Professional Documents
Culture Documents
Final Batch 03 Drawing Certificates
Final Batch 03 Drawing Certificates
Final Batch 03 Drawing Certificates
Dr.T H PATEL SYED SADATH ALI MD. KHALID S Name and Signature of the Examiners
(Head of the Department) (Camp Officer) (Camp Officer) 1._________________________
2.____________________________
EXTENSIVE SURVEY PROJECT 2022-2023
PROJECT ASSOCIATES
BATCH-03
ASHWINI N 3BR20CV005
RASHMI T 3BR20CV035
SAHANA M 3BR20CV036
SAHANA PR 3BR20CV037
SAI KEERTHI P 3BR20CV038
SHILPA 3BR20CV042
SHIREEN M 3BR20CV043
SHREE CHAITRAGIRI H 3BR20CV045
SINDHUJA 3BR20CV047
YOGESH NAIK K L 3BR20CV053
VARUN LIKITH 3BR19CV043
SUNILKUMAR BT 3BR21CV413
KISHAN KUMAR L 3BR21CV408
DINESH J D 3BR21CV405
MOHAMMED KHAIF 3BR21CV409
PUNITH M A 3BR21CV032
SAQLAIN ANSARI M A 3BR20CV040
SL.NO CONTENTS
NEW TANK PROJECT
1 KEY PLAN
2 CROSS SCETION OF BUND
3 CANAL ALIGNMENT
4 LONGITUDINAL SECTION OF CANAL
5 CROSS SECTION OF CANAL AND WEIR
6 SLUICE GRID LEVEL
7 WEIR OF NTP
8 DETAILS OF BUND
9 CONTOURS
WATER SUPPLY AND TOWN PLANNING
10 KEY PLAN
11 LONGITUDINAL SECTION OF RISING MAIN
12 WATER SUPPLY MAIN LINE PLAN
13 BLOCK LEVELS OF SOURCE AND CONVEYANCE POINT
14 CROSS SECTION OF WATER SUPPLY MAIN
15 KEY PLAN OF TOWN
16 BLOCK LEVELLING OF TOWN
HIGHWAY PROJECT
17 KEY PLAN
18 HORIZONTAL ALIGNMENT
19 VERTICAL ALIGNMENT
20 CROSS SECTION
OLD TANK PROJECT
21 KEY PLAN
22 LONGITUDINAL SECTION OF BUND
23 CROSS OF BUND
24 WEIR OF OTP
25 CONTOURS