This hot work permit document outlines the safety precautions and approvals needed for hot work such as welding or cutting. It lists 20 potential precautions that may be required including ventilation, fire watches, isolations, and protective equipment. The permit is only valid for a maximum of 12 hours between the valid from and valid to times. It also includes sections to document hazard considerations, gas testing results if needed, required certificates, and approvals from both the permit issuer and holder.
This hot work permit document outlines the safety precautions and approvals needed for hot work such as welding or cutting. It lists 20 potential precautions that may be required including ventilation, fire watches, isolations, and protective equipment. The permit is only valid for a maximum of 12 hours between the valid from and valid to times. It also includes sections to document hazard considerations, gas testing results if needed, required certificates, and approvals from both the permit issuer and holder.
This hot work permit document outlines the safety precautions and approvals needed for hot work such as welding or cutting. It lists 20 potential precautions that may be required including ventilation, fire watches, isolations, and protective equipment. The permit is only valid for a maximum of 12 hours between the valid from and valid to times. It also includes sections to document hazard considerations, gas testing results if needed, required certificates, and approvals from both the permit issuer and holder.
PERMIT HOLDER NAME WORK LOCATION PERMIT VALIDITY (maximum of 12hrs) Permit valid from: Permit valid to: PRECAUTIONS AND PROTECTIVE EQUIPMENTS (Do not start work until safety precaution arranged) 1. Gas test 11. Extra ventilation 2. Trained fire watcher required 12. Safety tag/sign/lock 3. Fire blanket 13. Drain covers 4. Fire extinguisher 14. Electrical Isolation(LOTO) 5. Equipment to be protected from hot metal and 15. Adequate Lighting spark 16. Escape Route checked 6. Removal of flammable materials from hot work 17. Road Closure comply area 18. Extra Ventilation 7. Barricade and Sign posted 19. Process Isolation 8. Stand By Person Required 20. Not applicable 9. Grounding/ Earthing 10. Scaffolding HAZARD CONSIDARATION GAS TESTING RESULTS 1. Fire hazard 7. Noise COMBUSTABLE %LEL OXYGEN % 2. Hot surface 8. Radiation H2S – ppm 3. Dust/Fibers 9. High Pressure CO – ppm 4. Slip/Trip 10. Working at height OTHER HYDROCARON % 5. Falling Object 11. Oxygen deficency (Limits : combustible% of LEL, Oxygen – 19.5 to 6. Chem/Tox/Corr/H2S 12. Static Electricity 23% by Vol, H2S 5ppm, CO – 25ppm, NH3 - CERTIFICATES & OTHER DOCUMENTS 25ppm, SO2 – 2ppm, Chlorine – 0.5ppm, Benzene JSA/RISK ASSESSMENT HSE Plan – 0.1ppm.) All Safe Testing Confined Space Entry Certificate Requirement Every___ Hrs. Excavation Certificate Others:_____________________________________ Date & Time : Name :
APPROVALS PERMIT ISSUER PERMIT HOLDER Name: Sign : Date : Time :
Judgments of the Court of Appeal of New Zealand on Proceedings to Review Aspects of the Report of the Royal Commission of Inquiry into the Mount Erebus Aircraft Disaster
C.A. 95/81
Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture - 40 Material Requirements Planning