI M ITS
ETI

I TI
S 15A

I
I d
DU IT ET R
FUTURE
ETIETCON
I STRUCTION 15B ail

I
14 Kh

ET
PP ETI ITS I Al
PPM
EMEM
M PPM
PPP ET 15
MM DU
ETIET I
SHAFT BY OTHERS PP EEEEEM
EEMMMMMPPP
EEM
ETI ITS
ITS
NOT USED

Fin 16
I
ETIET
I EEE ET .C
en
ITS I
BURJ KHALIFA tre
ETI

ETI
ITS Rd

ET

ETIET
ET . 17
ETIETI PP DU

I
PPM PPP
EMEM
M MMPPM ITS
PP EEEEEMEEM ETI ITS

I
I TI
ETE EEMMMMPPP d 18 19 20
EEEM ITS ail
R
ITS lK
h
I TI
ETE DU A

ET
PPMPP ITS
EEM P ETI
MPPMPP ITS DU

I
MM M
PP EEEEEM
EEM DU NOTES:

ETIET
SN

2791600 N EEMM PPP


EEEMM
M
ETI

I
ITS 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
Line

PP ITS
PPM
EEM
MM PPPP
MEPMM ITS DU 2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL
PP EEEEMEEM ETI
M PP ITS
M
EE MM P ITS
EEEM TRANSVERSE MERCATOR (DLTM).
ETI

ETIET
ETI ITS
PPMPPP 3. FOR GENERAL LEGEND AND NOTES REFER TO
EEM
M MPPPP SU ETI

I
DRAWING NO. DS-208-ITL-PSSN-G-105.

ETI
MEEMEMM
PP EEEEM ETI ETI
ITD

ETI
ET
EEMM P ITS
MPPP

I
EEEEMMM ITS U 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.
ETI

ITS
ETI D
ETI
PPPMPPPPPP ITS
ITS
ETI
DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.
EEM
MM ETI
PP EEEEMEEMMEMM ETI DU
ITS
EEMM PPP ITS ETI LEGEND:

ETI
M
EEEM
M ETI DU
ITS

ETI
ETI
ETI ETI DU PROPOSED
PPPMPPPPPP ITS
ITS
EEM
MM MMM ETI
PP EEEEMEEM E SU
ITD PROPOSED SEWER LINE
EEMM PPPP ETI ETI ITS
MM
MM
EEEE ITS PROPOSED MANHOLE
ETI SU
ITD ET

ETI
ETI ETI ITS
I

ETI
ETI PROPOSED MANHOLE W/ BACKDROP LEVEL
PM
P
PP
P P ITS SU
M
EEMM
M P
MM P
P ITD (BD.IL)
ETI PP EEEEM
EEEM DU ITS
EEMM PPPP ET
ETI ITS

I
M I SEWER LINE TO BE ABANDONED

ET
MM
EEEEM ETI ITS
ETI TS
DIU
DU ET SUBSIDIARY SEWAGE PUMP STATION TO BE
ETI ETI ITS ITS I
PPPMPPPPPP TS ABANDONED
EEM DIU

ETI
MM MMM
PP EEEEMEEM E
ETI

ETI
EEMM PPPP ETI ITUS
D TRENCHLESS/NON-DESTRUCTIVE METHOD
M
MM
EEEEM TS
DIU

ET
I TS NDM PIPELINE CONSTRUCTION

I
ETI

I
ITS US

ET
P DIT
MM PPMPPPPP
PM ITS STUB-OUT/PLUG FOR FUTURE CONNECTION
EEM ETI
EEM
PP EEEEM EMM ITS ITS
EEMM MM
PPPP ITS
2791500 N EEEEMM INDICATIVE LIMITS OF NDM CONSTRUCTION

ETI
ETI
ETI

ITS ITS

ET

ETI
ITSDU SHAFT

I
ETI EXISTING

I
ET
ITS ITS
ITSDU EXISTING SEWER LINE
PPP
EE
E
E
E
M
E
EM
M
M
M
M
MM
EPTPI
P
P
P
E TUS ITS
ITSID
ITS

EXISTING MANHOLE
S ITS

ETI
ITSIDTU
ETI

ETI
ET
I ET EXISTING HOUSE CONNECTION CHAMBER
ITS I

I
ET
ITS
EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
ET
I ETI

ETI
ET EXISTING MANHOLE W/ FUTURE CONNECTION
I
ET ETI
I EXISTING MANHOLE W/ FC ON BD (FC)
ETI

ETI
ET

I
ET

ETI
ET EXISTING PRIVATE INSPECTION CHAMBER
I

I
ET
EXISTING ABANDONED LINE

ETI
ET EXISTING STORM WATER LINE
I
I
ET

ETI
EXISTING WATER LINE

ETI
ET
I
EXISTING IRRIGATION LINE

I
ET

ETI
ET
I EXISTING EHV LINE
EXISTING HV LINE

ETI
I

ET
ET

I
EXISTING ETISALAT LINE

I
ET
ETI
EXISTING ITS LINE

ETI
ET
2791400 N I
EXISTING DU LINE
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-106

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107

ET
I

ETI
ET

I
ET EXISTING EMPOWER LINE

ITI
I

ETE
ET
EXISTING RAIL AGENCY
I
ET
I
DRAWING STATUS:-
I
ET

ET ETI

ETI
I

ET ET

ETI
I I
E TI T3 26-12-22 MS AM DA REVISED TENDER DRAWING

TI T2 16-09-22 MS AM DA REVISED TENDER DRAWING


E ET I

I
ETI ET

ET
I T1 29-08-22 MS AM DA REVISED TENDER DRAWING
ET
ETI I T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
ET I
I ET REV. DATE DR'N CH'D AP'D DESCRIPTION
ETI

ETI ET
I
ETI
ETI
ET
I TENDER DRAWING
ETI
Client:
ETI I
ET
ETI

ET
I
ETI
ETI

I
ET
ETI
I

ETI
2791300 N ETI ETI ET
ETI

ETI
ETI I
ET ETI

ETI
ETI ETI
I
DU ET
ETI
ETI
ETI ET ETI I
I ET
ETI

ETI ET

ETI
ETEIT I
I E
TI ET I
ETI I ET

UK
ETEIT
ETI

I E ET Consultant:
ETI TI I

ETEIT
ETI I E
TI
ETI

ETI ETEIT
I
ET

I
ET
ETI I
ETI
DU

ET
I

P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198


ET

Project Name: Project Number:


ETI ET
I
INTERCONNECTING URGENT
ETI DU

I
ET
I DEVELOPMENTS TO DM SEWERAGE DS-208/1
ET ET
I
ET
I
SYSTEM
ITS

ET
I
Drawing Title:
ET
BUR DUBAI AREA
I
ET

I
ET ITS
I
ITS
2791200 N
ITS EETT
II
ET
I
PROPOSED LINK SEWER PIPELINE
ET
I
ET

I ET
I
LAYOUT PLAN
S
I
ET

IT

ET
I EETT
U

II
D

IT ITS ET
I
495900 E

496000 E

496100 E

496200 E

496300 E

496400 E

496500 E
S ET ETE
I ITI ET Drawing Number: Date: Sheet: Scale: Rev
I

I
ET

S
IT

ET
I
ET

I
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109 ITS ET
I ET A1 @ 1000
IT I DS-208-ITL-PSSN-CI-0106 04-07-2022 06 OF 20 T3
U
D

S A3 @ 2000
S
IT
4953

4954

4955

4956

4957

4958
ET ET

I
I

ET
I

I
ET
ETI

I
ET
ET ETEIT

I TS
I
I

ET
ET
ITS IE ET
TI I
ET
I I
KEY PLAN

I
EIT
I
DU

ET
ET

ET
I

I
ET

ET
I ITS ET ETEIT
ITS IE ET
ET TI I

I
ET
ET I I

DTUS
I DU

AD
ET
ITI

RO
I
ET

ET
ITS ET ETEIT

ETE

I
I ET

ET

I TS
ITS

A
I ET IE I ET

TI

IN
ET
ET I TI I 01

IE
ET

M
I DU I AL MANKHOOL

I
ET
I ET

AL
ETI
ET ITS
I ET ET ETEITI

ET
ET
ITS I ET IE
ET I TI 02

I
ET

ET
I DU

I
IDTUS

ET
I

I
ET
ITS SH
2791700 N ET ET 2791700 N .RA

I
ET
I ET 03

I
IE SH

ET
TI

ITS
I T ID

I
I

ET
ET

IE
RO

ETI
I AD

I
IET

ET
ET IDTU
S ET ET 04 05
I I ET

ET
I IE
TI NOT USED
d Rd

I
I

ET
Zaye

ET
Shk.

I
ET
ET IDTU
S ET 07 06
ET ET I I ET

DU

I
I

ET
I

I
I

ET

ITS
I
ET
IDTU ET 08 09 ZAABEEL FIRST
S I AL SATWA

I
I

ET

ETI
ET
ET ET

ITS
I I ET AL BADAA NOT USED
I 2n
d AL JADDAF

I
10

ET
IDTU
S Za
ET

I
be

ET
ET I el

DU
I ET R
I

I
d.

S
IDTU

ET
ETI 11

ITS
I
IDTU

ET
S JUMEIRA

I
ET
ET ETI

ETI
ITS

I ET

al Rd
I ET ET 12

ETI
ET

I
I I

ET
I IDTU
S ETI I ZAABEEL SECOND
ETI

ETI
ET

Al Mustaqb
ET
EE
TTI I AL WASL
DU

ET 13
ET I
I IDTU

I
S

ET
IDTU
15A

ITS
Rd
EE 15B ail
I
TT h
ET II ET 14
ITS

ET I A lK
IE ET ET 15

I
NOT USED
TI I I

ET
I
ET
EE Fin 16
I

TT ETI
ET

II ET .C
DU

I BURJ KHALIFA en
tre

I
ET
Rd
ETI . 17

ITS
I
ET

EET ETI
ETI ETI ETI
ETI
DU

ET TI I ET ETI
ETI ETI ETI
ETI ETI
ITS

I I ETI ETI ETI ETI ETI ETI ETI ETI ETI I


ETI
ET R d 18 19 20
ETI ail

ETETI
EETT h
I

ETI lK
ET

II

ETI
I TI

I
DU

A
ETE

I
I

ET
ET
ETE ETI ETI ETI
I

ETI NOTES:
ET

IE
TTII EETT
II
DU

ETI ETI
ITS

2791600 N ETI 2791600 N


ETI
ETI
ETE
IETT 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

IT
I

II
ET

S
DU

2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL


I

ET
ET

ETI
I
ET I
I

ET TRANSVERSE MERCATOR (DLTM).


ET

I ET
I
DU
ITS

ET
ITS
I 3. FOR GENERAL LEGEND AND NOTES REFER TO

IT
ET
DRAWING NO. DS-208-ITL-PSSN-G-105.
I
ET

ITS

S
I
DU

ET
I
ET

I I
ET ET 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.
I

ET
DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

I
DU

ITS
ITS

ET ITS
ITS

ETI
ITS I ITS

ITS
I LEGEND:
I
ET

ET

ET
I

ITS
ET

ITS
ETI

I
PROPOSED
ITS
ETI
ETI
PROPOSED SEWER LINE

ETI
ITS
S
TI ETI PROPOSED MANHOLE

I
IT

ET

ITS

ITS
E
I

ITS
ET

PROPOSED MANHOLE W/ BACKDROP LEVEL


I

ETI
ET

ETI
(BD.IL)
ETI
SEWER LINE TO BE ABANDONED
I
ET

ITS TI

ETI
E EITI
ET ETI SUBSIDIARY SEWAGE PUMP STATION TO BE

ITS
I
ET

ITS
ABANDONED

ITS
ETI
I

EITI
I
ET

ET

ET

ETI
ETI
TRENCHLESS/NON-DESTRUCTIVE METHOD
ETI

TITI

ITS
EE
NDM PIPELINE CONSTRUCTION
TITI ETI
I
ET

EE
STUB-OUT/PLUG FOR FUTURE CONNECTION

ETI
I
ET TITI
EE ETEI T
I

I
ET

2791500
I ET INDICATIVE LIMITS OF NDM CONSTRUCTION
D N 2791500 N

ITS
U TITI
EE ETI SHAFT

ETI
EXISTING

ITS
ET ETI
I

ET
ET

I
ET
e SN
I EXISTING SEWER LINE
I ETI PP
P
Lin EE
EMM
MM
MPPP
DU ETI ETI E
EE
EM
M P
I

ETI
ET

ETI PP EXISTING MANHOLE

ETI
EEMM
MM
MP
PTPI
P
ET ETI ETI
E
E
E
EE
EM
M
MEP
P
ITS

ET I
I I ET ETI PP
PPP EXISTING HOUSE CONNECTION CHAMBER
MMMM
EEE MEPPTI

I
DU EEM
ETI ETI M

ET
E
ETEI ITS
I

ITS
ITS
ET

ET ETI
I ETI EE
EM
EM
MP
M
M PP
EP
P
PPI DU EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
ETI E
EEMM
M T
P ITS
ET ET
I I ET
I ET
ETI ETEI ITS ITS
I ET I

I
U EXISTING MANHOLE W/ FUTURE CONNECTION

ET
D
DU S ITS
IT ITS
ET I TI
I I ET E DU EXISTING MANHOLE W/ FC ON BD (FC)
I

ET
ET

ET ET I ETI
I

I
ET

I ET
EXISTING PRIVATE INSPECTION CHAMBER

ITS

I
ET
ET I

ET
I ET
I ET ETI

I
DU I
ET

PP
ETI EXISTING ABANDONED LINE

EEMM
ET S I
IT ETI
I ET ET
I
EXISTING STORM WATER LINE
I
ET

MMPPPP
ET

M
P
IT
ETI

MPP EEEEM
EM

I
S

IT

ET
I I EXISTING WATER LINE
ET

S
ET

ETI
TS

EEM
I

ITS
EXISTING IRRIGATION LINE

MPP
ET

PPP EMP
EEM

ITS
I

I
ET
I

I I EXISTING EHV LINE


ET

ET ET

MMPP
I
ET

I
MPP EEEM

ET
EMM
TTIII

ET
I EXISTING HV LINE
EEET
DU

ITS
ET

ETI

EM
I

ITUS
EXISTING ETISALAT LINE

PP
I ET

D
ET

I EEMM
ITS

MP

ITS
ITS
S
IT

ET I
ET U

M PPP E
I ETI ET
D I EXISTING ITS LINE
2791400 N 2791400 N

EPT
I

MPP EEEMM
TI ET

EM
EXISTING DU LINE
EDTU
I

I E TI
ET E ITS ITS ET
I
S

EM
EXISTING EMPOWER LINE
IT

PP
I

E
ET

EEMM
MP
I ITS
I ET ITS
ET

I ET

M PPP E
I EXISTING RAIL AGENCY
ET I ET
I

I ET ET

ETI

SN
E T I
DRAWING STATUS:-

PP
MPP EEEEMM
ITS I

TUS
ET DU

EM

SID
I
ET

ET

IT
e
IT

ET

I ET

I
I
ET

I
ET

Lin
ET I
I

ET

EEM
I I
I

ET

MPP
I

ET
ET

I
ET

PPP EMP
T ITS

EEM
E
I

ET
DU

I
I

M PP
ETI
ET

EEMM
S

I TS I I

M
IT

EM
I

EIT I ET
ET
ETI

ET T3 26-12-22 MS AM DA REVISED TENDER DRAWING


ET

ITS

MPP EEE
IT
I

ETI
ET
S
ET S

I T2 16-09-22 MS AM DA REVISED TENDER DRAWING

EM
I

I ET
ET

PP
IT

ET
I

E
EEMM
P
I
DU

EM
I ET I ITS
T1 29-08-22 MS AM DA REVISED TENDER DRAWING
ET ET I ET
S

ET I
IT

DU I
ET T0 04-07-22 MS AM DA DRAFT TENDER DRAWING
ET

IT

ITS
I

S
ET

S
ET S

E
IT ET REV. DATE DR'N CH'D AP'D DESCRIPTION
DU TI STUB-PS_E20

ET
I
ET

I
IT

I
I

I
ET ETI
I

ET

I
ET

I
ET
DU

ET
I
ET
I IL=-8.053
TENDER DRAWING
ET

ITS
S
IT

ET
ITS
ET

IT

ET I I
ET
S E
ET

I S ITS
Client:
I

I
ET

IT S
IDTU
I

TI
ET

I
ET

I
I

ET
ET
ET
S

ET
I
IT

II
EEETTT

I
DU

EE
E
EM
I
ET

M
MP
U

MP E
IT
D

PP
ET

ET
S

S
I

I
ET

FUTURE CONSTRUCTION
I

IT I
ET
I
I

MP
ET

ET
ET

I
ET

2791300 N SHAFT BY OTHERS ET


I 2791300 N

ET
I
ET

I
IT
ET

S
IT
I
I

I ETI
ET

ET
I
ET
I
ET

I
ET
I
ET

Lin
IT

S
S

IT

e
I
ET

I
ET

SN
I
I

ET
ET

PP
MMPP
EEEM Consultant:
S
ETI

EMM
IT

PP
EEEMMP
D
U
I

I
ET

ET
I

PP
ET

ET

MMPP
EEEM
IT I
ITS

ET
S
I
ET

I EMM PP
EEEMMP

EEEEMMMM
EEMM
PPPP
PP
S

DU
IT

PP P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198


I

MMPP
EEEM
ET

I
I

ET
IET

IT

EMM PP
Project Name:
S

EEEMMP Project Number:


ET
ET

ITS
I

I
ET

EEEEMMMM
INTERCONNECTING URGENT

EEMM
PPPP
PP
DEVELOPMENTS TO DM SEWERAGE DS-208/1
I

ITS
ET

I
I

I
ET
IET

ET

EEETM
I
ET

MI P

SYSTEM
ET

PEM
I
ET

P
ITS

Drawing Title:
ET
I

EEEMEEMEMMM
ITS

BUR DUBAI AREA

PPPPPPP
EM
M
ITS
DTUI

I
I

I
ET
ET

ET
E

2791200 N 2791200 N
I

PROPOSED LINK SEWER PIPELINE


ET

ITS

EEEMEEMEMMEMMM
ITS

PPPPPP
S

LAYOUT PLAN
ITS
I IT

ET
EDTU

I
I
ET
ET

ET

ITS
I

I
ET

EEEMEEMEMMEMMM
ITS
495200 E

ET E

495400 E

495500 E

495600 E

495700 E

495800 E
PPPPPPP
ETE

Drawing Number: Date: Sheet: Scale: Rev


ITI
495300I

ITS
I
I
ET
ET

A1 @ 1000
ET

DS-208-ITL-PSSN-CI-0107 04-07-2022 07 OF 20 T3
I

EEEMEEMEMMM
A3 @ 2000

PPPPPPP
EM
ETE

M
ITS

ITI
ITS
4955

4956

4957

4958

4959

4960

4961
EEM
IT

U
EEEEMMEMMM
M PPPP

D
S

PP
ETE
ITI

KEY PLAN

S
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-107 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-106

IT
ET
I

EEEMEEMEMMEMMM
IT

U
S

D
PPPPPPP

AD
ET

RO
I

A
IN
01

M
AL MANKHOOL

AL
EEEMEEMEMMM

U
D
ET 02

PPPPPPP
EM
M
I
SH
I

.RA
ET

03 SH
ID
RO
I AD
ET
04 05
NOT USED
d Rd

EMP
Zaye

EMEP
07 06 Shk.
ET

MPE
I I
ET

EMMM
EPP
ET 08 09 ZAABEEL FIRST
2791100 N

P
MP
AL SATWA
I
AL BADAA NOT USED
2n
ET d AL JADDAF
10 Za
I TI

EMPPMP
be

EME
E el
R
ET d.
I 11

EEM
JUMEIRA

EM
MEPP
P
MP

al Rd
12
ZAABEEL SECOND
I

Al Mustaqb
ET ET ET AL WASL
I

EMP
13

EMEP
I

ET
15A d

MP
I
R
15B ail

EEM
14 Kh

M
M
Al

EPP
I

P
MP
ET NOT USED 15

e SN
16

ET
Fin

I
.C
BURJ KHALIFA en
tre

EMPPMP
LinETI
Rd

EME
. 17

EE
EM
MM
ET
d 18 19 20

EPP
R

P
ail

MP
I
h
AlK

EMP
NOTES:

EMEP
ETI

ET

MP
I

EEM
1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

M
MEPP
P
MP
2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL
TRANSVERSE MERCATOR (DLTM).

ET

EMPPMP
I

EME
ETI
ET
I 3. FOR GENERAL LEGEND AND NOTES REFER TO

EE
DRAWING NO. DS-208-ITL-PSSN-G-105.

EM
M
2791000 N

M
EPP
P
MP
ET
4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.

ET
I

I
ET
I DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

EMPPMPE M
EME
I
ET
LEGEND:

I
ET
ETI

EM
I

ET
ET

MEP
PP
EET

I
PROPOSED

MP
TI I
I

I
ET

ET
PROPOSED SEWER LINE

I
ET
ET I
ET

EMPPMP
PROPOSED MANHOLE

EME
I

I
ET
I
ET
ET PROPOSED MANHOLE W/ BACKDROP LEVEL

EE
I

EM

ET
M
(BD.IL)

M
EPP

I
I
ET

P
MP
ET
I
ET

ETI SEWER LINE TO BE ABANDONED

I
ET

ET

I
I
I

ET
I ET
SUBSIDIARY SEWAGE PUMP STATION TO BE

I
ET
EET

EMP
I

EMEP
ET
TII ABANDONED
ETI

MP
ET
TRENCHLESS/NON-DESTRUCTIVE METHOD

EEM
I

M
M
I

EPP
NDM PIPELINE CONSTRUCTION

ET

ET
ET
I
ET

P
MP
I
ET

I
ETI STUB-OUT/PLUG FOR FUTURE CONNECTION

ET
I
I

ET
ET
I ET I INDICATIVE LIMITS OF NDM CONSTRUCTION
ET I

ETI
E
EEMEMEMMM SHAFT

I
I

ET
ET
P EXISTING
I

PPPP ET
ET

I I
ET EM
EXISTING SEWER LINE

I
I
ET

ET
P

ET
I
I ETI EM
EEMEMEM
EXISTING MANHOLE
ET MP
PPPP ET

I
I

ET
ETI

EXISTING HOUSE CONNECTION CHAMBER


ET

I
2790900 N EM
ET

I
P

ET
I
ET
I EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-108

I
ET
ET
I

ETI ET EXISTING MANHOLE W/ FUTURE CONNECTION

I
ET
I
I
ET
ET

EXISTING MANHOLE W/ FC ON BD (FC)

MMPPP
PP
I

ET

EEEM
I

EEEMM
I
ET

ET
I
I
ET

ET

EXISTING PRIVATE INSPECTION CHAMBER


I

I
ET
I
ET
ET
I EXISTING ABANDONED LINE
ET

I
ET

MMMPPPP
I
I

P
ET

EEEMM
ET

EEM
EXISTING STORM WATER LINE

I
I

ET
ET

I
ET

I
I

ET
I
ET
ET EXISTING WATER LINE
II
EETT

I
ET
I
ET

EXISTING IRRIGATION LINE

MMPPPP
PP
ET
I

M
I

EEEM
ET

EEMM
I

I
ET
ET

EXISTING EHV LINE


I

I
ET
I
ET

I
EI T
EXISTING HV LINE
II
EETT

IET
ET

ET

ET
I

I ET
I EXISTING ETISALAT LINE
I

I
ET
ET
ET

I
I

PP
ET

ET
P
EEM
EEMM
EXISTING ITS LINE

I
I
EI T
N

IET
ET
EET

II

ET EXISTING DU LINE
EETT

I
TI I

ET
eS

ET
ETE

I
ET

ET

I
Lin I

EXISTING EMPOWER LINE


ET
ITI

I
ET

PP
PP
EEM
EEMMM

ET
I
EXISTING RAIL AGENCY

EI T
I
ET

I
EET

ET
DRAWING STATUS:-
TI I

II

ET
I

EETT
ET

I
ET

I
I

2790800 N

I
EIT

ET
ET

M PPP
ET

P
ETM
I

EEMM
ET

I
I
ET

I EE
ET
EI T

ET
I
ET

I
ET
I

I
ET
I
ET

T3 26-12-22 MS AM DA REVISED TENDER DRAWING


I
ET
I
ET

ET

T2 16-09-22 MS AM DA REVISED TENDER DRAWING


I

EE TI I T1 29-08-22 MS AM DA REVISED TENDER DRAWING


EEEMMMMMPP
PPP
ETI
EET

T0 04-07-22 MS AM DA DRAFT TENDER DRAWING


I
ET

ETI
I

REV. DATE DR'N CH'D AP'D DESCRIPTION


ET
I
ET

TENDER DRAWING
ETI

MP
EEM I
P
TI

P
P
EET

EMMM
I

EE
ET

I
ET

Client:
I
ET

I
ET
I I

MMMPP
ETET

PP
ET
EEM
EEEMM
I
ET

I
ET
I
ET

EEEMMMMMPP
I

PP
ET
I I

E
ETET

I
ET

I
I

ET
ET

ET
I
I
ET

2790700 N
I
ET

ET
I
ET

I
Consultant:
I
ET
I
ET
I
ET
I
ET

I
ET

ET
I
I

P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198


ET

Project Name: Project Number:


I
ET
I
ET

ET
INTERCONNECTING URGENT
ET

I
EMP
EMP

DS-208/1
I
I

EMP
EMP EMP
ET

DEVELOPMENTS TO DM SEWERAGE
I
ET

ET
ET
EMP

I
EMP
EMP
EMP
I

SYSTEM
I
ET
I

ET
ET

I
Drawing Title:
ET
I
I
ET

ET IT
BUR DUBAI AREA
EMP
EMP

S
I
ET

EMP
EMP EMP

I
ET D
U
ETI
I

I
ET

I
EMP

ET
I
ET

PROPOSED LINK SEWER PIPELINE


EMP
EMP
EMP

ET

S
I

IT

ET IT
I

S
ET

DU

LAYOUT PLAN
EMP
EMP

ET
EMP EMP
EMP

I D
U
S
EETT
I
ET

IT
ETI
II

IT
EMP

ET
495500 E

495600 E

495700 E

495800 E

495900 E

496000 E

496100 E
EMP
EMP

S
EMP

I
2790600 N Drawing Number: Date: Sheet: Scale: Rev
D
I
ET

TI

EET
IE

TI I ET
ET
ET

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-110 I A1 @ 1000

D
S
I

U
ET DS-208-ITL-PSSN-CI-0109 04-07-2022 09 OF 20 T3
IT
EMP
EMP

I I
ET ET
EMP
EMP
I

A3 @ 2000
ET

I
ET
I
4951

4952

4953

4954

4955

4956

4957
ET ET
I I

I
ET

ET
ET
KEY PLAN

I
I

ET
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-108 FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-109

I
ET
ET ETE
I ITI ET

I
I

ET
I
ET
ET

AD
I

RO
ET
EETTI
I

A
IN
ET ETI 01
I

M
ET AL MANKHOOL

AL
I

N
TII

EETTI
EET

02

I
ET ETI

ET
eS

I
I

ET
ET I ET ETI
I I

I
ETEITI ETI SH

ET
ETI ETI .RA

Lin
03 SH
ET ET ETI ID
RO
I ETI

I
I AD

ET
ET
IE ETI
TI ETE
IT EMP
EMP EMP EMP
EMP
04 05
I EMP EMP
EMP EMP EMP
EMP

I
EMP EMP

ET
I
ET
NOT USED
I ITS
ETI ETI DU d Rd
ET ET
I I ET ETI
Shk.
Zaye

ETI
I
07 06

ET

ETI
EETT ET

ET
I
IEI

I
TI

EMP
EMP
I
ET
08 09 ZAABEEL FIRST
AL SATWA
ET
I AL BADAA NOT USED

I
2n

ET
EET

EMP
EMP
I

EMP
EMP
EMP
ET

ETIETI
TI I d AL JADDAF
10 Za

EMP
EMP
EMP
EMP
be

I
el

ET
Rd
ET .
I 11
JUMEIRA

ETI

EMP
EMP EMP
ITS

al Rd
DU
12

ETI
ET
ZAABEEL SECOND
2790500 N

Al Mustaqb
EMP
EMP
EMP
EMP

ETIETI
ETI
ETI
AL WASL
13
ET
I 15A

I
ETI
Rd

ET
15B ail
14 Kh

ETI
ET
Al

EMP
EMPEMP
I
15

ITS
ET NOT USED

DU
I
16

EMPEMP
ET
ET ET Fin
I .C
I ETI

EMP
EMP
en

EMP
EMP
EM
EEEMMM PEM ET
I
BURJ KHALIFA tre
Rd
ETI PPP E 17

ETI
ETI
ETI P ET .
EM
EE M I
ITS MMPP
PP DU
ET

P
PP
I

I
18 19 20

ETI
EE

EMM
Rd

TIEIT
ET

I
MMP

EPP
ET
E

M
ET M P I ail

ETI
EM
EM
EET
ITSP E

ITS
h

P EP
IE ET lK

DU
EMEM
T I MP
EM I A
ITS P ITS

ITS

EMP EMP
EMP
I
NOTES:

ET
DU

ETI
ET
ET I

I
IET

P
I

PP

EMP
EMP
EMP EMP EMP
EMM
ITS
1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

EPP
ET

ETI
EM
EM

ETI
P EP
ITS DU

EMEM
ETI

ETI
2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL

DU

ITS
ITS
ET

I
ITS
EM

ET
EEEE
MM
M MPPPP I
TRANSVERSE MERCATOR (DLTM).

I
ET
P ITS ETI

EMP EMP
DU I

I
3. FOR GENERAL LEGEND AND NOTES REFER TO

ET

ETI
P
PP
ET

M
EM
ITS ETTII

EPP
I E

M
EM
EEEE DRAWING NO. DS-208-ITL-PSSN-G-105.

EM

EMP
EMP
EMP
EM
MM
M MPPPP

P EP
P I

EMEM
ETE

I
I TI ET

ET
ITS ET
ETI 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.

ITS
IETTSI

I
I

ET
ETI

I
ET
ETI
EM
EEEEE
MM
M MPPPP ETI
DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.
PP

DU
ETI
ETI
LEGEND:

P
ETI

PPP EM
PP PP
PROPOSED

ITS
ETI

ETI
IETTSI

PP
M
ET

EEMEEM
M
I

EEM
2790400 N

ET
ETI

MPP
ETI PROPOSED SEWER LINE

P
P
EM
M
MMM
M
E
EEE
ETI

E
PROPOSED MANHOLE

E
ETI ETI
ETI

ETI
PROPOSED MANHOLE W/ BACKDROP LEVEL

U
(BD.IL)

P PP

ITD
S
IETTSI

PP
M
ET

MEEPM
M
I

EEM
ET

EEM
SEWER LINE TO BE ABANDONED
SUBSIDIARY SEWAGE PUMP STATION TO BE
ABANDONED

ETI
SU
TRENCHLESS/NON-DESTRUCTIVE METHOD

PMPP

ITD
IETTSI

PP
MEEM
ET
I

EEMM
ET
NDM PIPELINE CONSTRUCTION

EEM
STUB-OUT/PLUG FOR FUTURE CONNECTION

ETI
INDICATIVE LIMITS OF NDM CONSTRUCTION

P PP

ITS
I

I
SHAFT

ET

PP
I
ET

M
MEEPM
ET

EEMM
EXISTING

EEM

ET
DU
EXISTING SEWER LINE

I
ITS
ET
I EXISTING MANHOLE

P PP

ITS
I
ET

PP

I
I

M
MEEPM

ET
ET
EXISTING HOUSE CONNECTION CHAMBER

EEMM
EM

DU
EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
ITS
ETI
EXISTING MANHOLE W/ FUTURE CONNECTION

I
ET
P PP

ITS
I
ET

PP
I

M
MEEPM
ET

EEMM
EXISTING MANHOLE W/ FC ON BD (FC)

EEM
EXISTING PRIVATE INSPECTION CHAMBER
ITS

2790300 N

DU
ET
I EXISTING ABANDONED LINE

P PP

ITS
PP
M
MEEPM
EEMM
EXISTING STORM WATER LINE

EEM
I
ET
ETI
EXISTING WATER LINE
ITI S
ET

PP PP EXISTING IRRIGATION LINE

ITUS
PP
M
EEMEEM

D
M
EEM

EXISTING EHV LINE


I
ET

I
ET

ET
I I EXISTING HV LINE
ET

IT
S EXISTING ETISALAT LINE
P PP

ITS

ET
PP
M
MEEPM
M

I
EEM
I

EXISTING ITS LINE


EEM
ET

I
I

ET
ET

ITS EE EXISTING DU LINE


DU

TTI I S
ET IT
EEEM

EXISTING EMPOWER LINE


MMPPP

I
M

I
P EE

ET
PMPP

ITS
I

PP
ET

MEEM
I

M
EEMM

EEM
ET

EEM

EM EXISTING RAIL AGENCY


M
M

EETTI
PP
PP

P
ITS

I
ET

ETI DRAWING STATUS:-


EEM
EE M ET ITS
M
M P I
EEM
EEM

P
PP ETI
MPP

EM ITS I
P E

P ETI ET
P PP

ITS
EEM

ITS
EMM
I

ET
PP
ET

M
MEEPM
MPP

I
EEMM
PP

EEEM
EE MP ET
EEM

M
M PP I
P ETI
I

P
ET

EM ETI
P ET I
EEM
EEM

T3 26-12-22 MS AM DA REVISED TENDER DRAWING


M
M
PP EE
P

EEM
EE MP ET
I
ET

E
EEMM

M
M PP
P I T2 16-09-22 MS AM DA REVISED TENDER DRAWING
M

P
M
DU

P PP

ITS

IT
PP
PP

PP

EM
M
MEEPM

2790200 N S
EEMM

P T1 29-08-22 MS AM DA REVISED TENDER DRAWING


EEM

DU
I
ET

ET T0 04-07-22 MS AM DA DRAFT TENDER DRAWING


I
REV. DATE DR'N CH'D AP'D DESCRIPTION
I
ET
EEMM

P PP

ITS
PP

TENDER DRAWING
M

DU
MEEPM
PP

IT

EEMM
EM
S
EEM

I
MP

ET
P

Client:
DU
P PP

ITS
ET

PP
ITS

M
MEEPM
DU

EEEEE
EEMM

MP
I

M
MM
EEM

M PPP E
I

M
ET

EEEEE
M
MMPP
M
M
PPP E
P PP

TU

MP
S
ET

PP
M
MEEPM

ID
ITS

EEMM
I

EEM

EEEEE
I

MP
ET

M
MM
M
PPP
EM
P

EEEEE
ITS

M
MMP
M
M
PPP
ETI

EM
P
I
MP
UMPPPPP
ET

DU
M
EEEMM
ITS

EEM

EEEEEMP Consultant:
D

M
M
MM
PPP
EM
P
ITS

EEEEE
MM
MMP
ETI

M PPP
I

MMPPPP

EM
ET

PP
EEEMM

P
M
M

2790100 N
EEEU
D
ITS

P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198


ITS
DU

Project Name: Project Number:


MMPPPP
I
ET

M
P
M

INTERCONNECTING URGENT
EM
EEEM
E
E

DU ET
I
DS-208/1
ITS

DEVELOPMENTS TO DM SEWERAGE
ITS
DU
ETI

DU
ET SYSTEM
MP
I

M PPP
ET

I
P
EM
EM M

Drawing Title:
E

DU
EE
E
ITS ETI

DU

BUR DUBAI AREA


eS

ET
ITS

I
DU
Lin
I

PROPOSED LINK SEWER PIPELINE


ET

MMPPPP
PP
EEEMM
EEEMM

DU
I
ET

LAYOUT PLAN
ITS
MMPPPP
I
T

EM
P
495100 E

495200 E

495300 E

495400 E

495500 E

495600 E

495700 E
M
UE

EEEM
DEEUM
SD

Drawing Number: Date: Sheet: Scale: Rev


ET
ITI
ET

TS

FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-111 A1 @ 1000


DIU

DS-208-ITL-PSSN-CI-0110 04-07-2022 10 OF 20 T3
A3 @ 2000
MMPPP
I
ET

PP
EEEMM
EEEMM
I
I

ET
ET
4951

4952

4953
MP
I

PP
ET

PPP
M
M
EEEM
EEM M
ET
KEY PLAN

I
S I

ET
DIITU T
I
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-110

ET E
DU

I
ET

ET

ITS
2790000 N

AD
RO
MMPPPP
I
ET

PP
M

A
EEEM

IN
EEEMM
01

M
ET
AL MANKHOOL

AL
DIITU
I

I
DU

ET

ET

ET
ITS
DU 02

IDTU
S
DU

DU
SH
.RA

I
03

ET
SH

ITS
DU ID

I
RO

ET
EM AD

S
EEM

TIIT
I MP

I
ET

ET
DU PP 04 05

DEU

MMPPPPP
M
P
M
EEEM
NOT USED
d Rd

EEM
Zaye
Shk.

DU
PPPPP EM 07 06

D
IT
ITUS
EEM
MM
MP

I
ET
M

S
PP
E
EEM

ITS
EEM

I
ET
ZAABEEL FIRST

S
ET 08 09

TIT
I
I

AL SATWA

ET
ET

SN

DU
DEU
AL BADAA NOT USED
2n
d AL JADDAF
10 Za

e
be
PPPPP

ET el
EMM

Lin
I
ET
I R
M
EEM

ITS

D
EMP
EMP

IT
d.

EMP

ITUS
M

11
EE

I
ET
S
JUMEIRA

ITS
I
DU I

ET
ET

ET

al Rd
ET 12
DU

I ZAABEEL SECOND

Al Mustaqb
PPPPP

I AL WASL

EEMMP
ET

P
PP

ITS
EMM

I
13

EEMM
ET
DU
M
EEM

ITS

MP
MMPP
EEM

PP
15A

I
ET

EEEM
ET

M
d

EEEM
ET

S
I R
I 15B ail
I

IT
I

ET
ET

ET I
14 Kh
Al

DU
EEEMM
DU

MP E NOT USED 15
PP M P
ET Fin 16
ET
PPPPP

EEMMP
I .C

P
I

PP
DU

ITS
EMM

en

EEMM
ET
DU
BURJ KHALIFA
M

tre
ITS
EEM

MP
2789900 N

MMPPP
Rd
EEM

PP
17

I
.

EEEM
ET

EEEMM
I TS
I
ET

ET I
ET ET

DU
I I
DU

R d 18 19 20
h ail
lK
PPPPP

EEMMPPP
A

ITS
EMM

EEM
P
I
ET
M

ITS
EEM

ET

MP
ET

MMPPP
EEM

PP
I I

EEEM
NOTES:

M
ET

EEEM
I
ET

ITS

I
ET
DU
EM
EEEM ITS
DU

MP P
M
PP ET ET 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

I S
ET I I ITS

P PP
ET IT
I

EMP
EMPM
2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL

ITS
PEM
ITS

EEM
MMPPPE
PP

DU
TRANSVERSE MERCATOR (DLTM).

EEM
I

M
M
ET

EEEM
ET ET

ITS
I

I
I

ET
3. FOR GENERAL LEGEND AND NOTES REFER TO

I U
ET D
DU ET
I DRAWING NO. DS-208-ITL-PSSN-G-105.
I
ET

P PP
P

EMP
DU

EMMPM
P

ITS
ET

EM
ET

EEM
I 4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.

EEM
I ETI

MP
PPP
PP
M
M
EEEM
I

EEM M
ET
DU ET
I DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.

I
ET
ET
I LEGEND:
P
MP
EM

P PP
DU

U
DU

EMMP
E

P
P

ITDS
EMMP
EEM
EM
PROPOSED

EEM
ET

ITS

I
I PROPOSED SEWER LINE

ET
I
DU

ET
PROPOSED MANHOLE
PROPOSED MANHOLE W/ BACKDROP LEVEL
DU

ITS
ETI
DU (BD.IL)

MMPPPP
PP
EEEMM
EEEMM

DU
DU SEWER LINE TO BE ABANDONED

I
ET
I
ET
MPP
P
EM
EEM

2789800 N SUBSIDIARY SEWAGE PUMP STATION TO BE


ABANDONED
DU

TRENCHLESS/NON-DESTRUCTIVE METHOD
NDM PIPELINE CONSTRUCTION

MP
I
EEMMP ET
PP E
I
ET

DU
STUB-OUT/PLUG FOR FUTURE CONNECTION

ITS

EEMM
DU

INDICATIVE LIMITS OF NDM CONSTRUCTION


SHAFT
EXISTING

I
ET
I
ET
EXISTING SEWER LINE

DU
MEPMP

ITS
DU

EXISTING MANHOLE
EEM

EM
EEEMMPPP
EXISTING HOUSE CONNECTION CHAMBER

I
M

ET
P

I
ET
EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
MEPMP

ITS
DU

EM EXISTING MANHOLE W/ FUTURE CONNECTION


EEM

P
EEEM
MMP

N
PP
EXISTING MANHOLE W/ FC ON BD (FC)

eS

I
ET
EM
P
EXISTING PRIVATE INSPECTION CHAMBER

DU
Lin

EEMP
MPP
EEEM

P
ITS
MPP
M
DU

EEMM
P EXISTING ABANDONED LINE
EM
P
PMPP

EXISTING STORM WATER LINE


EMEEM

EEEM

I
MPP
M

ET
P

TI I
EET
EXISTING WATER LINE

DU
DU
EXISTING IRRIGATION LINE
2789700 N
EXISTING EHV LINE

IT
DU

TI I

PE
EET

EM
DU EXISTING HV LINE

S
IT
EXISTING ETISALAT LINE

MPPPP
EM
EXISTING ITS LINE

P
M

I
EM

ET
TI I

EEEM
EET
E
MPP

EMMP
PP
EM
M

P EXISTING DU LINE
S
EEEM

IT

EM
EM
EXISTING EMPOWER LINE
DU

PP E
EMMP
P EM TI I

I
EE

ET
MPP EET EXISTING RAIL AGENCY
EM EM
EEMMPPP
EM
EM P M P S
PP IT
PP

EM DRAWING STATUS:-
EM

EM P
EM

P
P
P

P
EM

EE
EM
MEMP EM
EMPMP EE
EM P
MMPP
P
P E
DU

I
EMMP

ET
S
P

P IT
EM

I I ET
EETT
PP

I
EM

T3 26-12-22 MS AM DA REVISED TENDER DRAWING


P
EM

EMDU

EM

DU
P

T2 16-09-22 MS AM DA REVISED TENDER DRAWING


I
ET

I
EETTI ET T1 29-08-22 MS AM DA REVISED TENDER DRAWING
P
EM

DU I
EEEMMPP

P
DU
ET

E M T0 04-07-22 MS AM DA DRAFT TENDER DRAWING


I

I
EETTI REV. DATE DR'N CH'D AP'D DESCRIPTION
P
EM

DU
IT

TI
TENDER DRAWING
S

E
P
EEEM

EM
EM
EEM
MM

I
EEEM
PE

EETTI
DU
P
EEEM
E
MPP
EMEP

I
2789600 N
M
P
M
MPPM

ET
M
M

P
MP
EPE

DU Client:
P
P
PPM
MP

I
PP

ET

ET
I

MP
IT
S

I E
EETTI
I
ET
PPPPP P ETI
EEM PM
MMP
ETI

DU I
EETTI EM
EMM
EEM
E
P
E MP
EEMP
E M
IU
ETD
EEMEM P P

S
ITS

PPPPPMP IT
PMPP
EEMEM MPP P

EEM
EM
E MME
MM P
P
TTII I
E

EEM P
MP
EEM

E
EET E MP ETI
EMMP P

EM
E M P ETI
I
EEM

E ET
DU
EMMP

ETI
P

ETI
TTIII SN
EEMEM P P

E I
EET e ET
PMPP
EEM

IS
Lin
T
ETDI U
EMMP P

DU
EM P P
EEM
EMMP P
EEM
EMMP

Consultant:
P

I
EETTTII
E IS
ETIT
DDUU I
DU ET
I
ET TIITS
ET

IE
I

I ET
DU ET
I
ET P.O. Box. 23461 - Dubai. U.A.E - Tel. 04 - 4303307 - Fax. 04 - 4303198
DU

I PP TIITS
ET EEEMMMMPPPP IE Project Name: Project Number:
I EEEMM ET
ET
ET

DU
INTERCONNECTING URGENT
I

DU ET
I

2789500 N I
ET
I
ET
TITS
IE I
DEVELOPMENTS TO DM SEWERAGE DS-208/1
DU

ET

ET
I
I
SYSTEM
I ET Drawing Title:
I ET
ET ITDSU I
ET

ET
EM
P TI
BUR DUBAI AREA
I

E
PP
MP
EEM
EM I I
I ET ET
ET ITDSU
ET
I
ET
I PROPOSED LINK SEWER PIPELINE
ET
I

ET
I
ETU
I
ET
ITS
I
ET
I
LAYOUT PLAN
D ETI
494700 E

494800 E

494900 E

495000 E

495100 E

495200 E

495300 E
I
ET
I ITS I Drawing Number: Date: Sheet: Scale: Rev
ET I ET
P
MMP ET
EEM
E I
DU FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-112 ET A1 @ 1000
DS-208-ITL-PSSN-CI-0111 04-07-2022 11 OF 20 T3
ITS A3 @ 2000
I
ET
I
ET
4947

4948

4949
DU
ITS
I
ET

I
KEY PLAN

ET
FOR CONTINUATION REFER TO DWG. DS208-ITL-PSSN-CI-111

I
ET
ET
DU

EMMP
S

P
IT

I
ET
I

DU
ET

AD
ITDS

RO
U

I
ET

A
IN
ITS
01

M
AL MANKHOOL

AL
ET
I
ET
ITDS

DU
I
U ET 02

I
ET
SH

I
P

ET
.RA

PM
2789400 N 03

P
SH

E
EM
ID

EM
RO

I
ET
S AD

ITI
DU IT

I
ET
ITS
04 05

EET
EMMP
P
I
ET
NOT USED
d Rd

E
ET Zaye
I I Shk.
ET 07 06

P U
P
EM D
PM
ETI

E
EM
I
ET

TI I
ET 08 09 ZAABEEL FIRST

S ET
I AL SATWA

IT E
ET

I
ITS

ET
AL BADAA NOT USED

EMMP
I

P
2n
ET d AL JADDAF
I

10

E
ET

Za

ET
ITI be

I
ET
I

el
ETE
ET

PM
I R

P
E

312
d.

EM
EM
JUMEIRA
11

ITS
I

ad
I
ET

ET

al Rd
EMMP
ET 12

P
I TI

Ro
ZAABEEL SECOND

E
IE
I

Al Mustaqb
ET

ET

P
AL WASL

PM
13

DU

I
P

ET
E
EM
EM
ET 15A
I Rd
I 15B ail
ET 14 Kh
ITS

TI

ETI
Al

EMMP
P
E NOT USED 15

E
TI I

ITS
16
EET

Fin

P
.C

PM
en

I
BURJ KHALIFA tre

ET
ITS
EM
EM
Rd
TI
I

17

DU
.
ET

DU IE
ET
ITS

EMMP

ETI
P
Rd 18 19 20
ail

E
TTII

ITS
h

I
lK
EE

ET
TI A

PM
IE

P
E
ET

ETI
EM
EM

ITS
NOTES:

DU

ETI
2789300 N

EEMMP
ET

P
DU

I I 1. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

ETI
I ET
DU

ET
I

P
ET

2. CO-ORDINATE SYSTEM BASED ON DUBAI LOCAL

PM

ETI
P
E
EM
EM
ETI TRANSVERSE MERCATOR (DLTM).

ITSETI
DU

ITS
I
I ET 3. FOR GENERAL LEGEND AND NOTES REFER TO

DU
EEMMP
ET

P
DU

ETI
TS

DRAWING NO. DS-208-ITL-PSSN-G-105.


DIU

TI
P

ETI E
PM
P
4. FOR PROFILE DRAWINGS REFER TO DRAWING NO.
E
EM
EM
TI

I
I ET
IE

DS-208-ITL-PSSN-CI-201 TO DS-208-ITL-PSSN-CI-216.
ET

ET

ETI
DU DU

ITS
ITS
EEMMP

DU
P

ETI ITS
LEGEND:
TS

ETI
DIU

ETI
P

ETI TI
PM
P

TI E
E

PROPOSED
EM
EM
I

E
IET

DU
ET

PROPOSED SEWER LINE

ETI
EEMMP
P

ITS
I
PROPOSED MANHOLE
DU ET
PROPOSED MANHOLE W/ BACKDROP LEVEL
P

I
PM

ET
ETI
P
E

(BD.IL)
EM

ETI
EM

SEWER LINE TO BE ABANDONED


EEMMP

ETI
P

SUBSIDIARY SEWAGE PUMP STATION TO BE

ETI

ETI
ITDSU
ABANDONED
P
EM

ETI
TRENCHLESS/NON-DESTRUCTIVE METHOD

ET
NDM PIPELINE CONSTRUCTION

I
ETI
EEMMP

STUB-OUT/PLUG FOR FUTURE CONNECTION


P

DUIT ETI

ETI
ETI
S S

ET
P

DITU INDICATIVE LIMITS OF NDM CONSTRUCTION


EM

I
2789200 N DU ET
I
DU ITDSU ETI SHAFT
EXISTING

DU
PP DU

ITDSU

IT
DSU
ETI
EEMMP

EXISTING SEWER LINE


P

ET
337/23
MEEPMMMP

I
Road

ET
PE E

EXISTING MANHOLE

ETI

I
ETI
ETI ETI
ETI EXISTING HOUSE CONNECTION CHAMBER
EM

ITS ETI
I
DU ET ETI
DU ITS ETI ETI
EMMP

DU
DU ETI EXISTING MANHOLE W/ BACKDROP LEVEL (BD.IL)
P

ETI
ITS ETI
ETI
E

DU ITS ETI ETI


P

ETI DU EXISTING MANHOLE W/ FUTURE CONNECTION


EM

ITS
DU

EETTI
DU ETI ETI

I
ETI

ITS

ETI
DU ITS ETI EXISTING MANHOLE W/ FC ON BD (FC)
DU
EXISTING PRIVATE INSPECTION CHAMBER
P

ET
TI U

EXISTING ABANDONED LINE


EM

ETI
D

I
ET
TITIETI

ETI
P

EXISTING STORM WATER LINE


EMP

ETI
EM

EE

ETI
EXISTING WATER LINE
P P
EM EM

ET
ETI
I ETI
ET

I
ETI
ETI EXISTING IRRIGATION LINE
TI DU
U
D

ETI ETI
P

EXISTING EHV LINE


EMP

ETI

DU
EPM

ETI E
EM

EXISTING HV LINE
P P
EM EM

EXISTING ETISALAT LINE


DU

ETI
P

ETTII DU
EMP

EXISTING ITS LINE


EM

2789100 N

ETI
ETI E
PMP P

EXISTING DU LINE

ETI
EMEEM

EXISTING EMPOWER LINE


SN
P

ETI
EM

EXISTING RAIL AGENCY


TI DU

Line

DRAWING STATUS:-
ETI

ETI
E

ETI
P
EMP
EM

ETI

ETI
T3 26-12-22 MS AM DA REVISED TENDER DRAWING
ETTI
I

ETI
E

DU

ETI
T2 16-09-22 MS AM DA REVISED TENDER DRAWING
DU
P
EMP

T1 29-08-22 MS AM DA REVISED TENDER DRAWING

ETI
EM

ETI

EEEEMMMPP T0 04-07-22 MS AM DA DRAFT TENDER DRAWING


EE EMM P
MMPPP
P
REV. DATE DR'N CH'D AP'D DESCRIPTION
ETI
DU

TI

ETI
EMP MP

ETI
TENDER DRAWING
P
EM E

DU

ETI
Client:
ETI
DU

ETI ETI

ETI

ETI
I
ET

ETI
ETIETI

ETI

2789000 N I
EI T
ET
DUETI

ETI
ETI
ETI

ETI
ETI
DU ETI
ETET
I I

ETI
DU I
ETIETI

ETET
I I EI T
DU ETET
I I ET
ETI

DU

DU
ETI

ETI
DU

You might also like