FALSE CEILING:
ALL DIMENSIONS, ELEVATIONS HAVE BEEN KEPT AS PER LATEST AFC
DRAWING NO.B215-000-8141-02201-R-1, B215-000-8141-02202-R-3 &
A/1/102
LOCATION DETAILS:
FIRST FLOOR CEILING : 1.EAST AIR LOCK LOBBY, 2.EAST
SIDE GENTS TOILET, 3.GIS ROOM, 4.WEST AIR LOCK LOBBY, 5. JANITOR, 6.WEST
SIDE LADIES TOILET.
SECOND FLOOR CEILING : 1.EAST AIR LOCK LOBBY, 2.EAST SIDE GENTS
TOILET, 3.RACK ROOM, 4.CONSOLE ROOM, 5.ENGG ROOM, 6.CORRIDOR, 7.LOBBY,
8.UPS/VFD ROOM, 9.MCC ROOM PRESURISED, 10.WEST AIR LOCK LOBBY,
11.JANITOR, 12.WEST SIDE LADIES TOILET.
THIRD FLOOR CEILING: 1.LOBBY/LOADING PLATFORM, 2.EAST
SIDE GENTS TOILET, 3.EAST SIDE P.C TOILET, 4.EAST SIDE LADIES TOILET,
5.RECEPTION CUM ENTRANCE FOYER, 6.OFFICE AREA, 7.CAFETERIA,
8.CONFERENCE ROOM, 9.MEETING ROOM-1, 10.VIP/TRANSIT ROOM-1, 11.FOD
1 ROOM, 12.VIP/TRANSIT ROOM-2 13.MEETING ROOM-2, 14.LIBRARY CUM READING FALSE CEILING
ROOM, 15.CABIN-1, 16.CABIN-2, 17.CABIN-3, 18.CABIN-4, 19.CABIN-5, 20.PANTRY,
21.WEST AIR LOCK LOBBY, 22.D.W,23.WEST SIDE GENTS & LADIES TOILET,
24.JANITOR.
OBSERVATIONS:-