1.1 Panel Door I Fully closed Fully closed Closed leads to B/D Visual Operator
1 Electrical Panel 1.2 A.C.unit C Cleanliness Free from dust Clean with cotton leads to B/D Hand Operator
Between Inform to
1.3 Temperature controller I Panel temp. leads to B/D Visual Operator
(25 to 35 deg.C) maintenance
3.1 FRL unit C I No Moisture No Moisture Moisture drain leads to B/D Hand Operator
3 Air Pressure
Inform to
3.2 At all joints, seals I Leakage No Leakage leads to B/D Hearing Operator
maintenance
Inform to
4.1 Counter Balancer I pressure in gauge As per die standard/weight leads to B/D Visual Operator
maintenance
Inform to
4.2 HOL I pressure in gauge As per die standard/weight leads to B/D Visual Operator
maintenance
Production
4
Parameter Points
Inform to
4.3 Die Cushion I pressure in gauge As per die standard/weight leads to B/D Visual Operator
maintenance
Inform to
4.4 Clutch & Brake I pressure in gauge As per press standard leads to B/D Visual Operator
maintenance
Name
Shift Operator (Sign.) :
Sign.
Name
Shift Engineer (Sign.) :
Sign.
Name
HOD (Sign.) :
Sign.
JCME/LM/F/001
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
2 Check the level of oil in Hydraulic Oil tanks Max. Level Level Gauge
Lubrication all the points where grease Lubrication should
3 By Hand
nipples have been provided be done
4 Check the counter balance lubrication Visual flow Open lub. point
Lubrication
5 Check the Pitman screw lubrication Visual flow Open lub. point
Check the cushion cylinder guide / bush
6 Visual flow Open lub point
lubrication
7 Check the slide guide lubrication flow Visual flow Visual
21
22
23
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/002
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
Sr. no Sub Assembly Activities Req. Standard Condition Checking Method Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
3 Check the gap between the guides 0.05 To 0.1 MM Filler Gauge
Slide Guide
4 Check the guides. No scratch Visual
13 Check the cam box & roller condition No wear out Visual
17 Check the tightness of the screws fixing the unit parts No looseness By Spanner
21 TDC stop cam not more then 8 degree No continues stroke Visual
Safety Check-points
22 Warning alarm if any interlocking bypass alarm generate in HMI Hearing
23 Work & Die area light 250 -300 lux Lux meter
24
25
26
27
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/003
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)
Machine No:-
1 Check the flywheel bearing lub. Visual flow Open lub. point
3 Replace suction and return line filter Provide new filter Replacement
4 Pneumatic Cushion & Adjustment Check play in the guides (replace if required) 0.3 – 0.7 MM Filler Gauge
6 Slide adjustment & control Check the chain/sprocket condition No Play Visual
9 Check & Replace Hydraulic oil As per Oil purity standard Filter/Replacement
10 Lubricate main motor shaft bearing with grease. Till Oil Grease appearance By Manual Grease Gun
11 Main Motor Check the main motor current Master Table By Amp. Meter
14 Crown Main Gear condition and Locking Key No wear tear & broken Visual
17 Check the gap of liners while disengaged clutch 2.5 to 4.5 mm by filler gauge
18 Counter Balancer Cylinder Check the piston rod condition No scratch Visual
19 MB Power Pack & Clamp Check the motor current Master Table Amp. Meter
20 Clean the panel with air blower to remove dust. No-dust Visual
24
25
26
27
Name
Technician
Sign.
Name
Shift Engineer
Sign.
Name
HOD
Sign.
JCME/LM/F/004
Prepared By :- Executive (Corp. Engg.) Checked By :- Head (Corp. TPM) Approved By :- Head (Corp. Engg.)