NOTES:-

1. ALL DIMENSIONS ARE IN MM & LEVELS IN METRES


2. ALL WELDS ARE 6 mm FILLET CONTINUOUS UNLESS OTHERWISE STATED.
3. PAINTING IS TO BE DONE AS PER TECHNICAL SPECIFICATION.
4. FINISHED DIMENSIONS ARE SHOWN. PROVIDE REQUIRED MACHINING ALLOWANCE
FOR PARTS WHICH ARE TO BE MACHINED.
5. CHECK THE DIMENSIONS OF BOUGHT-OUT ITEMS BEFORE FABRICATION OF FRAME.
ALTER ACCORDINGLY IF ANY CHANGE.
21 6. DRIVE UNIT ASSEMBLY REQUIRED ONE PER HOIST. TOTAL NOS. REQUIRED = 2NOS.
7. MAKE OF GEARBOX: NAW / ELECON / SHANTI / PREMIUM.
8. MAKE OF MOTOR: NGEF/ KIRLOSKAR/ BHARAT BIJLEE/MARATHON/ABB/GEC/CROMPTON GREAVES.
9. MAKE OF EM BRAKE: ELEKTROMAG/ BCH/STERLING CONTROL .
10. MAKE OF THRUSTOR BRAKE: ELEKTROMAG/ BCH/STERLING CONTROL .
11. MAKE OF COUPLING: NAW/MARK AEC/LOVEJOY/SHRIRAM/TECHSTAR/EQUI.

17

A A

PLAN

SECTION "B-B"
B

1
BILL OF MATERIAL FOR 1 HOIST
5 (TOTAL REQUIRED = 2NOS.)

D 2 C E

3 6 18
4

SECTION "C-C"

D C B E

SECTION "A-A" 19

SECTION "D-D"
TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD.

CHKD: RECM: APPVD:


WAPCOS LTD.

10
CONTRACTOR KUNDAH PSP CONSORTIUM
KUNDAH PUMPED STORAGE HYDRO ELECTRIC PROJECT,
PROJECT
PHASE-I (1x125 MW)
DRIVE UNIT ASSEMBLY & BASE FRAME
TITLE FOR 65T ROPE DRUM HOIST FOR SURGE SHAFT GATE
8
PHASE REV. REVISION DRW. CHKD. SUBM. DATE
PRE- FEASIBILITY STUDY
FEASIBILITY STUDY
15 16 9 CONCEPT & BASIC DRAWING

11 20 TENDER DRAWING
14 CONSTRUCTION DRAWING
AS BUILT DRAWING

7
12 13 DRAWING
SIZE:A1
DRWING NO:
OMIL/KPS-HEP/SURG/RDH/451
SCALE: REVISION:
NTS 00
PREPARED BY. CHECKED BY. SUBMITTED DATE OF SUBMISSION
SECTION "E-E" BY.
SUPPORTING FRAME PLAN
MOHIT MANISH JAIN HC JAIN 11.07.2023