PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 1 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
PAPUA LNG
UPSTREAM PROJECT
This document has been generated by an Electronic Document Management System. When printed it is considered as a “for information only”
copy. The controlled copy is the screen version, and it is the holder’s responsibility that he/she holds the latest valid version”.
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 2 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
HOLD LIST
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 3 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................................. 5
6 GENERAL REQUIRMENTS.......................................................................................... 12
6.1 General ............................................................................................................................. 12
6.2 Environmental and meteorological data ........................................................................ 12
6.3 Utilities Requirements ..................................................................................................... 12
6.3.1 Onshore CPF ........................................................................................................... 12
6.3.2 Wellpads .................................................................................................................. 12
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 4 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
List of Figures
Figure 1-1 PRL15 Area ................................................................................................................................................. 5
Figure 5-1 Order of precedence of applicable documents ......................................................................................... 11
List of Tables
Table 3-1 Definitions ..................................................................................................................................................... 6
Table 3-2 Acronyms & Abbreviations ........................................................................................................................... 7
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 5 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
1 INTRODUCTION
TotalEnergies E&P PNG Limited and its partners, are to develop the Elk-Antelope gas field located in the
permit area known as Petroleum Retention License No.15 (PRL-15), Gulf Province, in the Independent State
of Papua New Guinea (PNG). Papua LNG Development PTE. LTD (hereinafter referred as COMPANY), is
engaged in the development of the Upstream CPF and Well Pads in this project known as Papua LNG
Development Project.
The Elk-Antelope field is a significant gas discovery located within the Gulf Province of PNG. The field lies
south of the mountains and is approximately 120 km inland from the township of Kerema and 360 km northwest
from Port Moresby, the capital city and major industrial centre.
The upstream facilities are situated in a hilly area, between 50 and 400 meters above sea level, covered in
dense jungle with many rivers including one of the main accesses, the Purari River. The region is sparsely
populated with little infrastructure.
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 6 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 7 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 8 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
4 REFERENCE DOCUMENTS
4.1 COMPANY Reference Documents
CONTRACT No. CTR079452 BETWEEN PAPUA LNG DEVELOPMENT PTE. LTD. AND
TECHNIP ENERGIES (M) SDN. BHD.
FOR COMPETITIVE FRONT END ENGINEERING DESIGN (FEED)
PHASE 1 AND 2
FOR THE CENTRAL PROCESS FACILITY AND WELLPADS
GS EP INS 100 – PNG Overall Instrumentation Philosophy
Rev. 00, Dec-2021
GS EP INS 101 – PNG Instrumentation Design
Rev. 00, Dec-2021
GS EP INS 103 – PNG Instrument Database Management
Rev. 00, Dec-2021
GS EP INS 106 – PNG Instrument Installation
Rev. 00, Dec-2021
GS EP INS 109 – PNG Instrument cabinets
Rev. 00, Dec-2021
GS EP INS 110 – PNG Instrumentation for package units
Rev. 00, Dec-2021
GS EP INS 114 – PNG Instrument Tubing and Fittings
Rev. 00, Dec-2021
GS EP INS 116 – PNG Instrument Cables
Rev. 00, Dec-2021
GS EP INS 120 – PNG Control and Choke Valves
Rev. 00, Dec-2021
GS EP INS 125 – PNG Safety Relief Valves and Rupture Discs
Rev. 00, Dec-2021
GS EP INS 134 – PNG Design and supply of integrated control and safety system
Rev. 00, Dec-2021
GS EP INS 135 – PNG Cybersecurity Requirements for Industrial Information Systems (SII)
Rev. 00, Dec-2021
GS EP INS 137 – PNG On/Off Valve Control Panels and Actuators
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 9 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 10 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 11 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
5 ORDER OF PRECEDENCE
The design on PLNG Upstream Facilities is developed as per the requirements of the following regulations,
codes and standards in the following order of precedence:
• Local laws, standards and regulations,
• Project Specifications,
• TOTAL E&P Referential (Company Directives, Company Rules and applicable General Specifications),
• International Finance Corporation performance standards,
• International Oil and Gas Industry codes, standards and recommended practices.
Figure 5-1 Order of precedence of applicable documents
For financing, requirements of International Finance Corporation performance standards will be applied.
Papua New Guinea National Institute of Standards and Industrial Technology (NISIT) develops local standards
so called “Papua New Guinea Standards“ (PNGS), which are derived from Australian/New Zealand standards.
It is therefore anticipated that the Australian / New Zealand standards shall be complied with.
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 12 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
6 GENERAL REQUIRMENTS
6.1 General
In general, control and monitoring of the facilities shall be carried out with local electronic field instruments
reporting to and being controlled by safety and control systems. Relevant data required for the control of the
facilities will be made available to operators in a permanently manned central control room (CCR).
The Wellpads are not permanently manned facilities. They shall have their own Instrument technical shelter.
The obsolescence management and planning shall be in accordance with GS EP TEC 007 – PNG
“Obsolescence and Lifetime Cycle Management”. The design shall consider the requirement that all electronic
based systems and associated software will have to be upgraded during the design life of the facilities.
Prior to placing an instrument installation in service, it shall be verified, in accordance with all applicable
AS/NZS standards mentioned under reference documents in Section 4.2, that the installation is safe to
energize and will operate as intended.
6.3.2 Wellpads
Electrical power will be provided from the CPF via power cable (a distance of about 30 km). Two (Redundant)
230Vac UPS and one normal supply shall be provided for Instrumentation and ICSS equipment consumption.
It is not planned to provide instrument air at the Wellpads, WHCP HPU shall provide the hydraulic oil motive
fluid for all wellpad actuated Xmas tree safety valves- Downhole valves, Master valves, Wing valves, Choke
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 13 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
valves & Control valves. ON/OFF valves will have electrohydraulic actuators or hydraulic actuators operated
from WHCP HPU.
7 FIELD INSTRUMENTS
7.1 General
The selection criteria for Elk Antelope field instruments shall be based primarily on suitability for reliability and
low maintenance requirements.
Recent measuring technology may be considered where operational and cost benefits are foreseen. These
shall be subject to COMPANY approval.
Some specific field instruments (eg. field instruments for HVAC) do not require to be fully in line with the
requirements of sensors used for process/utility services. However these instruments shall be of the industrial
type and shall be suitable for the relevant hazardous area.
Loop power will be provided by the systems without the need for dedicated external supplies. Specific
instruments requiring external power will be identified.
All field instruments and field instrument equipment (including junction box and local cabinets) shall as a
minimum be certified suitable for zone 1 as per IECEx scheme or ANZEx/AUSEx scheme. Field instruments
shall be suitable for gas group IIB, Temperature Class T3, except for some specific areas (e.g. batteries room).
The Ex d protection method shall be applied for all instruments. Intrinsic safe instruments certified Ex i may be
considered only where Ex d equipment is not suitable. Junction box shall be Ex e certified. All outdoor
equipment not certified for use in zone 1 shall be de-energized in case of gas detection. Instrumentation
equipment shall not be installed in Zone 0 areas.
Requirements related to instruments for measuring Pressure, Temperature, Flow and Level and general
requirements are defined in GS EP INS 100 and GS EP INS 101. For installation requirements, refer to GS
EP INS 106.
For measurement of viscous fluids, solids containing fluids, highly corrosive fluids or where temperature
changes may influence the fluid conditions, the use of diaphragm seal and capillary to be considered for
Pressure instruments.
Where whole or parts of instrument and instrument equipment are required to be painted or coated, it shall
comply as applicable, with the requirements of GS EP COR 354.
The field instrument housing shall be AISI 316 or 316L as minimum.
Carbon steel field instrument mounting supports will be used instead of stainless steel supports as preferential
requirements. All field instrument mounting brackets shall be minimum AISI 316 or 316L. Isolating pad shall
be provided to avoid corrosion due to dis-similar material.
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 14 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 15 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
Solenoid valve and partial stroking test facilities shall only be provided if justified by SIL requirements. SIL
study shall establish the list of valves requiring PST and SOV test.
Valves partial stroke testing (PST) will be preferably achieved through a smart valve positioner.
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 16 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
7.9 Metering
Metering requirements are defined in “Metering Philosophy”, PG-P15-30-C023-150008.
This document is the property of TotalEnergies and shall not be disclosed to third parties or reproduced without permission of the owner.
Form_PPCM_008_rev03
Document Number:
PG-P15-30-C023-150002
GENERAL INSTRUMENT PROJECT SPECIFICATION
Revision : 00 Status : IFR
Rev. Date : 12-May-2023
Doc. Type : SPE Discipline : INS Phase: FE Class: 1 Page 17 of 17
CTR Ref. : 214059C-3001-JSD-1500-0002 System / Subsystem : SS Equipment Type : NA
8 INSTRUMENT CABLES
As a minimum all instrument cables located outside of building shall be armoured, oil resistant and flame
retardant (IEC 60332-3). In addition, all cables used for safety and protective functions (i.e. PSS, ESD, FGS,
package PSS, package FGS) shall be fire resistant as per IEC 60331-21.
Instrument cables shall be specified in line with the GS EP INS 116.
When junction boxes are used for fire resistant cables, then those junction boxes, and associated terminals,
shall require having the same protection characteristics against fire similar to the associated instrument cables.
9 INSTRUMENT EQUIPMENT
Local Control Panels and Junction boxes shall be as per GS EP INS 101.
Junction boxes and outdoor local control panels shall be made of fiberglass reinforced polyester (GRP) or AISI
316 or AISI 316L stainless steel. Cables glands for junction boxes and instruments shall be nickel plated brass.
Cabinets located within technical rooms shall be designed according to GS EP INS 109, GS EP INS 110 and
GS EP INS 140 requirements.
11 INSTRUMENT EARTHING
Instrument earthing shall comply with GS EP INS 115.