SL NO Loco No.

Home Railway Shed Type of LocoLoco Class POH Date POH Shop Failure Date

1 27805 ECoR ANGL Conventi WAG7 10-Oct-15 BSL 20-Oct-15


onal

2 23468 SER TATA Conventi WAG5 23-Mar-15 KGP 8-Oct-15


onal
3 27748 SER TATA Conventi WAG7 11-Sep-14 KPA 8-Oct-15
onal

4 23496 SER TATA Conventi WAG5 19-Mar-15 KGP 6-Oct-15


onal
5 27341 SER BNDM Conventi WAG7 9-Aug-15 KGP 3-Oct-15
onal
6 23415 SER TATA Conventi WAG5 26-Feb-15 KGP 2-Oct-15
onal

7 23550 SER TATA Conventi WAG5 21-Nov-14 KGP 27-Sep-15


onal

8 23369 SER TATA Conventi WAG5 7-Dec-14 KGP 25-Sep-15


onal
9 23550 SER TATA Conventi WAG5 21-Nov-14 KGP 25-Sep-15
onal
10 27722 SER BNDM Conventi WAG7 6-Jun-14 KGP 23-Sep-15
onal
11 27789 SER BNDM Conventi WAG7 6-Jul-15 KGP 18-Sep-15
onal

12 27789 SER BNDM Conventi WAG7 6-Jul-15 KGP 18-Sep-15


onal
13 27792 ECoR ANGL Conventi WAG7 20-May-15 KGP 16-Sep-15
onal
14 27833 SCR KZJ Conventi WAG7 10-Sep-15 PER 14-Sep-15
onal

15 23832 ECoR WAT Conventi WAG5 12-Jun-15 DHD 14-Sep-15


onal

16 27781 SER BNDM Conventi WAG7 6-Jun-15 KGP 13-Sep-15


onal
17 27794 ECoR ANGL Conventi WAG7 28-Aug-15 BSL 10-Sep-15
onal

18 27794 ECoR ANGL Conventi WAG7 28-Aug-15 BSL 10-Sep-15


onal

19 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 10-Sep-15


onal
20 22344 WR BRC Conventi WAP4 4-Sep-15 DHD 7-Sep-15
onal
21 27829 SCR KZJ Conventi WAG7 2-Sep-15 PER 5-Sep-15
onal

22 27803 SER BNDM Conventi WAG7 1-Sep-15 KGP 4-Sep-15


onal

23 27803 SER BNDM Conventi WAG7 1-Sep-15 KGP 4-Sep-15


onal
24 23317 SER TATA Conventi WAG5 31-Aug-15 KGP 1-Sep-15
onal

25 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 1-Sep-15


onal

26 23131 ECoR WAT Conventi WAG5 1-Sep-15 KGP 1-Sep-15


onal
27 23131 ECoR WAT Conventi WAG5 1-Sep-15 KGP 1-Sep-15
onal

28 27448 NCR CNB Conventi WAG7 16-May-15 KPA 31-Aug-15


onal

29 27343 SCR KZJ Conventi WAG7 22-Aug-15 PER 30-Aug-15


onal
30 23838 ECoR WAT Conventi WAG5 17-Jun-15 DHD 30-Aug-15
onal

31 27423 NCR CNB Conventi WAG7 23-Mar-15 CB 29-Aug-15


onal

32 27794 ECoR ANGL Conventi WAG7 28-Aug-15 BSL 28-Aug-15


onal

33 27781 SER BNDM Conventi WAG7 6-Jun-14 KGP 26-Aug-15


onal
34 27781 SER BNDM Conventi WAG7 6-Jun-15 KGP 26-Aug-15
onal

35 27299 NCR CNB Conventi WAG7 30-Jan-14 KPA 25-Aug-15


onal

36 27793 ECoR ANGL Conventi WAG7 5-Aug-15 KGP 22-Aug-15


onal
37 31061 CR AQ 3-Phase WAG9 10-Aug-15 BSL 20-Aug-15

38 22319 NCR CNB Conventi WAP4 13-Dec-14 BSL 19-Aug-15


onal
39 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 19-Aug-15
onal
40 23468 SER TATA Conventi WAG5 23-Mar-15 KGP 18-Aug-15
onal
41 27448 NCR CNB Conventi WAG7 16-May-15 KPA 18-Aug-15
onal
42 27791 ECoR ANGL Conventi WAG7 5-Jul-15 BSL 18-Aug-15
onal

43 22229 NCR CNB Conventi WAP4 11-Nov-14 BSL 17-Aug-15


onal

44 22296 NCR CNB Conventi WAP4 26-Jan-15 BSL 16-Aug-15


onal
45 27233 SER BNDM Conventi WAG7 27-Nov-14 KGP 15-Aug-15
onal

46 27233 SER BNDM Conventi WAG7 27-Nov-14 KGP 15-Aug-15


onal

47 27233 SER BNDM Conventi WAG7 27-Nov-14 KGP 15-Aug-15


onal
48 31061 CR AQ 3-Phase WAG9 10-Aug-15 BSL 14-Aug-15

49 22246 NCR CNB Conventi WAP4 5-Mar-15 BSL 12-Aug-15


onal

50 23552 SER TATA Conventi WAG5 6-Jan-15 KGP 12-Aug-15


onal
51 22266 NCR CNB Conventi WAP4 22-Mar-15 BSL 11-Aug-15
onal
52 27840 CR AQ Conventi WAG7 1-Apr-15 BSL 10-Aug-15
onal

53 27424 NCR CNB Conventi WAG7 25-Aug-14 CB 9-Aug-15


onal
54 27830 SCR KZJ Conventi WAG7 30-Jul-15 PER 9-Aug-15
onal

55 27423 NCR CNB Conventi WAG7 23-Mar-14 CB 8-Aug-15


onal

56 27441 NCR CNB Conventi WAG7 8-Jul-14 CB 8-Aug-15


onal
57 27789 SER BNDM Conventi WAG7 6-Jul-14 KGP 7-Aug-15
onal

58 27789 SER BNDM Conventi WAG7 6-Jul-15 KGP 7-Aug-15


onal

59 27789 SER BNDM Conventi WAG7 6-Jul-15 KGP 7-Aug-15


onal

60 22266 NCR CNB Conventi WAP4 22-Mar-15 BSL 6-Aug-15


onal
61 27273 NCR CNB Conventi WAG7 20-Sep-13 CB 4-Aug-15
onal
62 23321 SER TATA Conventi WAG5 3-May-15 KGP 4-Aug-15
onal

63 27349 ECR MGS Conventi WAG7 3-Feb-15 KPA 3-Aug-15


onal
64 27828 SCR KZJ Conventi WAG7 16-Jul-15 PER 2-Aug-15
onal

65 27448 NCR CNB Conventi WAG7 16-May-15 KPA 31-Jul-15


onal

66 23468 SER TATA Conventi WAG5 23-Mar-15 KGP 31-Jul-15


onal
67 23369 SER TATA Conventi WAG5 7-Dec-14 KGP 30-Jul-15
onal
68 23369 SER TATA Conventi WAG5 7-Dec-14 KGP 30-Jul-15
onal

69 27441 NCR CNB Conventi WAG7 8-Jul-15 CB 30-Jul-15


onal

70 27722 SER BNDM Conventi WAG7 6-Jun-14 KGP 30-Jul-15


onal
71 27423 NCR CNB Conventi WAG7 23-Mar-15 CB 27-Jul-15
onal

72 22228 NCR CNB Conventi WAP4 27-Sep-14 BSL 26-Jul-15


onal

73 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 26-Jul-15


onal

74 22796 ECR MGS Conventi WAP4 29-Dec-14 KPA 26-Jul-15


onal

75 27424 NCR CNB Conventi WAG7 25-Aug-14 CB 24-Jul-15


onal

76 27773 CR AQ Conventi WAG7 3-Dec-14 BSL 24-Jul-15


onal
77 27790 ECoR ANGL Conventi WAG7 6-Jun-15 BSL 22-Jul-15
onal

78 27790 ECoR ANGL Conventi WAG7 6-Jun-15 BSL 22-Jul-15


onal
79 22546 NCR CNB Conventi WAP4 29-Apr-15 BSL 21-Jul-15
onal

80 27194 SER BNDM Conventi WAG7 13-Jun-15 DHD 20-Jul-15


onal

81 22740 ECR MGS Conventi WAP4 15-Feb-14 KPA 20-Jul-15


onal

82 27441 NCR CNB Conventi WAG7 8-Jul-15 CB 19-Jul-15


onal
83 23116 WR BRC Conventi WAG5 17-Jul-15 DHD 18-Jul-15
onal

84 27442 NCR CNB Conventi WAG7 21-Jan-15 KPA 16-Jul-15


onal

85 27299 NCR CNB Conventi WAG7 30-Jan-14 KPA 16-Jul-15


onal

86 27193 SER BNDM Conventi WAG7 7-Jul-15 DHD 16-Jul-15


onal
87 27193 SER BNDM Conventi WAG7 7-Jul-15 DHD 16-Jul-15
onal
88 30016 NR GZB 3-Phase WAP5 27-Apr-15 BSL 15-Jul-15

89 30016 NR GZB 3-Phase WAP5 27-Apr-15 BSL 15-Jul-15

90 24026 NCR JHS Conventi WAG5 18-Jun-15 BSL 15-Jul-15


onal

91 24026 NCR JHS Conventi WAG5 18-Jun-15 BSL 15-Jul-15


onal
92 27309 ECR MGS Conventi WAG7 3-Jul-15 KPA 11-Jul-15
onal

93 27193 SER BNDM Conventi WAG7 7-Jul-15 DHD 9-Jul-15


onal
94 27288 CR AQ Conventi WAG7 9-Jun-15 DHD 8-Jul-15
onal
95 23641 SER TATA Conventi WAG5 30-May-15 KGP 7-Jul-15
onal
96 27832 SCR KZJ Conventi WAG7 22-Jun-15 PER 4-Jul-15
onal

97 27365 CR AQ Conventi WAG7 10-Dec-14 BSL 4-Jul-15


onal

98 30222 NR GZB 3-Phase WAP7 2-Mar-15 BSL 4-Jul-15

99 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 3-Jul-15


onal
100 27012 ECR MGS Conventi WAG7 24-Jun-15 KPA 2-Jul-15
onal

101 27301 SCR KZJ Conventi WAG7 23-May-15 PER 30-Jun-15


onal
102 30231 NR GZB 3-Phase WAP7 2-Feb-15 BSL 29-Jun-15

103 27358 SCR KZJ Conventi WAG7 22-Jun-15 PER 28-Jun-15


onal
104 27831 SCR KZJ Conventi WAG7 15-Jun-15 PER 25-Jun-15
onal

105 27194 SER BNDM Conventi WAG7 13-Jun-15 DHD 22-Jun-15


onal
106 27194 SER BNDM Conventi WAG7 13-Jun-15 DHD 22-Jun-15
onal
107 27194 SER BNDM Conventi WAG7 13-Jun-15 DHD 22-Jun-15
onal
108 27725 SER BNDM Conventi WAG7 31-May-14 KGP 21-Jun-15
onal

109 27725 SER BNDM Conventi WAG7 31-May-14 KGP 21-Jun-15


onal

110 23468 SER TATA Conventi WAG5 23-Mar-15 KGP 20-Jun-15


onal
111 23239 WR BRC Conventi WAP4 17-Jun-15 DHD 19-Jun-15
onal

112 23838 ECoR WAT Conventi WAG5 17-Jun-15 DHD 17-Jun-15


onal
113 23838 ECoR WAT Conventi WAG5 17-Jun-15 DHD 17-Jun-15
onal

114 27230 SER BNDM Conventi WAG7 27-Jan-15 DHD 15-Jun-15


onal

115 27230 SER BNDM Conventi WAG7 27-Jan-15 DHD 15-Jun-15


onal
116 22247 SCR LGD Conventi WAP4 24-Jan-15 PER 14-Jun-15
onal
117 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 14-Jun-15
onal

118 23832 ECoR WAT Conventi WAG5 13-Jun-15 DHD 13-Jun-15


onal
119 27814 CR AQ Conventi WAG7 13-Apr-15 BSL 13-Jun-15
onal

120 23594 NCR JHS Conventi WAG5 7-Jun-13 BSL 12-Jun-15


onal

121 24024 NCR JHS Conventi WAG5 8-May-13 BSL 10-Jun-15


onal

122 27784 SER BNDM Conventi WAG7 14-Apr-15 KGP 7-Jun-15


onal

123 27784 SER BNDM Conventi WAG7 14-Apr-15 KGP 7-Jun-15


onal
124 23321 SER TATA Conventi WAG5 3-May-15 KGP 5-Jun-15
onal

125 27190 SER BNDM Conventi WAG7 23-Mar-15 DHD 1-Jun-15


onal
126 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 1-Jun-15
onal
127 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 1-Jun-15
onal

128 27792 ECoR ANGL Conventi WAG7 20-May-15 KGP 30-May-15


onal
129 27792 ECoR ANGL Conventi WAG7 20-May-15 KGP 30-May-15
onal
130 27301 SCR KZJ Conventi WAG7 23-May-15 PER 30-May-15
onal

131 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 29-May-15


onal

132 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 29-May-15


onal

133 22072 NR GZB Conventi WAP1 12-Dec-14 BSL 28-May-15


onal
134 27011 ECR MGS Conventi WAG7 3-Nov-14 KPA 28-May-15
onal

135 27792 ECoR ANGL Conventi WAG7 20-May-15 KGP 26-May-15


onal

136 23302 ECoR WAT Conventi WAG5 26-May-15 KGP 26-May-15


onal

137 23302 ECoR WAT Conventi WAG5 26-May-15 KGP 26-May-15


onal
138 27786 SCR KZJ Conventi WAG7 17-Apr-14 KPA 25-May-15
onal

139 27747 SER BNDM Conventi WAG7 19-Nov-14 KGP 23-May-15


onal

140 27747 SER BNDM Conventi WAG7 9-Nov-14 KGP 23-May-15


onal
141 31063 CR AQ 3-Phase WAG9 16-May-15 BSL 20-May-15

142 23321 SER TATA Conventi WAG5 3-May-15 KGP 19-May-15


onal

143 24011 NCR JHS Conventi WAG5 9-Jun-14 BSL 18-May-15


onal
144 27346 SER BNDM Conventi WAG7 8-May-15 KGP 15-May-15
onal

145 27346 SER BNDM Conventi WAG7 8-May-15 KGP 15-May-15


onal

146 22609 SCR LGD Conventi WAP4 26-Jan-15 PER 14-May-15


onal

147 22581 SCR LGD Conventi WAP4 17-Jul-12 PER 14-May-15


onal

148 27734 SER BNDM Conventi WAG7 13-Sep-15 KGP 13-May-15


onal

149 27734 SER BNDM Conventi WAG7 13-Sep-14 KGP 13-May-15


onal
150 23552 SER TATA Conventi WAG5 6-Jan-15 KGP 12-May-15
onal

151 30230 NR GZB 3-Phase WAP7 5-Dec-14 BSL 12-May-15

152 23752 ECoR WAT Conventi WAG5 19-Dec-14 KGP 12-May-15


onal
153 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 11-May-15
onal

154 22515 SCR LGD Conventi WAP4 20-Aug-14 KPA 11-May-15


onal
155 30229 NR GZB 3-Phase WAP7 19-Nov-14 BSL 10-May-15

156 30229 NR GZB 3-Phase WAP7 19-Nov-14 BSL 10-May-15

157 22048 NR GZB Conventi WAP1 27-Nov-14 DHD 10-May-15


onal
158 22205 SCR LGD Conventi WAP4 14-Jul-12 PER 9-May-15
onal
159 24011 NCR JHS Conventi WAG5 19-Jun-14 BSL 9-May-15
onal

160 22257 SCR LGD Conventi WAP4 27-Mar-15 PER 7-May-15


onal
161 23321 SER TATA Conventi WAG5 3-May-15 KGP 6-May-15
onal

162 27749 SER TATA Conventi WAG7 19-Oct-14 KPA 4-May-15


onal
163 27308 ECR MGS Conventi WAG7 5-Apr-15 KPA 4-May-15
onal

164 30222 NR GZB 3-Phase WAP7 2-Mar-15 BSL 3-May-15

165 27567 NCR JHS Conventi WAG5 11-Jun-14 BSL 2-May-15


onal
166 27310 ECR MGS Conventi WAG7 24-Feb-15 KPA 1-May-15
onal

167 27227 SER BNDM Conventi WAG7 28-Jan-15 KGP 29-Apr-15


onal

168 27227 SER BNDM Conventi WAG7 28-Jan-15 DHD 29-Apr-15


onal

169 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 26-Apr-15


onal
170 23447 NCR JHS Conventi WAG5 6-Jul-14 CB 26-Apr-15
onal
171 23634 ECoR WAT Conventi WAG5 25-Apr-15 KGP 25-Apr-15
onal

172 23634 ECoR WAT Conventi WAG5 25-Apr-15 KGP 25-Apr-15


onal

173 27567 NCR JHS Conventi WAG7 11-Jun-14 CB 24-Apr-15


onal

174 23594 NCR JHS Conventi WAG5 25-Aug-14 BSL 24-Apr-15


onal
175 22238 SCR LGD Conventi WAP4 16-Jul-14 PER 23-Apr-15
onal

176 23567 ECoR WAT Conventi WAG5 21-Mar-13 KGP 20-Apr-15


onal

177 23057 ECoR WAT Conventi WAG5 24-Feb-15 KGP 20-Apr-15


onal

178 24007 NCR JHS Conventi WAG5 29-Jul-14 BSL 19-Apr-15


onal

179 22534 NR GZB Conventi WAP4 16-Dec-14 BSL 19-Apr-15


onal

180 30217 NR GZB 3-Phase WAP7 9-Apr-15 BSL 18-Apr-15

181 30251 NR GZB 3-Phase WAP7 3-Feb-15 BSL 18-Apr-15

182 23415 SER TATA Conventi WAG5 26-Feb-15 KGP 18-Apr-15


onal
183 23702 ECoR WAT Conventi WAG5 20-Dec-12 KGP 18-Apr-15
onal

184 23101 ECoR WAT Conventi WAG5 21-Dec-14 KGP 17-Apr-15


onal

185 24014 NCR JHS Conventi WAG5 7-Jul-14 BSL 16-Apr-15


onal

186 24405 NCR JHS Conventi WAG5 28-Jan-15 BSL 15-Apr-15


onal

187 27224 ECR MGS Conventi WAG7 2-Oct-14 KPA 15-Apr-15


onal
188 23714 ECoR WAT Conventi WAG5 6-Feb-15 KGP 15-Apr-15
onal

189 23369 SER TATA Conventi WAG5 7-Dec-14 KGP 14-Apr-15


onal

190 27814 CR AQ Conventi WAG7 13-Apr-15 BSL 13-Apr-15


onal

191 27204 CR AQ Conventi WAG7 7-Feb-13 BSL 11-Apr-15


onal
192 27225 ECR MGS Conventi WAG7 4-Oct-14 KPA 11-Apr-15
onal

193 27184 CR AQ Conventi WAG7 29-Oct-11 BSL 10-Apr-15


onal

194 22615 NCR CNB Conventi WAP4 29-Jan-15 BSL 9-Apr-15


onal

195 27190 SER BNDM Conventi WAG7 23-Mar-15 DHD 8-Apr-15


onal
196 22801 WR BRC Conventi WAP4 6-Apr-15 BSL 8-Apr-15
onal

197 27274 CR AQ Conventi WAG7 21-Jul-14 BSL 7-Apr-15


onal

198 22597 SCR LGD Conventi WAP4 15-Feb-15 PER 6-Apr-15


onal

199 22257 SCR LGD Conventi WAP4 27-Mar-15 PER 6-Apr-15


onal
200 24016 NCR JHS Conventi WAG5 28-Dec-14 BSL 6-Apr-15
onal

201 27230 SER BNDM Conventi WAG7 27-Jan-15 DHD 6-Apr-15


onal
202 27230 SER BNDM Conventi WAG7 27-Jan-15 DHD 6-Apr-15
onal
203 22688 NR GZB Conventi WAP4 29-Dec-14 BSL 4-Apr-15
onal
204 30242 NR GZB 3-Phase WAP7 23-Jan-15 BSL 4-Apr-15

205 30242 NR GZB 3-Phase WAP7 23-Jan-15 BSL 4-Apr-15

206 27310 ECR MGS Conventi WAG7 24-Feb-15 KPA 1-Apr-15


onal

207 30225 NR GZB 3-Phase WAP7 21-Oct-14 BSL 31-Mar-15

208 22251 SCR LGD Conventi WAP4 16-Mar-15 PER 31-Mar-15


onal

209 22750 ECR MGS Conventi WAP4 3-Jun-14 KPA 30-Mar-15


onal
210 23496 SER TATA Conventi WAG5 19-Mar-15 KGP 30-Mar-15
onal

211 27186 SER BNDM Conventi WAG7 3-Mar-15 KGP 29-Mar-15


onal

212 23468 SER TATA Conventi WAG5 23-Mar-15 KGP 28-Mar-15


onal

213 22257 SCR LGD Conventi WAP4 2-Feb-15 PER 28-Mar-15


onal
214 22257 SCR LGD Conventi WAP4 2-Feb-15 PER 28-Mar-15
onal

215 22257 SCR LGD Conventi WAP4 28-Mar-15 PER 28-Mar-15


onal

216 23415 SER TATA Conventi WAG5 26-Feb-15 KGP 27-Mar-15


onal

217 27724 SER BNDM Conventi WAG7 30-May-14 KGP 27-Mar-15


onal
218 27190 SER BNDM Conventi WAG7 23-Mar-15 DHD 25-Mar-15
onal
219 30035 NR GZB 3-Phase WAP5 15-Jan-15 BSL 22-Mar-15

220 24029 NCR JHS Conventi WAG5 24-Feb-15 BSL 20-Mar-15


onal

221 22356 WR BRC Conventi WAP4 17-Mar-15 BSL 19-Mar-15


onal
222 27775 CR AQ Conventi WAG7 11-Oct-14 BSL 16-Mar-15
onal

223 23698 ECoR WAT Conventi WAG5 23-Jun-14 DHD 14-Mar-15


onal

224 27174 SER BNDM Conventi WAG7 23-Mar-14 DHD 13-Mar-15


onal
225 27281 ECR MGS Conventi WAG7 4-Jan-15 KPA 13-Mar-15
onal
226 24067 NCR JHS Conventi WAG5 27-Jun-14 DHD 12-Mar-15
onal

227 23550 SER TATA Conventi WAG5 22-Nov-14 KGP 12-Mar-15


onal

228 24005 NCR JHS Conventi WAG5 16-May-14 BSL 11-Mar-15


onal
229 23583 SER TATA Conventi WAG5 21-Oct-14 KGP 10-Mar-15
onal

230 27263 CR AQ Conventi WAG7 7-Feb-15 BSL 10-Mar-15


onal
231 22251 SCR LGD Conventi WAP4 13-Jan-15 PER 10-Mar-15
onal

232 22606 SCR LGD Conventi WAP4 8-Oct-14 KPA 9-Mar-15


onal
233 24029 NCR JHS Conventi WAG5 24-Feb-15 BSL 4-Mar-15
onal

234 30229 NR GZB 3-Phase WAP7 19-Nov-14 BSL 28-Feb-15

235 30230 NR GZB 3-Phase WAP7 2-Dec-14 BSL 28-Feb-15

236 22750 ECR MGS Conventi WAP4 3-Jun-14 KPA 27-Feb-15


onal
237 23415 SER TATA Conventi WAG5 26-Feb-15 KGP 27-Feb-15
onal

238 24014 NCR JHS Conventi WAG5 7-Jul-14 BSL 25-Feb-15


onal
239 22769 WR BRC Conventi WAP4 2-May-14 BSL 23-Feb-15
onal

240 30231 NR GZB 3-Phase WAP7 2-Feb-15 BSL 22-Feb-15

241 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 20-Feb-15


onal
242 23550 SER TATA Conventi WAG5 21-Nov-14 KGP 20-Feb-15
onal

243 24067 NCR JHS Conventi WAG5 27-Jun-14 DHD 17-Feb-15


onal

244 24067 NCR JHS Conventi WAG5 27-Jun-14 DHD 17-Feb-15


onal
245 22563 WR BRC Conventi WAP4 16-Feb-15 BSL 17-Feb-15
onal

246 24462 WR BL Conventi WAG5 20-Aug-14 DHD 16-Feb-15


onal
247 22798 ECR MGS Conventi WAP4 22-Nov-14 KPA 14-Feb-15
onal

248 23463 NCR JHS Conventi WAG5 7-May-14 CB 12-Feb-15


onal

249 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 12-Feb-15


onal
250 22643 SCR LGD Conventi WAP4 6-Jan-15 KPA 10-Feb-15
onal

251 22643 SCR LGD Conventi WAP4 6-Jan-15 KPA 10-Feb-15


onal

252 22643 SCR LGD Conventi WAP4 6-Jan-15 KPA 10-Feb-15


onal

253 22643 SCR LGD Conventi WAP4 6-Jan-15 KPA 10-Feb-15


onal
254 24007 NCR JHS Conventi WAG5 29-Jul-14 BSL 9-Feb-15
onal

255 23022 WR BRC Conventi WAG5 6-Feb-15 DHD 7-Feb-15


onal

256 27166 SER BNDM Conventi WAG7 15-Feb-14 DHD 4-Feb-15


onal
257 27230 SER BNDM Conventi WAG7 27-Jan-15 DHD 2-Feb-15
onal

258 22335 WR BRC Conventi WAP4 13-Sep-14 DHD 2-Feb-15


onal

259 23585 SER TATA Conventi WAG5 27-Sep-14 KGP 29-Jan-15


onal

260 27230 SER BNDM Conventi WAG7 27-Jan-15 DHD 29-Jan-15


onal

261 27771 CR AQ Conventi WAG7 21-Jan-15 BSL 28-Jan-15


onal
262 27326 SCR KZJ Conventi WAG7 15-Jan-15 KPA 28-Jan-15
onal

263 27773 CR AQ Conventi WAG7 1-Dec-14 BSL 27-Jan-15


onal
264 27771 CR AQ Conventi WAG7 22-Jan-15 BSL 27-Jan-15
onal

265 22316 SCR LGD Conventi WAP4 16-Dec-14 KPA 26-Jan-15


onal

266 22316 SCR LGD Conventi WAP4 16-Dec-14 KPA 26-Jan-15


onal

267 22316 SCR LGD Conventi WAP4 16-Dec-14 KPA 26-Jan-15


onal

268 22316 SCR LGD Conventi WAP4 16-Dec-14 KPA 26-Jan-15


onal
269 22316 SCR LGD Conventi WAP4 16-Dec-14 KPA 26-Jan-15
onal

270 22316 SCR LGD Conventi WAP4 16-Dec-14 KPA 26-Jan-15


onal

271 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal

272 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal

273 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal

274 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal

275 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal

276 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal
277 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15
onal

278 22609 SCR LGD Conventi WAP4 2-Dec-14 PER 26-Jan-15


onal

279 27442 NCR CNB Conventi WAG7 17-Nov-13 KPA 25-Jan-15


onal
280 22299 NCR CNB Conventi WAP4 9-Jan-15 BSL 25-Jan-15
onal
281 27294 SCR KZJ Conventi WAG7 20-Jan-15 BSL 24-Jan-15
onal

282 22247 SCR LGD Conventi WAP4 8-Nov-14 PER 24-Jan-15


onal

283 22247 SCR LGD Conventi WAP4 8-Dec-14 KPA 24-Jan-15


onal

284 22247 SCR LGD Conventi WAP4 8-Nov-14 PER 24-Jan-15


onal
285 22247 SCR LGD Conventi WAP4 8-Nov-14 PER 24-Jan-15
onal

286 22796 ECR MGS Conventi WAP4 29-Dec-14 KPA 24-Jan-15


onal

287 22552 NCR CNB Conventi WAP4 2-Jul-13 BSL 23-Jan-15


onal
288 23585 SER TATA Conventi WAG5 27-Sep-14 KGP 23-Jan-15
onal

289 27274 CR AQ Conventi WAG7 21-Jul-14 BSL 23-Jan-15


onal

290 23101 ECoR WAT Conventi WAG5 21-Dec-14 KGP 22-Jan-15


onal
291 23101 ECoR WAT Conventi WAG5 21-Dec-14 KGP 22-Jan-15
onal

292 27244 NCR CNB Conventi WAG7 1-Mar-13 KPA 21-Jan-15


onal

293 22066 WR BRC Conventi WAP4 17-Jan-15 DHD 20-Jan-15


onal

294 22048 NR GZB Conventi WAP1 1-Dec-14 DHD 20-Jan-15


onal
295 23625 ECoR WAT Conventi WAG5 17-Aug-14 KGP 20-Jan-15
onal

296 22066 WR BRC Conventi WAP4 17-Jan-15 DHD 19-Jan-15


onal

297 23491 SER TATA Conventi WAG5 17-Jan-15 KGP 18-Jan-15


onal

298 23434 ECoR WAT Conventi WAG5 10-May-14 KGP 17-Jan-15


onal
299 23434 ECoR WAT Conventi WAG5 10-May-14 KGP 17-Jan-15
onal

300 22642 SCR LGD Conventi WAP4 24-Nov-14 PER 14-Jan-15


onal

301 27011 ECR MGS Conventi WAG7 3-Nov-14 DHD 14-Jan-15


onal

302 27739 SER BNDM Conventi WAG7 2-Nov-14 KGP 14-Jan-15


onal

303 30230 NR GZB 3-Phase WAP7 8-Dec-14 BSL 12-Jan-15

304 23798 ECoR WAT Conventi WAG5 9-Jan-15 DHD 10-Jan-15


onal
305 23789 ECoR WAT Conventi WAG5 9-Jan-15 DHD 10-Jan-15
onal

306 23798 ECoR WAT Conventi WAG5 9-Jan-15 DHD 10-Jan-15


onal

307 23552 SER TATA Conventi WAG5 6-Jan-15 KGP 8-Jan-15


onal

308 22515 SCR LGD Conventi WAP4 19-Aug-14 KPA 8-Jan-15


onal
309 23594 NCR JHS Conventi WAG5 25-Aug-14 BSL 7-Jan-15
onal

310 27010 ECR MGS Conventi WAG7 18-Jul-14 DHD 6-Jan-15


onal

311 27236 SER TATA Conventi WAG7 30-Aug-14 KGP 5-Jan-15


onal
312 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 5-Jan-15
onal

313 27276 CR AQ Conventi WAG7 30-Aug-14 BSL 5-Jan-15


onal

314 30006 NR GZB 3-Phase WAP5 23-Aug-14 BSL 5-Jan-15

315 30225 NR GZB 3-Phase WAP7 20-Oct-14 BSL 4-Jan-15


316 22625 SCR LGD Conventi WAP4 12-Nov-14 PER 3-Jan-15
onal

317 27722 SER BNDM Conventi WAG7 6-Jun-14 KGP 3-Jan-15


onal

318 22547 NCR CNB Conventi WAP4 14-May-14 BSL 2-Jan-15


onal

319 27245 NCR CNB Conventi WAG7 31-Dec-13 CB 2-Jan-15


onal
320 30227 NR GZB 3-Phase WAP7 23-Jul-14 BSL 1-Jan-15
321 27749 SER TATA Conventi WAG7 19-Oct-14 KPA 30-Dec-14
onal

322 27296 SCR KZJ Conventi WAG7 26-Dec-14 BSL 29-Dec-14


onal

323 27246 NCR CNB Conventi WAG7 31-Dec-13 CB 29-Dec-14


onal
324 22319 NCR CNB Conventi WAP4 13-Dec-14 BSL 29-Dec-14
onal

325 23614 WCR NKJ Conventi WAG5H 28-Oct-14 KPA 29-Dec-14


onal

326 27224 ECR MGS Conventi WAG7 20-Oct-14 KPA 28-Dec-14


onal
327 27297 NCR CNB Conventi WAG7 28-Jan-14 KPA 27-Dec-14
onal

328 22562 WR BRC Conventi WAP4 26-Dec-14 BSL 27-Dec-14


onal
329 27129 NCR JHS Conventi WAG7 14-Jul-14 KPA 26-Dec-14
onal

330 27724 SER BNDM Conventi WAG7 30-May-14 KGP 26-Dec-14


onal

331 27724 SER BNDM Conventi WAG7 30-May-14 KGP 26-Dec-14


onal

332 27010 ECR MGS Conventi WAG7 18-Jul-14 DHD 25-Dec-14


onal
333 23020 WR BRC Conventi WAG5 20-Dec-14 DHD 23-Dec-14
onal

334 23101 ECoR WAT Conventi WAG5 21-Dec-14 KGP 22-Dec-14


onal

335 27271 NCR CNB Conventi WAG7 17-May-13 KPA 22-Dec-14


onal
336 22551 NCR CNB Conventi WAP4 15-Aug-14 BSL 22-Dec-14
onal

337 22228 NCR CNB Conventi WAP4 27-Sep-14 BSL 22-Dec-14


onal

338 27273 NCR CNB Conventi WAG7 20-Sep-13 CB 21-Dec-14


onal

339 23550 SER TATA Conventi WAG5 21-Nov-14 KGP 21-Dec-14


onal

340 27246 NCR CNB Conventi WAG7 31-Dec-13 CB 20-Dec-14


onal
341 27322 SCR KZJ Conventi WAG7 18-Nov-14 KPA 20-Dec-14
onal

342 22578 NCR CNB Conventi WAP4 1-Jul-14 BSL 19-Dec-14


onal

343 27442 NCR CNB Conventi WAG7 23-Dec-14 CB 19-Dec-14


onal
344 27011 ECR MGS Conventi WAG7 3-Nov-14 DHD 19-Dec-14
onal
345 22055 NCR CNB Conventi WAP4 2-Jul-14 DHD 17-Dec-14
onal
346 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 17-Dec-14
onal
347 23559 WCR NKJ Conventi WAG5H 17-Dec-13 PER 17-Dec-14
onal

348 27399 CR AQ Conventi WAG7 21-May-13 BSL 16-Dec-14


onal
349 22319 NCR CNB Conventi WAP4 13-Dec-14 BSL 14-Dec-14
onal

350 22511 SCR LGD Conventi WAP4 5-Jan-14 PER 13-Dec-14


onal

351 23884 SER TATA Conventi WAG5 13-Aug-14 KGP 11-Dec-14


onal

352 27216 NCR CNB Conventi WAG7 16-Apr-14 KPA 10-Dec-14


onal
353 23752 ECoR WAT Conventi WAG5 9-Dec-14 DHD 10-Dec-14
onal

354 22264 SCR LGD Conventi WAP4 3-Nov-14 KPA 9-Dec-14


onal

355 22264 SCR LGD Conventi WAP4 3-Nov-14 KPA 9-Dec-14


onal

356 22264 SCR LGD Conventi WAP4 3-Nov-14 KPA 9-Dec-14


onal
357 22264 SCR LGD Conventi WAP4 3-Nov-14 KPA 9-Dec-14
onal

358 22264 SCR LGD Conventi WAP4 3-Nov-14 KPA 9-Dec-14


onal

359 22264 SCR LGD Conventi WAP4 3-Nov-14 PER 9-Dec-14


onal

360 22264 SCR LGD Conventi WAP4 3-Nov-14 PER 9-Dec-14


onal

361 22264 SCR LGD Conventi WAP4 3-Nov-14 PER 9-Dec-14


onal

362 22264 SCR LGD Conventi WAP4 3-Nov-14 PER 9-Dec-14


onal

363 22264 SCR LGD Conventi WAP4 3-Nov-14 PER 9-Dec-14


onal
364 22264 SCR LGD Conventi WAP4 9-Dec-14 KPA 9-Dec-14
onal

365 23369 SER TATA Conventi WAG5 7-Dec-14 KGP 8-Dec-14


onal
366 27788 SCR KZJ Conventi WAG7 30-Nov-14 KPA 7-Dec-14
onal

367 31043 ECR GMO 3-Phase WAG9 1-May-14 BSL 7-Dec-14

368 27760 WCR NKJ Conventi WAG7 13-Sep-14 CB 7-Dec-14


onal
369 24005 NCR JHS Conventi WAG6 16-May-14 BSL 7-Dec-14
onal

370 23735 WCR NKJ Conventi WAG5H 13-Sep-14 DHD 6-Dec-14


onal
371 27380 SCR KZJ Conventi WAG7 30-Nov-14 BSL 6-Dec-14
onal
372 27382 SCR KZJ Conventi WAG7 2-Dec-14 PER 5-Dec-14
onal
373 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 4-Dec-14
onal

374 23903 SER BKSC Conventi WAG5 31-Jan-10 KGP 4-Dec-14


onal

375 27748 SER TATA Conventi WAG7 11-Sep-14 KPA 4-Dec-14


onal
376 27748 SER TATA Conventi WAG7 11-Sep-14 KPA 4-Dec-14
onal

377 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 3-Dec-14


onal

378 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 3-Dec-14


onal
379 22229 NCR CNB Conventi WAP4 11-Nov-14 BSL 1-Dec-14
onal
380 22798 ECR MGS Conventi WAP4 22-Nov-14 KPA 1-Dec-14
onal

381 27734 SER BNDM Conventi WAG7 13-Sep-14 KGP 30-Nov-14


onal

382 23583 SER TATA Conventi WAG5 21-Oct-14 KGP 29-Nov-14


onal

383 23370 WCR TKD Conventi WAG5 31-Oct-14 KPA 29-Nov-14


onal
384 27272 NCR CNB Conventi WAG7 30-Jan-14 KPA 27-Nov-14
onal

385 23417 NCR JHS Conventi WAG5 14-Mar-14 DHD 27-Nov-14


onal

386 22312 SCR LGD Conventi WAP4 6-Feb-14 BSL 26-Nov-14


onal

387 22607 SCR LGD Conventi WAP4 2-Nov-14 PER 26-Nov-14


onal
388 23501 WCR TKD Conventi WAG5 18-Oct-14 KPA 26-Nov-14
onal

389 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 25-Nov-14


onal

390 23661 CR BSL Conventi WAG5 29-Mar-14 BSL 25-Nov-14


onal

391 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal

392 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal

393 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal

394 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal

395 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal
396 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14
onal

397 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal

398 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 24-Nov-14


onal
399 22642 SCR LGD Conventi WAP4 16-Oct-14 PER 24-Nov-14
onal

400 22642 SCR LGD Conventi WAP4 16-Oct-14 PER 24-Nov-14


onal
401 23714 ECoR WAT Conventi WAG5 7-Oct-14 KGP 24-Nov-14
onal

402 22594 SCR LGD Conventi WAP4 14-May-14 PER 23-Nov-14


onal

403 24011 NCR JHS Conventi WAG5 14-Jul-13 BSL 23-Nov-14


onal

404 24003 NCR JHS Conventi WAG5 1-Sep-13 BSL 23-Nov-14


onal

405 24012 NCR JHS Conventi WAG5 10-Nov-12 BSL 23-Nov-14


onal
406 24403 NCR JHS Conventi WAG7 15-Oct-13 BSL 22-Nov-14
onal

407 22552 NCR CNB Conventi WAP4 2-Jul-13 BSL 22-Nov-14


onal

408 22552 NCR CNB Conventi WAP4 22-Nov-14 BSL 22-Nov-14


onal
409 27284 CR AQ Conventi WAG7 25-Oct-13 BSL 22-Nov-14
onal

410 27011 ECR MGS Conventi WAG7 13-Nov-14 DHD 22-Nov-14


onal

411 24032 NCR JHS Conventi WAG5 1-Aug-13 BSL 21-Nov-14


onal

412 24005 NCR JHS Conventi WAG5 11-Aug-12 BSL 21-Nov-14


onal
413 24035 NCR JHS Conventi WAG5 10-Jan-14 BSL 21-Nov-14
onal

414 23861 NCR JHS Conventi WAG5 11-Mar-13 PER 21-Nov-14


onal

415 27739 SER BNDM Conventi WAG7 2-Nov-14 KGP 21-Nov-14


onal
416 27739 SER BNDM Conventi WAG7 2-Nov-14 KGP 21-Nov-14
onal

417 27080 NCR JHS Conventi WAG7 10-Oct-13 KPA 20-Nov-14


onal

418 22297 CR BSL Conventi WAP4 10-Aug-14 BSL 20-Nov-14


onal

419 27224 ECR MGS Conventi WAG7 2-Oct-14 KPA 19-Nov-14


onal
420 27011 ECR MGS Conventi WAG7 3-Nov-14 DHD 18-Nov-14
onal

421 24070 NCR JHS Conventi WAG5 5-Oct-14 BSL 18-Nov-14


onal
422 24035 NCR JHS Conventi WAG5 10-Jan-14 BSL 18-Nov-14
onal

423 23161 NCR JHS Conventi WAG5 13-Jul-11 CB 18-Nov-14


onal

424 22238 SCR LGD Conventi WAP4 17-Jul-14 PER 18-Nov-14


onal
425 24011 NCR JHS Conventi WAG5 14-Jul-13 BSL 17-Nov-14
onal

426 27274 CR AQ Conventi WAG7 21-Jul-14 BSL 17-Nov-14


onal

427 22313 SCR LGD Conventi WAP4 26-Oct-14 KPA 15-Nov-14


onal

428 24036 NCR JHS Conventi WAG5 13-Nov-14 DHD 15-Nov-14


onal
429 27073 NCR JHS Conventi WAG7 15-Feb-14 BSL 15-Nov-14
onal

430 23840 NCR JHS Conventi WAG5 25-Feb-14 BSL 14-Nov-14


onal

431 23594 NCR JHS Conventi WAG5 7-Jun-13 BSL 14-Nov-14


onal

432 24401 NCR JHS Conventi WAG7 7-Feb-14 KGP 13-Nov-14


onal
433 27521 NCR JHS Conventi WAG5 29-Apr-13 KGP 13-Nov-14
onal

434 23571 ECoR WAT Conventi WAG5 9-Feb-14 KPA 13-Nov-14


onal

435 23146 CR BSL Conventi WAG5 11-Jun-14 BSL 12-Nov-14


onal

436 23419 NCR JHS Conventi WAG5 2-Jul-13 DHD 12-Nov-14


onal

437 24060 NCR JHS Conventi WAG5 12-Jul-13 BSL 12-Nov-14


onal
438 22625 SCR LGD Conventi WAP4 12-Nov-14 KPA 12-Nov-14
onal

439 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14


onal

440 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14


onal

441 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14


onal
442 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14
onal

443 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14


onal

444 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14


onal

445 22625 SCR LGD Conventi WAP4 1-Oct-14 KPA 12-Nov-14


onal

446 22606 SCR LGD Conventi WAP4 21-Sep-14 PER 11-Nov-14


onal
447 23370 WCR TKD Conventi WAG5 31-Oct-14 KPA 10-Nov-14
onal

448 27220 CR AQ Conventi WAG7 28-Jun-14 BSL 10-Nov-14


onal

449 24065 NCR JHS Conventi WAG5 7-Nov-14 BSL 9-Nov-14


onal

450 23381 NCR JHS Conventi WAG5 9-Jun-13 DHD 8-Nov-14


onal

451 22214 SCR LGD Conventi WAP4 9-Jan-14 DHD 8-Nov-14


onal
452 22214 SCR LGD Conventi WAP4 9-Jan-14 DHD 8-Nov-14
onal

453 27276 CR AQ Conventi WAG7 30-Aug-14 BSL 8-Nov-14


onal

454 27276 CR AQ Conventi WAG7 30-Aug-14 BSL 8-Nov-14


onal

455 23586 ECoR WAT Conventi WAG5 27-Jun-14 KGP 7-Nov-14


onal

456 30232 NR GZB 3-Phase WAP7 10-Aug-14 BSL 7-Nov-14

457 22607 SCR LGD Conventi WAP4 7-Nov-14 PER 7-Nov-14


onal
458 27080 NCR JHS Conventi WAG7 10-Oct-13 KPA 7-Nov-14
onal

459 23753 NCR JHS Conventi WAG5 1-Apr-14 KPA 7-Nov-14


onal
460 27519 NCR JHS Conventi WAG7 9-May-14 CB 7-Nov-14
onal

461 23163 NCR JHS Conventi WAG5 6-Oct-12 CB 7-Nov-14


onal

462 27785 SER BNDM Conventi WAG7 27-Dec-13 KGP 7-Nov-14


onal

463 23692 ECoR WAT Conventi WAG5 9-Aug-14 DHD 6-Nov-14


onal
464 24462 WR BL Conventi WAG5 20-Aug-14 DHD 6-Nov-14
onal

465 23963 NCR JHS Conventi WAG5 26-Aug-14 BSL 5-Nov-14


onal

466 23419 NCR JHS Conventi WAG5 2-Jul-13 DHD 5-Nov-14


onal
467 27442 NCR CNB Conventi WAG7 23-Oct-14 CB 5-Nov-14
onal

468 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 4-Nov-14


onal

469 24012 NCR JHS Conventi WAG5 10-Nov-12 BSL 3-Nov-14


onal

470 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 3-Nov-14


onal
471 24032 NCR JHS Conventi WAG5 1-Aug-13 BSL 2-Nov-14
onal

472 22607 SCR LGD Conventi WAP4 20-Sep-14 PER 2-Nov-14


onal

473 22607 SCR LGD Conventi WAP4 20-Sep-14 PER 2-Nov-14


onal

474 22607 SCR LGD Conventi WAP4 20-Sep-14 PER 2-Nov-14


onal

475 22607 SCR LGD Conventi WAP4 20-Sep-14 PER 2-Nov-14


onal
476 22607 SCR LGD Conventi WAP4 20-Sep-14 PER 2-Nov-14
onal

477 24007 NCR JHS Conventi WAG5 22-Jul-13 BSL 1-Nov-14


onal
478 23419 NCR JHS Conventi WAG5 2-Jul-13 DHD 1-Nov-14
onal

479 24051 NCR JHS Conventi WAG7 23-May-13 BSL 1-Nov-14


onal

480 23501 WCR TKD Conventi WAG5 18-Oct-14 KPA 30-Oct-14


onal

481 27768 SCR KZJ Conventi WAG7 22-Oct-14 KPA 30-Oct-14


onal

482 30006 NR GZB 3-Phase WAP5 23-Aug-14 BSL 30-Oct-14

483 23045 CR BSL Conventi WAG5 17-Jan-13 BSL 26-Oct-14


onal

484 22055 NCR CNB Conventi WAP4 2-Jul-14 DHD 23-Oct-14


onal
485 27141 NCR CNB Conventi WAG7 19-Jan-13 KPA 23-Oct-14
onal

486 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 22-Oct-14


onal

487 23528 CR BSL Conventi WAG5 17-Apr-14 BSL 21-Oct-14


onal

488 27258 CR AQ Conventi WAG7 18-Dec-13 BSL 21-Oct-14


onal

489 23528 CR BSL Conventi WAG5 17-Apr-14 BSL 21-Oct-14


onal

490 27198 SER TATA Conventi WAG7 21-Apr-14 DHD 20-Oct-14


onal
491 23501 WCR TKD Conventi WAG5 18-Oct-14 KPA 20-Oct-14
onal

492 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 19-Oct-14

493 22551 NCR CNB Conventi WAP4 15-Aug-14 BSL 19-Oct-14


onal

494 22753 ECR MGS Conventi WAP4 23-Dec-13 KPA 19-Oct-14


onal

495 24453 SER BKSC Conventi WAG5 28-Feb-13 BSL 16-Oct-14


onal
496 23007 WR BL Conventi WAG5 16-Mar-14 KPA 16-Oct-14
onal

497 27373 WCR NKJ Conventi WAG7 14-Oct-14 KPA 15-Oct-14


onal
498 27225 ECR MGS Conventi WAG7 5-Oct-14 KPA 14-Oct-14
onal

499 30004 NR GZB 3-Phase WAP5 3-Jul-14 BSL 14-Oct-14


500 22739 ECR MGS Conventi WAP4 7-Oct-13 KPA 13-Oct-14
onal

501 30006 NR GZB 3-Phase WAP5 23-Aug-14 BSL 12-Oct-14

502 30228 NR GZB 3-Phase WAP7 22-Sep-14 BSL 12-Oct-14

503 23236 SER TATA Conventi WAG7 30-Aug-14 KGP 12-Oct-14


onal

504 27424 NCR CNB Conventi WAG7 25-Aug-14 CB 12-Oct-14


onal
505 27424 NCR CNB Conventi WAG7 26-Aug-14 CB 12-Oct-14
onal

506 23434 ECoR WAT Conventi WAG5 10-May-14 KGP 11-Oct-14


onal

507 22325 WR BRC Conventi WAP4 17-Oct-14 BSL 10-Oct-14


onal

508 23752 ECoR WAT Conventi WAG5 9-Oct-14 DHD 10-Oct-14


onal

509 27295 SCR KZJ Conventi WAG7 3-Oct-14 BSL 8-Oct-14


onal
510 27295 SCR KZJ Conventi WAG7 3-Oct-14 BSL 8-Oct-14
onal

511 27295 SCR KZJ Conventi WAG7 3-Oct-14 BSL 8-Oct-14


onal
512 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14
onal

513 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14


onal

514 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14


onal
515 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14
onal

516 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14


onal
517 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14
onal

518 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14


onal

519 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14


onal
520 27325 SCR KZJ Conventi WAG7 28-Aug-14 KPA 8-Oct-14
onal

521 27295 SCR KZJ Conventi WAG7 3-Oct-14 BSL 8-Oct-14


onal

522 22606 SCR LGD Conventi WAP4 8-Oct-14 KPA 8-Oct-14


onal

523 22606 SCR LGD Conventi WAP4 8-Oct-14 KPA 8-Oct-14


onal
524 22606 SCR LGD Conventi WAP4 8-Oct-14 KPA 8-Oct-14
onal

525 22606 SCR LGD Conventi WAP4 8-Oct-14 KPA 8-Oct-14


onal
526 27224 ECR MGS Conventi WAG7 3-Oct-14 KPA 8-Oct-14
onal

527 23714 ECoR WAT Conventi WAG5 7-Oct-14 KGP 7-Oct-14


onal

528 23714 ECoR WAT Conventi WAG5 7-Oct-14 KGP 7-Oct-14


onal
529 27338 ECR MGS Conventi WAG7 4-Aug-14 KGP 6-Oct-14
onal

530 27295 SCR KZJ Conventi WAG7 3-Oct-14 BSL 5-Oct-14


onal

531 27760 WCR NKJ Conventi WAG7 13-Sep-14 CB 3-Oct-14


onal
532 27724 SER BNDM Conventi WAG7 31-May-14 KGP 2-Oct-14
onal

533 22237 SCR LGD Conventi WAP4 8-May-14 KPA 2-Oct-14


onal

534 30004 NR GZB 3-Phase WAP5 10-Jul-14 BSL 2-Oct-14

535 30001 NR GZB 3-Phase WAP5 25-May-14 BSL 2-Oct-14

536 22598 SCR LGD Conventi WAP4 1-Oct-14 KPA 1-Oct-14


onal
537 23625 ECoR WAT Conventi WAG5 18-Aug-14 KGP 28-Sep-14
onal

538 22334 NR GZB Conventi WAP4 18-Sep-14 BSL 26-Sep-14


onal
539 22551 NCR CNB Conventi WAP4 15-Aug-14 BSL 25-Sep-14
onal

540 27443 NCR CNB Conventi WAG7 22-Mar-14 CB 25-Sep-14


onal

541 27152 WCR NKJ Conventi WAG7 19-Mar-13 KPA 25-Sep-14


onal
542 27297 NCR CNB Conventi WAG7 28-Jan-14 KPA 24-Sep-14
onal

543 24446 SER BKSC Conventi WAG5 22-May-13 BSL 21-Sep-14


onal
544 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14
onal
545 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14
onal

546 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14


onal

547 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14


onal
548 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14
onal
549 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14
onal

550 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14


onal

551 22226 SCR LGD Conventi WAP4 20-Sep-14 PER 20-Sep-14


onal

552 27725 SER BNDM Conventi WAG7 31-May-14 KGP 18-Sep-14


onal

553 30232 NR GZB 3-Phase WAP7 10-Aug-14 BSL 18-Sep-14


554 22561 WR BRC Conventi WAP4 16-Sep-14 BSL 18-Sep-14
onal
555 22335 WR BRC Conventi WAP4 14-Sep-14 DHD 15-Sep-14
onal

556 23692 ECoR WAT Conventi WAG5 9-Aug-14 DHD 15-Sep-14


onal

557 23692 ECoR WAT Conventi WAG5 9-Aug-14 DHD 15-Sep-14


onal

558 27734 SER BNDM Conventi WAG7 13-Sep-14 KGP 13-Sep-14


onal
559 27274 CR AQ Conventi WAG7 21-Jul-14 BSL 13-Sep-14
onal

560 23735 WCR NKJ Conventi WAG5H 12-Jul-14 DHD 12-Sep-14


onal
561 27372 WCR NKJ Conventi WAG7 27-Jul-14 KPA 12-Sep-14
onal

562 30006 NR GZB 3-Phase WAP5 23-Aug-14 BSL 11-Sep-14


563 23290 SER TATA Conventi WAG5 6-May-14 KGP 10-Sep-14
onal

564 24451 WCR NKJ Conventi WAG5H 10-Jun-14 DHD 10-Sep-14


onal

565 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 10-Sep-14

566 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 9-Sep-14

567 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 9-Sep-14


568 23843 WCR NKJ Conventi WAG5H 6-Apr-14 DHD 9-Sep-14
onal

569 22753 ECR MGS Conventi WAP4 4-Sep-14 KPA 8-Sep-14


onal

570 22055 NCR CNB Conventi WAP4 7-Feb-14 DHD 8-Sep-14


onal
571 22753 ECR MGS Conventi WAP4 6-Sep-14 KPA 6-Sep-14
onal

572 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 6-Sep-14


onal

573 23007 WR BL Conventi WAG5 16-Mar-14 KPA 4-Sep-14


onal

574 23007 WR BL Conventi WAG5 16-Mar-14 KPA 4-Sep-14


onal
575 23007 WR BL Conventi WAG5 16-Mar-14 KPA 4-Sep-14
onal

576 23007 WR BL Conventi WAG5 16-Mar-14 KPA 4-Sep-14


onal
577 23007 WR BL Conventi WAG5 16-Mar-14 KPA 4-Sep-14
onal
578 27192 SER TATA Conventi WAG7 5-Apr-14 DHD 3-Sep-14
onal

579 22771 ER HWH Conventi WAP4 19-Jul-14 KPA 2-Sep-14


onal

580 23460 WR BL Conventi WAG5H 12-Dec-13 KPA 2-Sep-14


onal
581 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 1-Sep-14
onal

582 27733 SER BNDM Conventi WAG7 25-Aug-14 KGP 1-Sep-14


onal
583 27722 SER BNDM Conventi WAG7 6-Jun-14 KGP 1-Sep-14
onal

584 27738 SCR KZJ Conventi WAG7 29-Aug-14 BSL 1-Sep-14


onal

585 27738 SCR KZJ Conventi WAG7 29-Aug-14 BSL 1-Sep-14


onal

586 27738 SCR KZJ Conventi WAG7 29-Aug-14 BSL 1-Sep-14


onal
587 23830 WCR NKJ Conventi WAG5H 11-Aug-14 DHD 31-Aug-14
onal

588 22235 NCR CNB Conventi WAP4 4-Oct-12 KPA 30-Aug-14


onal

589 27732 SER BNDM Conventi WAG7 19-Jul-14 KPA 30-Aug-14


onal
590 23528 CR BSL Conventi WAG5 17-Apr-14 BSL 28-Aug-14
onal

591 24453 SER BKSC Conventi WAG5 28-Feb-13 BSL 28-Aug-14


onal

592 27722 SER BNDM Conventi WAG7 6-Jun-14 KGP 27-Aug-14


onal

593 23535 SR AJJ Conventi WAG5H 30-Apr-14 PER 26-Aug-14


onal

594 27141 NCR CNB Conventi WAG7 19-Jan-13 KPA 21-Aug-14


onal
595 22551 NCR CNB Conventi WAP4 15-Aug-14 DHD 20-Aug-14
onal

596 22551 NCR CNB Conventi WAP4 15-Aug-14 BSL 20-Aug-14


onal

597 23078 ER ASN Conventi WAG5 7-Aug-14 KPA 20-Aug-14


onal

598 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 20-Aug-14

599 30001 NR GZB 3-Phase WAP5 25-May-14 BSL 19-Aug-14

600 30223 NR GZB 3-Phase WAP7 7-Jun-14 BSL 19-Aug-14


601 23625 ECoR WAT Conventi WAG5 17-Aug-14 KGP 18-Aug-14
onal

602 23625 ECoR WAT Conventi WAG5 17-Aug-14 KGP 18-Aug-14


onal

603 23625 ECoR WAT Conventi WAG5 17-Aug-14 KGP 18-Aug-14


onal

604 23625 ECoR WAT Conventi WAG5 17-Aug-14 KGP 18-Aug-14


onal

605 23625 ECoR WAT Conventi WAG5 17-Aug-14 KGP 17-Aug-14


onal

606 27009 ECR MGS Conventi WAG7 27-Aug-14 KPA 17-Aug-14


onal
607 23574 CR BSL Conventi WAG5 23-Jul-14 BSL 16-Aug-14
onal

608 23574 CR BSL Conventi WAG5 23-Jul-14 BSL 16-Aug-14


onal

609 27338 ECR MGS Conventi WAG7 4-Aug-14 KGP 15-Aug-14


onal

610 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 15-Aug-14

611 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 15-Aug-14

612 22589 SCR LGD Conventi WAP4 10-Jul-13 PER 15-Aug-14


onal
613 22552 NCR CNB Conventi WAP4 2-Jul-13 BSL 14-Aug-14
onal

614 22552 NCR CNB Conventi WAP4 2-Jul-13 DHD 14-Aug-14


onal

615 22560 WR BRC Conventi WAP4 2-Mar-14 BSL 13-Aug-14


onal
616 27202 NCR CNB Conventi WAG7 20-Oct-12 KPA 12-Aug-14
onal

617 23759 WCR NKJ Conventi WAG5H 31-Jul-14 KPA 12-Aug-14


onal

618 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 11-Aug-14

619 31043 ECR GMO 3-Phase WAG9 1-May-14 BSL 10-Aug-14

620 22597 SCR LGD Conventi WAP4 15-Feb-14 PER 9-Aug-14


onal
621 23692 ECoR WAT Conventi WAG5 9-Aug-14 DHD 9-Aug-14
onal

622 22292 NR GZB Conventi WAM4 22-Feb-14 KPA 8-Aug-14


onal

623 23843 WCR NKJ Conventi WAG5H 6-Apr-14 DHD 8-Aug-14


onal

624 27202 NCR CNB Conventi WAG7 20-Oct-12 KPA 5-Aug-14


onal
625 22578 NCR CNB Conventi WAP4 1-Jul-14 BSL 4-Aug-14
onal

626 30227 NR GZB 3-Phase WAP7 23-Jul-14 BSL 4-Aug-14

627 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 3-Aug-14


onal

628 27300 SCR KZJ Conventi WAG7 14-Jul-14 KPA 2-Aug-14


onal

629 27300 SCR KZJ Conventi WAG7 14-Jul-14 KPA 2-Aug-14


onal
630 27300 SCR KZJ Conventi WAG7 14-Jul-14 KPA 2-Aug-14
onal
631 27300 SCR KZJ Conventi WAG7 14-Jul-14 KPA 2-Aug-14
onal
632 21391 ECR MGS Conventi WAM4 27-Jun-13 KPA 1-Aug-14
onal

633 27010 ECR MGS Conventi WAG7 18-Jul-14 DHD 31-Jul-14


onal

634 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 31-Jul-14


onal

635 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 31-Jul-14


onal

636 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 31-Jul-14


onal

637 22325 WR BRC Conventi WAP4 17-Jun-14 BSL 31-Jul-14


onal
638 23498 CR BSL Conventi WAG5 28-Dec-13 BSL 30-Jul-14
onal

639 22055 NCR CNB Conventi WAP4 2-Jul-14 DHD 29-Jul-14


onal

640 22062 ECR MGS Conventi WAP4 23-Oct-13 DHD 26-Jul-14


onal
641 30001 NR GZB 3-Phase WAP5 25-May-14 BSL 26-Jul-14

642 30001 NR GZB 3-Phase WAP5 25-May-14 BSL 26-Jul-14

643 23755 CR BSL Conventi WAG5 22-Jul-14 DHD 26-Jul-14


onal

644 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 26-Jul-14


645 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 25-Jul-14
onal

646 22547 NCR CNB Conventi WAP4 14-May-14 DHD 25-Jul-14


onal

647 22547 NCR CNB Conventi WAP4 14-May-14 BSL 25-Jul-14


onal

648 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 24-Jul-14


onal
649 27736 SCR KZJ Conventi WAG7 19-Jul-14 BSL 24-Jul-14
onal

650 27736 SCR KZJ Conventi WAG7 19-Jul-14 BSL 24-Jul-14


onal

651 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 23-Jul-14

652 27329 SCR KZJ Conventi WAG7 15-Jun-14 KPA 22-Jul-14


onal
653 27329 SCR KZJ Conventi WAG7 15-Jun-14 KPA 22-Jul-14
onal

654 27329 SCR KZJ Conventi WAG7 15-Jun-14 KPA 22-Jul-14


onal

655 27329 SCR KZJ Conventi WAG7 15-Jun-14 KPA 22-Jul-14


onal

656 30223 NR GZB 3-Phase WAP7 7-Jun-14 BSL 22-Jul-14


657 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 21-Jul-14
onal
658 31044 ECR GMO 3-Phase WAG9 26-Jun-14 BSL 20-Jul-14

659 31044 ECR GMO 3-Phase WAG9 26-Jun-14 BSL 20-Jul-14

660 31044 ECR GMO 3-Phase WAG9 26-Jun-14 BSL 20-Jul-14

661 31044 ECR GMO 3-Phase WAG9 26-Jun-14 BSL 20-Jul-14


662 23881 ER ASN Conventi WAG5 2-Jun-14 KPA 20-Jul-14
onal

663 23797 WR BL Conventi WAG5 26-Jun-14 DHD 19-Jul-14


onal

664 30001 NR GZB 3-Phase WAP5 19-May-14 BSL 17-Jul-14

665 30004 NR GZB 3-Phase WAP5 10-Apr-14 BSL 16-Jul-14

666 22312 SCR LGD Conventi WAP4 6-Feb-14 BSL 15-Jul-14


onal

667 27272 NCR CNB Conventi WAG7 30-Jan-14 KPA 14-Jul-14


onal
668 27271 NCR CNB Conventi WAG7 17-May-13 KPA 14-Jul-14
onal

669 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 13-Jul-14

670 31044 ECR GMO 3-Phase WAG9 26-Jun-14 BSL 11-Jul-14

671 24013 NCR JHS Conventi WAG5 22-Aug-13 BSL 11-Jul-14


onal

672 22594 SCR LGD Conventi WAP4 14-May-14 PER 10-Jul-14


onal
673 27787 SCR KZJ Conventi WAG7 18-Jun-14 KPA 9-Jul-14
onal

674 27787 SCR KZJ Conventi WAG7 18-Jun-14 KPA 9-Jul-14


onal

675 27787 SCR KZJ Conventi WAG7 18-Jun-14 KPA 9-Jul-14


onal

676 24005 NCR JHS Conventi WAG5 16-May-14 BSL 9-Jul-14


onal

677 30223 NR GZB 3-Phase WAP7 5-Jun-14 BSL 9-Jul-14

678 30002 NR GZB 3-Phase WAP5 23-Feb-14 BSL 8-Jul-14


679 22750 ECR MGS Conventi WAP4 3-Jun-14 KPA 8-Jul-14
onal

680 22597 SCR LGD Conventi WAP4 15-Feb-14 PER 8-Jul-14


onal
681 27758 WCR NKJ Conventi WAG7 16-Jan-14 BSL 8-Jul-14
onal

682 22597 SCR LGD Conventi WAP4 15-Feb-14 PER 8-Jul-14


onal

683 27717 SER BNDM Conventi WAG7 9-May-14 KGP 7-Jul-14


onal
684 23873 WCR NKJ Conventi WAG5H 11-Aug-13 DHD 6-Jul-14
onal

685 30223 NR GZB 3-Phase WAP7 7-Jun-14 BSL 6-Jul-14

686 30001 NR GZB 3-Phase WAP5 25-May-14 BSL 6-Jul-14

687 22207 ECR MGS Conventi WAP4 18-Nov-13 DHD 5-Jul-14


onal
688 23797 WR BL Conventi WAG5 26-Jun-14 DHD 5-Jul-14
onal

689 31043 ECR GMO 3-Phase WAG9 1-May-14 BSL 5-Jul-14

690 27164 SER BNDM Conventi WAG7 3-Jul-13 KGP 4-Jul-14


onal

691 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 3-Jul-14


onal
692 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 3-Jul-14

693 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 3-Jul-14

694 23582 CR BSL Conventi WAG5 9-Jun-14 BSL 2-Jul-14


onal
695 27088 NCR CNB Conventi WAG7 10-Apr-10 CB 1-Jul-14
onal

696 31048 ECR GMO 3-Phase WAG9 16-Jun-14 KPA 1-Jul-14

697 22312 SCR LGD Conventi WAP4 6-Feb-14 BSL 1-Jul-14


onal
698 31036 ECR GMO 3-Phase WAG9 20-Jan-01 BSL 30-Jun-14

699 31048 ECR GMO 3-Phase WAG9 26-Apr-02 KPA 30-Jun-14

700 31048 ECR GMO 3-Phase WAG9 26-Apr-02 KPA 30-Jun-14


701 31048 ECR GMO 3-Phase WAG9 26-Apr-02 BSL 30-Jun-14

702 31038 ECR GMO 3-Phase WAG9 28-Apr-01 BSL 30-Jun-14

703 21321 ECR MGS Conventi WAM4 7-Aug-13 KPA 30-Jun-14


onal

704 30220 NR GZB 3-Phase WAP7 15-Dec-13 BSL 29-Jun-14


705 31016 ECR GMO 3-Phase WAG9 17-Jul-99 BSL 28-Jun-14

706 31016 ECR GMO 3-Phase WAG9 17-Jul-99 BSL 28-Jun-14

707 31016 ECR GMO 3-Phase WAG9 17-Jul-99 BSL 28-Jun-14


708 24451 WCR NKJ Conventi WAG5 10-Jun-14 DHD 28-Jun-14
onal

709 23556 ECoR WAT Conventi WAG5 29-May-14 KGP 27-Jun-14


onal

710 23434 ECoR WAT Conventi WAG5 10-May-14 KGP 27-Jun-14


onal

711 23586 ECoR WAT Conventi WAG5 27-Jun-14 KGP 27-Jun-14


onal
712 31028 ECR GMO 3-Phase WAG9 21-Apr-00 BSL 27-Jun-14

713 31028 ECR GMO 3-Phase WAG9 21-Apr-00 BSL 27-Jun-14

714 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

715 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

716 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

717 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

718 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

719 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal
720 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14
onal

721 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

722 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

723 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

724 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

725 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal
726 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14
onal

727 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

728 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

729 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

730 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal

731 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14


onal
732 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-Jun-14
onal

733 27174 SER BNDM Conventi WAG7 23-Mar-14 DHD 27-Jun-14


onal

734 31029 ECR GMO 3-Phase WAG9 4-Mar-00 BSL 26-Jun-14


735 27220 CR AQ Conventi WAG7 26-Jun-14 BSL 26-Jun-14
onal
736 22284 NCR CNB Conventi WAP4 23-Mar-13 KPA 26-Jun-14
onal

737 22512 SCR LGD Conventi WAP4 23-Jun-14 KPA 26-Jun-14


onal
738 23749 WCR NKJ Conventi WAG5 8-Jan-13 DHD 26-Jun-14
onal

739 31043 ECR GMO 3-Phase WAG9 16-Aug-01 BSL 25-Jun-14

740 31039 ECR GMO 3-Phase WAG9 28-May-01 KPA 25-Jun-14

741 27242 NCR CNB Conventi WAG7 12-Jul-13 CB 25-Jun-14


onal

742 24451 WCR NKJ Conventi WAG5 10-Jun-14 DHD 24-Jun-14


onal
743 27181 WCR NKJ Conventi WAG7 17-Dec-13 DHD 23-Jun-14
onal

744 31030 ECR GMO 3-Phase WAG9 12-Aug-00 BSL 23-Jun-14

745 31041 ECR GMO 3-Phase WAG9 29-May-01 BSL 23-Jun-14

746 31041 ECR GMO 3-Phase WAG9 29-May-01 BSL 23-Jun-14

747 31041 ECR GMO 3-Phase WAG9 29-May-01 BSL 23-Jun-14

748 22512 SCR LGD Conventi WAP4 23-Jun-14 KPA 23-Jun-14


onal

749 22512 SCR LGD Conventi WAP4 23-Jun-14 KPA 23-Jun-14


onal

750 22512 SCR LGD Conventi WAP4 23-Jun-14 KPA 23-Jun-14


onal
751 23698 ECoR WAT Conventi WAG5 23-Jun-14 DHD 23-Jun-14
onal

752 23698 ECoR WAT Conventi WAG5 23-Jun-14 DHD 23-Jun-14


onal

753 23698 ECoR WAT Conventi WAG5 23-Jun-14 DHD 23-Jun-14


onal
754 22533 NCR CNB Conventi WAP4 6-Apr-13 KPA 23-Jun-14
onal

755 23571 ECoR WAT Conventi WAG5 19-Feb-14 KPA 21-Jun-14


onal

756 31026 ECR GMO 3-Phase WAG9 1-Oct-12 BSL 20-Jun-14


757 31035 ECR GMO 3-Phase WAG9 9-Jan-01 BSL 20-Jun-14

758 27779 SCR KZJ Conventi WAG7 10-Jun-14 BSL 20-Jun-14


onal
759 27779 SCR KZJ Conventi WAG7 10-Jun-14 BSL 20-Jun-14
onal
760 27779 SCR KZJ Conventi WAG7 10-Jun-14 BSL 20-Jun-14
onal

761 31026 ECR GMO 3-Phase WAG9 6-Dec-99 BSL 19-Jun-14

762 30007 NR GZB 3-Phase WAP5 10-Apr-14 BSL 19-Jun-14

763 27259 CR AQ Conventi WAG7 10-Apr-14 BSL 18-Jun-14


onal
764 27717 SER BNDM Conventi WAG7 1-Sep-14 KGP 17-Jun-14
onal

765 27248 NCR CNB Conventi WAG7 26-Jun-13 KPA 16-Jun-14


onal
766 27704 SER BNDM Conventi WAG7 29-Oct-13 KGP 16-Jun-14
onal

767 31026 ECR GMO 3-Phase WAG9 6-Dec-99 BSL 16-Jun-14

768 31030 ECR GMO 3-Phase WAG9 12-Aug-00 KPA 16-Jun-14

769 22516 SCR LGD Conventi WAP4 16-Jun-14 PER 16-Jun-14


onal

770 22516 SCR LGD Conventi WAP4 16-Jun-14 PER 16-Jun-14


onal
771 24005 SECR BIA Conventi WAG5 16-May-14 BSL 13-Jun-14
onal

772 24005 NCR JHS Conventi WAG5 16-May-14 BSL 13-Jun-14


onal

773 31038 ECR GMO 3-Phase WAG9 28-Apr-01 BSL 12-Jun-14

774 31025 ECR GMO 3-Phase WAG9 12-Nov-99 BSL 12-Jun-14

775 31026 ECR GMO 3-Phase WAG9 6-Dec-99 BSL 12-Jun-14

776 31026 ECR GMO 3-Phase WAG9 6-Dec-99 BSL 12-Jun-14


777 31025 ECR GMO 3-Phase WAG9 12-Nov-99 BSL 12-Jun-14

778 31046 ECR GMO 3-Phase WAG9 8-Mar-02 KPA 11-Jun-14

779 31035 ECR GMO 3-Phase WAG9 9-Jan-01 BSL 11-Jun-14

780 31038 ECR GMO 3-Phase WAG9 28-Apr-01 BSL 11-Jun-14

781 27140 NCR CNB Conventi WAG7 23-Mar-13 KPA 11-Jun-14


onal

782 31046 ECR GMO 3-Phase WAG9 8-Mar-02 KPA 10-Jun-14

783 31039 ECR GMO 3-Phase WAG9 28-May-01 KPA 10-Jun-14

784 31024 ECR GMO 3-Phase WAG9 16-Oct-99 BSL 10-Jun-14


785 27303 WCR NKJ Conventi WAG7 20-Jun-13 PER 10-Jun-14
onal

786 27210 NCR CNB Conventi WAG7 23-Feb-12 KPA 10-Jun-14


onal

787 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 10-Jun-14


onal
788 22592 SCR LGD Conventi WAP4 29-Sep-13 PER 10-Jun-14
onal
789 22345 NR GZB Conventi WAP4 10-Jan-14 KPA 9-Jun-14
onal
790 31037 ECR GMO 3-Phase WAG9 27-Jan-01 BSL 8-Jun-14

791 22069 SCR LGD Conventi WAP4 24-Mar-14 DHD 8-Jun-14


onal
792 21390 ECR MGS Conventi WAM4 8-Nov-12 KPA 7-Jun-14
onal

793 22284 NCR CNB Conventi WAP4 23-Mar-13 KPA 7-Jun-14


onal
794 24452 WCR NKJ Conventi WAG5 27-May-14 DHD 6-Jun-14
onal

795 31043 ECR GMO 3-Phase WAG9 16-Aug-01 BSL 6-Jun-14

796 31041 ECR GMO 3-Phase WAG9 29-May-01 BSL 6-Jun-14

797 23144 CR BSL Conventi WAG5 19-Apr-13 BSL 5-Jun-14


onal
798 23144 CR BSL Conventi WAG5 19-Apr-13 BSL 5-Jun-14
onal
799 31038 ECR GMO 3-Phase WAG9 28-Apr-01 BSL 4-Jun-14

800 31032 ECR GMO 3-Phase WAG9 5-Sep-00 BSL 4-Jun-14


801 31030 ECR GMO 3-Phase WAG9 12-Aug-00 KPA 4-Jun-14

802 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 4-Jun-14


onal

803 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 4-Jun-14


onal
804 22740 ECR MGS Conventi WAP4 15-Feb-14 KPA 3-Jun-14
onal

805 31333 ECR GMO 3-Phase WAG9 28-Feb-12 BSL 3-Jun-14

806 31030 ECR GMO 3-Phase WAG9 12-Aug-00 KPA 3-Jun-14


807 27226 NCR CNB Conventi WAG7 27-Dec-12 KPA 3-Jun-14
onal

808 31030 ECR GMO 3-Phase WAG9 12-Aug-00 KPA 2-Jun-14

809 27149 WCR NKJ Conventi WAG7 7-Mar-14 DHD 2-Jun-14


onal

810 24452 WCR NKJ Conventi WAG5 27-May-14 DHD 2-Jun-14


onal
811 23464 WR BL Conventi WAG5 16-May-14 DHD 2-Jun-14
onal

812 31034 ECR GMO 3-Phase WAG9 4-Nov-00 BSL 1-Jun-14

813 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 31-May-14


onal
814 24418 WR BL Conventi WAG5 9-May-13 KPA 31-May-14
onal

815 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 31-May-14


onal
816 27273 NCR CNB Conventi WAG7 20-Sep-13 CB 31-May-14
onal

817 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 30-May-14

818 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 30-May-14

819 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 29-May-14

820 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 29-May-14

821 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 29-May-14

822 23875 WCR NKJ Conventi WAG5 22-Oct-13 DHD 29-May-14


onal

823 30007 NR GZB 3-Phase WAP5 10-Apr-14 BSL 29-May-14


824 27280 NCR CNB Conventi WAG7 3-Sep-13 CB 28-May-14
onal

825 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 27-May-14

826 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 27-May-14

827 22515 SCR LGD Conventi WAP4 27-Jun-14 KPA 27-May-14


onal
828 27786 SCR KZJ Conventi WAG7 17-Apr-14 KPA 26-May-14
onal

829 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 26-May-14

830 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 26-May-14


831 27711 SCR KZJ Conventi WAG7 25-Jul-13 KPA 25-May-14
onal

832 31043 ECR GMO 3-Phase WAG9 1-May-14 BSL 23-May-14

833 27181 WCR NKJ Conventi WAG7 17-Dec-13 DHD 23-May-14


onal
834 27181 WCR NKJ Conventi WAG7 17-Dec-13 DHD 23-May-14
onal

835 30007 NR GZB 3-Phase WAP5 15-Apr-14 BSL 23-May-14


836 27279 NCR CNB Conventi WAG7 29-Jan-14 CB 23-May-14
onal

837 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 23-May-14


onal

838 27299 NCR CNB Conventi WAG7 30-Jan-14 KPA 22-May-14


onal
839 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 22-May-14
onal

840 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 22-May-14

841 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 21-May-14

842 22069 SCR LGD Conventi WAP4 24-Mar-14 DHD 21-May-14


onal

843 27765 WCR NKJ Conventi WAG7 30-Apr-14 KPA 20-May-14


onal
844 22547 NCR CNB Conventi WAP4 14-May-14 BSL 20-May-14
onal

845 22547 NCR CNB Conventi WAP4 14-May-14 BSL 20-May-14


onal

846 22547 NCR CNB Conventi WAP4 14-May-14 BSL 19-May-14


onal

847 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 19-May-14

848 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 19-May-14

849 27303 WCR NKJ Conventi WAG7 24-Jun-13 PER 18-May-14


onal

850 27363 SCR KZJ Conventi WAG7 30-Apr-14 KPA 17-May-14


onal

851 23894 ER ASN Conventi WAG5 26-Feb-14 KPA 17-May-14


onal
852 22594 SCR LGD Conventi WAP4 17-May-14 PER 17-May-14
onal

853 27678 WCR NKJ Conventi WAG7 23-Oct-12 BSL 16-May-14


onal

854 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 16-May-14


onal
855 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 16-May-14
onal

856 24457 WR BL Conventi WAG5 27-May-13 DHD 15-May-14


onal

857 31043 ECR GMO 3-Phase WAG9 1-May-14 BSL 15-May-14


858 27245 NCR CNB Conventi WAG7 12-Apr-13 KPA 15-May-14
onal

859 30220 NR GZB 3-Phase WAP7 18-Dec-13 BSL 15-May-14

860 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 14-May-14

861 27009 ECR MGS Conventi WAG7 25-May-11 KPA 14-May-14


onal

862 22313 SCR LGD Conventi WAP4 26-Oct-13 KPA 13-May-14


onal
863 27255 CR AQ Conventi WAG7 13-May-14 BSL 13-May-14
onal
864 27255 CR AQ Conventi WAG7 13-May-14 BSL 13-May-14
onal

865 27255 CR AQ Conventi WAG7 13-May-14 BSL 13-May-14


onal

866 27255 CR AQ Conventi WAG7 13-May-14 BSL 13-May-14


onal

867 31041 ECR GMO 3-Phase WAG9 13-Feb-14 BSL 13-May-14

868 31042 ECR GMO 3-Phase WAG9 24-Dec-13 BSL 13-May-14

869 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 13-May-14

870 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 13-May-14

871 30007 NR GZB 3-Phase WAP5 10-Apr-14 BSL 13-May-14


872 27009 ECR MGS Conventi WAG7 25-May-11 KPA 11-May-14
onal

873 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 10-May-14

874 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 10-May-14

875 23867 WCR NKJ Conventi WAG5 1-Oct-13 DHD 10-May-14


onal

876 21390 ECR MGS Conventi WAM4 8-Nov-12 KPA 9-May-14


onal

877 22237 SCR LGD Conventi WAP4 7-May-14 KPA 9-May-14


onal

878 22237 SCR LGD Conventi WAP4 8-May-14 KPA 8-May-14


onal

879 22237 SCR LGD Conventi WAP4 8-May-14 KPA 8-May-14


onal
880 22237 SCR LGD Conventi WAP4 8-May-14 KPA 8-May-14
onal
881 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 8-May-14

882 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 8-May-14

883 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 8-May-14

884 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 8-May-14

885 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 8-May-14

886 22697 SR RPM Conventi WAP4 1-Mar-13 PER 8-May-14


onal

887 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 7-May-14

888 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 7-May-14

889 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 6-May-14


890 27742 SCR KZJ Conventi WAG7 13-Nov-13 KPA 6-May-14
onal

891 27291 WCR NKJ Conventi WAG7 29-Nov-13 PER 6-May-14


onal

892 21321 ECR MGS Conventi WAM4 6-Aug-13 KPA 6-May-14


onal
893 21321 ECR MGS Conventi WAM4 6-Aug-13 KPA 6-May-14
onal

894 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 5-May-14

895 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 5-May-14

896 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 5-May-14

897 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 5-May-14

898 22594 SCR LGD Conventi WAP4 14-May-14 PER 5-May-14


onal
899 27149 WCR NKJ Conventi WAG7 7-Mar-14 DHD 2-May-14
onal

900 31046 ECR GMO 3-Phase WAG9 23-Apr-14 BSL 2-May-14

901 31046 ECR GMO 3-Phase WAG9 23-Apr-14 KPA 2-May-14

902 22292 NR GZB Conventi WAP4 20-Feb-14 KPA 2-May-14


onal

903 22345 NR GZB Conventi WAP4 10-Jan-14 KPA 2-May-14


onal

904 22061 NR GZB Conventi WAP4 6-Sep-13 DHD 1-May-14


onal
905 22513 ER HWH Conventi WAP4 30-Mar-14 KPA 1-May-14
onal

906 27369 WCR NKJ Conventi WAG7 27-Mar-14 KPA 1-May-14


onal
907 27174 SER BNDM Conventi WAG7 23-Mar-14 DHD 30-Apr-14
onal

908 27174 SER BNDM Conventi WAG7 23-May-14 DHD 30-Apr-14


onal

909 23976 WR BL Conventi WAG5 13-Jul-13 DHD 29-Apr-14


onal
910 22749 ECR MGS Conventi WAP4 4-Apr-14 KPA 29-Apr-14
onal

911 27422 NCR CNB Conventi WAG7 7-Nov-13 KPA 29-Apr-14


onal

912 30219 NR GZB 3-Phase WAP7 21-Oct-13 BSL 28-Apr-14

913 30219 NR GZB 3-Phase WAP7 21-Oct-13 BSL 28-Apr-14


914 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14
onal

915 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14


onal

916 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14


onal
917 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14
onal

918 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14


onal

919 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14


onal

920 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14


onal

921 27774 CR AQ Conventi WAG7 28-Apr-14 BSL 28-Apr-14


onal
922 21346 ECR MGS Conventi WAM4 1-Jun-13 KPA 27-Apr-14
onal

923 27769 SCR KZJ Conventi WAG7 11-Jan-14 KPA 25-Apr-14


onal

924 27149 WCR NKJ Conventi WAG7 7-Mar-14 DHD 25-Apr-14


onal

925 22553 WR BRC Conventi WAP4 1-Apr-14 BSL 25-Apr-14


onal
926 27323 SCR KZJ Conventi WAG7 20-Apr-14 PER 25-Apr-14
onal

927 30220 NR GZB 3-Phase WAP7 18-Dec-13 BSL 25-Apr-14

928 23559 WCR NKJ Conventi WAG5 17-Dec-13 PER 24-Apr-14


onal

929 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 23-Apr-14

930 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 23-Apr-14

931 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 23-Apr-14


932 21310 ECR MGS Conventi WAM4 19-May-13 KPA 22-Apr-14
onal

933 27114 WCR NKJ Conventi WAG7 31-Oct-13 PER 21-Apr-14


onal

934 27399 CR AQ Conventi WAG7 16-May-13 BSL 21-Apr-14


onal

935 27399 CR AQ Conventi WAG7 16-May-13 BSL 21-Apr-14


onal
936 22749 ECR MGS Conventi WAP4 4-Apr-14 KPA 20-Apr-14
onal
937 22749 ECR MGS Conventi WAP4 4-Apr-14 KPA 20-Apr-14
onal
938 21382 ECR MGS Conventi WAM4 5-Oct-13 KPA 20-Apr-14
onal

939 30007 NR GZB 3-Phase WAP7 10-Apr-14 BSL 20-Apr-14

940 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 19-Apr-14


onal
941 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 18-Apr-14

942 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 18-Apr-14

943 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 18-Apr-14

944 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 18-Apr-14

945 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 18-Apr-14

946 23015 WCR NKJ Conventi WAG5 31-Dec-13 KPA 18-Apr-14


onal
947 23894 ER ASN Conventi WAG5 26-Feb-14 KPA 17-Apr-14
onal

948 22292 NR GZB Conventi WAP4 24-Feb-14 KPA 17-Apr-14


onal
949 22697 SR RPM Conventi WAP4 1-Mar-13 PER 16-Apr-14
onal

950 31041 ECR GMO 3-Phase WAG9 13-Feb-14 BSL 15-Apr-14

951 22596 SCR LGD Conventi WAP4 31-Oct-13 PER 14-Apr-14


onal

952 30219 NR GZB 3-Phase WAP7 21-Oct-13 BSL 14-Apr-14

953 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 11-Apr-14


954 31035 ECR GMO 3-Phase WAG9 26-Nov-13 BSL 11-Apr-14

955 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 11-Apr-14

956 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 10-Apr-14


onal

957 27259 CR AQ Conventi WAG7 10-Apr-14 BSL 10-Apr-14


onal
958 27259 CR AQ Conventi WAG7 10-Apr-14 BSL 10-Apr-14
onal

959 27259 CR AQ Conventi WAG7 10-Apr-14 BSL 10-Apr-14


onal

960 27259 CR AQ Conventi WAG7 10-Apr-14 BSL 10-Apr-14


onal

961 27259 CR AQ Conventi WAG7 10-Apr-14 BSL 10-Apr-14


onal

962 27754 WCR NKJ Conventi WAG7 16-Feb-14 BSL 7-Apr-14


onal

963 23047 CR BSL Conventi WAG5 23-Mar-13 BSL 7-Apr-14


onal
964 23047 CR BSL Conventi WAG5 23-Mar-13 BSL 7-Apr-14
onal

965 30220 NR GZB 3-Phase WAP7 18-Dec-13 BSL 5-Apr-14

966 27271 NCR CNB Conventi WAG7 17-May-13 KPA 5-Apr-14


onal

967 23015 WCR NKJ Conventi WAG5 31-Dec-13 KPA 5-Apr-14


onal

968 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 5-Apr-14

969 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 5-Apr-14


970 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 4-Apr-14

971 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 4-Apr-14

972 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 4-Apr-14

973 31039 ECR GMO 3-Phase WAG9 8-Mar-14 KPA 4-Apr-14

974 27114 WCR NKJ Conventi WAG7 31-Oct-13 PER 4-Apr-14


onal

975 21381 ER ASN Conventi WAM4 29-Mar-14 KPA 4-Apr-14


onal

976 27780 SCR KZJ Conventi WAG7 19-Feb-14 KPA 4-Apr-14


onal
977 27780 SCR KZJ Conventi WAG7 19-Feb-14 KPA 4-Apr-14
onal
978 27780 SCR KZJ Conventi WAG7 19-Feb-14 KPA 4-Apr-14
onal

979 23919 WCR NKJ Conventi WAG5 16-May-13 DHD 3-Apr-14


onal

980 22207 ECR MGS Conventi WAP4 18-Nov-13 DHD 3-Apr-14


onal
981 22740 ECR MGS Conventi WAP4 15-Feb-14 KPA 2-Apr-14
onal

982 27758 WCR NKJ Conventi WAG7 16-Jan-14 BSL 2-Apr-14


onal

983 24439 WCR NKJ Conventi WAG5 9-Nov-12 PER 1-Apr-14


onal
984 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 30-Mar-14
onal

985 23777 ECoR WAT Conventi WAG5 5-Nov-13 KPA 29-Mar-14


onal

986 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 27-Mar-14

987 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal

988 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal

989 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal

990 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal

991 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal

992 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal
993 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 26-Mar-14
onal

994 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 26-Mar-14


onal

995 22595 SCR LGD Conventi WAP4 26-Mar-14 PER 26-Mar-14


onal
996 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 26-Mar-14
onal

997 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 26-Mar-14


onal
998 23023 ECoR WAT Conventi WAG5 4-Feb-14 KGP 26-Mar-14
onal

999 23875 WCR NKJ Conventi WAG5 22-Oct-13 DHD 25-Mar-14


onal

1000 22069 SCR LGD Conventi WAP4 24-Mar-14 DHD 24-Mar-14


onal

1001 22069 SCR LGD Conventi WAP4 24-Mar-14 DHD 24-Mar-14


onal

1002 22069 SCR LGD Conventi WAP4 24-Mar-14 DHD 24-Mar-14


onal
1003 22069 SCR LGD Conventi WAP4 24-Mar-14 DHD 24-Mar-14
onal

1004 30002 NR GZB 3-Phase WAP5 26-Feb-14 BSL 24-Mar-14


1005 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 23-Mar-14

1006 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 22-Mar-14

1007 22062 ECR MGS Conventi WAP4 23-Oct-13 DHD 22-Mar-14


onal

1008 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 21-Mar-14

1009 23801 ER ASN Conventi WAG5 13-Nov-13 KPA 20-Mar-14


onal
1010 22684 NCR CNB Conventi WAP4 25-Nov-12 KPA 19-Mar-14
onal

1011 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 19-Mar-14

1012 21391 ECR MGS Conventi WAM4 27-Jun-13 KPA 15-Mar-14


onal
1013 21391 ECR MGS Conventi WAM4 27-Jun-13 KPA 15-Mar-14
onal

1014 27181 WCR NKJ Conventi WAG7 17-Dec-13 DHD 15-Mar-14


onal
1015 27181 [Method [Method Conventi WAG7 17-Dec-13 DHD 15-Mar-14
error error onal
12152] 12152]

1016 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 15-Mar-14


onal

1017 27092 NCR CNB Conventi WAG7 10-Feb-14 DHD 15-Mar-14


onal

1018 22598 SCR LGD Conventi WAP4 1-Oct-13 KPA 14-Mar-14


onal
1019 22740 ECR MGS Conventi WAP4 15-Feb-14 KPA 13-Mar-14
onal

1020 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 13-Mar-14


onal
1021 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 13-Mar-14
onal

1022 21321 ECR MGS Conventi WAM4 7-Aug-13 KPA 11-Mar-14


onal

1023 22043 NR GZB Conventi WAP1 7-Mar-13 DHD 10-Mar-14


onal
1024 30002 NR GZB 3-Phase WAP5 26-Feb-14 BSL 9-Mar-14
1025 23894 ER ASN Conventi WAG5 26-Feb-14 KPA 8-Mar-14
onal

1026 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 8-Mar-14

1027 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1028 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1029 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal
1030 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14
onal

1031 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1032 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1033 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1034 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1035 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1036 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal
1037 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14
onal

1038 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1039 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal
1040 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14
onal

1041 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1042 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal
1043 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14
onal

1044 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1045 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal
1046 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14
onal

1047 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1048 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1049 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1050 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1051 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1052 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1053 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal
1054 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14
onal

1055 27221 CR AQ Conventi WAG7 8-Mar-14 DHD 8-Mar-14


onal

1056 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 7-Mar-14

1057 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 7-Mar-14

1058 30002 NR GZB 3-Phase WAP5 26-Feb-14 BSL 7-Mar-14

1059 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 6-Mar-14


1060 22737 ER HWH Conventi WAP4 5-Feb-14 KPA 5-Mar-14
onal

1061 27068 ECR MGS Conventi WAG7 17-Jun-09 KGP 4-Mar-14


onal
1062 27068 ECR MGS Conventi WAG7 17-Jun-09 KGP 4-Mar-14
onal

1063 21391 ECR MGS Conventi WAM4 27-Jun-13 KPA 3-Mar-14


onal

1064 27169 SER BNDM Conventi WAG7 20-Dec-13 DHD 3-Mar-14


onal
1065 22312 SCR LGD Conventi WAP4 6-Feb-14 BSL 3-Mar-14
onal

1066 22345 NR GZB Conventi WAP4 10-Jan-14 KPA 1-Mar-14


onal
1067 27690 NCR CNB Conventi WAG7 26-Jun-12 KPA 28-Feb-14
onal

1068 27278 NR LDH Conventi WAG7 22-Feb-14 DHD 27-Feb-14


onal

1069 27241 WCR NKJ Conventi WAG7 11-Sep-13 PER 27-Feb-14


onal

1070 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 26-Feb-14


onal

1071 27279 NCR CNB Conventi WAG7 29-Jan-14 CB 24-Feb-14


onal
1072 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 24-Feb-14

1073 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 24-Feb-14

1074 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 23-Feb-14

1075 21382 ECR MGS Conventi WAM4 1-Jun-13 KPA 23-Feb-14


onal
1076 22739 ECR MGS Conventi WAP4 7-Oct-13 KPA 23-Feb-14
onal

1077 22739 ECR MGS Conventi WAP4 7-Oct-13 KPA 23-Feb-14


onal

1078 30218 NR GZB 3-Phase WAP7 8-Oct-13 BSL 23-Feb-14


1079 22345 NR GZB Conventi WAP4 10-Jan-14 KPA 22-Feb-14
onal

1080 22345 NR GZB Conventi WAP4 10-Jan-14 KPA 22-Feb-14


onal

1081 31041 ECR GMO 3-Phase WAG9 13-Feb-14 BSL 22-Feb-14

1082 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 21-Feb-14


onal

1083 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 21-Feb-14


onal

1084 27140 NCR CNB Conventi WAG7 23-Mar-13 KPA 21-Feb-14


onal
1085 30216 NR GZB 3-Phase WAP7 23-Aug-13 BSL 20-Feb-14

1086 30005 NR GZB 3-Phase WAP5 12-Feb-14 BSL 20-Feb-14

1087 31041 ECR GMO 3-Phase WAG9 13-Feb-14 BSL 20-Feb-14

1088 31041 ECR GMO 3-Phase WAG9 13-Feb-14 BSL 20-Feb-14

1089 23550 SER TATA Conventi WAG5 21-Nov-14 KGP 20-Feb-14


onal

1090 23163 NCR JHS Conventi WAG5 31-Oct-13 BSL 19-Feb-14


onal

1091 23021 WR BRC Conventi WAG5 5-Jan-14 BSL 15-Feb-14


onal

1092 30000 NR GZB 3-Phase WAP5 25-Jan-14 BSL 15-Feb-14

1093 22597 SCR LGD Conventi WAP4 15-Feb-14 PER 15-Feb-14


onal
1094 22597 SCR LGD Conventi WAP4 15-Feb-14 PER 15-Feb-14
onal
1095 27240 CR AQ Conventi WAG7 15-Feb-14 BSL 15-Feb-14
onal

1096 27240 CR AQ Conventi WAG7 15-Feb-14 BSL 15-Feb-14


onal

1097 27240 CR AQ Conventi WAG7 15-Feb-14 BSL 15-Feb-14


onal

1098 27240 CR AQ Conventi WAG7 15-Feb-14 BSL 15-Feb-14


onal

1099 23867 WCR NKJ Conventi WAG5 1-Oct-13 DHD 13-Feb-14


onal

1100 22345 NR GZB Conventi WAP4 10-Jan-14 KPA 13-Feb-14


onal
1101 27177 NCR CNB Conventi WAG7 11-Dec-12 KPA 12-Feb-14
onal

1102 22552 NCR CNB Conventi WAP4 2-Jul-13 BSL 11-Feb-14


onal

1103 27762 SCR KZJ Conventi WAG7 1-Dec-13 KPA 11-Feb-14


onal

1104 27762 SCR KZJ Conventi WAG7 1-Dec-13 KPA 11-Feb-14


onal

1105 23460 WR BL Conventi WAG5H 12-Dec-13 KPA 9-Feb-14


onal
1106 27246 NCR CNB Conventi WAG7 31-Dec-13 CB 8-Feb-14
onal

1107 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 7-Feb-14

1108 27291 WCR NKJ Conventi WAG7 29-Nov-13 PER 5-Feb-14


onal

1109 27279 NCR CNB Conventi WAG7 29-Jan-14 CB 5-Feb-14


onal
1110 27219 NCR CNB Conventi WAG7 28-Aug-12 KPA 5-Feb-14
onal

1111 31392 ECR MGS Conventi WAM4 4-Feb-12 KPA 5-Feb-14


onal

1112 31392 ECR MGS Conventi WAM4 4-Feb-12 KPA 5-Feb-14


onal

1113 31392 ECR MGS Conventi WAM4 4-Feb-12 KPA 5-Feb-14


onal
1114 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 4-Feb-14
onal

1115 30220 NR GZB 3-Phase WAP7 18-Dec-13 BSL 3-Feb-14

1116 30000 NR GZB 3-Phase WAP5 25-Jan-14 BSL 2-Feb-14

1117 27200 NCR CNB Conventi WAG7 23-Jul-12 KPA 2-Feb-14


onal

1118 24006 NCR JHS Conventi WAG5 14-Jul-13 BSL 1-Feb-14


onal
1119 27705 SER BNDM Conventi WAG7 23-Jan-14 KGP 1-Feb-14
onal

1120 27205 CR AQ Conventi WAG7 18-Dec-13 BSL 31-Jan-14


onal

1121 22598 SCR LGD Conventi WAP4 1-Oct-13 KPA 30-Jan-14


onal

1122 30000 NR GZB 3-Phase WAP5 25-Jan-14 BSL 30-Jan-14

1123 27201 NCR CNB Conventi WAG7 11-Jan-13 KPA 30-Jan-14


onal

1124 22715 SR RPM Conventi WAP4 28-Sep-13 PER 30-Jan-14


onal

1125 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 30-Jan-14


onal
1126 30214 NR GZB 3-Phase WAP7 8-Jun-13 BSL 28-Jan-14

1127 27718 SER BNDM Conventi WAG7 25-Dec-13 KGP 28-Jan-14


onal

1128 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1129 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1130 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1131 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1132 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1133 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1134 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Jan-14

1135 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 27-Jan-14


1136 23015 WCR NKJ Conventi WAG5 31-Dec-13 KPA 27-Jan-14
onal

1137 27273 NCR CNB Conventi WAG7 20-Sep-13 CB 27-Jan-14


onal

1138 22703 WR BRC Conventi WAP4 14-Dec-13 BSL 25-Jan-14


onal
1139 24443 WR BL Conventi WAG5 4-Oct-13 DHD 24-Jan-14
onal

1140 31032 ECR GMO 3-Phase WAG9 13-Jul-13 BSL 24-Jan-14

1141 31032 ECR GMO 3-Phase WAG9 13-Jul-13 BSL 23-Jan-14

1142 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 23-Jan-14

1143 22313 SCR LGD Conventi WAP4 26-Oct-13 KPA 23-Jan-14


onal
1144 24458 WR BL Conventi WAG5 27-May-13 DHD 23-Jan-14
onal

1145 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 23-Jan-14


onal

1146 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 23-Jan-14


onal

1147 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 22-Jan-14

1148 23559 WCR NKJ Conventi WAG5 17-Dec-13 PER 21-Jan-14


onal
1149 22216 ECR MGS Conventi WAP4 21-May-12 KPA 21-Jan-14
onal

1150 22216 ECR MGS Conventi WAP4 21-May-12 KPA 21-Jan-14


onal

1151 22554 NR GZB Conventi WAP4 13-Dec-13 KPA 20-Jan-14


onal
1152 23460 WR BL Conventi WAG5 12-Dec-13 KPA 20-Jan-14
onal

1153 31032 ECR GMO 3-Phase WAG9 13-Jul-13 BSL 19-Jan-14

1154 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 18-Jan-14


onal

1155 27723 SER BNDM Conventi WAG7 13-Jul-14 KGP 18-Jan-14


onal
1156 22252 NCR CNB Conventi WAP4 19-Jul-12 KPA 18-Jan-14
onal

1157 23489 ECoR WAT Conventi WAG5 1-Sep-13 KGP 18-Jan-14


onal
1158 27742 SCR KZJ Conventi WAG7 22-Oct-13 KPA 18-Jan-14
onal

1159 22207 ECR MGS Conventi WAP4 18-Nov-13 DHD 18-Jan-14


onal
1160 27114 WCR NKJ Conventi WAG7 31-Oct-13 PER 17-Jan-14
onal

1161 27706 WCR NKJ Conventi WAG7 12-Oct-13 BSL 16-Jan-14


onal

1162 23358 ECoR WAT Conventi WAG5 26-Nov-13 KGP 16-Jan-14


onal

1163 22207 ECR MGS Conventi WAP4 18-Nov-13 DHD 13-Jan-14


onal

1164 22207 ECR MGS Conventi WAP4 18-Nov-13 DHD 13-Jan-14


onal
1165 27247 NCR CNB Conventi WAG7 16-Mar-13 KPA 13-Jan-14
onal

1166 24443 WR BL Conventi WAG5 4-Oct-13 DHD 12-Jan-14


onal

1167 27695 WCR NKJ Conventi WAG7 25-Aug-13 BSL 12-Jan-14


onal

1168 27229 WCR NKJ Conventi WAG7 10-Sep-13 DHD 12-Jan-14


onal

1169 22716 SR RPM Conventi WAP4 16-Nov-13 PER 11-Jan-14


onal

1170 27767 SCR KZJ Conventi WAG7 31-Dec-13 KPA 10-Jan-14


onal

1171 27767 SCR KZJ Conventi WAG7 31-Dec-13 KPA 10-Jan-14


onal

1172 23875 WCR NKJ Conventi WAG5 20-Oct-13 DHD 9-Jan-14


onal
1173 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 9-Jan-14
onal
1174 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 9-Jan-14
onal
1175 22552 NCR CNB Conventi WAP4 2-Jul-13 BSL 8-Jan-14
onal

1176 23489 ECoR WAT Conventi WAG5 1-Sep-13 KGP 8-Jan-14


onal
1177 22701 WR BRC Conventi WAP4 2-Sep-13 BSL 7-Jan-14
onal

1178 23867 WCR [Method Conventi WAG5 1-Oct-13 DHD 7-Jan-14


error onal
12152]

1179 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1180 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1181 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1182 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1183 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1184 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1185 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1186 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1187 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1188 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1189 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1190 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1191 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1192 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1193 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1194 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1195 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1196 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1197 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1198 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1199 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1200 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1201 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1202 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1203 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1204 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1205 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1206 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1207 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1208 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal

1209 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14


onal
1210 22214 SCR LGD Conventi WAP4 7-Jan-14 DHD 7-Jan-14
onal

1211 30220 NR GZB 3-Phase WAP7 18-Dec-13 BSL 6-Jan-14

1212 30220 NR GZB 3-Phase WAP7 18-Dec-13 BSL 6-Jan-14

1213 24460 WR BL Conventi WAG5 1-Jun-13 DHD 6-Jan-14


onal
1214 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14
onal

1215 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14


onal

1216 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14


onal

1217 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14


onal

1218 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14


onal

1219 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14


onal
1220 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14
onal

1221 23269 ECoR WAT Conventi WAG5 6-Jan-14 KGP 6-Jan-14


onal

1222 22346 NR GZB Conventi WAP4 18-Aug-13 KPA 6-Jan-14


onal

1223 22346 NR GZB Conventi WAP4 23-Aug-13 KPA 6-Jan-14


onal

1224 27769 SCR KZJ Conventi WAG7 16-Dec-13 KPA 5-Jan-14


onal

1225 27769 SCR KZJ Conventi WAG7 16-Dec-13 KPA 5-Jan-14


onal
1226 27742 SCR KZJ Conventi WAG7 16-Dec-13 KPA 5-Jan-14
onal
1227 23460 WR BL Conventi WAG5 12-Dec-13 KPA 5-Jan-14
onal

1228 23460 WR BL Conventi WAG5H 12-Dec-13 KPA 3-Jan-14


onal

1229 23460 WR BL Conventi WAG5 12-Dec-13 KPA 2-Jan-14


onal

1230 23460 WR BL Conventi WAG5 12-Dec-13 KPA 2-Jan-14


onal

1231 23460 WR BL Conventi WAG5 12-Dec-13 KPA 2-Jan-14


onal
1232 24445 WR BL Conventi WAG5 15-Mar-13 CB 1-Jan-14
onal

1233 27181 WCR NKJ Conventi WAG7 17-Dec-13 DHD 1-Jan-14


onal
1234 22596 SCR LGD Conventi WAP4 31-Oct-13 PER 30-Dec-13
onal

1235 23976 WR BL Conventi WAG5 13-Jul-13 DHD 30-Dec-13


onal
1236 30219 NR GZB 3-Phase WAP7 21-Oct-13 BSL 30-Dec-13

1237 30214 NR GZB 3-Phase WAP7 8-Jun-13 BSL 29-Dec-13

1238 24015 NCR JHS Conventi WAG5 6-Sep-13 BSL 27-Dec-13


onal
1239 23100 CR BSL Conventi WAG5 5-Aug-13 BSL 26-Dec-13
onal

1240 27093 NCR CNB Conventi WAG7 28-Apr-12 KPA 23-Dec-13


onal

1241 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 23-Dec-13

1242 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 21-Dec-13


onal
1243 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 21-Dec-13
onal

1244 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 20-Dec-13


onal

1245 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 20-Dec-13


onal

1246 22305 SCR LGD Conventi WAP4 20-Jan-14 PER 20-Dec-13


onal

1247 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 20-Dec-13


onal
1248 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 20-Dec-13
onal
1249 22589 SCR LGD Conventi WAP4 10-Jul-13 PER 19-Dec-13
onal
1250 23405 WR BRC Conventi WAG5 11-Feb-13 DHD 19-Dec-13
onal

1251 22684 NCR CNB Conventi WAP4 24-Nov-12 KPA 19-Dec-13


onal
1252 27742 SCR KZJ Conventi WAG7 22-Oct-13 KPA 19-Dec-13
onal

1253 23377 ECoR WAT Conventi WAG5 5-Nov-13 KPA 18-Dec-13


onal

1254 23377 ECoR WAT Conventi WAG5 5-Nov-13 KPA 18-Dec-13


onal

1255 23377 ECoR WAT Conventi WAG5 5-Nov-13 KPA 18-Dec-13


onal

1256 23377 ECoR WAT Conventi WAG5 5-Nov-13 KPA 18-Dec-13


onal

1257 30220 NR GZB 3-Phase WAP7 18-Feb-14 BSL 18-Dec-13


1258 22207 ECR MGS Conventi WAP4 18-Nov-13 KPA 16-Dec-13
onal

1259 22207 ECR MGS Conventi WAP4 18-Nov-13 KPA 16-Dec-13


onal
1260 27089 NCR CNB Conventi WAG7 2-Nov-12 KPA 16-Dec-13
onal

1261 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal
1262 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal

1263 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal

1264 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal
1265 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal
1266 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal

1267 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal
1268 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal

1269 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal
1270 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal
1271 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal
1272 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13
onal

1273 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal

1274 22075 WR BRC Conventi WAP4 13-Dec-13 DHD 14-Dec-13


onal

1275 22703 WR BRC Conventi WAP4 14-Dec-13 BSL 14-Dec-13


onal
1276 22703 WR BRC Conventi WAP4 14-Dec-13 BSL 14-Dec-13
onal
1277 22703 WR BRC Conventi WAP4 14-Dec-13 BSL 14-Dec-13
onal

1278 22703 WR BRC Conventi WAP4 14-Dec-13 BSL 14-Dec-13


onal
1279 23584 WCR NKJ Conventi WAG5 30-Jul-13 KPA 14-Dec-13
onal

1280 23867 WCR NKJ Conventi WAG5 1-Oct-13 DHD 14-Dec-13


onal

1281 22075 WR BRC Conventi WAP4 14-Dec-13 DHD 13-Dec-13


onal
1282 23460 WR BL Conventi WAG5 12-Dec-13 KPA 13-Dec-13
onal

1283 22712 SR RPM Conventi WAP4 10-Aug-13 PER 13-Dec-13


onal

1284 22305 SCR LGD Conventi WAP4 20-Dec-13 PER 12-Dec-13


onal

1285 27291 WCR NKJ Conventi WAG7 29-Nov-13 PER 12-Dec-13


onal

1286 27241 WCR NKJ Conventi WAG7 11-Sep-13 PER 11-Dec-13


onal
1287 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 11-Dec-13

1288 22711 ECR MGS Conventi WAP4 7-Aug-12 KPA 11-Dec-13


onal

1289 22711 ECR MGS Conventi WAP4 7-Aug-12 KPA 11-Dec-13


onal

1290 22711 ECR MGS Conventi WAP4 7-Aug-12 KPA 11-Dec-13


onal

1291 23555 WCR ET Conventi WAG5 23-Feb-13 KPA 11-Dec-13


onal
1292 22252 NCR CNB Conventi WAP4 31-Jan-13 KPA 10-Dec-13
onal

1293 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 10-Dec-13

1294 23109 WCR ET Conventi WAG5 11-Oct-12 KGP 8-Dec-13


onal

1295 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 5-Dec-13


onal
1296 27210 NCR CNB Conventi WAG7 23-Dec-13 KPA 5-Dec-13
onal

1297 27210 NCR CNB Conventi WAG7 23-Dec-13 KPA 5-Dec-13


onal

1298 27161 SER BNDM Conventi WAG7 23-Oct-13 DHD 4-Dec-13


onal

1299 22716 SR RPM Conventi WAP4 16-Nov-13 PER 3-Dec-13


onal

1300 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 3-Dec-13

1301 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 2-Dec-13


1302 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 30-Nov-13

1303 22715 SR RPM Conventi WAP4 28-Sep-13 PER 30-Nov-13


onal

1304 22715 SR RPM Conventi WAP4 28-Sep-13 PER 30-Nov-13


onal

1305 27744 SCR KZJ Conventi WAG7 29-Jun-13 KPA 30-Nov-13


onal

1306 23039 WR BRC Conventi WAG5 2-Nov-13 BSL 30-Nov-13


onal

1307 21346 ECR MGS Conventi WAM4 1-Jun-13 KPA 30-Nov-13


onal

1308 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 30-Nov-13


onal
1309 23115 CR BSL Conventi WAG5 27-Jul-13 BSL 30-Nov-13
onal

1310 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 29-Nov-13


onal
1311 22760 WCR ET Conventi WAP4 8-Sep-13 BSL 29-Nov-13
onal

1312 22073 NR GZB Conventi WAP1 11-Jul-13 DHD 29-Nov-13


onal
1313 23039 WR BRC Conventi WAG5 2-Nov-13 BSL 28-Nov-13
onal

1314 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 28-Nov-13


onal

1315 23786 WCR ET Conventi WAG5 20-May-13 DHD 27-Nov-13


onal

1316 23358 ECoR WAT Conventi WAG5 26-Nov-13 KGP 26-Nov-13


onal

1317 23329 WCR ET Conventi WAG5 24-Sep-13 KPA 26-Nov-13


onal

1318 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 26-Nov-13


onal
1319 23825 WCR ET Conventi WAG5 8-Jul-13 DHD 25-Nov-13
onal
1320 22759 WCR ET Conventi WAP4 26-Jul-13 BSL 25-Nov-13
onal

1321 23108 WCR ET Conventi WAG5 18-Mar-13 KGP 24-Nov-13


onal

1322 22712 SR RPM Conventi WAP4 10-Aug-13 PER 23-Nov-13


onal
1323 22571 NR GZB Conventi WAP4 13-Aug-13 KPA 22-Nov-13
onal
1324 27728 SCR KZJ Conventi WAG7 31-Oct-13 PER 20-Nov-13
onal

1325 27728 SCR KZJ Conventi WAG7 31-Oct-13 PER 20-Nov-13


onal

1326 27728 SCR KZJ Conventi WAG7 31-Oct-13 PER 20-Nov-13


onal

1327 27728 SCR KZJ Conventi WAG7 31-Oct-13 PER 20-Nov-13


onal

1328 27728 SCR KZJ Conventi WAG7 31-Oct-13 PER 20-Nov-13


onal
1329 22590 SCR LGD Conventi WAM4 9-Jun-13 PER 20-Nov-13
onal

1330 27303 WCR NKJ Conventi WAG7 20-Jun-13 PER 19-Nov-13


onal
1331 23873 WCR NKJ Conventi WAG5 11-Aug-13 DHD 19-Nov-13
onal

1332 23151 CR BSL Conventi WAG5 12-Sep-13 BSL 19-Nov-13


onal

1333 23336 SR AJJ Conventi WAG5H 6-Nov-13 PER 19-Nov-13


onal

1334 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 18-Nov-13

1335 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 16-Nov-13


1336 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 16-Nov-13

1337 23493 SR AJJ Conventi WAG5 31-Jul-13 PER 15-Nov-13


onal
1338 23654 CR BSL Conventi WAG5 5-Sep-13 DHD 14-Nov-13
onal

1339 23824 WCR ET Conventi WAG5 11-Sep-13 BSL 11-Nov-13


onal

1340 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 10-Nov-13


onal
1341 24459 WR BL Conventi WAG5 2-Jan-13 CB 9-Nov-13
onal

1342 30219 NR GZB 3-Phase WAP7 20-Oct-13 BSL 9-Nov-13

1343 27695 WCR NKJ Conventi WAG7 25-Aug-13 BSL 9-Nov-13


onal

1344 27729 SCR KZJ Conventi WAG7 24-Apr-13 PER 8-Nov-13


onal
1345 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13
onal

1346 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13


onal

1347 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13


onal

1348 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13


onal

1349 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13


onal

1350 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13


onal
1351 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13
onal

1352 23517 ECoR WAT Conventi WAG5 6-Nov-13 KPA 7-Nov-13


onal

1353 23517 ECoR WAT Conventi WAG5 20-Sep-13 KPA 7-Nov-13


onal

1354 23517 ECoR WAT Conventi WAG5 20-Sep-13 KPA 7-Nov-13


onal

1355 23517 ECoR WAT Conventi WAG5 20-Sep-13 KPA 7-Nov-13


onal
1356 23517 ECoR WAT Conventi WAG5 20-Sep-13 KPA 7-Nov-13
onal

1357 23875 WCR NKJ Conventi WAG5 22-Oct-13 DHD 7-Nov-13


onal
1358 23873 WCR NKJ Conventi WAG5 11-Aug-13 DHD 7-Nov-13
onal

1359 31042 ECR GMO 3-Phase WAG9 24-Dec-13 KPA 7-Nov-13

1360 22557 SR ED Conventi WAM4 16-Dec-12 PER 5-Nov-13


onal
1361 23862 ECoR WAT Conventi WAG5 23-Jul-13 KGP 4-Nov-13
onal

1362 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 3-Nov-13


onal
1363 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 3-Nov-13
onal
1364 23875 WCR NKJ Conventi WAG5 22-Oct-13 DHD 1-Nov-13
onal

1365 31032 ECR GMO 3-Phase WAG9 13-Jul-13 BSL 31-Oct-13

1366 22596 SCR LGD Conventi WAP4 31-Oct-13 PER 31-Oct-13


onal

1367 22596 SCR LGD Conventi WAP4 31-Oct-13 PER 31-Oct-13


onal
1368 22681 CR BSL Conventi WAP4 3-May-12 BSL 31-Oct-13
onal

1369 23575 ECoR WAT Conventi WAG5 22-Nov-12 DHD 31-Oct-13


onal

1370 24015 NCR JHS Conventi WAG5 6-Sep-13 BSL 31-Oct-13


onal
1371 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 30-Oct-13
onal

1372 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 30-Oct-13

1373 24013 NCR JHS Conventi WAG5 21-Aug-13 BSL 29-Oct-13


onal

1374 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 29-Oct-13

1375 27270 NCR CNB Conventi WAG7 14-Sep-13 KPA 29-Oct-13


onal

1376 21384 ER ASN Conventi WAM4 30-Jul-13 KPA 29-Oct-13


onal

1377 23873 WCR NKJ Conventi WAG5H 11-Aug-13 DHD 29-Oct-13


onal
1378 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 28-Oct-13

1379 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 27-Oct-13

1380 22313 SCR LGD Conventi WAP4 26-Oct-13 KPA 26-Oct-13


onal
1381 22313 SCR LGD Conventi WAP4 26-Oct-13 KPA 26-Oct-13
onal
1382 22313 SCR LGD Conventi WAP4 26-Oct-13 KPA 26-Oct-13
onal

1383 22313 SCR LGD Conventi WAP4 26-Oct-13 KPA 26-Oct-13


onal
1384 27229 WCR NKJ Conventi WAG7 10-Sep-13 DHD 26-Oct-13
onal

1385 23584 WCR NKJ Conventi WAG5H 30-Jul-13 KPA 26-Oct-13


onal
1386 23517 ECoR WAT Conventi WAG5 20-Sep-13 KPA 26-Oct-13
onal

1387 30014 NR GZB 3-Phase WAP5 10-Aug-13 BSL 25-Oct-13

1388 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 25-Oct-13


onal
1389 21392 ECR MGS Conventi WAM4 4-Feb-12 KPA 25-Oct-13
onal

1390 27243 NCR CNB Conventi WAG7 15-Apr-13 CB 25-Oct-13


onal
1391 22756 WCR ET Conventi WAP4 25-Oct-13 BSL 25-Oct-13
onal

1392 23555 WCR ET Conventi WAG5 23-Feb-13 KPA 24-Oct-13


onal

1393 30219 NR GZB 3-Phase WAP7 20-Oct-13 BSL 23-Oct-13

1394 27167 SER BNDM Conventi WAG7 29-Sep-13 KGP 22-Oct-13


onal

1395 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 21-Oct-13


onal
1396 27706 WCR NKJ Conventi WAG7 12-Oct-13 BSL 19-Oct-13
onal

1397 31037 ECR GMO 3-Phase WAG9 10-Oct-13 BSL 19-Oct-13

1398 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 18-Oct-13


onal

1399 27298 NCR CNB Conventi WAG7 5-Jul-13 KPA 18-Oct-13


onal
1400 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 18-Oct-13
onal

1401 22539 NCR CNB Conventi WAP4 12-May-12 BSL 17-Oct-13


onal

1402 22539 NCR CNB Conventi WAP4 12-May-12 BSL 17-Oct-13


onal

1403 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 17-Oct-13


onal
1404 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 17-Oct-13
onal

1405 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 17-Oct-13


onal

1406 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 17-Oct-13


onal

1407 23842 ECoR WAT Conventi WAG5 23-Sep-13 DHD 17-Oct-13


onal

1408 22528 ER HWH Conventi WAP4 5-Sep-13 KPA 17-Oct-13


onal

1409 27264 CR AQ Conventi WAG7 12-Aug-13 BSL 17-Oct-13


onal
1410 23722 WCR ET Conventi WAG5 21-Nov-12 DHD 16-Oct-13
onal
1411 27703 SER BNDM Conventi WAG7 11-Oct-13 KGP 15-Oct-13
onal

1412 22715 SR RPM Conventi WAP4 28-Sep-13 PER 15-Oct-13


onal

1413 22648 SR RPM Conventi WAP4 24-Apr-12 PER 15-Oct-13


onal
1414 22523 ER HWH Conventi WAP4 23-Sep-13 KPA 15-Oct-13
onal

1415 24009 NCR JHS Conventi WAG5 15-May-13 BSL 14-Oct-13


onal
1416 21382 ECR MGS Conventi WAM4 5-Oct-13 KPA 13-Oct-13
onal

1417 21382 ECR MGS Conventi WAM4 5-Oct-13 KPA 13-Oct-13


onal

1418 22715 SR RPM Conventi WAP4 28-Sep-13 PER 12-Oct-13


onal
1419 22715 SR RPM Conventi WAP4 28-Sep-13 PER 12-Oct-13
onal

1420 27139 NCR CNB Conventi WAG7 16-Aug-12 KPA 12-Oct-13


onal

1421 23786 WCR ET Conventi WAG5 20-May-13 DHD 11-Oct-13


onal

1422 23825 WCR ET Conventi WAG5 8-Jul-13 DHD 10-Oct-13


onal

1423 23489 ECoR WAT Conventi WAG5 1-Sep-13 KGP 10-Oct-13


onal

1424 22044 NR GZB Conventi WAP1 4-May-13 DHD 9-Oct-13


onal
1425 22523 ER HWH Conventi WAP4 23-Sep-13 KPA 9-Oct-13
onal
1426 30216 NR GZB 3-Phase WAP7 23-Aug-13 BSL 9-Oct-13

1427 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 8-Oct-13

1428 22044 NR GZB Conventi WAP1 2-May-13 DHD 8-Oct-13


onal
1429 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 7-Oct-13
onal

1430 23824 WCR ET Conventi WAG5 11-Sep-13 BSL 6-Oct-13


onal

1431 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 6-Oct-13

1432 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 6-Oct-13

1433 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 6-Oct-13

1434 22760 WCR ET Conventi WAP4 8-Sep-13 BSL 5-Oct-13


onal

1435 21321 ECR MGS Conventi WAM4 6-Aug-13 KPA 5-Oct-13


onal
1436 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 5-Oct-13
onal

1437 22346 NR GZB Conventi WAP4 23-Aug-13 KPA 4-Oct-13


onal
1438 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 4-Oct-13

1439 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 3-Oct-13

1440 27687 SER BNDM Conventi WAG7 18-Aug-13 KGP 3-Oct-13


onal

1441 22267 CR BSL Conventi WAP4 31-Dec-11 BSL 3-Oct-13


onal

1442 23818 ER ASN Conventi WAG5 30-Aug-13 KPA 2-Oct-13


onal
1443 27241 WCR NKJ Conventi WAG7 11-Sep-13 PER 2-Oct-13
onal

1444 22061 NR GZB Conventi WAP4 3-Sep-13 DHD 1-Oct-13


onal
1445 22598 SCR LGD Conventi WAP4 1-Oct-13 KPA 1-Oct-13
onal
1446 22598 SCR LGD Conventi WAP4 1-Oct-13 KPA 1-Oct-13
onal

1447 22598 SCR LGD Conventi WAP4 1-Oct-13 KPA 1-Oct-13


onal

1448 31036 ECR GMO 3-Phase WAG9 17-Sep-13 BSL 30-Sep-13

1449 24458 WR BL Conventi WAG5 28-May-13 DHD 30-Sep-13


onal
1450 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1451 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1452 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1453 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1454 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1455 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1456 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1457 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1458 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 30-Sep-13
onal
1459 24458 WR BL Conventi WAG5 28-May-13 DHD 28-Sep-13
onal

1460 27139 NCR CNB Conventi WAG7 16-Aug-12 KPA 27-Sep-13


onal

1461 22236 WR BRC Conventi WAP4 4-Apr-13 DHD 27-Sep-13


onal
1462 23919 WCR NKJ Conventi WAG5 17-May-13 DHD 26-Sep-13
onal

1463 27009 ECR MGS Conventi WAG7 25-May-11 KPA 26-Sep-13


onal

1464 22710 ECR MGS Conventi WAP4 24-May-12 KPA 25-Sep-13


onal

1465 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 25-Sep-13


onal
1466 22592 SCR LGD Conventi WAP4 23-Sep-13 PER 23-Sep-13
onal

1467 22592 SCR LGD Conventi WAP4 23-Sep-13 PER 23-Sep-13


onal

1468 22346 NR GZB Conventi WAP4 23-Aug-13 KPA 23-Sep-13


onal
1469 22704 WR BRC Conventi WAP4 30-Sep-13 BSL 23-Sep-13
onal
1470 23107 WCR ET Conventi WAG5 2-Jun-13 BSL 23-Sep-13
onal
1471 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 22-Sep-13
onal

1472 24460 WR BL Conventi WAG5 1-Jun-13 DHD 21-Sep-13


onal
1473 27696 SECR BIA Conventi WAG7 12-Aug-13 KGP 21-Sep-13
onal

1474 27731 SCR KZJ Conventi WAG7 6-May-13 PER 21-Sep-13


onal
1475 23863 WCR NKJ Conventi WAG5H 18-Mar-13 DHD 20-Sep-13
onal

1476 23054 SECR BIA Conventi WAG5 14-Jun-13 BSL 19-Sep-13


onal

1477 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 19-Sep-13


onal
1478 22270 SR ED Conventi WAP4 24-Aug-13 PER 18-Sep-13
onal

1479 30210 NR GZB 3-Phase WAP7 1-Apr-13 BSL 18-Sep-13

1480 21321 ECR MGS Conventi WAM4 6-Aug-13 KPA 18-Sep-13


onal

1481 24459 WR BL Conventi WAG5 2-Jan-13 CB 17-Sep-13


onal
1482 24458 WR BL Conventi WAG5 28-May-13 DHD 16-Sep-13
onal
1483 27693 WCR NKJ Conventi WAG7 2-Apr-13 PER 16-Sep-13
onal

1484 21390 ECR MGS Conventi WAM4 18-Nov-12 KPA 14-Sep-13


onal

1485 27131 NCR JHS Conventi WAG7 29-Nov-12 BSL 14-Sep-13


onal

1486 27131 NCR JHS Conventi WAG7 29-Nov-13 KPA 14-Sep-13


onal
1487 21392 ECR MGS Conventi WAM4 4-Feb-13 KPA 13-Sep-13
onal

1488 27766 SCR KZJ Conventi WAG7 31-Aug-13 KPA 13-Sep-13


onal

1489 27766 SCR KZJ Conventi WAG7 31-Aug-13 KPA 13-Sep-13


onal

1490 27766 SCR KZJ Conventi WAG7 31-Aug-13 KPA 13-Sep-13


onal

1491 22346 NR GZB Conventi WAP4 23-Aug-13 KPA 12-Sep-13


onal
1492 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 10-Sep-13

1493 27766 SCR KZJ Conventi WAG7 31-Aug-13 KPA 10-Sep-13


onal
1494 27740 SCR KZJ Conventi WAG7 26-Aug-13 PER 10-Sep-13
onal

1495 27740 SCR KZJ Conventi WAG7 26-Aug-13 PER 10-Sep-13


onal
1496 27740 SCR KZJ Conventi WAG7 26-Aug-13 PER 10-Sep-13
onal
1497 27761 SCR KZJ Conventi WAG7 24-Aug-13 KPA 10-Sep-13
onal

1498 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 9-Sep-13

1499 31034 ECR GMO 3-Phase WAG9 26-Jul-13 BSL 9-Sep-13

1500 31032 ECR GMO 3-Phase WAG9 13-Jul-13 BSL 9-Sep-13

1501 22648 SR RPM Conventi WAP4 24-Apr-12 PER 9-Sep-13


onal
1502 24448 WCR NKJ Conventi WAG5 1-Jun-13 PER 9-Sep-13
onal

1503 30214 NR GZB 3-Phase WAP7 8-Jun-13 BSL 8-Sep-13

1504 22225 NCR CNB Conventi WAP4 19-Jul-12 KPA 7-Sep-13


onal
1505 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 5-Sep-13
onal
1506 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 5-Sep-13
onal

1507 30216 NR GZB 3-Phase WAP7 23-Aug-13 BSL 4-Sep-13

1508 30217 NR GZB 3-Phase WAP7 4-Jul-13 BSL 4-Sep-13

1509 27730 SCR KZJ Conventi WAG7 6-Jun-13 PER 4-Sep-13


onal
1510 27730 SCR KZJ Conventi WAG7 6-Jun-13 PER 4-Sep-13
onal
1511 23493 SR AJJ Conventi WAG5 1-Aug-13 PER 3-Sep-13
onal

1512 23489 ECoR WAT Conventi WAG5 1-Sep-13 KGP 3-Sep-13


onal
1513 23489 ECoR WAT Conventi WAG5 1-Sep-13 KGP 3-Sep-13
onal

1514 27303 WCR NKJ Conventi WAG7 20-Jun-13 PER 3-Sep-13


onal
1515 27730 SCR KZJ Conventi WAG7 6-Jun-13 PER 3-Sep-13
onal

1516 27256 NCR CNB Conventi WAG7 5-Sep-12 KPA 2-Sep-13


onal

1517 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13


onal
1518 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13
onal
1519 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13
onal
1520 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13
onal
1521 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13
onal

1522 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13


onal

1523 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13


onal
1524 22701 WR BRC Conventi WAP4 1-Sep-13 BSL 1-Sep-13
onal

1525 27205 CR AQ Conventi WAG7 31-Aug-13 BSL 31-Aug-13


onal

1526 27245 NCR CNB Conventi WAG7 12-Apr-13 KPA 30-Aug-13


onal

1527 27695 WCR NKJ Conventi WAG7 25-Aug-13 BSL 30-Aug-13


onal

1528 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13


onal
1529 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1530 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal

1531 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13


onal

1532 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13


onal
1533 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1534 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1535 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1536 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1537 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1538 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1539 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1540 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal

1541 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13


onal
1542 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal

1543 21143 WR BRC Conventi WAG5 22-Aug-13 KPA 29-Aug-13


onal
1544 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal

1545 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13


onal
1546 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1547 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1548 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1549 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1550 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1551 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1552 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1553 21143 WR BRC Conventi WAG5 29-Aug-13 KPA 29-Aug-13
onal
1554 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 27-Aug-13

1555 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 27-Aug-13


onal

1556 30216 NR GZB 3-Phase WAP7 23-Aug-13 BSL 27-Aug-13

1557 23053 SECR BIA Conventi WAG5 22-Oct-12 KGP 27-Aug-13


onal

1558 30214 NR GZB 3-Phase WAP7 8-Jun-13 BSL 26-Aug-13

1559 30216 NR GZB 3-Phase WAP7 23-Aug-13 BSL 26-Aug-13

1560 22505 NR GZB Conventi WAP4 9-Nov-12 BSL 26-Aug-13


onal
1561 23976 WR BL Conventi WAG5H 13-Jul-13 DHD 26-Aug-13
onal

1562 24444 WR BL Conventi WAG5H 4-Jan-13 CB 26-Aug-13


onal

1563 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 26-Aug-13


onal
1564 30217 NR GZB 3-Phase WAP7 4-Jul-13 BSL 25-Aug-13
1565 22759 WCR ET Conventi WAP4 26-Jul-13 BSL 24-Aug-13
onal

1566 27745 SCR KZJ Conventi WAG7 10-Aug-13 PER 24-Aug-13


onal

1567 27745 SCR KZJ Conventi WAG7 10-Aug-13 PER 24-Aug-13


onal
1568 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13
onal

1569 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13


onal

1570 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13


onal
1571 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13
onal

1572 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13


onal

1573 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13


onal

1574 23482 ECoR WAT Conventi WAG5 23-Aug-13 BSL 23-Aug-13


onal

1575 27216 NCR CNB Conventi WAG7 16-Mar-13 KPA 22-Aug-13


onal
1576 21343 SECR BIA Conventi WAM4 24-May-13 KGP 21-Aug-13
onal

1577 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 20-Aug-13

1578 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 20-Aug-13


onal
1579 24418 WR BL Conventi WAG5 9-Jun-13 CB 20-Aug-13
onal

1580 23873 WCR NKJ Conventi WAG5H 11-Aug-13 DHD 20-Aug-13


onal

1581 27730 SCR KZJ Conventi WAG7 6-Jun-13 PER 20-Aug-13


onal
1582 27731 SCR KZJ Conventi WAG7 6-May-13 PER 20-Aug-13
onal

1583 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 19-Aug-13


onal

1584 30210 NR GZB 3-Phase WAP7 1-Apr-13 BSL 19-Aug-13

1585 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 19-Aug-13


1586 22777 SCR LGD Conventi WAP4 19-Aug-13 PER 19-Aug-13
onal

1587 22777 SCR LGD Conventi WAP4 19-Aug-13 PER 19-Aug-13


onal

1588 22777 SCR LGD Conventi WAP4 19-Aug-13 PER 19-Aug-13


onal

1589 21391 ECR MGS Conventi WAM4 27-Jun-13 KPA 18-Aug-13


onal

1590 22535 NCR CNB Conventi WAP4 27-Mar-12 BSL 18-Aug-13


onal

1591 21321 ECR MGS Conventi WAM4 6-Aug-13 KPA 17-Aug-13


onal

1592 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 17-Aug-13


onal
1593 23299 WCR TKD Conventi WAG5 30-Jul-13 KGP 17-Aug-13
onal

1594 27242 NCR CNB Conventi WAG7 10-Aug-13 CB 16-Aug-13


onal

1595 27089 NCR CNB Conventi WAG7 2-Nov-12 KPA 16-Aug-13


onal

1596 27711 SCR KZJ Conventi WAG7 20-Jul-13 KPA 16-Aug-13


onal

1597 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 15-Aug-13


onal
1598 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 15-Aug-13
onal

1599 22680 CR BSL Conventi WAP4 3-Mar-12 BSL 15-Aug-13


onal

1600 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 15-Aug-13

1601 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 14-Aug-13

1602 30218 NR GZB 3-Phase WAP7 10-Aug-13 BSL 14-Aug-13

1603 23567 ECoR WAT Conventi WAG5 20-Mar-13 BSL 13-Aug-13


onal

1604 31030 ECR GMO 3-Phase WAG9 17-Jun-13 KPA 13-Aug-13

1605 30214 NR GZB 3-Phase WAP7 8-Jun-13 BSL 12-Aug-13

1606 23722 WCR ET Conventi WAG5 21-Nov-12 DHD 12-Aug-13


onal
1607 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 12-Aug-13
onal
1608 23161 NCR JHS Conventi WAG5 15-Jun-13 CB 10-Aug-13
onal

1609 24445 WR BL Conventi WAG5H 15-Mar-13 CB 10-Aug-13


onal

1610 24460 WR BL Conventi WAG5H 1-Jun-13 DHD 9-Aug-13


onal
1611 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 9-Aug-13
onal

1612 23382 WCR TKD Conventi WAG5 17-Jul-13 KPA 9-Aug-13


onal
1613 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 8-Aug-13
onal

1614 23555 WCR ET Conventi WAG5 23-Feb-13 KPA 8-Aug-13


onal
1615 22006 NR GZB Conventi WAP1 12-Jun-13 BSL 7-Aug-13
onal

1616 22043 NR GZB Conventi WAP1 8-Mar-13 DHD 7-Aug-13


onal

1617 24444 WR BL Conventi WAG5H 4-Jan-13 CB 7-Aug-13


onal

1618 27210 NCR CNB Conventi WAG7 23-Feb-13 KPA 7-Aug-13


onal

1619 23461 WR BL Conventi WAG5 28-Feb-13 CB 6-Aug-13


onal
1620 23054 SECR BIA Conventi WAG5H 14-Jun-13 BSL 6-Aug-13
onal

1621 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 5-Aug-13


onal
1622 23255 WCR NKJ Conventi WAG5 17-Apr-13 CB 4-Aug-13
onal

1623 31032 ECR GMO 3-Phase WAG9 13-Jul-13 BSL 4-Aug-13

1624 27744 SCR KZJ Conventi WAG7 29-Jun-13 KPA 31-Jul-13


onal
1625 27744 SCR KZJ Conventi WAG7 29-Jun-13 KPA 31-Jul-13
onal
1626 22697 SR RPM Conventi WAP4 1-Mar-13 PER 31-Jul-13
onal

1627 24448 WCR NKJ Conventi WAG5 1-Jun-13 PER 31-Jul-13


onal
1628 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 30-Jul-13
onal

1629 23088 WCR ET Conventi WAG5 5-Jun-13 KPA 30-Jul-13


onal
1630 22570 SR ED Conventi WAP4 24-Jun-13 PER 29-Jul-13
onal

1631 21382 ECR MGS Conventi WAM4 5-Oct-13 KPA 29-Jul-13


onal
1632 22570 SR ED Conventi WAP4 25-Jun-13 PER 28-Jul-13
onal

1633 21392 ECR MGS Conventi WAM4 4-Feb-12 KPA 28-Jul-13


onal

1634 23035 WCR ET Conventi WAG5 21-Jul-13 KGP 27-Jul-13


onal
1635 22697 SR RPM Conventi WAP4 1-Mar-13 PER 27-Jul-13
onal
1636 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 26-Jul-13
onal

1637 24444 WR BL Conventi WAG5 31-Jan-13 CB 24-Jul-13


onal
1638 27141 NCR CNB Conventi WAG7 19-Jan-13 KPA 24-Jul-13
onal
1639 27226 NCR CNB Conventi WAG7 27-Dec-12 KPA 24-Jul-13
onal

1640 22043 NR GZB Conventi WAP1 8-Mar-13 DHD 23-Jul-13


onal
1641 22572 SR ED Conventi WAP4 17-Jul-13 PER 23-Jul-13
onal

1642 30210 NR GZB 3-Phase WAP7 1-Apr-13 BSL 23-Jul-13

1643 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal
1644 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13
onal

1645 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal

1646 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal

1647 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal

1648 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal
1649 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13
onal

1650 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal

1651 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal

1652 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal
1653 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13
onal

1654 21350 ECoR WAT Conventi WAG5 23-Jul-13 KGP 23-Jul-13


onal

1655 23612 WCR ET Conventi WAG5 18-Jun-13 KPA 23-Jul-13


onal

1656 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 22-Jul-13


onal

1657 23786 WCR ET Conventi WAG5 20-May-13 DHD 21-Jul-13


onal

1658 27098 NCR CNB Conventi WAG7 29-May-12 KPA 21-Jul-13


onal
1659 21392 ECR MGS Conventi WAM4 4-Feb-12 KPA 21-Jul-13
onal

1660 27202 NCR CNB Conventi WAG7 20-Oct-12 KPA 20-Jul-13


onal

1661 22284 NCR CNB Conventi WAP4 23-Mar-13 KPA 20-Jul-13


onal

1662 22705 WR BRC Conventi WAP4 2-Apr-13 BSL 19-Jul-13


onal
1663 27684 NR LDH Conventi WAG7 6-Jun-13 CB 19-Jul-13
onal

1664 24006 NCR JHS Conventi WAG5 14-Jul-13 BSL 18-Jul-13


onal

1665 21378 SECR BIA Conventi WAM4 21-Jul-12 KGP 18-Jul-13


onal
1666 27731 SCR KZJ Conventi WAG7 6-May-13 PER 16-Jul-13
onal

1667 27731 SCR KZJ Conventi WAG7 6-May-13 PER 16-Jul-13


onal
1668 27731 SCR KZJ Conventi WAG7 6-May-13 PER 16-Jul-13
onal
1669 23590 WCR ET Conventi WAG5 27-Jun-12 KPA 16-Jul-13
onal

1670 23919 WCR NKJ Conventi WAG5 17-May-13 DHD 15-Jul-13


onal

1671 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 15-Jul-13


onal

1672 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 15-Jul-13


onal
1673 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 15-Jul-13
onal
1674 23161 NCR JHS Conventi WAG5 15-Jun-13 CB 14-Jul-13
onal

1675 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 14-Jul-13


onal

1676 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 14-Jul-13


onal

1677 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 13-Jul-13


onal
1678 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 13-Jul-13
onal

1679 27694 WCR NKJ Conventi WAG7 20-Mar-13 PER 13-Jul-13


onal

1680 21151 ECoR WAT Conventi WAG5 4-Oct-12 KGP 13-Jul-13


onal

1681 30217 NR GZB 3-Phase WAP7 4-Jul-13 BSL 13-Jul-13


1682 21379 ER ASN Conventi WAM4 8-May-13 KPA 13-Jul-13
onal

1683 21382 ECR MGS Conventi WAM4 5-Oct-13 KPA 13-Jul-13


onal

1684 27681 NR LDH Conventi WAG7 12-Jun-13 CB 12-Jul-13


onal
1685 27129 NCR JHS Conventi WAG7 14-Jul-12 KPA 12-Jul-13
onal

1686 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13


onal
1687 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal
1688 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal

1689 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13


onal
1690 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal
1691 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal
1692 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal
1693 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal
1694 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13
onal

1695 22702 WR BRC Conventi WAP4 12-Jul-13 BSL 12-Jul-13


onal

1696 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 11-Jul-13


onal
1697 22323 SCR LGD Conventi WAP4 30-Jan-13 PER 11-Jul-13
onal

1698 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 10-Jul-13


onal
1699 22589 SCR LGD Conventi WAP4 10-Jul-13 PER 10-Jul-13
onal
1700 21361 SECR BIA Conventi WAM4 21-Aug-12 KGP 8-Jul-13
onal
1701 23048 ECoR WAT Conventi WAG5 15-Jul-12 KGP 8-Jul-13
onal

1702 23510 WCR ET Conventi WAG5 21-Jan-13 KPA 7-Jul-13


onal

1703 23161 NCR JHS Conventi WAG5 15-Jun-13 CB 7-Jul-13


onal

1704 31027 CR AQ 3-Phase WAP7 14-Nov-11 BSL 6-Jul-13


1705 22738 ECR MGS Conventi WAP4 23-Dec-13 KPA 6-Jul-13
onal

1706 27152 WCR NKJ Conventi WAG7 19-Mar-13 KPA 4-Jul-13


onal

1707 22552 NCR CNB Conventi WAP4 2-Jul-13 BSL 4-Jul-13


onal

1708 24458 WR BL Conventi WAG5 28-May-13 DHD 4-Jul-13


onal
1709 24440 WCR NKJ Conventi WAG5H 15-Mar-13 PER 3-Jul-13
onal

1710 21392 ECR MGS Conventi WAM4 4-Feb-12 KPA 3-Jul-13


onal
1711 23112 WCR ET Conventi WAG5 22-Mar-12 KPA 2-Jul-13
onal

1712 27694 WCR NKJ Conventi WAG7 31-Mar-13 PER 1-Jul-13


onal

1713 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 30-Jun-13


onal

1714 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 30-Jun-13


onal
1715 24448 WCR NKJ Conventi WAG5H 1-Jun-13 PER 29-Jun-13
onal

1716 24431 WCR NKJ Conventi WAG5H 20-Feb-13 PER 29-Jun-13


onal

1717 22044 NR GZB Conventi WAP1 2-May-13 DHD 27-Jun-13


onal

1718 30215 NR GZB 3-Phase WAP7 21-Apr-13 BSL 27-Jun-13


1719 22705 WR BRC Conventi WAP4 2-Apr-13 BSL 27-Jun-13
onal
1720 27693 WCR NKJ Conventi WAG7 2-Apr-13 PER 26-Jun-13
onal

1721 27694 WCR NKJ Conventi WAG7 31-Mar-13 PER 25-Jun-13


onal

1722 22724 NR GZB Conventi WAP4 3-Jan-13 BSL 25-Jun-13


onal
1723 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 25-Jun-13
onal
1724 23054 SECR BIA Conventi WAG5 14-Jun-13 BSL 25-Jun-13
onal

1725 27080 NCR JHS Conventi WAG7 30-Jun-13 KPA 23-Jun-13


onal

1726 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 22-Jun-13


onal

1727 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 21-Jun-13


onal
1728 23863 WCR NKJ Conventi WAG5 18-Mar-13 DHD 20-Jun-13
onal

1729 30210 NR GZB 3-Phase WAP7 1-Apr-13 BSL 20-Jun-13

1730 21113 ECoR WAT Conventi WAG5 7-Jun-13 KGP 20-Jun-13


onal

1731 23555 WCR ET Conventi WAG5 23-Feb-12 KPA 19-Jun-13


onal
1732 23287 WR BRC Conventi WAP4 18-Jun-13 DHD 18-Jun-13
onal
1733 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 18-Jun-13
onal
1734 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 18-Jun-13
onal
1735 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 18-Jun-13
onal
1736 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 18-Jun-13
onal
1737 23287 WR BRC Conventi WAG5 18-Jun-13 DHD 18-Jun-13
onal
1738 23287 WR BRC Conventi WAG5 11-Jun-13 DHD 18-Jun-13
onal
1739 27730 SCR KZJ Conventi WAG7 6-Jun-13 PER 17-Jun-13
onal
1740 24458 WR BL Conventi WAG5 28-May-13 DHD 16-Jun-13
onal

1741 22705 WR BRC Conventi WAP4 2-Apr-13 BSL 14-Jun-13


onal
1742 22006 NR GZB Conventi WAP1 12-Jun-13 DHD 14-Jun-13
onal

1743 22509 ER HWH Conventi WAP4 21-Feb-13 KPA 14-Jun-13


onal

1744 21379 ER ASN Conventi WAM4 8-May-13 KPA 14-Jun-13


onal

1745 22648 SR RPM Conventi WAP4 24-Apr-12 PER 13-Jun-13


onal
1746 22711 ECR MGS Conventi WAP4 7-Aug-12 KPA 12-Jun-13
onal

1747 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 12-Jun-13


onal

1748 22396 ER HWH Conventi WAP4 3-Apr-13 KPA 11-Jun-13


onal

1749 27210 NCR CNB Conventi WAG7 23-Feb-13 KPA 10-Jun-13


onal

1750 23414 WCR TKD Conventi WAG5 5-May-13 KPA 9-Jun-13


onal
1751 23414 WCR TKD Conventi WAG5 5-May-13 KPA 9-Jun-13
onal

1752 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 9-Jun-13


onal

1753 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 9-Jun-13


onal
1754 22590 SCR LGD Conventi WAP4 9-Jun-13 PER 9-Jun-13
onal

1755 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal
1756 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13
onal
1757 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13
onal

1758 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal

1759 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal

1760 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal
1761 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13
onal

1762 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal

1763 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal

1764 23500 WCR TKD Conventi WAG5 31-May-13 KPA 8-Jun-13


onal

1765 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 8-Jun-13


onal

1766 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 8-Jun-13


onal
1767 23088 WCR ET Conventi WAG5 5-Jun-13 KPA 7-Jun-13
onal

1768 22698 SR ED Conventi WAP4 27-Jul-12 PER 7-Jun-13


onal

1769 22046 NR GZB Conventi WAP1 13-Dec-12 DHD 7-Jun-13


onal
1770 23088 WCR ET Conventi WAG5 5-Jun-13 KPA 7-Jun-13
onal

1771 22044 NR GZB Conventi WAP1 2-May-13 DHD 6-Jun-13


onal
1772 24418 WR BL Conventi WAG5 9-May-13 CB 6-Jun-13
onal
1773 27675 WCR NKJ Conventi WAG7 13-Jan-13 BSL 5-Jun-13
onal

1774 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 5-Jun-13


onal

1775 24431 WCR NKJ Conventi WAG5 20-Feb-13 PER 5-Jun-13


onal

1776 22723 NR GZB Conventi WAP4 6-Mar-13 BSL 5-Jun-13


onal
1777 22043 NR GZB Conventi WAP1 8-Mar-13 DHD 4-Jun-13
onal

1778 23575 ECoR WAT Conventi WAG5 22-Nov-12 DHD 4-Jun-13


onal
1779 22710 ECR MGS Conventi WAP4 24-May-12 KPA 4-Jun-13
onal

1780 22710 ECR MGS Conventi WAP4 24-May-12 KPA 4-Jun-13


onal

1781 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 4-Jun-13


onal

1782 24459 WR BL Conventi WAG5 8-Dec-12 CB 4-Jun-13


onal
1783 24444 WR BL Conventi WAG5 4-Jan-13 CB 3-Jun-13
onal
1784 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 3-Jun-13
onal

1785 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 3-Jun-13


onal

1786 27694 WCR NKJ Conventi WAG7 31-Mar-13 PER 3-Jun-13


onal

1787 21387 ER ASN Conventi WAM4 6-Mar-13 KPA 3-Jun-13


onal
1788 27746 SCR KZJ Conventi WAG7 30-May-13 KPA 3-Jun-13
onal

1789 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 2-Jun-13

1790 21104 ECoR WAT Conventi WAG5 19-Dec-12 KGP 2-Jun-13


onal

1791 23590 WCR ET Conventi WAG5 27-Jun-12 KPA 1-Jun-13


onal
1792 21392 ECR MGS Conventi WAM4 4-Feb-12 KPA 31-May-13
onal
1793 27137 WCR NKJ Conventi WAG7 17-May-13 KPA 30-May-13
onal

1794 27129 NCR JHS Conventi WAG7 14-Jul-12 KPA 29-May-13


onal

1795 21379 ER ASN Conventi WAM4 8-May-13 KPA 29-May-13


onal

1796 22236 WR BRC Conventi WAP4 4-Apr-13 DHD 29-May-13


onal

1797 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1798 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13


1799 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1800 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1801 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1802 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1803 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1804 31040 CR AQ 3-Phase WAG9 29-May-13 BSL 29-May-13

1805 27129 NCR JHS Conventi WAG7 14-Jul-12 KPA 28-May-13


onal
1806 23786 WCR ET Conventi WAG5 23-May-13 DHD 28-May-13
onal

1807 23786 WCR ET Conventi WAG5 20-May-13 DHD 28-May-13


onal
1808 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 27-May-13

1809 21343 SECR BIA Conventi WAM4 24-May-13 KGP 27-May-13


onal

1810 23590 WCR ET Conventi WAG5 27-Jun-12 KPA 26-May-13


onal

1811 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 26-May-13


onal

1812 27147 NCR CNB Conventi WAG7 15-Feb-12 KPA 24-May-13


onal

1813 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 24-May-13


onal
1814 24444 WR BL Conventi WAG5 31-Jan-13 CB 24-May-13
onal

1815 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 24-May-13


onal

1816 22044 NR GZB Conventi WAP1 2-May-13 DHD 24-May-13


onal
1817 23255 WCR NKJ Conventi WAG5 17-Apr-13 CB 24-May-13
onal

1818 24440 WCR NKJ Conventi WAG5 15-Mar-13 PER 24-May-13


onal
1819 23048 ECoR WAT Conventi WAG5 15-Jul-12 KGP 23-May-13
onal

1820 23919 WCR NKJ Conventi WAG5 17-May-13 DHD 23-May-13


onal

1821 22754 WCR ET Conventi WAP4 1-Apr-13 BSL 23-May-13


onal
1822 27080 NCR JHS Conventi WAG5 30-Jun-13 KPA 23-May-13
onal
1823 23981 WR BL Conventi WAG5H 4-Aug-11 DHD 22-May-13
onal

1824 24001 NCR JHS Conventi WAG5 23-Sep-11 BSL 22-May-13


onal

1825 24003 NCR JHS Conventi WAG5 1-Dec-12 BSL 21-May-13


onal
1826 22735 NR GZB Conventi WAP4 28-Feb-13 BSL 21-May-13
onal

1827 22236 WR BRC Conventi WAP4 4-Apr-13 DHD 20-May-13


onal

1828 22236 WR BRC Conventi WAP4 4-Apr-13 DHD 20-May-13


onal

1829 22236 WR BRC Conventi WAP4 4-Apr-13 DHD 20-May-13


onal

1830 27675 WCR NKJ Conventi WAG7 13-Jan-13 BSL 19-May-13


onal

1831 30209 NR GZB 3-Phase WAP7 31-Dec-12 BSL 19-May-13


1832 27243 NCR CNB Conventi WAG7 21-Apr-13 CB 18-May-13
onal

1833 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal

1834 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal

1835 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal

1836 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal

1837 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal
1838 27399 CR BSL Conventi WAG7 16-May-13 BSL 16-May-13
onal

1839 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal

1840 27399 CR AQ Conventi WAG7 16-May-13 BSL 16-May-13


onal

1841 24044 NCR JHS Conventi WAG5 12-Mar-13 DHD 15-May-13


onal

1842 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 15-May-13

1843 24044 NCR JHS Conventi WAG5 12-Mar-13 DHD 15-May-13


onal
1844 27135 WCR NKJ Conventi WAG7 17-Jan-13 KPA 14-May-13
onal

1845 30215 NR GZB 3-Phase WAP7 21-May-13 BSL 14-May-13

1846 22709 WCR ET Conventi WAP4 15-Dec-11 BSL 13-May-13


onal
1847 27139 NCR CNB Conventi WAG7 16-Aug-12 KPA 11-May-13
onal
1848 27245 NCR CNB Conventi WAG7 12-Apr-13 KPA 11-May-13
onal

1849 27245 NCR CNB Conventi WAG7 12-Apr-13 KPA 11-May-13


onal

1850 27731 SCR KZJ Conventi WAG7 6-May-13 PER 11-May-13


onal
1851 22539 NCR CNB Conventi WAP4 12-May-12 BSL 10-May-13
onal

1852 22724 NR GZB Conventi WAP4 3-Jan-13 BSL 9-May-13


onal

1853 23708 SCR BZA Conventi WAG5 5-May-13 DHD 8-May-13


onal
1854 23708 SCR BZA Conventi WAG5 5-May-13 DHD 8-May-13
onal

1855 23567 ECoR WAT Conventi WAG5 20-Mar-13 BSL 8-May-13


onal

1856 23567 ECoR WAT Conventi WAG5 20-Mar-13 BSL 8-May-13


onal
1857 23567 ECoR WAT Conventi WAG5 20-Mar-13 BSL 8-May-13
onal
1858 22230 NCR CNB Conventi WAP4 17-Dec-12 KPA 7-May-13
onal

1859 22044 NR GZB Conventi WAP1 6-May-13 DHD 6-May-13


onal

1860 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 5-May-13


1861 22225 NCR CNB Conventi WAP4 19-Jul-12 KPA 5-May-13
onal

1862 22717 SCR LGD Conventi WAP4 21-Apr-12 BSL 5-May-13


onal

1863 22243 ECR MGS Conventi WAG7 1-Jan-13 KPA 4-May-13


onal
1864 27205 CR AQ Conventi WAG7 1-May-13 BSL 4-May-13
onal

1865 23749 WCR NKJ Conventi WAG5 8-Jan-13 DHD 3-May-13


onal

1866 22284 NCR CNB Conventi WAP4 23-Mar-13 KPA 3-May-13


onal
1867 22284 NCR CNB Conventi WAP4 23-Mar-13 KPA 3-May-13
onal

1868 22705 WR BRC Conventi WAP4 2-Apr-13 BSL 3-May-13


onal

1869 24019 NCR JHS Conventi WAG5H 3-Apr-13 BSL 3-May-13


onal

1870 30209 NR GZB 3-Phase WAP7 31-Dec-12 BSL 1-May-13

1871 24523 NCR JHS Conventi WAG7 3-Apr-13 BSL 30-Apr-13


onal
1872 24019 NCR JHS Conventi WAG5 3-Apr-13 BSL 30-Apr-13
onal

1873 31028 ECR GMO 3-Phase WAG9 28-Jan-13 BSL 30-Apr-13

1874 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 29-Apr-13

1875 27152 WCR NKJ Conventi WAG7 19-Mar-13 KPA 28-Apr-13


onal

1876 24438 WCR NKJ Conventi WAG5 6-Jan-13 PER 27-Apr-13


onal
1877 30215 NR GZB 3-Phase WAP7 27-Apr-13 BSL 27-Apr-13

1878 24445 WR BL Conventi WAG5 15-Mar-13 CB 27-Apr-13


onal

1879 22533 NCR CNB Conventi WAP4 6-Apr-13 KPA 26-Apr-13


onal

1880 32010 NR GZB 3-Phase WAP7 1-Apr-13 BSL 26-Apr-13


1881 24431 WCR NKJ Conventi WAG5 20-Feb-13 PER 25-Apr-13
onal

1882 23045 CR BSL Conventi WAG5 17-Jan-13 BSL 25-Apr-13


onal

1883 24404 NCR JHS Conventi WAG5 8-Mar-13 BSL 25-Apr-13


onal
1884 22268 SR ED Conventi WAP4 10-Dec-12 PER 25-Apr-13
onal

1885 24445 WR BL Conventi WAG5 15-Mar-13 CB 25-Apr-13


onal

1886 27202 NCR CNB Conventi WAG7 20-Oct-12 KPA 24-Apr-13


onal

1887 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 22-Apr-13


onal

1888 22678 WR BRC Conventi WAP4 22-Apr-13 BSL 22-Apr-13


onal
1889 22043 NR GZB Conventi WAP1 8-Mar-13 DHD 22-Apr-13
onal
1890 22721 NR GZB Conventi WAM4 16-Mar-13 BSL 21-Apr-13
onal
1891 30209 NR GZB 3-Phase WAP7 31-Dec-12 BSL 20-Apr-13

1892 27176 NCR CNB Conventi WAG7 12-Mar-13 KPA 20-Apr-13


onal

1893 27176 NCR CNB Conventi WAG7 12-Mar-13 KPA 20-Apr-13


onal

1894 21362 SECR BIA Conventi WAM4 19-May-12 KGP 20-Apr-13


onal

1895 27176 NCR CNB Conventi WAG7 16-Mar-13 KPA 20-Apr-13


onal
1896 22250 SR ED Conventi WAP4 9-Apr-13 PER 19-Apr-13
onal

1897 27331 ECR MGS Conventi WAG7 18-Jun-12 KPA 18-Apr-13


onal

1898 31031 ECR GMO 3-Phase WAG9 2-Mar-13 BSL 17-Apr-13

1899 21355 WCR ET Conventi WAM4 29-May-12 KGP 17-Apr-13


onal
1900 24405 NCR JHS Conventi WAG5 28-Jan-12 BSL 17-Apr-13
onal

1901 22649 SR RPM Conventi WAP4 15-Nov-11 PER 17-Apr-13


onal

1902 22649 SR RPM Conventi WAP4 15-Nov-11 PER 17-Apr-13


onal

1903 23330 WCR ET Conventi WAG5 31-Jan-13 KGP 16-Apr-13


onal

1904 23330 WCR ET Conventi WAG5 31-Jan-13 KGP 16-Apr-13


onal

1905 31031 ECR GMO 3-Phase WAG9 2-Mar-13 BSL 15-Apr-13


1906 24440 WCR NKJ Conventi WAG5 15-Mar-13 PER 15-Apr-13
onal

1907 24438 WCR NKJ Conventi WAG5 6-Jan-13 PER 14-Apr-13


onal

1908 3010 NR GZB 3-Phase WAP7 1-Apr-13 BSL 13-Apr-13

1909 22533 NCR CNB Conventi WAP4 6-Apr-13 KPA 13-Apr-13


onal
1910 22533 NCR CNB Conventi WAP4 6-Apr-13 KPA 13-Apr-13
onal

1911 24445 WR BL Conventi WAG5 15-Mar-13 CB 12-Apr-13


onal
1912 24445 WR BL Conventi WAG5H 15-Mar-13 CB 12-Apr-13
onal

1913 21104 ECoR WAT Conventi WAG5 19-Dec-12 KGP 12-Apr-13


onal

1914 21104 ECoR WAT Conventi WAG5 19-Dec-12 KGP 12-Apr-13


onal

1915 21370 WCR ET Conventi WAM4 5-Aug-12 KGP 11-Apr-13


onal

1916 27201 NCR CNB Conventi WAG7 11-Jan-13 KPA 11-Apr-13


onal

1917 24444 WR BL Conventi WAG5 31-Jan-13 CB 9-Apr-13


onal
1918 22225 NCR CNB Conventi WAP4 19-Jul-13 KPA 8-Apr-13
onal

1919 22673 WR BRC Conventi WAP4 29-Nov-12 BSL 8-Apr-13


onal
1920 22673 WR BRC Conventi WAP4 29-Nov-12 BSL 8-Apr-13
onal
1921 23108 WCR ET Conventi WAG5 18-Mar-12 KPA 8-Apr-13
onal

1922 23108 WCR ET Conventi WAG5 18-Mar-12 KGP 8-Apr-13


onal

1923 22505 NR GZB Conventi WAP4 2-Nov-12 BSL 8-Apr-13


onal

1924 22505 NR GZB Conventi WAP4 2-Nov-12 BSL 8-Apr-13


onal

1925 23108 WCR ET Conventi WAG5 18-Mar-13 KGP 8-Apr-13


onal

1926 22225 NCR CNB Conventi WAP4 19-Jul-12 KPA 8-Apr-13


onal
1927 22649 SR RPM Conventi WAP4 15-Nov-11 PER 7-Apr-13
onal
1928 27210 NCR CNB Conventi WAG7 23-Feb-13 KPA 5-Apr-13
onal

1929 27244 NCR CNB Conventi WAG7 1-Mar-13 KPA 5-Apr-13


onal

1930 27093 NCR CNB Conventi WAG7 28-Apr-13 KPA 4-Apr-13


onal

1931 22648 SR RPM Conventi WAP4 24-Apr-12 PER 4-Apr-13


onal

1932 30210 NR GZB 3-Phase WAP7 4-Apr-13 BSL 4-Apr-13

1933 30210 NR GZB 3-Phase WAP7 4-Apr-13 BSL 4-Apr-13

1934 27135 WCR NKJ Conventi WAG7 17-Jan-13 KPA 4-Apr-13


onal
1935 23590 WCR ET Conventi WAG5 27-Jun-12 KPA 3-Apr-13
onal
1936 24438 WCR NKJ Conventi WAG5 6-Jan-13 PER 2-Apr-13
onal
1937 31028 ECR GMO 3-Phase WAG9 28-Jan-13 BSL 2-Apr-13

1938 23863 WCR NKJ Conventi WAG5 18-Mar-13 DHD 2-Apr-13


onal

1939 27694 WCR NKJ Conventi WAG7 20-Mar-13 PER 31-Mar-13


onal
1940 27694 WCR NKJ Conventi WAG7 20-Mar-13 PER 31-Mar-13
onal

1941 22043 NR GZB Conventi WAP1 8-Mar-13 DHD 31-Mar-13


onal
1942 27685 NR LDH Conventi WAG7 16-Feb-13 CB 31-Mar-13
onal

1943 27675 WCR NKJ Conventi WAG7 13-Jan-13 BSL 29-Mar-13


onal
1944 27691 NCR CNB Conventi WAG7 11-Jun-12 KPA 27-Mar-13
onal

1945 27682 NR LDH Conventi WAG7 17-Jan-13 CB 26-Mar-13


onal
1946 22036 NR GZB Conventi WAP1 9-Jun-12 DHD 25-Mar-13
onal

1947 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 25-Mar-13

1948 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 25-Mar-13

1949 22046 NR GZB Conventi WAP1 13-Dec-12 DHD 25-Mar-13


onal
1950 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 24-Mar-13

1951 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 24-Mar-13

1952 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 23-Mar-13

1953 22719 NR GZB Conventi WAP4 1-Sep-12 BSL 22-Mar-13


onal
1954 24444 WR BL Conventi WAG5 31-Jan-13 CB 22-Mar-13
onal
1955 31031 ECR GMO 3-Phase WAG9 2-Mar-13 BSL 21-Mar-13

1956 31031 ECR GMO 3-Phase WAG9 2-Mar-13 BSL 21-Mar-13

1957 27247 NCR CNB Conventi WAG7 16-Mar-13 KPA 21-Mar-13


onal

1958 23567 ECoR WAT Conventi WAG5 20-Mar-13 BSL 21-Mar-13


onal

1959 21132 ECoR WAT Conventi WAG5 20-May-10 KGP 20-Mar-13


onal

1960 31031 ECR GMO 3-Phase WAG9 2-Mar-13 BSL 20-Mar-13

1961 27135 WCR NKJ Conventi WAG7 17-Jan-13 KPA 20-Mar-13


onal
1962 23749 WCR NKJ Conventi WAG5 8-Jan-13 DHD 20-Mar-13
onal

1963 30209 NR GZB 3-Phase WAP7 31-Dec-12 BSL 19-Mar-13


1964 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 18-Mar-13

1965 24438 WCR NKJ Conventi WAG5 6-Jan-13 PER 17-Mar-13


onal

1966 22721 NR GZB Conventi WAP4 16-Mar-13 BSL 16-Mar-13


onal
1967 27629 NR LDH Conventi WAG7 13-Feb-13 CB 16-Mar-13
onal
1968 22708 NR GZB Conventi WAP4 5-Jul-12 BSL 16-Mar-13
onal
1969 22721 NR GZB Conventi WAM4 16-Mar-13 BSL 16-Mar-13
onal
1970 22649 SR RPM Conventi WAP4 15-Nov-11 PER 16-Mar-13
onal

1971 22043 NR GZB Conventi WAP1 8-Mar-13 DHD 15-Mar-13


onal
1972 31028 ECR GMO 3-Phase WAG9 28-Jan-13 BSL 15-Mar-13

1973 22724 NR GZB Conventi WAM4 3-Mar-13 BSL 13-Mar-13


onal
1974 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 12-Mar-13

1975 22719 NR GZB Conventi WAP4 1-Sep-12 BSL 11-Mar-13


onal

1976 27680 NR LDH Conventi WAG7 5-Mar-13 CB 11-Mar-13


onal
1977 22505 NR GZB Conventi WAP4 2-Nov-12 BSL 9-Mar-13
onal
1978 27135 WCR NKJ Conventi WAG7 17-Jan-13 KPA 9-Mar-13
onal

1979 21390 ECR MGS Conventi WAM4 18-Nov-12 KPA 7-Mar-13


onal

1980 22723 NR GZB Conventi WAP4 6-Mar-13 BSL 7-Mar-13


onal
1981 31028 ECR GMO 3-Phase WAG9 28-Jan-13 BSL 7-Mar-13

1982 23555 WCR ET Conventi WAG5 23-Feb-13 DHD 6-Mar-13


onal
1983 27201 NCR CNB Conventi WAG7 11-Jan-13 KPA 5-Mar-13
onal

1984 30207 NR GZB 3-Phase WAP7 5-Aug-12 BSL 4-Mar-13

1985 31029 ECR GMO 3-Phase WAG9 8-Dec-12 BSL 4-Mar-13

1986 27210 NCR CNB Conventi WAG7 23-Feb-13 KPA 4-Mar-13


onal

1987 27226 NCR CNB Conventi WAG7 27-Dec-12 KPA 3-Mar-13


onal

1988 27226 NCR CNB Conventi WAG7 27-Dec-12 KPA 3-Mar-13


onal
1989 23404 WCR TKD Conventi WAG5 2-Mar-13 KPA 3-Mar-13
onal

1990 22747 SCR LGD Conventi WAP4 1-Oct-12 PER 3-Mar-13


onal

1991 24431 WCR NKJ Conventi WAG5 20-Feb-13 PER 1-Mar-13


onal
1992 24431 WCR NKJ Conventi WAG5 20-Feb-13 PER 1-Mar-13
onal
1993 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 1-Mar-13
onal

1994 24431 WCR NKJ Conventi WAG5 20-Feb-13 PER 1-Mar-13


onal

1995 22201 SCR LGD Conventi WAP4 16-May-12 BSL 28-Feb-13


onal

1996 27690 NCR CNB Conventi WAG7 12-Jun-12 KPA 27-Feb-13


onal

1997 31028 ECR GMO 3-Phase WAG9 28-Jan-13 BSL 27-Feb-13


1998 21378 SECR BIA Conventi WAM4 21-Jul-12 KGP 27-Feb-13
onal

1999 27666 NR LDH Conventi WAG7 12-Sep-12 CB 26-Feb-13


onal

2000 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 23-Feb-13

2001 27269 NCR CNB Conventi WAG7 11-Feb-13 KPA 23-Feb-13


onal

2002 27674 WCR NKJ Conventi WAG7 29-Aug-12 BSL 23-Feb-13


onal

2003 31038 ECR GMO 3-Phase WAG9 22-Nov-13 BSL 23-Feb-13

2004 27676 WCR NKJ Conventi WAG7 6-Dec-12 BSL 22-Feb-13


onal
2005 27676 WCR NKJ Conventi WAG7 6-Dec-12 BSL 22-Feb-13
onal

2006 27682 NR LDH Conventi WAG7 17-Jan-13 CB 22-Feb-13


onal
2007 27682 NR LDH Conventi WAG7 17-Jan-13 CB 22-Feb-13
onal
2008 31028 ECR GMO 3-Phase WAG9 28-Jan-13 BSL 19-Feb-13

2009 27685 NR LDH Conventi WAG7 15-Feb-13 CB 18-Feb-13


onal
2010 27682 NR LDH Conventi WAG7 15-Feb-13 CB 18-Feb-13
onal
2011 27141 NCR CNB Conventi WAG7 19-Jan-13 KPA 16-Feb-13
onal
2012 27141 NCR CNB Conventi WAG7 19-Jan-13 KPA 16-Feb-13
onal

2013 22267 CR BSL Conventi WAP4 31-Dec-11 BSL 16-Feb-13


onal

2014 23749 WCR NKJ Conventi WAG5 8-Jan-13 DHD 15-Feb-13


onal

2015 27139 NCR CNB Conventi WAG7 12-Aug-12 KPA 14-Feb-13


onal

2016 27139 NCR CNB Conventi WAG7 12-Aug-12 KPA 14-Feb-13


onal
2017 30221 NR GZB 3-Phase WAP7 9-Oct-12 BSL 11-Feb-13

2018 22054 NR GZB Conventi WAP1 2-May-12 DHD 9-Feb-13


onal
2019 31029 ECR GMO 3-Phase WAG9 8-Dec-12 BSL 9-Feb-13

2020 31029 ECR GMO 3-Phase WAG9 8-Dec-12 BSL 8-Feb-13

2021 22036 NR GZB Conventi WAP1 9-Jun-12 DHD 8-Feb-13


onal
2022 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 8-Feb-13
onal

2023 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 7-Feb-13

2024 30208 NR GZB 3-Phase WAP7 7-Feb-13 BSL 7-Feb-13

2025 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 5-Feb-13


2026 27299 NCR CNB Conventi WAG7 31-Jan-13 KPA 5-Feb-13
onal

2027 21362 SECR BIA Conventi WAM4 19-May-12 KGP 3-Feb-13


onal
2028 23477 CR BSL Conventi WAG5 27-Jun-12 PER 3-Feb-13
onal

2029 23722 WCR ET Conventi WAG5 21-Nov-12 DHD 2-Feb-13


onal

2030 27226 NCR CNB Conventi WAG7 27-Dec-12 KPA 2-Feb-13


onal

2031 22252 NCR CNB Conventi WAP4 31-Jan-13 KPA 2-Feb-13


onal

2032 21361 SECR BIA Conventi WAM4 21-Aug-12 KGP 2-Feb-13


onal
2033 31028 ECR GMO 3-Phase WAG9 1-Jan-13 BSL 2-Feb-13

2034 21344 SECR BIA Conventi WAM4 20-Feb-12 KGP 1-Feb-13


onal
2035 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 1-Feb-13
onal

2036 21130 ECoR WAT Conventi WAG5 5-Jun-10 KGP 31-Jan-13


onal

2037 30209 NR GZB 3-Phase WAP7 31-Jan-13 BSL 31-Jan-13

2038 22046 NR GZB Conventi WAP1 13-Jan-13 BSL 31-Jan-13


onal

2039 22046 NR GZB Conventi WAP1 13-Jan-13 DHD 31-Jan-13


onal
2040 22046 NR GZB Conventi WAP1 13-Dec-12 DHD 31-Jan-13
onal

2041 24004 NCR JHS Conventi WAG5 8-Jan-13 BSL 28-Jan-13


onal

2042 27689 NCR JHS Conventi WAG7 3-Oct-12 KPA 28-Jan-13


onal

2043 22681 CR BSL Conventi WAP4 3-May-12 BSL 26-Jan-13


onal
2044 21362 SECR BIA Conventi WAM4 19-May-12 KGP 26-Jan-13
onal

2045 23742 SCR BZA Conventi WAG5 28-Mar-12 DHD 23-Jan-13


onal
2046 27141 NCR CNB Conventi WAG7 19-Jan-13 KPA 23-Jan-13
onal

2047 27201 NCR CNB Conventi WAG7 17-Jan-13 KPA 22-Jan-13


onal

2048 27675 WCR NKJ Conventi WAG7 13-Jan-13 BSL 22-Jan-13


onal

2049 22724 NR GZB Conventi WAM4 3-Jan-13 BSL 22-Jan-13


onal
2050 22213 SCR LGD Conventi WAP4 26-Nov-12 PER 22-Jan-13
onal
2051 23045 CR BSL Conventi WAP4 17-Jan-13 BSL 20-Jan-13
onal

2052 23684 SCR BZA Conventi WAG5 24-Dec-12 DHD 20-Jan-13


onal

2053 23684 SCR BZA Conventi WAG5 24-Dec-12 DHD 20-Jan-13


onal

2054 23045 CR BSL Conventi WAG5H 17-Jan-13 BSL 20-Jan-13


onal

2055 23749 WCR NKJ Conventi WAG5 8-Jan-12 DHD 18-Jan-13


onal
2056 23749 WCR NKJ Conventi WAG5 8-Jan-12 DHD 18-Jan-13
onal
2057 23749 WCR NKJ Conventi WAG5 1-Aug-12 DHD 18-Jan-13
onal
2058 27742 SCR KZJ Conventi WAG7 22-Oct-13 KPA 18-Jan-13
onal

2059 22724 NR GZB Conventi WAP4 3-Jan-13 BSL 16-Jan-13


onal
2060 21326 WCR ET Conventi WAM4 28-Jan-12 KPA 15-Jan-13
onal

2061 22711 ECR MGS Conventi WAP4 7-Aug-12 KPA 14-Jan-13


onal

2062 22054 NR GZB Conventi WAP1 2-May-12 DHD 14-Jan-13


onal
2063 31029 ECR GMO 3-Phase WAG9 8-Dec-12 BSL 14-Jan-13

2064 24419 ECoR WAT Conventi WAG5 7-Jun-12 KGP 14-Jan-13


onal

2065 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 13-Jan-13


onal
2066 22243 ECR MGS Conventi WAP4 1-Jan-13 KPA 13-Jan-13
onal

2067 24028 NCR JHS Conventi WAG5 18-Apr-12 DHD 11-Jan-13


onal

2068 27226 NCR CNB Conventi WAG7 27-Dec-12 KPA 10-Jan-13


onal
2069 30013 NR GZB 3-Phase WAP7 9-Oct-12 BSL 10-Jan-13

2070 27679 NR LDH Conventi WAG7 13-Dec-12 CB 10-Jan-13


onal

2071 21362 SECR BIA Conventi WAM4 19-May-12 KGP 10-Jan-13


onal

2072 30221 NR GZB 3-Phase WAP7 9-Oct-12 BSL 10-Jan-13

2073 23436 CR BSL Conventi WAG5 2-Jan-13 BSL 9-Jan-13


onal

2074 23436 CR BSL Conventi WAG5 2-Jan-13 BSL 9-Jan-13


onal

2075 27131 NCR JHS Conventi WAG7 29-Nov-12 KPA 9-Jan-13


onal
2076 21370 WCR ET Conventi WAM4 5-Aug-12 KGP 9-Jan-13
onal

2077 22322 SCR LGD Conventi WAP4 22-Dec-12 PER 8-Jan-13


onal

2078 22322 SCR LGD Conventi WAP4 22-Dec-12 PER 8-Jan-13


onal

2079 31033 CR AQ 3-Phase WAG9 22-Dec-12 BSL 6-Jan-13


2080 21365 SECR BIA Conventi WAM4 4-Apr-12 KGP 6-Jan-13
onal

2081 23782 SCR BZA Conventi WAG5 15-Nov-12 DHD 5-Jan-13


onal

2082 23109 WCR ET Conventi WAG5 11-Oct-12 KGP 5-Jan-13


onal

2083 27676 WCR NKJ Conventi WAG7 6-Dec-12 BSL 5-Jan-13


onal

2084 23688 SCR BZA Conventi WAG5 31-Dec-12 DHD 4-Jan-13


onal

2085 23688 SCR BZA Conventi WAG5 31-Dec-12 DHD 4-Jan-13


onal
2086 22748 SCR LGD Conventi WAP4 8-Dec-12 PER 4-Jan-13
onal

2087 27691 NCR CNB Conventi WAG7 6-Nov-12 KPA 4-Jan-13


onal

2088 27201 NCR CNB Conventi WAG7 1-Nov-13 KPA 4-Jan-13


onal

2089 22734 NR GZB Conventi WAP4 3-Jan-13 BSL 3-Jan-13


onal
2090 30209 NR GZB 3-Phase WAP7 3-Jan-13 BSL 3-Jan-13

2091 27177 NCR CNB Conventi WAG7 11-Dec-12 KPA 31-Dec-12


onal

2092 27177 NCR CNB Conventi WAG7 11-Dec-12 KPA 31-Dec-12


onal

2093 23684 SCR BZA Conventi WAG5 24-Dec-12 DHD 28-Dec-12


onal
2094 23704 SCR BZA Conventi WAG5 20-Dec-12 DHD 26-Dec-12
onal

2095 23704 SCR BZA Conventi WAG5 26-Dec-12 DHD 26-Dec-12


onal

2096 23704 SCR BZA Conventi WAG5 26-Dec-12 DHD 26-Dec-12


onal

2097 31024 ECR GMO 3-Phase WAG9 8-Sep-12 BSL 25-Dec-12

2098 23413 WCR TKD Conventi WAG5 18-Nov-12 KPA 25-Dec-12


onal

2099 23702 ECoR WAT Conventi WAG5 20-Dec-12 DHD 23-Dec-12


onal
2100 21362 SECR BIA Conventi WAM4 19-May-12 KGP 23-Dec-12
onal

2101 21390 ECR MGS Conventi WAM4 18-Nov-12 KPA 23-Dec-12


onal

2102 23702 ECoR WAT Conventi WAG5 20-Dec-11 DHD 23-Dec-12


onal

2103 27690 NCR CNB Conventi WAG7 20-Jun-12 KPA 23-Dec-12


onal

2104 27139 NCR CNB Conventi WAG7 16-Aug-12 KPA 20-Dec-12


onal

2105 22708 NR GZB Conventi WAP4 10-Jul-12 BSL 18-Dec-12


onal
2106 30211 NR GZB 3-Phase WAP7 18-Dec-12 BSL 18-Dec-12

2107 21302 SER TATA Conventi WAM4 13-Nov-12 KGP 17-Dec-12


onal

2108 27688 NCR CNB Conventi WAG7 25-Jul-12 KPA 15-Dec-12


onal

2109 23702 ECoR WAT Conventi WAG5 20-Dec-11 DHD 14-Dec-12


onal

2110 22046 NR GZB Conventi WAP1 13-Dec-12 DHD 13-Dec-12


onal
2111 27661 NR LDH Conventi WAG7 8-Aug-12 CB 13-Dec-12
onal
2112 30212 NR GZB 3-Phase WAP7 14-Nov-12 BSL 13-Dec-12

2113 21390 ECR MGS Conventi WAM4 18-Nov-12 KPA 12-Dec-12


onal

2114 27206 WCR NKJ Conventi WAG7 8-Oct-12 KPA 12-Dec-12


onal

2115 30221 NR GZB 3-Phase WAP7 9-Oct-12 BSL 9-Dec-12


2116 24002 NCR JHS Conventi WAG5 2-Oct-12 BSL 8-Dec-12
onal

2117 22708 NR GZB Conventi WAP1 5-Jul-12 BSL 8-Dec-12


onal
2118 21344 SECR BIA Conventi WAM4 20-Feb-12 KGP 8-Dec-12
onal
2119 23053 SECR BIA Conventi WAG5 22-Oct-12 KGP 4-Dec-12
onal

2120 22215 ER HWH Conventi WAP4 29-Sep-12 KPA 4-Dec-12


onal

2121 21390 ECR MGS Conventi WAM4 18-Nov-12 KPA 2-Dec-12


onal
2122 23233 WR BRC Conventi WAG5 27-Nov-08 KPA 29-Nov-12
onal

2123 23016 WCR NKJ Conventi WAG5 21-Nov-12 CB 27-Nov-12


onal

2124 22679 WR BRC Conventi WAP4 15-Sep-12 BSL 27-Nov-12


onal

2125 22542 WR BRC Conventi WAP4 11-Aug-12 BSL 26-Nov-12


onal

2126 22710 ECR MGS Conventi WAP4 22-May-12 KPA 26-Nov-12


onal
2127 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 21-Nov-12

2128 30207 NR GZB 3-Phase WAP7 5-Aug-12 BSL 19-Nov-12

2129 22505 NR GZB Conventi WAP1 2-Nov-12 BSL 18-Nov-12


onal

2130 21376 WCR ET Conventi WAM4 28-Jun-12 KGP 18-Nov-12


onal

2131 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 17-Nov-12

2132 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 17-Nov-12

2133 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 17-Nov-12

2134 22720 NR GZB Conventi WAP4 14-May-12 BSL 15-Nov-12


onal

2135 22030 NR GZB Conventi WAP1 30-Jul-12 DHD 15-Nov-12


onal
2136 22034 NR GZB Conventi WAP1 12-Nov-12 DHD 15-Nov-12
onal
2137 22030 NR GZB Conventi WAP1 30-Jul-12 DHD 15-Nov-12
onal
2138 21302 SER TATA Conventi WAM4 13-Nov-12 KGP 13-Nov-12
onal

2139 21302 SER TATA Conventi WAM4 13-Nov-12 KGP 13-Nov-12


onal
2140 22029 NR GZB Conventi WAP1 24-Sep-12 DHD 12-Nov-12
onal
2141 23961 WR BL Conventi WAG5H 25-Jan-12 DHD 12-Nov-12
onal

2142 22505 NR GZB Conventi WAP4 2-Nov-12 BSL 9-Nov-12


onal
2143 22505 NR GZB Conventi WAP4 2-Nov-12 BSL 9-Nov-12
onal
2144 22505 NR GZB Conventi WAP4 2-Nov-12 BSL 9-Nov-12
onal
2145 23960 WCR ET Conventi WAG5 29-Dec-11 DHD 9-Nov-12
onal

2146 31026 ECR GMO 3-Phase WAG9 1-Oct-12 BSL 8-Nov-12

2147 31025 ECR GMO 3-Phase WAG9 13-Sep-12 BSL 7-Nov-12

2148 27200 NCR CNB Conventi WAG7 23-Jul-12 KPA 6-Nov-12


onal

2149 27185 NCR CNB Conventi WAG7 23-Aug-12 KPA 6-Nov-12


onal

2150 27185 NCR CNB Conventi WAG7 23-Aug-12 KPA 6-Nov-12


onal

2151 22720 NR GZB Conventi WAP4 14-May-12 BSL 5-Nov-12


onal
2152 22708 NR GZB Conventi WAP4 10-Jul-12 BSL 4-Nov-12
onal
2153 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 3-Nov-12
onal

2154 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 3-Nov-12


onal

2155 30221 NR GZB 3-Phase WAP7 9-Oct-12 BSL 3-Nov-12

2156 22210 WR BRC Conventi WAP4 10-Feb-12 BSL 2-Nov-12


onal

2157 24407 WR BL Conventi WAG5H 19-Nov-11 DHD 2-Nov-12


onal

2158 22720 NR GZB Conventi WAP4 14-May-12 BSL 31-Oct-12


onal

2159 27690 NCR CNB Conventi WAG7 20-Jun-12 KPA 28-Oct-12


onal

2160 27678 WCR NKJ Conventi WAG7 23-Oct-12 BSL 27-Oct-12


onal
2161 27093 NCR CNB Conventi WAG7 28-Apr-12 KPA 26-Oct-12
onal

2162 21362 SECR BIA Conventi WAM4 19-May-12 KGP 26-Oct-12


onal

2163 24405 NCR JHS Conventi WAG5 28-Jan-12 BSL 25-Oct-12


onal

2164 27148 NCR CNB Conventi WAG7 16-Mar-12 KPA 23-Oct-12


onal
2165 27100 NCR CNB Conventi WAG7 14-Mar-12 KGP 23-Oct-12
onal

2166 27179 NCR CNB Conventi WAG7 1-Mar-12 KGP 22-Oct-12


onal
2167 30207 NR GZB 3-Phase WAP7 5-Aug-12 BSL 21-Oct-12

2168 22215 ER HWH Conventi WAP4 29-Sep-12 KPA 18-Oct-12


onal

2169 30013 NR GZB 3-Phase WAP5 9-Jun-12 BSL 17-Oct-12

2170 22720 NR GZB Conventi WAP4 14-May-12 BSL 17-Oct-12


onal
2171 21328 SER TATA Conventi WAM4 1-Sep-12 KGP 17-Oct-12
onal

2172 21328 SER TATA Conventi WAM4 1-Sep-12 KGP 17-Oct-12


onal

2173 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 17-Oct-12

2174 21344 SECR BIA Conventi WAM4 20-Feb-12 KGP 16-Oct-12


onal
2175 21378 SECR BIA Conventi WAM4 21-Jul-12 KGP 14-Oct-12
onal

2176 22539 NCR CNB Conventi WAP4 12-May-12 BSL 13-Oct-12


onal

2177 23112 WCR ET Conventi WAG5 22-Mar-12 KPA 13-Oct-12


onal
2178 23740 WCR NKJ Conventi WAG5 6-Oct-12 DHD 12-Oct-12
onal

2179 21376 WCR ET Conventi WAM4 28-Jun-12 KGP 11-Oct-12


onal

2180 31026 ECR GMO 3-Phase WAG9 1-Oct-12 BSL 10-Oct-12


2181 22586 SER SRC Conventi WAP4 25-Sep-12 KGP 9-Oct-12
onal

2182 27219 NCR CNB Conventi WAG7 28-Aug-12 KPA 9-Oct-12


onal

2183 31025 ECR GMO 3-Phase WAG9 13-Sep-12 BSL 8-Oct-12

2184 31026 ECR GMO 3-Phase WAG9 1-Oct-12 BSL 8-Oct-12

2185 22035 NR GZB Conventi WAP1 18-Jan-12 DHD 7-Oct-12


onal
2186 21361 SECR BIA Conventi WAM4 21-Aug-12 KGP 6-Oct-12
onal

2187 21378 SECR BIA Conventi WAM4 21-Jul-12 KGP 3-Oct-12


onal

2188 23998 WR BL Conventi WAG5H 12-Mar-11 DHD 1-Oct-12


onal
2189 22711 ECR MGS Conventi WAP4 21-Sep-12 KPA 1-Oct-12
onal

2190 22535 NCR CNB Conventi WAP4 12-Mar-12 BSL 30-Sep-12


onal

2191 27666 NR LDH Conventi WAG7 12-Sep-12 CB 29-Sep-12


onal
2192 27666 NR LDH Conventi WAG7 12-Sep-12 CB 29-Sep-12
onal
2193 21370 WCR ET Conventi WAM4 5-Aug-12 KGP 26-Sep-12
onal

2194 31025 ECR GMO 3-Phase WAG9 13-Sep-12 BSL 26-Sep-12

2195 22530 ER HWH Conventi WAP4 13-Aug-12 KPA 23-Sep-12


onal
2196 22030 NR GZB Conventi WAP1 30-Jul-12 DHD 22-Sep-12
onal

2197 22030 NR GZB Conventi WAP1 30-Jul-12 DHD 22-Sep-12


onal

2198 30207 NR GZB 3-Phase WAP7 5-Aug-12 BSL 21-Sep-12

2199 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 21-Sep-12


onal
2200 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 19-Sep-12
onal

2201 22719 NR GZB Conventi WAP1 1-Sep-12 BSL 18-Sep-12


onal
2202 27219 NCR CNB Conventi WAG7 28-Aug-12 KPA 18-Sep-12
onal

2203 27666 NR LDH Conventi WAG7 12-Sep-12 CB 18-Sep-12


onal
2204 27178 NCR CNB Conventi WAG7 3-Feb-12 KPA 16-Sep-12
onal
2205 27203 NCR CNB Conventi WAP4 20-May-12 BSL 14-Sep-12
onal

2206 22711 ECR MGS Conventi WAP4 1-Aug-12 KPA 14-Sep-12


onal

2207 27106 CR AQ Conventi WAG7 23-Jul-12 BSL 12-Sep-12


onal

2208 23085 WCR TKD Conventi WAG5 4-Jul-12 KPA 11-Sep-12


onal

2209 22532 NCR CNB Conventi WAP4 2-Nov-11 BSL 10-Sep-12


onal

2210 22216 ECR MGS Conventi WAP4 21-May-12 KPA 10-Sep-12


onal

2211 22216 ECR MGS Conventi WAP4 21-May-12 KPA 10-Sep-12


onal
2212 24442 WR BL Conventi WAG5H 6-Oct-11 DHD 10-Sep-12
onal

2213 27203 NCR CNB Conventi WAP4 21-May-12 BSL 9-Sep-12


onal

2214 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 9-Sep-12

2215 23590 WCR ET Conventi WAG5 27-Jun-12 KPA 8-Sep-12


onal

2216 27669 NR LDH Conventi WAG7 16-Aug-12 CB 8-Sep-12


onal
2217 23314 WCR TKD Conventi WAG5 25-Aug-12 KPA 7-Sep-12
onal

2218 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 7-Sep-12

2219 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 7-Sep-12


2220 27670 NR LDH Conventi WAG7 31-Aug-12 CB 6-Sep-12
onal
2221 21376 WCR ET Conventi WAM4 28-Jun-12 KGP 4-Sep-12
onal

2222 27690 NCR CNB Conventi WAG7 20-Jun-12 KPA 4-Sep-12


onal

2223 27690 NCR CNB Conventi WAG7 20-Jun-12 KPA 4-Sep-12


onal

2224 27178 NCR CNB Conventi WAG7 3-Mar-12 KPA 3-Sep-12


onal

2225 27208 CR AQ Conventi WAG7 11-Apr-12 BSL 29-Aug-12


onal

2226 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 29-Aug-12


onal
2227 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 29-Aug-12
onal
2228 22720 NR GZB Conventi WAP4 14-May-12 BSL 29-Aug-12
onal
2229 22567 NR GZB Conventi WAP4 20-Mar-12 BSL 28-Aug-12
onal
2230 27331 ECR MGS Conventi WAG7 16-Jun-12 KPA 26-Aug-12
onal

2231 21299 SER TATA Conventi WAM4 24-Jul-12 KGP 26-Aug-12


onal
2232 23143 WCR TKD Conventi WAG5 4-Aug-12 KPA 26-Aug-12
onal

2233 22030 NR GZB Conventi WAP1 30-Jul-12 DHD 25-Aug-12


onal
2234 27139 NCR CNB Conventi WAG7 16-Aug-12 KPA 24-Aug-12
onal

2235 27139 NCR CNB Conventi WAG7 16-Aug-12 KPA 24-Aug-12


onal

2236 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 22-Aug-12

2237 30207 NR GZB 3-Phase WAP7 5-Aug-12 BSL 21-Aug-12


2238 21299 SER TATA Conventi WAP4 24-Jul-12 KGP 20-Aug-12
onal

2239 21843 WR BL Conventi WCAM1 24-Apr-11 BSL 19-Aug-12


onal

2240 27669 NR LDH Conventi WAG7 16-Aug-12 CB 19-Aug-12


onal
2241 22711 ECR MGS Conventi WAP4 1-Aug-12 KPA 15-Aug-12
onal
2242 22212 CR BSL Conventi WAP4 4-Mar-11 BSL 15-Aug-12
onal
2243 27688 NCR CNB Conventi WAG7 15-Jul-12 KPA 15-Aug-12
onal

2244 27688 NCR CNB Conventi WAG7 15-Jul-12 KPA 15-Aug-12


onal
2245 22720 NR GZB Conventi WAM4 14-May-12 BSL 13-Aug-12
onal
2246 23331 WCR ET Conventi WAG5 18-Nov-11 BSL 12-Aug-12
onal

2247 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 12-Aug-12

2248 27663 NR LDH Conventi WAG7 24-Jul-12 CB 10-Aug-12


onal

2249 27663 NR LDH Conventi WAG7 24-Jul-12 CB 10-Aug-12


onal

2250 30013 NR GZB 3-Phase WAP5 9-Jun-12 BSL 10-Aug-12

2251 23331 WCR ET Conventi WAG5 18-Nov-11 BSL 9-Aug-12


onal
2252 27148 NCR CNB Conventi WAG7 16-Mar-12 KPA 6-Aug-12
onal
2253 27148 NCR CNB Conventi WAG7 16-Mar-12 KPA 6-Aug-12
onal

2254 22030 NR GZB Conventi WAP1 30-Jul-12 DHD 5-Aug-12


onal

2255 22720 NR GZB Conventi WAP4 18-May-12 BSL 5-Aug-12


onal
2256 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 5-Aug-12

2257 22566 SER SRC Conventi WAP4 2-Aug-12 KGP 4-Aug-12


onal

2258 22711 ECR MGS Conventi WAP4 1-Aug-12 KPA 2-Aug-12


onal

2259 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 2-Aug-12


2260 27100 NCR CNB Conventi WAG7 14-Mar-12 KGP 2-Aug-12
onal

2261 27655 NR LDH Conventi WAG7 30-May-12 CB 1-Aug-12


onal

2262 21344 SECR BIA Conventi WAM4 20-Feb-12 KGP 1-Aug-12


onal

2263 27147 NCR CNB Conventi WAG7 15-Feb-12 KGP 29-Jul-12


onal

2264 22032 NR GZB Conventi WAP1 4-Mar-12 DHD 29-Jul-12


onal

2265 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 28-Jul-12

2266 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 26-Jul-12


2267 22605 WR BRC Conventi WAP4 8-Jan-11 BSL 26-Jul-12
onal

2268 27207 CR AQ Conventi WAG7 13-Jul-12 BSL 25-Jul-12


onal

2269 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 23-Jul-12

2270 31016 ECR GMO 3-Phase WAG9 14-Jul-12 BSL 23-Jul-12

2271 22216 ECR MGS Conventi WAP4 21-May-12 KPA 22-Jul-12


onal

2272 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 22-Jul-12


2273 23981 WR BL Conventi WAG5H 4-Aug-11 DHD 21-Jul-12
onal
2274 22710 ECR MGS Conventi WAP4 22-May-12 KPA 21-Jul-12
onal

2275 21396 WCR ET Conventi WAM4 24-Apr-12 KGP 21-Jul-12


onal

2276 21843 WR BL Conventi WCAM1 26-Apr-11 BSL 20-Jul-12


onal

2277 22535 NCR CNB Conventi WAP4 20-Mar-12 BSL 19-Jul-12


onal
2278 22535 NCR CNB Conventi WAP4 20-Mar-12 BSL 19-Jul-12
onal

2279 27183 NCR CNB Conventi WAG7 10-Jun-12 KPA 19-Jul-12


onal

2280 23127 WCR TKD Conventi WAG5 20-May-12 BSL 19-Jul-12


onal
2281 23127 WCR TKD Conventi WAG5 20-May-12 BSL 19-Jul-12
onal
2282 23127 WCR TKD Conventi WAG5 20-May-12 BSL 19-Jul-12
onal
2283 22708 NR GZB Conventi WAP1 5-Jul-12 BSL 18-Jul-12
onal

2284 22205 SCR LGD Conventi WAP4 15-Jul-12 PER 17-Jul-12


onal

2285 22032 NR GZB Conventi WAP1 1-Mar-12 DHD 17-Jul-12


onal
2286 22032 NR GZB Conventi WAP1 1-Mar-12 DHD 17-Jul-12
onal
2287 23110 WCR ET Conventi WAG5 4-Apr-12 KGP 15-Jul-12
onal

2288 24410 WR BL Conventi WAG5H 19-Nov-11 DHD 12-Jul-12


onal

2289 27331 ECR MGS Conventi WAG7 16-Jun-12 KPA 12-Jul-12


onal

2290 23111 WCR ET Conventi WAG5 17-Apr-12 BSL 12-Jul-12


onal
2291 27691 NCR CNB Conventi WAG7 11-Jun-12 KPA 11-Jul-12
onal

2292 23085 WCR TKD Conventi WAG5 4-Jul-12 KPA 9-Jul-12


onal

2293 23085 WCR TKD Conventi WAG5 4-Jul-12 KPA 9-Jul-12


onal
2294 21378 SECR BIA Conventi WAM4 2-Jul-12 KGP 9-Jul-12
onal

2295 22036 NR GZB Conventi WAP1 9-Jun-12 DHD 8-Jul-12


onal
2296 22672 WR BRC Conventi WAP4 26-Jun-12 BSL 8-Jul-12
onal

2297 22036 NR GZB Conventi WAP1 9-Jun-12 DHD 8-Jul-12


onal
2298 21335 WCR ET Conventi WAM4 17-Nov-11 KPA 6-Jul-12
onal

2299 27107 CR AQ Conventi WAG7 10-Jun-12 BSL 5-Jul-12


onal

2300 27094 NCR CNB Conventi WAG7 5-Jan-12 KGP 5-Jul-12


onal

2301 21326 WCR ET Conventi WAM4 28-Dec-11 KPA 5-Jul-12


onal

2302 22650 ER HWH Conventi WAP4 20-Mar-12 KPA 4-Jul-12


onal
2303 22210 WR BRC Conventi WAP4 10-Feb-12 BSL 4-Jul-12
onal

2304 23387 WCR ET Conventi WAG5 18-Jun-10 DHD 4-Jul-12


onal

2305 22036 NR GZB Conventi WAP1 9-Jun-12 DHD 4-Jul-12


onal

2306 22036 NR GZB Conventi WAP1 9-Jun-12 DHD 4-Jul-12


onal

2307 22720 NR GZB Conventi WAP4 14-May-12 BSL 3-Jul-12


onal
2308 21335 WCR ET Conventi WAM4 17-Nov-11 KPA 2-Jul-12
onal
2309 27331 ECR MGS Conventi WAG7 16-Jun-12 KPA 2-Jul-12
onal

2310 22054 NR GZB Conventi WAP1 9-May-12 DHD 1-Jul-12


onal
2311 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 30-Jun-12

2312 22054 NR GZB Conventi WAP1 5-Feb-12 DHD 29-Jun-12


onal

2313 22040 NR GZB Conventi WAP1 10-Feb-12 DHD 27-Jun-12


onal
2314 23960 WCR ET Conventi WAG5 29-Dec-11 DHD 27-Jun-12
onal

2315 22399 SER SRC Conventi WAP4 31-Dec-11 KGP 27-Jun-12


onal

2316 23226 WCR TKD Conventi WAG5 8-Jun-12 KPA 26-Jun-12


onal
2317 30013 NR GZB 3-Phase WAP5 8-Jun-12 BSL 24-Jun-12

2318 22333 WR BRC Conventi WAP4 4-Mar-11 BSL 23-Jun-12


onal

2319 22541 WR BRC Conventi WAP4 30-Sep-11 BSL 23-Jun-12


onal

2320 27331 ECR MGS Conventi WAG7 16-Jun-12 KPA 20-Jun-12


onal
2321 27331 ECR MGS Conventi WAG7 27-Apr-13 KPA 18-Jun-12
onal

2322 22710 ECR MGS Conventi WAP4 22-May-12 KPA 14-Jun-12


onal

2323 21335 WCR ET Conventi WAM4 17-Nov-11 KPA 13-Jun-12


onal

2324 27691 NCR CNB Conventi WAG7 11-Jun-12 KPA 13-Jun-12


onal

2325 22216 ECR MGS Conventi WAP4 21-May-12 KPA 11-Jun-12


onal
2326 22035 NR GZB Conventi WAP1 19-Jan-12 DHD 11-Jun-12
onal

2327 22216 ECR MGS Conventi WAP4 19-May-12 KPA 11-Jun-12


onal

2328 21389 ER ASN Conventi WAM4 14-Mar-12 KPA 9-Jun-12


onal

2329 23331 WCR ET Conventi WAG5 18-Nov-11 BSL 9-Jun-12


onal

2330 22374 ER HWH Conventi WAP4 3-May-12 KPA 7-Jun-12


onal
2331 22393 WR BRC Conventi WAP4 19-Nov-10 BSL 6-Jun-12
onal

2332 22677 WR BRC Conventi WAP4 5-May-12 BSL 6-Jun-12


onal

2333 27178 NCR CNB Conventi WAG7 3-Feb-12 KPA 4-Jun-12


onal

2334 23127 WCR TKD Conventi WAG5 20-May-12 BSL 3-Jun-12


onal
2335 21365 SECR BIA Conventi WAM4 4-Apr-12 KGP 31-May-12
onal

2336 22333 WR BRC Conventi WAP4 4-Mar-11 BSL 30-May-12


onal

2337 22216 ECR MGS Conventi WAP4 21-May-12 KPA 25-May-12


onal

2338 22216 ECR MGS Conventi WAP4 19-May-12 KPA 25-May-12


onal

2339 23025 WCR ET Conventi WAG5 23-Mar-11 KPA 24-May-12


onal
2340 21326 WCR ET Conventi WAM4 28-Jan-12 KPA 24-May-12
onal

2341 27203 NCR CNB Conventi WAG7 20-May-12 BSL 22-May-12


onal

2342 27203 NCR CNB Conventi WAG7 20-May-12 BSL 22-May-12


onal

2343 22201 SCR LGD Conventi WAP4 16-May-12 PER 19-May-12


onal

2344 21358 SECR BIA Conventi WAM4 27-Nov-11 KGP 17-May-12


onal

2345 23331 WCR ET Conventi WAG5 18-Nov-11 BSL 16-May-12


onal
2346 23960 WCR ET Conventi WAG5 29-Dec-11 DHD 15-May-12
onal

2347 22686 NR GZB Conventi WAP4 14-Jan-12 BSL 15-May-12


onal

2348 22332 ER HWH Conventi WAP4 16-Apr-12 KPA 15-May-12


onal

2349 23734 WCR ET Conventi WAG5 14-Aug-11 DHD 14-May-12


onal
2350 23316 NR LDH Conventi WAG5 11-May-12 CB 11-May-12
onal

2351 21349 SECR BIA Conventi WAM4 27-Aug-11 KGP 6-May-12


onal
2352 21212 SECR BIA Conventi WAM4 24-Jul-11 KGP 4-May-12
onal

2353 21344 SECR BIA Conventi WAM4 20-Feb-12 KGP 4-May-12


onal
2354 22707 NR GZB Conventi WAP4 4-Dec-11 BSL 4-May-12
onal

2355 27105 CR AQ Conventi WAG7 26-Jun-11 BSL 3-May-12


onal
2356 22686 NR GZB Conventi WAP4 14-Jan-12 BSL 2-May-12
onal

2357 23111 WCR ET Conventi WAG5 12-Jul-11 BSL 26-Apr-12


onal

2358 21294 SECR BIA Conventi WAM4 22-May-11 KGP 25-Apr-12


onal

2359 24567 NR GZB Conventi WAP4 20-Mar-12 BSL 24-Apr-12


onal
2360 22686 NR GZB Conventi WAP4 14-Jan-12 BSL 23-Apr-12
onal

2361 22057 WR BRC Conventi WAP4 12-Nov-11 BSL 23-Apr-12


onal

2362 22398 SER SRC Conventi WAP4 19-Nov-11 KGP 22-Apr-12


onal

2363 27178 NCR CNB Conventi WAG7 3-Feb-12 KPA 17-Apr-12


onal
2364 21848 WR BL Conventi WCAM1 1-Jul-11 BSL 17-Apr-12
onal

2365 27147 NCR CNB Conventi WAG7 15-Feb-12 KGP 15-Apr-12


onal

2366 21314 SECR BIA Conventi WAM4 23-Jun-11 KGP 15-Apr-12


onal

2367 22535 NCR CNB Conventi WAP4 20-Mar-12 BSL 12-Apr-12


onal

2368 27148 NCR CNB Conventi WAG7 16-Mar-12 KPA 11-Apr-12


onal

2369 21351 SECR BIA Conventi WAM4 8-Jan-12 KGP 10-Apr-12


onal
2370 22279 WR BRC Conventi WAP4 27-Dec-10 BSL 4-Apr-12
onal

2371 22567 NR GZB Conventi WAP4 20-Mar-12 BSL 3-Apr-12


onal

2372 22709 WCR ET Conventi WAP4 15-Dec-11 BSL 2-Apr-12


onal

2373 23973 WR BL Conventi WAG5H 18-Sep-10 BSL 25-Mar-12


onal

2374 22567 NR GZB Conventi WAP4 20-Mar-12 BSL 20-Mar-12


onal

2375 23971 WR BL Conventi WAG5H 27-Jan-11 BSL 19-Mar-12


onal
2376 22202 SCR LGD Conventi WAP4 19-Feb-12 PER 21-Feb-12
onal

2377 27214 ECR GMO Conventi WAG7 31-Oct-11 KPA 26-Jan-12


onal
2378 31013 ECR GMO 3-Phase WAG9 14-Dec-11 BSL 28-Dec-11

2379 24408 WR BL Conventi WAG5H 30-Nov-11 DHD 22-Dec-11


onal
2380 23973 WR BL Conventi WAG5H 17-Sep-10 BSL 20-Dec-11
onal

2381 27214 ECR GMO Conventi WAG7 31-Oct-11 KPA 13-Dec-11


onal

2382 21845 WR BL Conventi WCAM1 5-Jan-10 BSL 11-Dec-11


onal

2383 23998 WR BL Conventi WAG5H 5-Jul-11 DHD 8-Dec-11


onal
2384 31021 ECR GMO 3-Phase WAG9 16-Oct-11 BSL 28-Nov-11

2385 27211 ECR GMO Conventi WAG7 18-Aug-11 KGP 25-Nov-11


onal
2386 27211 ECR GMO Conventi WAG7 18-Aug-11 KGP 19-Oct-11
onal
2387 27417 ECR GMO Conventi WAG7 11-Aug-11 KPA 14-Oct-11
onal

2388 27082 ECR GMO Conventi WAG7 22-Jul-11 KGP 10-Oct-11


onal
2389 31022 ECR GMO 3-Phase WAG9 15-Jul-11 BSL 6-Sep-11

2390 31022 ECR GMO 3-Phase WAG9 15-Jul-11 BSL 19-Aug-11

2391 27082 ECR GMO Conventi WAG7 22-Jul-11 KGP 13-Aug-11


onal

2392 27085 ECR GMO Conventi WAG7 15-Jun-11 KGP 11-Aug-11


onal

2393 31018 ECR GMO 3-Phase WAG9 23-May-11 BSL 31-Jul-11


2394 27082 ECR GMO Conventi WAG7 22-Jul-11 KGP 28-Jul-11
onal

2395 31018 ECR GMO 3-Phase WAG9 23-May-11 BSL 30-Jun-11

2396 27083 ECR GMO Conventi WAG7 12-May-11 KPA 27-Jun-11


onal

2397 31018 ECR GMO 3-Phase WAG9 23-May-11 BSL 19-Jun-11

2398 31018 ECR GMO 3-Phase WAG9 23-May-11 BSL 7-Jun-11


Equipment Responsible
Brief details of failure Action taken No of days after POH

Miscellaneou Loco no. All the defects 10


s 27805/WAG7/ANGL has mentioned above
undergone POH at BSL are attended at
WS on 10.10.2015.The ELS/ANGL during
said loco is received at IC-0 after POH
ELS/ANGL on on 20.10.2015.
20.10.2015.On checking, The pending
the following defects are modifications are
noticed in the loco. i. All being planned
CTF drum along with during next major
contacts are of 1000A inspection.
instead of 1500A. ii.
Heavy flashing on fixed
contact-2 & Mobile
contact-2, 6 of J-2. iii. TM
Cable modification of TM-
2 & TM-5 have not done.
iv. Oil seepage from all
power and auxiliary
bushings. v. Switch panel
door is not provided. vi.
Cab-1 driver side sander
assembly deficient. vii.
Cab-2 Asst. driver side
head light dimmer not
glowing. viii. S32 NC-4
valve air leakage. ix. CTF-
2 inside NC-4 valve air
Auxiliary leakage.
MVMT-1 x. SS4 sound.
abnormal not MVMT-1 199
Motor changed.
Axle Box Axle box-9 having metal After dismantled 392
content. the axle box-9,
several places
metal chips out
spot mark found
at the edge of
the thrower and
outer bearing
inner racer
surface having
overheating
mark. Wheel set-
5 changed.
Bogie & its Bogie-2 frame crack Bogie-2 changed. 201
Mech. equip. about 11 inch on SS-11.
Arno QOA permanent. Winding ARNO replaced. 55
earthed.
Vacuum VCB insulator badly VCB changed. 218
Circuit damaged condition.
Breaker
(VCB)
Bogie & its Bogie frame crack Bogie-1 changed. 310
Mech. equip. between wheel no. 1 & 3.

Auxiliary MVSL-2 abnormal sound. MVSL-2 changed. 292


Motor
Traction TM-6 IP open circuit. TM-6 changed. 308
Motor
SIV SIV internal fault due to Input fuse 474
melting of its input fuse. replaced.
Details of SIV: Make of
fuse- Ferraz Shawmut, Sl.
No. -
12,5URD72D11A0500,
RATING - 1250V/500A,
D.O.C- 07.07.13.
GR/RGR/CGR RGR burnt. Operation of RGR & all CGRs 74
SMGR and CGR was OK. replaced.
It is suspected that CGR-
3 was not closed for
mechanical problem and
resulted into overheating
of RGR due to flowing of
current through RGR.

GR/RGR/CGR RGR burnt. CGR-1, 2 & 3 74


replaced.
ESMON SPM not working The PG sensor 119
sometimes. Make- found
Laxven, E1 model. malfunctioning/D
efective. New PG
sensor provided
Miscellaneou 1)DC-DC converter not 1) Same allowed. 4
s replaced. 2)Marker lights 2) Same allowed.
not replaced. 3) SMI-234 3) Same allowed.
not carried out (CTF’s 4) Same allowed.
1500 AMPS not 5) Same allowed.
provided.) 4)DBR grids 6) Cab fans
(RF) not replaced. 5)Line terminals secured
contactors U-fork rollers properly. 7) All
provided with bronze removed and
rollers instead of epoxy spring tension
rollers. 6)Both cabs cab adjusted to
fans terminals safety 2.8kg/cm2 brush
covers not provided. 7)All holders provided.
TMs Brush holder spring 8) Same MLR
tension below 2.5 kg/cm2 type capacitors
8)RSI blocks DC damping allowed. 9) Same
panel MLR type FL units allowed.
capacitors are not 10) Same Micro
replaced with MSR type. switches allowed
9)Both cabs FL control and Tell-Tell
units & Doom lamp units fuses replaced
are not replaced with with new spares.
new spares. As per TC- 11) Same
123. 10)RSI panel Micro allowed. 12)
switches & Tell-Tell fuses Same allowed.
are not replaced with 13) Same
new spares. 11)TFP ,GR allowed. 14)
breather modification not Cleaned. 15)
RPS/RS/DBR RFdone. 12)All were
1,2,3,4&5 damping
open Wheel
Letter turning
to M/s 94
circuit, Fail equipment: Stesalite
DBR, S.No. N-13-065, telema/Kolkata
Make: Stesalit telema and Dy.CEE/Loco
& carrag &
wagon
workshop/Dahod,
vide lt No.
WAT/TRS/T/32C/
328, Dt. 07-10-15

Traction Abnormal sound from Tm-5 replaced. 99


Motor TM-5.
Miscellaneou Loco no. Same attended 13
s 27794/WAG7/ANGL has by Shed. All the
undergone POH at BSL defects are
WS on 28.08.2015.The communicated to
said loco is received at BSL WS vide
ELS/ANGL on letter no.
10.09.2015.On checking, ELS/ANGL/T-
the following defects are 43/15/4481,
noticed in the loco. i. The dated 12.09.2015
color of TFP oil is found
to be clip yellow which
indicates old oil. As per
RDSO SMI/120, old TFP
oil should have replaced
with new TFP oil during
POH. ii. LSDBR is
permanently in
extinguished condition. iii.
PHGR is having air
leakage. iv. CTF-1 & 2
are having sluggish
operation v. J-2 is very
fast operation. vi. Line
contactors are not
operated through HVMT-
1 & 2. vii. Auto-sanding
not working during
testing of QD. viii. GR oil
EP Contactor level is below
J-2 Fixed +200C.
contact ix.
no-8 J-2 Fixed contact 13
and mobile contact no-2 no-8 and mobile
flashed due to bedding contact no-2
not proper. Both Fixed & changed by shed.
mobile contacts of LC-2 LC-2 also
also found flashed due to changed by shed.
improper fitment.

Vacuum VCB (BTIL make) VCB auxiliary 236


Circuit auxiliary interlock switch switch changed.
Breaker tilted.
(VCB)
Miscellaneou Defects noticed during To be attend 3
s IC'0'. 1)Relay base crack
QV-
60,Q119,Q45,Q100,Q100
,QRS,Q118. 2)MVSI-2, 01
nos lug broken. 3)MVSI-1
terminal cover not
properly open. 4)RPS all
power cable connection
not proper lugging &
cable strands are open
condition. 5)a3,a5 power
cable connection not
proper lugging. 6)a3
terminal oil noticed.
7)Conservator tank
support plate 01 nos bolt
not provided. 8)In TK &
BD panel all nut, plain
washer & spring washer
to be change as fully
corrosive. 9)TK panel 10
sqmm SB washer & nut
to be change. 10)SMGR
PRV ‘C’ clamp not
provided. 11)PHGR
copper pipe hanging &
clamp not provided.
12)a1,a7 a0&a8 link
Miscellaneou 1) BA panels all fixing 1) All fixing bolts 3
s bolts slacked. 2) MVSL- slacked. 2) Same
1&2,MVSI-1&2 grease was attended on
leakages. 3) All TMs shop floor. 3) All
Brush holder spring removed and
tension below 2.4 kg/cm2 spring tension
4) TM-1 mica between adjusted, brush
Commutator segments holders provided.
not cleared properly at 4) Kept under
edges. 5) Both cabs FL observation. 5)
control units & Doom Same FL units
lamp units are not allowed. 6) Same
replaced with new MLR type
spares. As per TC-123. 6) capacitors
RSI DC damping panel allowed. 7) Same
MLR type capacitors are Micro switches
not replaced with MSR allowed and Tell-
type 7) RSI panel Micro Tell fuses
switches & Tell-Tell fuses replaced with
are not replaced. 8) TFP, new spares. 8)
GR breather modification Same allowed. 9)
not done. 9) PRV shavo Same allowed.
type available instead of 10) TFP oil
Semag. 10) TFP oil BDV filtration done.
showing low. 11) SIV 11) Same
panel gaskets not allowed. 12) All
changed. 12) Roof gasket roof gaskets new
not in suitable height. 13) one provided. 13)
SIV PU Battery
paintingcharger
not done.
not14) Same allowed.
Coupler tightened 3
working due to looseness
of FOC in battery
charger.
SIV Battery charger not Coupler tightened 3
working due to looseness
of FOC in battery
charger.
Miscellaneou For IC0 inspection. During IC0 1
s inspection
following defects
were found. 1)
Collar of tee M/F
found crack near
BC-4. Same
attended. 2) Blow
hole on MR EQ.
pipe under
footplate. same
attended. 3) MR
pipe tee touching
with adjacent
screw. Same
attended. 4) Q49
and Q50 (Both
ABB type) relays
were fitted in
WOAMA relay
base. Relay base
changed. 5) All
safety relay
having completed
their codal life of
15 years.

CBC/Draft Abnormal sound coming Checked found 227


gear/TSC from CAB-1 side under abnormal sound
gear. coming from Cab-
1 side CBC draft
gear. Draft gear
changed.
ESMON During IC-0 inspection Indicator was 0
Speedometer indicator provided by shed,
defective vide letter to
Dy.CEE/KGP lt
No.
WAT/TRS/T/58/2
868, Dt.
10/09/15
Axle Box During IC-0 inspection Axle box changed 0
Axle box -3 high matalic by shed, Letter to
Dy.CEE/KGP vide
letter No.
WAT/TRS/T/58/2
868, Dt.
10/09/15

Pantograph PT-2 horn and panto strip panto pan with 107
broken from one side due carbon strip
to OHE wire was hanging. changed.

Miscellaneou 1)Loco body under frame 1)Rubber packing 8


s in between TM cables provided. 2)Same
cleats rubber packing not attended on shop
provided. 2)MVSI-1&2, floor. 3)MVSL-1
MVSL-1&2 grease replaced with
pipes ,grease leakage. Overhauled one.
3)MVSL-1 fan slacked on 4)Secured
shaft. 4)All cab fans properly. 5)All
terminals not secured removed and
properly. 5)All TMs Brush spring tension
holder spring tension adjusted, brush
below 2.3 kg/cm2. 6)TM- holders provided.
4 Commutator height 6)TM-4 changed.
equal to Teflon ring 7)Provided.
carbon brushes dust may 8)Same double
struck up between bottle VCB
segments and may cause allowed. 9)Same
flashing & V cone MLR type
burning. 7)TM-2&5 capacitors
floating chain cleats not allowed. 10)Same
provided. 8)Double bottle Micro switches
VCB (GEC make) not allowed and Tell-
replaced with single Tell fuses
bottle. 9)RSI DC damping replaced with
panel MLR type new spares.
capacitors are not 11)Same allowed.
replaced with MSR type. 12)Same allowed.
10)RSI panel Micro 13)Axle box
switches & Tell-Tell fuses removed checked
Vacuum VCB pressure regulator VCB changed by 74
Circuit pressure dropped up to shed, lt to
Breaker 4.8 Kg/cm2 against set DWM/DHD vide
(VCB) value of 5.2Kg/cm2, Fail lt. NO
equipment VCB, Make: WAT/TRS/T/58/2
Schneider, 316, Dt. 02-09-15
S.No.28252/L1
Bogie & its After checking lining Bogie-1 WRP 159
Mech. equip. mark & slightely scratch done.
found in all wheel of
Bogie No. 1
Miscellaneou The following Letter has been 0
s modifications are not written to POH
carried out by BSL WS. 1. Shop.
All RSI to TFP cables are Modifications are
to be changed from 240 being planned by
Sq.mm to 300 Sq.mm & ELS/ANGL during
Transposition of cables next Major insp.
from RSI to TFP 2. Low
speed facility in the SPM
3. Modification to provide
1/4 upon 1 ball type
isolating cock in place of
D-1 emergency Brake
valve in tap changer
(unmodified CAB) Electric
Locomotives 4. Provision
of stainless steel pipes
(corrosion resistant) of
size ½â€™â€™ and
¾â€™â€™ for A9 & SA9
valves in cabs only 5.
Modified interferences
between TM assembly
components, in order to
ensure adequate
interference between
assembly components of
traction motor type
Pressure HS15250A
PVEF 6. Re-routing
not working. RGEB RGEB was 446
switch was found defective. Its replaced
diaphragm was found
punctured.
Pressure PVEF not working. RGEB RGEB was 81
switch was found defective. Its replaced
diaphragm was found
punctured.
Relay Q 45 coil found open More than 18 yrs. 572
circuit. old relay required
changing with
new.

Miscellaneou The following Letter written to 17


s modifications are not KGP WS.
carried out by KGP work Modifications are
shop during POH. 1.Low being planned by
speed facility in the SPM ELS/ANGL during
is to be provided. next major insp.
2.Replacement of D-1
Auto Drain valve with
modified D-1 Auto drain
valve (GM type) &
(Modification to provide
1/4 upon 1 ball type
isolating cock in place of
D-1 emergency Brake
valve in tap
changer(unmodified CAB)
Electric Locomotives)
3.Provision of stainless
steel pipes (corrosion
resistant) of size
½â€™â€™ and
¾â€™â€™ for A9 & SA9
valves in cabs only 4.
Modification of side wall
of loco body for removal
of auxiliaries like MVSL
etc. 5. Provision of CCAD
for air dryer.
Traction 1)During IC0 schedule ATTENDED BY 10
motor TM-2 removed for SHED.
inductance more (values
found 4.135, 4.085,
4.132mH & difference
found0.051mH against
standard limit 0.015 mH)
2) Rotor bar found crack
on NDE side. 3) In TM
new rotor provided at
ELS/AQ but after run test
of 50 minutes, abnormal
sound heared from DE
bearing. After
dismentaling the motor a
scratch line noticed on
inner racer and similar
scratch noticed on four
roller & inner side of the
bearing, causing
abnormal sound.

Miscellaneou SA-9 cast iron handle Handle welding 249


s broken. done.
GR/RGR/CGR CGR cam shaft play and Cam shaft unit 214
worn out. changed.
SMGR GR zero checking rod SMGR L-bracket 148
hard operation. adjusted.
Traction Balancing weight broken Traction moter 94
Motor and touch with armature replaced.
coil.
Miscellaneou The following Letter written to 44
s modifications are not POH Shop.
carried out by BSL WS. 1. Modifications are
All RSI to TFP cables are being planned by
to be changed from 240 ELS/ANGL during
Sq.mm to 300 Sq.mm & next Major insp.
Transposition of cables
from RSI to TFP 2. Low
speed facility in the SPM
3. Modification to provide
1/4 upon 1 ball type
isolating cock in place of
D-1 emergency Brake
valve in tap changer
(unmodified CAB) Electric
Locomotives 4. Provision
of stainless steel pipes
(corrosion resistant) of
size ½â€™â€™ and
¾â€™â€™ for A9 & SA9
valves in cabs only 5.
Modified interferences
between TM assembly
components, in order to
ensure adequate
interference between
assembly components of
traction motor type
Battery HS15250A 6. Re-routing
Due to vibration of Complete 279
Charger charger capacitor wire capacitor bank
(CHBA) broken from thimble. changed.
Control CCA melting, C 1o1 coil CCA, C101 coil 202
Circuit burnt. replaced.
ESMON SPM-1 not working. Power supply 261
Power supply card was card replaced.
got defective.
ESMON SPM-1 not working. Power supply 261
Power supply card was card replaced.
got defective.
ESMON SPM-1 not working. Power supply 261
Power supply card was card replaced.
got defective.
Miscellaneou During IC0 schedule of ATTENDED BY 4
s loco 31061, it is found SHED.
that DC link capacitor of
location 15.5/13 having
oil leakage.
Vacuum Rotex make EFDJ same replaced. 160
Circuit (closing) coil burnt.
Breaker
(VCB)
Auxiliary MVMT-1 impeller blade MVMT-1 218
Motor broken. changed.
Pn. Valve Feed valve diaphragm Feed valve 142
burst. replaced.
Transformer Heavy oil found ATTENDED BY 131
accumulated in SHED
transformer area during
schedule inspection. It
was noted that oil
leakage from neck
portion joint of TFP & oil
leakage also observed at
MPH to 100 mm valve
joint.
SIV Chopper card, W phase Complete SIV 349
IGBT and diode burnt. changed with
HIRECT make.
Miscellaneou 1)MVSL-1&2, MVSI-1&2 1)Same was 10
s grease pipe leakage. 2)All attended on shop
TM’s B/H’s spring floor. 2)Adjusted
tension below 2.4kg/cm2. to 2.8 kg/cm2 &
3)TM1,3,4,5,6 old brush provided back.
holders provided. 4)RSI 3)Allowed.
blocks DC damping panel 4)Same MLR type
MLR type capacitors are capacitors
not replaced with MSR allowed. 5)Same
type. 5)RSI blocks, Micro Micro switches
switches & Tell-Tell fuses allowed & Tell-
are not replaced with Tell fuses
new spares 6)Both cabs replaced with
FL control units (PCB) & new spares.
doom lamp units are not 6)Same FL units
replaced with new spares allowed. 7)Loco
as per TC-123. 7)TFP oil under
not replaced as per must monitoring-same
changing item. 8)GR & allowed.
TFP breather not 8)allowed.
modified. 9)SIV panel 9)Same allowed,
door gasket not changed. spare gasket not
10)All roof gaskets available. 10)All
damaged & not proper gaskets changed.
height of rubber. 11)Body 11)Same allowed
PU painting not done 12)Same allowed.
12)At BA panels, isolating 13)Same allowed.
cocks to strainers thread 14)Same allowed.
ESMON pieces provided
Recorder power instead
supply 15)Same allowed.
Power supply 503
misbehave due to this card replaced.
resion Both SPM not
working.
SIV DC link voltage high, After changing 396
Inverter control card 470 Inverter control
& Resistance R 40 card, Loco made
defective. normal.
Vacuum LSDJ not glowing due to Bolts tightened. 397
Circuit non closing of auxiliary
Breaker interlock against cable
(VCB) no. 211 & 220 because of
slackness of auxiliary
switch cam driving plate.
Its mounting allen bolts
were loose. Make : BT

Vacuum LSDJ not glowing due to Bolt tightened 32


Circuit non closing of auxiliary
Breaker interlock against cable
(VCB) no. 211 & 220 because of
slackness of auxiliary
switch cam driving plate.
Its mounting allen bolts
were loose. Make : BT

Vacuum "LSDJ not glowing due to Bolts tightened. 32


Circuit non closing of auxiliary
Breaker interlock against cable
(VCB) no. 211 & 220 because of
slackness of auxiliary
switch cam driving plate.
Its mounting allen bolts
were loose. Make : BT "

EP Contactor loco checked, mv drop same contactor 137


found excess in S-53. replaced.
Traction TM-4 B/Boxes Arc horn TM-4 replaced. 683
Motor flashed and carbonized.
CBC/Draft Cab-2 CBC not moving. CBC turning pin 93
gear/TSC changed and
function checked
found normal.
MPFDCS ICDJ, all pilot lamp not In shed checked 181
glowing. and found MPCS
backplane
shorted and CPU
card no 1 & 2
defective.
Miscellaneou 1)MPH earth shunt not 1)MPH earth 17
s provided. 2)Both shunt provided.
cab’s cab fan’s 2)Cab fans
terminals not secured terminals secured
properly. 3)MVSL-2 properly. 3)Same
impeller slack. 4)MVSL-1 replaced. 4)M-
grease pipe leakage. Seal applied &
5)MVSL-1&2 , MVSI-1&2 outlet dummy
outlet dummies not removed.
removed. 6)All TM’s 5)MVSL-
B/H’s spring tension 1&2,MVSI-1&2
below 2.5kg/cm2 7)For outlet dummies
TM-2&5 chain floating removed.
cleats not provided. 6)Adjusted to 2.8
8)RSI blocks DC damping kg/cm2 &
panel MLR type provided.
capacitors are not 7)Secured.
replaced with MSR type. 8)Same MLR type
9)RSI blocks, Micro capacitors
switches & Tell-Tell fuses allowed. 9)Same
are not replaced with Micro switches
new spares. 10)AAL allowed & Tell-
make VCB (single bottle) Tell fuses
replaced with GEC make replaced with
double VCB. (As per TC- new spares.
123 double bottle VCB 10)Same double
tube replaced with single bottle VCB
bottle VCB. But POH shop allowed. 11)Same
BP/FP angle FP reverse modification
feed valve base gasket FLFPunits
feedallowed.
valve 76
cock/ rubber burst at one end causing gasket changeed.
hose heavy air leakage.

Traction TM-6 badly flashed. After shed arrival 130


Motor TM checked
found TM-6 mica
came out. TM
changed.
SMGR ICDJ & LSGR not glowing. Loco checked and 235
found both cab
NR on '0' position
and SMGR dial on
'0' position. BA
ON and found
LSGR not glowing
even GR on '0'
position. SMGR
cover opened and
found bottom
row SMGR
interlocks position
were disturbed
condition i.e.
interlock no. 89-
90 (against
LSGR) was open
condition,
interlock no. 91-
92 (against Q-46)
was closed
condition. On
further checking
found SMGR one
intermediate
pinion was came
out from it
position due to its
SMGR ICDJ & LSGR not glowing. Loco checked and 235
found both cab
NR on '0' position
and SMGR dial on
'0' position. BA
ON and found
LSGR not glowing
even GR on '0'
position. SMGR
cover opened and
found bottom
row SMGR
interlocks position
were disturbed
condition i.e.
interlock no. 89-
90 (against
LSGR) was open
condition,
interlock no. 91-
92 (against Q-46)
was closed
condition. On
further checking
found SMGR one
intermediate
pinion was came
out from its
HT/LT cable TM-6 armeture side position due bolt
connection to its 22
connection bolt melted and belt replaced.
and cable cut.
SIV "SIV internal fault due to Input fuse 419
melting of its input fuse. replaced.
Details of SIV: Make of
fuse- Ferraz Shawmut, Sl.
No. -
12,5URD72D11A0500,
RATING - 1250V/500A,
D.O.C- 07.07.13. "
SIV SIV some times not U-Phase burden 126
working. SIV data resistance
downloaded found IMV- changed.
OC-1 fault further on line
data checked found U-
Phase showing less
current.
Miscellaneou Slightly spot mark found WRP done 302
s on wheel No.1,2,12 due
to foreign material.
Arno ARNO not working. ARNO ARNO replaced. 531
stater winding earthed.

Pn. Pipeline MR pressure not Loco checked in 209


maintain. shed and found
CP-2 pressure not
build up due to
copper pipe was
broken from LP
cylinder to inter-
cooler.
SIV SIV data download found MCU & ISPS-1 333
M-15,P-15,M-5,P-5,DCOC card changed.
fault.
Transformer Oil leakage from side attended by 233
dome plate (PHGR side) shed.
of GR.
Miscellaneou The following Planed to be 46
s modifications are not carried out the
carried out by BSL work modifications
shop during POH. 1.Low during next major
speed facility in the SPM schedule at
is to be provided. ELS/ANGL.
2.Retro-fitment of AC
MVRF to be provided in
vertical DBR in place of
existing DC MVRF
3.Replacement of D-1
Auto Drain valve with
modified D-1 Auto drain
valve (GM type) &
(Modification to provide
1/4 upon 1 ball type
isolating cock in place of
D-1 emergency Brake
valve in tap
changer(unmodified CAB)
Electric Locomotives)
4.Provision of stainless
steel pipes (corrosion
resistant) of size
½â€™â€™ and
¾â€™â€™ for A9 & SA9
valves in cabs only
5.Modified interferences
Pn. Valve between
Provision TM assembly
of C2N/FT-1 Same is planned 46
feed valve as per by ELS/ANGL
RDSO’s IB. No. during next major
MP.IB.BK.07.32.09 schedule.
Rev.00 dated 27-05-2009
has been asked to carry
out during POH vide
proforma-C. But same
has not been carried out.
Only provision of isolating
coc at delivery port of FP
has been carried out.
Vacuum LSDJ source line not Gap of spring 83
Circuit working due to AUX connector clamp
Breaker switch not operating adjust.
(VCB) properly.
HT/LT cable QOP-1 dropping due to Cable was 37
damage of insulation of repaired.
TM-2 MP power cable in
the cleat and earthed
through cleat's bolt.
Length of the cable was
also short.
Pn. Pipeline Pressure not maintaining Loco checked at 520
by CP-2. CP and reported
CP-2 pressure not
build up due to
copper pipe was
broken from LP
cylinder to
intercooler. Same
copper pipe
changed.
Traction Stator Ip lead cut from Traction Motor 11
Motor thumble joint. replaced.
Miscellaneou Defects noticed during Bookings to be 1
s IC'0'_ 1.TB panel EEC attended.
RTV not applied. 2.Both
cab Driving desk SB
isolating pipe not
removed. 3.VEUL valve
cable support rod welding
broken. 4.cab-1 back
push button pressed with
bolt. 5.Cab-2 BP
extension Pipe proper not
fitted. 6.Before MR-1
master NRV not provided.
7.C2-A31 control pipe
charging tank safety
clamp n/p. 8.MV-4
magnet valve foundation
not provided. 9.Both cab
RS valve isolating coc
type provided. 10.RGCP
pn pipe connection to be
provided in MR-2 existing
in VESA pipe. 11.DJ box
inlet & outlet air pipe
safety clamp not
provided. 12.VESA-3
outlet pipe rubbing with
capacitor panel. 13.In
Auxiliary HT-1 & CP
As per parathion
reportd by MVMT-2 176
Motor SSE/HWH MVMT-2 changed.
having bearing abnormal
sound.
Traction It is a theft case. TM-1 & All cable 532
Motor TM-6 each TM one cable changed.
theft & one cable cut
from one end but could
not cut other end.
EM Contactor CTF-2 contact no. 5 Contact was 9
flashed. replaced
Transformer Oil leakage from a0, a1, Nuts tightened 9
a7, a8, radiator to TFP
cock, radiator dummy nut
& TFP tank bolts.
Bogie & its Primary spring broken Spring cahnged 79
Mech. equip.
TM/MR TM scavenger blower -2 Motor Changed. 79
Scavenge burnt
motor
Traction TM-6 isolate , Loco direct 27
Motor to Home shed as working
on 5 TM, TM-6 Arm. PE
side power coil evulate
damaged and burnt due
to blance weight came
out.
Traction TM-6 isolate , Loco direct 27
Motor to Home shed as working
on 5 TM, TM-6 Arm. PE
side power coil evulate
damaged and burnt due
to blance weight came
out.
MPFDCS Sometime message given Loco checked in 8
in MPCS display "DJ shed by firm staff
tripped via VCB and reported in
defective". MPCS fault data
message logged
"DJ tripped via
VCB defective".
This message is
appeared
sometime during
DJ opening by
BLDJ switch.
Again it is found
that two nos of
separates NO
interlock of BLDJ
in each cab is
utilized in INPUT-
0 and OUTPUT of
MTDJ coil circuit.
During DJ
opening by BLDJ,
since the opening
time of both the
BLDJ NO interlock
are not
synchronized due
to mechanical
ESMON SPM-2 not working due to reason.
Connector 2
defective connector. replaced.
CTF/Reversor Reversor J1 drum contact ATTENDED BY 29
no. 2 & finger contact no. SHED.
5,6 flashed.
Miscellaneou For IC0 inspection. During inspection 38
s following defects
were found. 1) All
batteries fitted
were over aged.
All BA changed.
2) Battery box
inside WOODEN
PLANK found
damaged
condition. All BA
box changed. 3)
Oil leakage from
TFP top plate
near Radiator
drain cock,
radiator bottom
flange joint and
cover dummy
bolt, conservator
gauge glass (A33
side). Same
attended. 4) ALL
Safety relays
fitted in
locomotive have
completed their
codal life. 5) All
relays contact of
Miscellaneou 1)Cab-2 female coupler 1)Attended. 12
s pin No-07(C-coupler) 2)Grease pipes
open condition. 2)MVSI- replaced & out let
1&2 grease pipes dummies
leakages & out let removed.
dummy condition. 3)Grease pipes
3)MVSL-1&2 grease pipe replaced & out let
leakages & out let dummies
dummy condition. removed. 4)Same
4)Except TM-2&5, all allowed. 5)Same
TM”s brush holders Micro switches
spring tension below 2.4 allowed and Tell-
kg/cm2. 5)RSI panel Tell fuses
Micro switches & Tell replaced with
–Tell fuses one not new one. 6)Same
replaced with new lamps. allowed 7)Same
6)RSI-1&2 DC damping allowed. 8)TFP
panel MLR type filtration oil
capacitors not replaced added +15 above
with MSR type. 7)FLPCB 2.5 inch. 9)Same
+DOOM lamps are not was tightened oil
replaced with new. 8)TFP leakage arrested.
oil level +15C min mark. 10)Same allowed.
9)MPH to Radiator flange 11) Rubber
fixing bolts slacked, oil packing provided.
leakage. 10)TFP and GR 12) Same
breather as per SMI No secured properly
283 modification not 13) New “o
Miscellaneou done. 11)All
ATFEX TM’s
burnt. On “ ring`s
attended by shed 206
s checking ATFEX terminal
no. C & F found burnt
badly. It happened due to
loose connection in
backside of connecting
terminal C & F.

Traction Bogie -1 isolate. Valve set GTO 124


converter burst
GTO (SR)
Bogie & its Buffer no. 4 Crack. Buffer changed. 167
Mech. equip.
Pn. Valve DJ tripped & heavy air Loco checked at 8
leakage from MCPA GHD by M/Staff
safety valve(SS2). and found MCPA
safety valve blow
due to setting
was disturb same
attended. In shed
safety valve
dismantle done
and found rusted
particle in side.
Safety valve
changed.

Miscellaneou 1) Add CCBA 16A fuse 1) 16A fuse 38


s provided instead of 35A. replaced with 35A
2) Both cabs BPEMS fuse. 2)Both
switch provided near to cab’s BPEMS
SA9 instead of switch shifted to
driver’s desk. 3) driver’s desk.
J1,CTF 1,2,&3 1000A 3) J1 replaced
provided instead of with 1500A.
1500A. 4) MVSL- Remaining CTF
1&2,MVSI-1&2 grease 1,2,&3 1000A
pipes leakage. 5) TM-2 & allowed 4)Grease
Tm-4 spring tension is pipe replaced &
less. 6) As per MS-364 same was
TM inspection cover attended on shop
threaded blocks required floor. 5) Spring
provision, but in POH tension adjusted.
threaded blocks removed 6) Same
& again studs provided permitted will be
for inspection fixing. 7) attended on AOH
Double bottle VCB was schedule. 7)
not replaced with single Same allowed. 8)
bottle. 8) RSI blocks Same allowed. 9)
damping panel MLR type Same replaced
capacitors are not with PC-8 type
replaced with MSR type. 10) Loco under
9) QSIT relay “DU” monitoring
type provided. 10) –same allowed.
Transformer oil was not 11) TFP lifted
replaced in POH dummy nut
Radiator Oil leakage from radiator Radiator cahnged 147

Miscellaneou 1) SMI-234 not carried 1) allowed. 2) 6


s out(conversion of allowed. 3)
Reversers and CTF’s Grease pipe
to 1500 Amps). 2)MS 405 replaced with
not carried out(`HOM new copper pipe.
modification). 3) MVSI- 4) Same allowed.
1&2, MVSL-1&2 grease 5) Same allowed.
pipes non standard 6) Adjusted to
copper pipes provided& 2.8 kg’s. 7)
grease leakage. 4) TM-1 Same secured
Big inspection cover stud properly. 8) Same
modification not done. 5) allowed. 9) Same
All TM's brush holders allowed. 10)
springs not replaced as Same allowed.
TC-21. 6) All TM’s 11) Tell-tell fuse
Brush holders spring changed with
tension below 2.4 new fuses. 12)
kg’s. 7) For TM-2 &5 Rubber packing
floating cleats with chain provided. 13)
not provided. 8) All Same attended.
TM’s terminal cover 14) New gaskets
gasket not provided. 9) provided. 15)
AAL single bottle VCB Bolts changed.
replaced with Double 16) New
bottle VCB of AAL(As per provided. 17)
TC-123 Double bottle Loco lifted found
VCB is to be replace with normal. 18) Same
single bottle. 10) RSI-1&2 allowed. 19)
DC damping panel MLR Same allowed
Miscellaneou 1) SMI-234 not carried 1) allowed. 2) 10
s out(conversion of allowed. 3)
Reversers and CTF’s attended. 4)
to 1500 Amps). 2) MS Grease pipe
405 not carried replaced new
out(`HOM modification). grease pipe. 5)
3)L-3 Arc chute slack. 4) MVSL-1&2
MVSI-1&2 grease pipes replaced 6)TM-3
old copper type & grease changed 7)Same
leakage. 5)MVSL-1&2 allowed
found grease leakage & 8)Adjusted to 2.8
impeller (fan) slacked kg’s. 9) Same
6)TM-3 PE side grease secured properly.
entered(inside motor at 10)Relay Base
evolute portion. 7)Except changed.
TM-6 all TM”s brush 11)Same allowed.
holders springs not 12)Tell-tell fuse
replaced as TC-21. 8)All changed with
TM’s Brush holders new fuses
spring tension below 2.6 13)allowed
kg’s. 9)For TM-2 &5 14)Same allowed
floating cleats with chain 15)Same allowed.
not provided. 10)Q44 16)Same contact
relay base broken arm replaced
condition. 11)RSI-1&2 DC with good one
damping panel MLR type 17)Same allowed
capacitors not replaced 18)attended. 19)
with MSR type. 12)Both Rubber packing
EM Contactor RSI
J-1 blocks
contactmicro switches
no. 1, 2&8 provided.were
Contacts 20) 9
flashed badly. replaced.
Miscellaneou Air leakage from VESA-1, Magnet valves 9
s VESA-2 & VEUL-1 were replaced.
Switch Auto-regression was not Switch was 9
getting bypassed while replaced
HPAR was put on
‘0’ position. It was
detected that sequence
of this switch was wrong
i.e. on position ‘0’,
its interlock was getting
opened and vice-versa.
CTF/Reversor QOP-2 dropping due to Notching spring 386
short-circuited by J-2 assembly was
notching spring assembly. replaced.
Uncoupling of locking
arrangement is due to
breakage of its pivot pin
from the brazing point.
Details of J2 :-Make -
ELCO
EM Contactor QOP-2 dropping due to Notching spring 386
short-circuited by J-2 assembly was
notching spring assembly. replaced.
Uncoupling of locking
arrangement is due to
breakage of its pivot pin
from the brazing point.
Details of J2 :-Make -
ELCO
Miscellaneou TLTE trouble. After shed arrival 89
s loco was checked
and found cab-2
BL switch
interlock opened
even in unlocked
condition causing
TLTE due to its
cam operating
axle half inch top
portion badly
worn out. Cab-2
BL changed and
function checked
found normal.
Miscellaneou Defects noticed during Bookings noticed 2
s IC'0' 1.W no 5,6,7,8 sand during IC'0'.
pipe missing. 2.VEUL-2
defective air pressure
drop at MR Pr.9.5 kg.
3.RGCP cut in 9/9.5 kg
cut out, 4.SS1 blow as 10
kg/cm2. 5.MCP2 &3 oil
leakage from head.
6.WSM3 &4 not working.
7.MR gauge difference.
8.Arno start with
abnormal sound. 9.Cab1
both side main door
gasket not provided.
10.Cab-1 ALP side MS
safety cover not
provided. 11.Conservator
tank 3 way coc oil
leakage 12.BC MS pipe
rubbing with other pn.
pipe due to less gap
above w no 5. 13.CBC
height more CBC-
1=1115,CBC2=1095
14.SB-2 oil leakage pump
F/bolt & E/shunt & a/cup
bolt no 4. 15.SB 5-6 oil
leakage
Miscellaneou During IC-opump F/bolt.1)
inspection Action taken by 0
s All batteries are over shed : 1) All
aged 2) MVRF batteries changed
commutator flashed & 2) MVRF changed
over heated 3) DGA 5) same was
abnormal 4) Body paint changed Vide
patches came out 5) J-2 letter to
fixed contact No-7 & 8 Dy.CEE/DHD,
mobile contact No-1 & 2 WAT/TRS/T/58/1
flashed 606, Dt. 18-06-15
Transformer Sl No Name of the Letter to Dy. 0
component PPM value in CEEE/POH
oil During IC-o inspection workshop/ DHD,
found that DGA was vide letter No.
abnormal, Details are WAT/TRS/T/58/2
given 1)Methane(CH4)- 017, DT.
35.75620 13/08/15
2)Ethane(C2H6)-
37.05580
3)Ethylene(C2H4)-
310.5000
4)Hydrogen(H2)-3.39060
5)C0-116.97200 6)C02
5621.0900

SMGR Sticking up of SMGR was Screws provided 139


experienced. 2 nos.
fixation screws in
planetary gear were
found deficient and one
screw was in loose
condition.
EP Contactor Air leakage from J-1 NC-4 NC-4 valve was 139
valve. replaced.
Miscellaneou primary helical spring Waiting for 141
s broken on Axle box-7 and attention.
Axle box no.11 grease
metal content is more
i.e.0.32%.
Transformer Loco failed due to QLM Transformer 585
dropped and safety valve checking found
blown. Fail equipment that oil pipe
TFP, S.No. 2800053484, securing clamp
Make: NGEF broken & fallen
and shorted auto
winding batch
No-9 with tank.
Letter to Dy.
CEEE/POH
workshop/ KPA,
vide letter No.
WAT/TRS/T/58/2
022, DT.
05/08/15
Miscellaneou During IC-o inspection The following 0
s 1)ARNO bush 1 No. crack works are
2)Gear case No-1 & 2 attended by
CCF throwing on wheel sheda 1)Bush
side 3)Body to bogie changed 2)Same
earth shunts are deficient attended 3)Earth
4)CP-2 breather assembly shunts provided
tap cap and diaphragm 4)Breather
deficient. 5)PT-2 right assembly &
side spring (plunger) box diaphragm
damaged 6)Line insulator changed
2 Nos flashed 7)RPS No-1 5)Plunger box
fuse open circuit 8)a3, changed 6)2 Nos
a4,a5 & a6 bushes open line insulator
circuit 9)Servo motors are changed 7)Same
non modified 10)C-118 changed 8)All
contactor RC damping bushes were
panel unit cables not tightened
provided 11)TM-1 EF 9)Modified
open circuit servomotors were
provided
10)Same
provided 11)TM-1
changed Letter to
Dy. CEEE/POH
workshop/ DHD,
vide letter No.
WAT/TRS/T/58/1
558, DT.
Pn. Pipeline Loco failed for MR attended by shed 61
pressure not maintaining.
Heavy leakage found
from CP 1+2 metal
braided pipe line,
provided during POH.

Pantograph PT-1 broken in loco nO 735


23594, As per joint report
PT of CLI,maintenance
staff and TRD staff and
found that PT-1 broken
due to entagled with OHE
at T/out location and
broken due to
rempreature rice and
tramway OHE of line No
12 below. Loco checked
in shed on dt. 15.06.15
and found TRD PT-1
damage .Same complete
Panto changed.

Miscellaneou J-1 not close.VCD isol. 763


s Due to cab-2 pedal
switch defective.Loco
checked in shed on
12.06.15 & found J-1
contact not operated
only.Suspected J-1 shaft
broken. Cab-2 foot switch
not making electrically
contact same foot switch
changed.

ESMON SPM-2 not working due to SPM-2 was 54


jamming of its stepper replaced
motor.
ESMON SPM-2 not working due to SPM-2 was 54
jamming of its stepper replaced
motor.
ESMON Difference in reading of SPM master (AAL 33
SPM between the both Telpro-ZC make)
cabs. having 180 dial
guage whereas
indicator 150 dial
gauge resulting
difference in
reading of SPM
between both
cab. SPM full unit
changed.

EM Contactor C145 delay opening. C145 was 70


replaced.
Vacuum "Loco was charging VCB was replaced 323
Circuit without closing of VCB.
Breaker On dismantling the VCB,
(VCB) movement in the moving
contact stem was
detected without applying
any additional force
which caused less
contacts gap. As such,
owing to less contact gap
between fixed and
moving contact,
conduction was observed.
Details of VCB: Make:
AREVA, Type: 22CB
(single interrupter), Sl.
No.: 17627/L1, DOC:
15.03.05, LOD: 14.07.14
during POH at Kharagpur
Workshop. "
Vacuum Loco was charging VCB was replaced 323
Circuit without closing of VCB.
Breaker On dismantling the VCB,
(VCB) movement in the moving
contact stem was
detected without applying
any additional force
which caused less
contacts gap. As such,
owing to less contact gap
between fixed and
moving contact,
conduction was observed.
Details of VCB: Make:
AREVA, Type: 22CB
(single interrupter), Sl.
No.: 17627/L1, DOC:
15.03.05, LOD: 14.07.14
during POH at Kharagpur
Workshop.

Suspension Wheel set-1 PE side Wheel set-1 is 10


Bearing (SB) suspension tube crack. changed at Shed
Axle no- HH 32-66, RWF-
2006, Suspension tube sl.
no- 6.10.P 70B
Miscellaneou a) SPM CF card deficient All the above 10
s in loco & no remark in log deficiencies are
book is found. b) WAG-5 reported to KGP
slack adjusters are used WS. a) SPM CF
in place of WAG-7 in card provided by
wheel no- 9 & 11. c) shed. b) WAG-5
Some modifications as slack adjusters
desired were not carried are replaced by
out. details are:- i) Low WAG-7 slack
speed facility in SPM is adjusters in
not provided ii) Retro- wheel no 9 & 11.
fitment of AC MVRF is not c) All
done. iii) Replacement of modifications will
D-1 Auto Drain valve with be planned
modified D-1 Auto drain accordingly at
valve (GM type) & ELS/ANGL.
(Modification to provide
1/4 upon 1 ball type
isolating cock in place of
D-1 emergency Brake
valve in tap
changer(unmodified CAB)
Electric Locomotives) iv)
Provision of stainless
steel pipes (corrosion
resistant) of size
½â€™â€™ and
¾â€™â€™ for A9 & SA9
valves in cabs only v)
Miscellaneou 1) Add CCBA 16A fuse 1) 16A fuse 7
s provided instead of 35A. replaced with 35A
2) Both cabs BPEMS fuse. 2)Both
switch provided near to cab’s BPEMS
SA9 instead of switch shifted to
driver’s desk. 3) driver’s desk.
J1,CTF 1,2,&3 1000A 3) J1 replaced
provided instead of with 1500A.
1500A. 4) MVSL- Remaining CTF
1&2,MVSI-1&2 grease 1,2,&3 1000A
pipes leakage. 5) TM-2 & allowed 4)Grease
Tm-4 spring tension is pipe replaced &
less. 6) As per MS-364 same was
TM inspection cover attended on shop
threaded blocks required floor. 5) Spring
provision, but in POH tension adjusted.
threaded blocks removed 6) Same
& again studs provided permitted will be
for inspection fixing. 7) attended on AOH
Double bottle VCB was schedule. 7)
not replaced with single Same allowed. 8)
bottle. 8) RSI blocks Same allowed. 9)
damping panel MLR type Same replaced
capacitors are not with PC-8 type
replaced with MSR type. 10) Loco under
9) QSIT relay “DU” monitoring
type provided. 10) –same allowed.
Transformer oil was not 11) TFP lifted
ESMON replaced in POH
Speedometer -1 not dummy
SPM wasnut 320
working due to jamming replaced
of its stepper motor.
ESMON Speedometer -1 not SPM was 320
working due to jamming replaced
of its stepper motor.
Transformer Oil leakage from TFP joint Pipe changed 167
Transformer QLM drop and TFP oil Loco checked in 206
spread out. shed and found
TFP oil spread
out due to DGA
of TFP was
abnormal as
C2H2
84.1825ppm &
C2H4
83.3914ppm. IR
value and ratio
checked and
found
normal.Equipmen
t History- Make
BHEL, S.no -
625519 , Mfd-
1995
Vacuum VCB chattering. On VCB changed by 6
Circuit checking, the VCB control shed.
Breaker chamber found burnt.
(VCB) Make- BT, Sl- VN11C956

Axle Box During IC-O inspection, Axle box 7,8 & 12 0


Axle box 7,8 & 12 high changed by shed,
metalic Letter to Dy.
CEEE/POH
workshop/ KGP,
vide letter No.
WAT/TRS/T/58/1
490, DT.
02/06/15
Auxiliary During IC-o inspection MVMT-2 changed 0
Motor found that MVMT-2 burnt by shed, Letter to
Dy. CEEE/POH
workshop/ KGP,
vide letter No.
WAT/TRS/T/58/1
490, DT.
02/06/15
Miscellaneou 1) MVSL-1 DE side grease 1) Attended on 403
s leakage. 2) CP-2 coupling shop floor. 2)
sound. 3) TM-6 arc horns Coupling spring
flashed. 4) Different broken, new
grade brushes provided spring provided.
in TM-5(EG 3) Thoroughly
9049,EG8220). 5) TM- cleaned with
1,3&6 270 sq mm cables ORION-77 and all
available,300 sq mm arc horns
cleats provided. 6) Cab-1 replaced. 4)
VCD foot switch spindle Same were
deficient. 7) Side bearer removed ,patina
no-01 fixing bolts slack. cleaned and EG
8) All side bearers are 8220 batch
old. 9)Sand rubber pad brushes provided.
not provided. 10) Sand 5) Replaced with
box no-2&5 hose pipes 270 sq mm
deficient. 11) TM-1&6 terminal cleats.
axle cap bolts slack. 12) 6) Foot switch
TM-4&5 axle bolts sealing replaced with
not done. good one. 7)
Same were
tightened. 8)
Same allowed on
condition basis.
9) 4 nos side
stopper rubber
pads provided.
Vacuum "ICDJ due to 10) New
Pressure sand
adjusted 185
Circuit malfunctioning of
Breaker pressure regulator. Make
(VCB) of Pressure Regulator -
SHAVONORGEN"

Vacuum ICDJ due to Pressure adjusted 195


Circuit malfunctioning of
Breaker pressure regulator. Make
(VCB) of Pressure Regulator -
SHAVONORGEN
Transformer QLM dropped. During TFP changed at 4
testing at ELS/AQ after ELS/AQ , also
POH, DJ tripped with Failure intimated
QLM dropping (OHE also to POH/BSL via
tripped).QLM checked , letter no.
found normal. But ELS/AQ/T-8
transformer DGA found dated 22.05.2015
negative.

SMGR CCPT melting. After shed arrival 16


loco was checked
and found SMGR
control block
diode fixation
plate two nos bolt
deficient & one
bolt fallen down
and fixation plate
hanging
condition. Further
diode back
portion touched
with control block
body and causing
CCPT melting.
Control block
changed and
function checked
found normal.

Bogie & its Bogie-2 frame crack Casted bogie is 343


Mech. equip. between Wheel no. 7 & being provided in
9. AS per TLC/BRC bogie- place of
2 frame fresh crack fabricated bogie.
between W/No 7 & 9
about 2". Same
temparary welding done
and loco given ready upto
home shed with speed of
50 Kmph
HT/LT cable QOP-1 dropping due to L-2 along with 7
flashing and earthing of fixation bolt
L-2 bottom fixation bolt. replaced.
HT/LT cable QOP-1 dropping due to L-2 along with 7
flashing and earthing of fixation bolt
L-2 bottom fixation bolt. replaced.
Miscellaneou Secondary housing crack Same attended. 108
s between wheel no. 8 &
10.
Axle Box Axle box no.3 grease rust Same attended 1031
formed + Wheel set
no.2&3 suspension tube
metal content.
SMGR "Tripping during Intemediate gear -123
regression due to sticking and guide pin
up of SMGR. replaced.
Intermediate gear
(BT’s part no. A6103)
was found defective i.e.
there was scratch marks
on it & and guide pin
having grove mark.
Details of SMGR :- Sr.No.
40C 051958, Make- BT,
LOD - 09/2014, "

SMGR Tripping during Intemediate gear 242


regression due to sticking and guide pin
up of SMGR. replaced.
Intermediate gear
(BT’s part no. A6103)
was found defective i.e.
there was scratch marks
on it & and guide pin
having grove mark.
Details of SMGR :- Sr.No.
40C 051958, Make- BT,
LOD - 09/2014,
Bogie & its SB-5 showing high After shed arrival 126
Mech. equip. temperature. loco was checked
and found SB-5
metal fuse
300gm due to
journal scored.
Wheel set-5
changed.

Traction TM blower -2 burnt TM blower 158


motor blower changed

Traction During IC inspection, one Letter to Dy. 144


Motor number commutator CEEE/POH
fixation bolt was found workshop/ KGP,
came out in Traction vide letter No.
motor-5. Fail equipment: WAT/TRS/T/58/1
Traction motor- 5, Sl No. 364, DT.
2702 19/05/15
RSI block QRSI-2 dropped. Loco checked 114
found normal.
Both RSI block
fuse and diode
checked found
normal. QRSI-1 &
2 setting checked
at test bench and
found 4.51 amps
and 4.56 amps
respectively.
QRSI dropping
checked in loco
and found QRSI-
1 dropped at
1400 amps and
QRSI-2 dropped
at 1100 amps.
QRSI- 1 & 2
interchanged and
new QRSI fitted
found the
problem remains
same. So
suspected RSILM
(CT of RSI block)
defective. Same
changed and
Miscellaneou PHS on axle box no.3 checked
Same found
replaced. 264
s broken.
TM/MR MRB1 Scavenger Motor Motor changed 172
Scavenge defective
motor
TM/MR MRB1 Scavenger Motor Motor changed 172
Scavenge defective
motor
Traction QOP drop due to TM6 TM changed 164
Motor cone burnt
Miscellaneou PHS on axle box no.6 Same replaced. 1029
s broken.
Bogie & its Bogie-2 crack between Casted bogie is 324
Mech. equip. W/No. 9 & 11 loco placed being provided in
at BRC shed. As per place of
TLC/BRC Bogie-2 frame fabricated bogie.
crack between W/No. 9 &
11. Same loco checked at
BRC / TI shed and found
Bogie-2 frame fresh crack
between W/No. 9 & 11
about 1.5 inch.Same
welding done at ELS/
BRC with out lifting.
Bogie Negative ponits -
74.

Axle Box PHS on Axle bon no.12 Same replaced. 41


broken.
Miscellaneou During IC0 inspection Item no 3
s following defects were 1,2,3,10,11 & 12
found. 1) SL-2 sides attended.
cover broken (Bogie-2
side). 2) Oil leakage from
radiator top dummy bolt
in MPH side and side
cover bolt. 3) CGR
vertical gear play. 4) All
capacitor old fitted. 5) All
TMs bellows fitted are
serviceable. 6) TM-2 CE
bearing is over aged
(2007). 7) TM-5 pinion is
over aged (2006). 8) All
auxiliary blower motor
duct and impeller are old
fitted. 9) ALL Safety
relays fitted in locomotive
have completed their
codal life. 10) A-16 (SPM)
is defective. 11) Q-51
base is defective. 12) All
relays contact of ABB
make are old and worn
out.

Bogie & its Axle box-10 having metal After dismantling 197
Mech. equip. content and grease it was found that
burnt. Wheel set-5 racer
and thrower
badly melted due
to rubbing with
each other. So
wheel set-5
changed.
MPFDCS TM-4 isolated due to auto Loco checked in 29
regression from QD2. shed by firm staff
and found
current difference
between TM-4 &
TM-5 is showing
200 Amp but
checked by
Clamp meter and
found current
difference is 30
Amp. Due to not
proper calibrated
in MPCS current
difference
showing above.
Re-calibration
done by firm staff
after that TM
current difference
is normal.
Equipment
History- Make-
SIL, S.No-
0041004C14

Traction Traction Converter no 1 Valve set 62


converter valve set GTO burst cahnged
GTO (SR)
Gear case GC-3 smoked. As per 325
TLC/BSP loco failed in
BSP div. due to G/C no. 3
smoked. Wheel set no-3
lifted and loco will go to
ELS/BIA as LELA with 25
Kmph. speed restriction
MPFDCS LSGR lamp not glowing Loco checked at 66
after DJ opening. BMG and found
DJ closing and
opening normal
but some time
LSGR not
glowing. Further
checked and
found output card
no-2 was
defective. Same
card changed by
spare
card.Equipment
history-Make-
Stesalit S.No-
B50311504
CHT QLM dropped. Insulation CHT replaced 91
of cable head termination
system (bottom portion)
was found flashed. Make
of CHT- Safe System

CHT QLM dropped. Insulation CHT replaced 91


of cable head termination
system (bottom portion)
was found flashed. Make
of CHT- Safe System

SL SL1 inner coil winding 218


flashed/earthed
Miscellaneou ICDJ, No booking in loco 294
s log book.Loco checked in
shed on dt. 27.04.15 and
found nothing. MV drop
also checked & found ok.
No ICDJ booking in loco
log book. Make BT, Sr.
No V02C087
Compressor During IC-0 inspection Letter to Dy. 0
(1) Compressor fly wheel CEEE/POH
flange heavy crack, workshop/ KGP
Compressor(as CP-2), and Anest Iwata
Sl.No.MM0534,Mfg :12/1 Motherson Ltd,
2 (2) Cpmpressor fly Nodia, vide letter
wheel flange heavy crack No.
Compressor (as CP-3), WAT/TRS/T/32C/
Sl.No. ML0692, 1208, DT.
Mfg :11/12 02/05/15

Traction During IC-0 inspection it Letter to Dy. 0


Motor is found that TM-3 CE CEEE/POH
side lubricating pad workshop/ KGP,
assembly spring vide letter No.
expanded condition. Fail WAT/TRS/T/58/1
equipment : Lubricating 363, DT.
pad assembly, Make: 19/05/15
Mullick felt industries, Yr
of Mfg: 11/14
Auxiliary MVSL-2 ab/sound.Loco POH/LKO advised 317
Motor checked in ASN/ELS & vide this office
found MVSL-2 giving letter no
heavy ab/sound. Same JHS/RS/T-82/AKS
MVL-2 changed. After
dismantalling of MVSL-2
and found driving &
bearing caze broken.
Make Ranjan, Sr. No. D-
07-09-433, Mfg 9/2007,
Bearing make.
Traction TM-3 isolate due to QLM, 242
Motor QOP-1 drop.Loco checked
in shed on dt 03.05.15
and found TM-3 rocker
lead flashed. power ckt.
IR value checked found
100 megha Ohms. Same
rocker rrotated and lead
attended. Last checked
on dt. 02.04.15 duriing IC
sch.
Miscellaneou The outer racer of axle Wheel set was 281
s box no.07 on wheel set- replaced
04 (HR 11-39) was found
slack and rotated on
journal
Traction Armature PE side Letter to Dy. 760
Motor balancing pices welding CEEE/POH
worked out and fallen on workshop/ KGP,
in between armature core vide letter No.
and MP coil. Armature PE WAT/TRS/T/58/1
side PG band scored and 214, DT.
armature core PE side 04/05/15
scored

Traction Traction Motor - 3& 6 Letter to Dy. 55


Motor were metal fused. Fail CEEE/POH
equipment: Traction workshop/ KGP,
Motor. TM-3 S.No.4151 & vide letter No.
TM-6 S.No. 4755 WAT/TRS/T/58/1
212, DT.
04/05/15
Miscellaneou CCPT melting Loco 264
s checked in shed on dt
09.05.15 & found cable
No. NN700 of BLRDJ
existing in CAB-2 & CAB-
2 side complete rubber
was exist on pipe. In
CAB-1 side wipper pipe
one clamp open
suspected CAB-1 side
PP700 wire rubbeing
EP Contactor TM badely flashed Reverser contacts 124
changed

Transformer/ Transformer pressure not TFP pump 9


Converter oil OK defective same
pump replaced
Oil cooler TFP1 oil radiator leakge Radiator changed 74
blower unit
CHT CHT flashed. CHT changed. 51
Traction MP coil No.4 flashed. Letter to Dy. 849
Motor Failure equipment: CEEE/POH
Traction Motor, S.No. RL- workshop/ KGP,
96, Make : CLW vide letter No.
WAT/TRS/T/58/1
210, DT.
04/05/15
Traction Armature evolutes TM changed by 117
Motor flashed and stator PE side shed. Letter to
all coils insulation over Dy. CEEE/POH
heated. Failure workshop/ KGP,
equipment: Traction vide letter No.
Motor, Make: CLW, TM Sl WAT/TRS/T/58/1
No. 803, Armature 219, DT.
No.4123 04/05/15
MPFDCS T.No.(5262T) while O/P card changed 283
waiting for line clear at by M/s Medha
HRB station main line & representative
loop occupied by another during under
train, VCB tripped in rear warranty.
loco with message on
Loco was checked at NKJ
trip shed. In loco no.
24014 MPCS control unit
mother board found
defective. Make Medha,
Comm. 07.07.14. On dt.
29.04.15 firm has
replaced the main control
unit.

CBC/Draft CBC coupling not open.As CBC coupling 77


gear/TSC per TLC/AGC CAB-1 CBC operation is being
coupling not open. Same checked in every
attended by C & W staff sch.
and found ok.

Pn. Valve Air leakage from F-1 Loco checked at 195


selector valve. CNB and found F-
1 selector valve
base gasket was
damaged. Same
gasket changed.
Compressor compressor not rotating, Compressor 68
Fail equipment: changed by shed,
Compressor, S.No. 354, Letter to Dy.
Make: Panesar CEEE/POH
workshop/ KGP
and M/s Panesar
engg.company
/Kaithal-136027 ,
vide letter No.
WAT/TRS/T/58/1
047, DT.
16/04/15
GR/RGR/CGR GR oil increasing . Checked found 128
lantern gear
housing packing
ring damage.
Same attended.
Vacuum During IC0 schedule in Failure intimated 0
Circuit VCB Aluminium base to POH/BSL via
Breaker plate found crack near letter no.
(VCB) bottom insulator. Torque ELS/AQ/T-8
required to open bolts dated 24.04.2015
near cracked base plate
found 40N-m instead of
standerd 30 N-m
torque.It shows extra
torque applied during
fitment at POH, hence
base platelevel found
uneven & it may be
cracked due to bad
workmanship.
Miscellaneou Reversor J2 drum contact Failure intimated 793
s no. 1, 2 & Finger contact to POH/BSL via
no. 1, 2, 7 & 8 flashed. letter no.
This is a premature ELS/AQ/T-8
failure case. dated 25.04.2015
& flashed
contacts changed
at ELS/AQ.
MPFDCS C105 not closed. In shed checked 189
and found C105
was not closed
due to supply not
available on its
coil. On checking
found MPCS O/P
card no-1 and
channel no-07
was defective.
O/P card no-1
changed by firm
(Stesalit).

Miscellaneou Reversor J2 drum contact Failure intimated 1259


s no. 1, 2 & Finger contact to POH/BSL via
no. 1, 2, 7 & 8 flashed. letter no.
This is a premature ELS/AQ/T-8
failure case. dated
25.04.2015. &
flashed contacts
changed at
ELS/AQ

SIV In SIV input Isolator Same Isolator 70


found burnt due to this removed and
QSIT permanent drop. replaced with
copper busbar.
Relay TLTE due to less crushing Q51 relay was 16
of N/C interlock of Q51 replaced.
relay because of
displacement of tension
spring. Make of relay-
Woama
Miscellaneou During IC'0'sch. following This is fou your 2
s defects were noticed_ 1 information.
Main bushing bottom side
oil leaking. 2 Oil leaking
from a1 & a7. 3 A34
bushing & CGR below
crack & oil leaking from
X’mer neck porion&
x’mer work to attend
outside by removing
X’mer. 4 Hand brake
def. 5 S11 sluggish in
operation & EP valve air
leaking. 6 CFDC1 & 2
safety clamp N/P. 7
MCPA motor cover could
not open & touching RS
pipe. 8 Double pole main
bushing thread worn out.
9 RPS cable connection
E25 bolt short. 10 HT2
power cable A25
seperator broken. 11 Add
BP coc & VEAD coc vent
type N/P. 12 H38,
H25,A16,F24,F25 & H26
power cable separator
broken. 13 Strap
Transformer touching
Heavy oiltoleakage
‘j’bkt.
from Failure intimated 260
neck portion of to POH/BSL via
transformer found. letter no.
Leakage attended & loco ELS/AQ/T-8
allowed on line under dated 07.04.2015
observation.

Bogie & its Bolster: Crack at D5 zone Same attended 50


Mech. equip. about 100 mm, same
welding done
Auxiliary Replaced, since vibrating Same attended 10
Motor badly (improper
alignment during fixing)
Transformer TFP oil leakage.Loco Same gauge 99
checked in shed on glass chenged
7.4.15 and found oil with new glass.
leaking from gauge glass POH/ BSL is
due to glass frame was advised
curved from middle near
third bolt from the
bottom.
Switch HVSI-2 switch less spring Switch was 69
tension replaced
SMGR PHGR not working due to Cup seals 69
jamming of piston. replaced.
Relay QLM drop QLM relay 96
cahnged
Traction Traction Converter isoalte Valve set GTO 71
converter burst
(SR)
Traction Traction Converter isoalte Valve set GTO 71
converter burst
(SR)
MPFDCS Both cab LSGR not Loco checked at 36
working. ASN shed and
found both cab
LSGR lamp not
glowing due to
MPCS output card
No-2 defective.
Same card
changed by spare
card.
Machine Abnormal sound . MRB changed. 161
room blower
Auxiliary Replaced, since vibrating Same attended 15
Motor badly (improper
alignment during fixing)

Bogie & its W/No-10 P/H/Spring Loco liftted at 300


Mech. equip. broken. BMG shed and
W/No-10
P/H/Spring
changed.
Miscellaneou During IC0 inspection All defects were 11
s following defects were attended.
found. 1) RSI-I tel tel
fuse 3 nos. melted
condition. 2)L3 sluggish
operation. 3) SMGR valve
no.2 air leakage. 4) Q118
relay base defective. 5)
All safety relay having
completed their codal life
of 15 years. 6) Arno
changed due to
overaged.
Transformer Oil leakage a3 & a4. V- V-seal replaced. 26
seal gasket of both
bushing were damaged
and cut condition.
Miscellaneou During IC0 inspection All defects were 5
s following defects were attended.
found. 1) Cab 2 ACP T/S
and P/B switch defective.
2) Cab 1 MP stuck up. 3)
All safety relay having
completed their codal life
of 15 years. 4) Q44 &
Q118 relay having
overheating mark. 5) Q49
relay base defective.

Auxiliary Auxiliary Machines Same provided 54


Motor 1.MVMT-2 replaced, since
vibrating badly (improper
alignment during fixing)
2. CP-1&2 breather safety
clamps not provided. 3.
MCPA bottom oil tray not
provided. 4. MVRF
terminal cover deficient.
Bogie & its Bogie: 1. TM-1 mounting Attended 54
Mech. equip. pad is rubbing with TM.
2. Cab-2 D/S sand box
found rusted and housing
having hole sand leaking.
3. Stay plates bolts of
Wheel no. 2, 3, 4, 6, 7, 8,
9, 10, 11 & 12 found
slack.
Pantograph Pneumatic: 1.PT-1&2 Same attended. 0
both side, plunger boxes
replaced since less spring
tension available. 2. PT-1
throttle valve overhauled
and provided back since
air leaking heavily.

Traction TM-5 ISOLATE DUE TO AFTER SHED 29


Motor AUTO REGRESSION ARRIVAL SAME
WITH LSP glowing. CHECKED AND
FOUND TM-5
ONE CABLE
JOINT WITH
ARMATURE
WELDED & OPEN
CONDITION.
SAME
ATTENDED.

Miscellaneou TFP oil leakage from its Oil leakage 301


s conservator 3-way cock attended
HT/LT cable Tripping through QOP-1 Reverser - 2 was 2
and smoke emission from replaced and the
J-2. Bus bar connected to busbar was
J-2 contact no. 8 was attended.
flashed due to looseness
of its fixation bolt. This
resulted into flashing of
J-2 contact no. 1, 2, 3, 7,
8 & 9.
Transformer/ SR pump burnt pump changed. 66
Converter oil
pump
Miscellaneou After application of DBR Loco checked in 24
s to observe 30 kmph ER, shed on dt
TLTE with LSB not 24.03.15 & found
extinguished & message during DBR when
on MPCS(Medha) "CTF MP put on
manually on braking side traction side CTF-
only", LP set it manually 2 stuck up. CTF-2
to traction side, tied with operation became
GI wire, Put HBA off/on, jam & stuck up in
tried by rear cab but not between position.
succeed due to MPCS After dismantling
defective. R/Engine of CTF-2 and
given. TI/BSL-04.03.15, found its contact
Maj/sec- BD-NGP, alignment was
Min/sec-BD-TMT not proper (one
(Badnera-Timtala), Time- side less & one
14.25-16.03 hrs. Loco at side more) CTF-2
TMT, Planned to ELS/AQ. last Overhauled
by ELW/BSL on
02.02.15 during
POH sch.

Transformer 1.Conservator tank Conservator tank 2


leakage from RGR replaced by BRC
support insulator fixing shed.
clamp.(A34 side)
2.X’mer drain plug
leakage drop by drop.
3.GR oil gauge glass
leakage from GR body.
Transformer QLM relay dropped, oil Failure intimated 156
splashed. Found winding to POH BSL via
inter turn short. letter no.
Observations : 1. Oil ELS/AQ/T-8
badly blackish and heavy dated 21.03.2015
burning smell. 2. IR of
auto winding > 100
Mohm. 3. Ratio test done
found dead short after
17th tap with A33
winding. 4. Core lifted
and found flashing and
burning at the tap
changer leads (just below
neck portion) on tap No.
16 and 17 and copper
turn came out, insulation
of other leads also found
damaged.
Compressor Compressor No-1 Letter to 264
abnormal sound from CWM/WR/DHD
crank shaft. Fail and M/s
equipment : Compressor, ELGI/Coimbatore,
S.No. EMRS960553, vide letter No.
Make: ELGI WAT/TRS/T/58/8
59, DT. 18/03/15

Arno Abnormal sound. ARNO was 355


replaced.
Axle Box Axle box no-3 hot. Loco checked at 68
BIA shed and
found axle box
no- 3 racer was
cracked causing
axle box no-3
temperature
high. Complete
axle changed.
Pn. Pipeline Bogie-1 permanent 258
isolate due to BC No. 4
pn. pipe burst at under
frame.As per TLC/FZR
Bogie-1 isolated due to
BC No. 4 pn. pipe burst
at under frame due to
hitting something. Same
pipe brazzing done and
loco given ready.

CBC/Draft CBC not moving freely. CBC with draft 110


gear/TSC gear and
complete
assembly
changed and
function checked
found normal.
Details of CBC:-
Make: FAS, S.no:
29, Comm. Date:
21/11/14 (fitted
during POH KGP).
MFG: 02/14.

GR/RGR/CGR GR oil showing more than 299


80 drgee.Loco checked at
BRC/ELS and found GR
oil level was more in
guage (Showing +80
drgee). Same oil drained
out and kept at +20
drgee and testing done
ok.
Miscellaneou Tripping in OP-II. On checking it 140
s was found that
sometimes C107
normally open
auxiliary interlock
against the cable
no. 709 & 708
springs was stuck
up, caused its
contact crushing
less and remains
open on vibration
and further loco
trips through Q-
118. C107
auxiliary interlock
changed.

Miscellaneou Reversor J-1 drum Letter no. 31


s contact no. 2, 4, 6 & ELS/AQ/T-8
finger contact no. 2, 3, 4, dated 17.03.2015
5, 6, 8, 10, 12 flashed written to POH/
badly. Also reversor drum BSL.
get carbonized & burnt.
This reversor was
provided new during
POH. Contact bedding
found improper.
Bogie & its Bogie: 1. Axle box-1 Same attended 56
Mech. equip. (NBC) grease having
brass metal content and
suspecting cage rubbing,
bearing clearance also
found 0.20 mm. Which is
more than limit. The Max
limit is 0.15 mm. 2.
Wheel set No: 4
suspension tube and
enclosure having more
gap and getting over
heated. 3. AB No: 10
longitudinal clearance is
3.6 mm.(std limit: 0.4
mm to 2.0 mm). 4. Buffer
height is 1) 1045 mm, 2)
1059 mm, 3) 1052 mm,
4) 1062 mm. (std limit:
1030 to 1105 mm).

Axle Box 1) AB No.3& 9 metal 1) AB No.3 found 152


content is more i.e. AB no damage and
No.3 is 0.29% & AB No.9 AB No.9 inner
is 0.63% as against the racer (outer side)
standards of 0.25% was slack and
maximum. also a dent mark
was found on
racer. Further,
Wheel set no.2
axle journal was
found step size
with dia
148.08mm. The
racer provided is
found old one.
New racer
provided
Miscellaneou TM-2 isolate due to J-1 POH/BSL advised 8
s contact of TM-2 showing vide this office
gap.Loco attended by letter no
BSL/TI shed J-1 gap JHS/RS/T-82/AKS
adjusted due to bolt was
loose and gap was
showing between contact
tips. Make BHEL.

Gear case Gear case upper half one Gear case 101
bolt broken changed
Traction Boogie isolate GTO short 88
converter
(SR)
Pn. Valve Heavy air leakage from Loco checked at 269
MR-3 safety valve. HTE and found
air leakage from
SS-1 valve. SS-1
valve changed.
Miscellaneou During IC0 following All defects were 1
s defects were found. 1) attended during
Maximum auxiliary IC0.
motor’s foundation
bolts are non-standard.
2) MVMT-2 having
bearing sound. 3) Both
MVMT check nut (slotted
nut) are old fitted. 4)
MVRH and MVSI-2 duct is
old fitted. 5) CTF-2
backside gasket damage.
6) HVMT-1 changed due
to defective (sluggish
operation). 7) Air dryer
switch changed due to
old switch fitted. 8) RC
network for VCB, one
connection cable
deficient. 9) Cab 1 MP
changed due to MPS not
working 10) Oil-leakage
from GR head shaft due
to mounting stud thread
badly damaged condition.
11) BA 1+2+3 panel
control cable (max. cable)
insulation crack and
Switch damage
VCD condition. 12)
not acknowledge by VCD foot switch ( 233
PVCD .Loco checked at PVCD) is being
JHS yd on dt. 25.02.15 over hauled in
and found CAB-2 foot every major sch.
switch defective same & changed on
foot switch changed. condition basis.
After dismantling of
switch & found its contact
broken. POH done on dt
07.06.14
Traction While working on line TM changed. Bad 297
Motor QOP1 dropped, TM3 workmanship by
isolated. Loco checked in POH-BSL.
shed found Traction
motor CE side locking
plate broken. The reason
behind CE side locking
plate broken may be due
to quality of locking bolt.
BRC shed is using locking
plate bolt of grade 8.8P
as per SMI-220 issued by
RDSO but during POH
grade of locking plate
was found 10.9P. The
above failure appears due
to bad quality of locking
plate bolt provided during
POHed. So, you are
requested to take
necessary action to avoid
recurrence of such work
carried out during POH.

Transformer/ TFP oil pressure less. Pump chanegd 20


Converter oil
pump
SMGR DJ trip & ICDJ . Loco checked at 424
KIUL by MGS M/
staff and found
SMGR BBC
interlock no. (1-
2) leaf was
broken inside at
bend point. The
interlock wire no.
(720- 721) is
connected on
Q44 branch. It is
a cause of Q44
not pickup.
Bogie & its Bogie-2 Cross-beam Bogie changed 91
Mech. equip. crack. and loco given fit.

ESMON Both side SPM not 235


working.As per TLC/MGS
both SPM not working.
Loco checked in shed on
dt 21.02.15 and found
both SPM not working
due to SPM PG connector
was broken from PG side
due to suspected hitting
something. Same
Connector changed. Make
AAL (Telpro ZC)

Pn. Valve Bogie-1 isotale due to 235


pipe uncoupled.As per
TLC/MGS Bogie-1
isolated. due to pn. pipe
uncoupled & Both SPM
not working. Loco
checked in shed on dt.
21.02.15 & found Bogie-1
isolated due to BC No. 4
pn. pipe was uncoupled
from T-joint coupling &
its pipe was uncoupled
from T-joint coupling &
its pipe bend. Same Pn.
Pipe attended & T- Joint
changed.
Miscellaneou Defects noticed during This is for your 1
s IC'0' on 17.02.15 1.Buffer information
and CBC height more H1-
1097,H2-1095,H3-1110,
H4-1092,CBC1-
1105,CBC2-1120.
2.Wheel dia to be check
on level track. 3.All strap
assembly silling missing.
4.Both cab both driving
sheet welded not moving
5.Cab-1 FP gauge
showing difference 6.CFL-
1 & 3 bottom side pipe
grommet 7.VCD unit
display glass crack.
8.Both BL desk slack
9.Both MP braking side to
be lock 10.Both CTF to be
isolate 11.X’mer link
a1,a7,a1-a8 patti cannot
be properly tightness
12.C-107 interlock wrong
connection 13.Radiator
drain plunge oil notice.
14.CGR no 1,2,3 and RGR
cable connection flat
washer not provided.
Auxiliary 01 NO15.TK
LEADpanel wire
OF MVMT-2 LETTER 180
Motor WAS FLASHED NEAR WRITTEN TO
BRAZED JOINT AND MTR/DHD
UNCOUPLED. THE OTHER
02 LEADS ARE OPEN
CIRCUIT. BAD
MAINTENANCE(NAWABI
ELECT/DHD), MATERIAL
UNDER WARRANTY.
MVMT MAKE - SIEMENS,
REWOUND BY NAWABI
ELECT/DHD ON DT-
04/08/14, PROVIDED
DURING MTR/DHD
SIV SIV external faults. In shed checked 84
found in SIV data
found "single
phase current"
showing All aux
ckt checked
found normal. All
EMC contactor
checked working
normal. SIV
checked by firm
found "TDCIF"
card was
misbehaving
some time.
TDCIF card
changed by firm.

VCD VCD isolate (AS per VCD main unit 281


message book).Loco changed.
checked in shed on dt.
15.02.15 and found VCD
not acknowledged by SA-
9 in both cab due to VCD
main unit was defective.
Same unit changed. Make
Medha
Auxiliary CP-2 Abnormal sound. CP-2 changed. 26
Motor
Traction Traction Motor Hitachi TM Same attended 35
Motor suspension tube bolt Not
replaced
Bogie & its Bogie: All Brake hanger Same provided 35
Mech. equip. connecting straps safety
slings deficient.
Miscellaneou Under Frame: Side buffer Same attended 35
s assembly along with
fixing bolts, not replaced.

Axle Box Axle No. HR - 08 - Same provided 35


72(W/Set No.3). Old FAG
bearing provided
Miscellaneou TM-4 isolate due to All sch. staff has 195
s regression.Loco checked been counseled
in shed on dt. 09.02.15 & in counselling
found J-2 tips no. H-25 & register
F-25 was flashed due to
crushing was poor. TM-4
& 5 was ok. Same J-2
changed. Make BHEL.

Miscellaneou During IC'0' following to be attend. 1


s defects were noticed_ 1
A/dryer copper pipe
nipple connection
uncoupled. so heavy air
leakage 2 Bogie no 1 BL
cone handle touching
with MR pipe when close
position. 3 BL drop 1.0 kg
4 SS2 cap loose & blow
9.0 kg. 5 VEUL-2 magnet
valve coil 6 Buffer & CBC
height more H1-1075,H2-
1105,H3-1113,H4-
1123,CBC1-1112,CBC2-
1108. 7 center pivot no
1&2 dust guard not fitted
properly gap notice. 8
wheel dia to be check 9
Eq.6 & 8 rubbing bogie
frame on axle box 10 10
CBC-2 excess open after
lock condition 11 CBC
1&2 draft gear gap notice
12 Hanger lever no 7-19
play 13 Bogie-1 BL cone
handle touching with MR
pipe when close position.
Auxiliary 14Smoke
SS-01 emission
blow 20.2from
kg 15 MVMT-2 was 354
Motor MVMT-2. Rewound motor replaced.
by M/s Nawabi Electricals.
Miscellaneou Flashing on roof while Both resistances 6
s opening VCB due to were replaced..
breakage of resistance
terminal in VCB RC
network.
Traction While wkg.in T.No.12476 TM changed, Bad 142
Motor TM-1 isolate. Loco check workmanship by
in shed on 05.02.14 POH-DHD.
found TM-1 armature
earth. Stator
no.987X0206-625, Arm
No.K665-9799-5-08,DOC-
14.09.14,
prov.POH/DHD)
Relay ICDJ due to Q-44 not On thorough 124
energizing. checking it was
found that Q-44
(WOAMMA) was
de-energizing on
slight jerk as its
coil connecting
pin loose contact
with base strip.
So Q-44 relay
with base
changed and
function checked
with jerk found
normal.

EM Contactor C118 contact flashed Contacts were 2


heavily for improper replaced.
bedding.
Transformer OHE Tripped with both 7
panto when DJ closed. A-
33 cable bushing earthing
shunt near stress cone
flashed badly.
Miscellaneou 1) SMI 234 (Reliability 1) 1000Amps 13
s improvement measures replaced with
to be taken on CTF/ 1500A reversers.
Reversors and up 2) All arc horns
gradation to 1500amps replaced and
high capacity CTF/ cleaned
Reversors)not carried thoroughly. 3)
out.1000Amps reverses Same were
provided condition. 2) removed. 4) Gap
TM-2 all arc horns adjusted to 3
flashed. 3) Used cotton mm. 5) Earth
waste and waste papers shunt provided.
fallen over TM-4 6) Earth shunt
protection covers from provided. 7)
MVMT duct. 4) TM-5 &6 Vibration
brush holder to connector attended. 8) In
gap more than 4mm floor attention
instead of 2 to 4 mm. 5) welding done. 9)
CP-3 earth shunt Tightened. 10)
deficient. 6) MPH earth Will be attended
shunt deficient. 7) MVMT in next major
1&2 vibrating. 8) MVMT-1 schedule. 11)
impeller balancing Sand hose pipe
counter weight clip not provided. 12)
welded. 9) Side bearer Allowed on
no.5,6,8 fixing bolt slack. conditional basis.
10) Side bearers are un 13) Sealing done.
modified. As per 14) Welding
Bogie & its modification
During checksheet
on no.277
Tyre done. 15)
Re-profiling done 57
Mech. equip. turning machine profiling at ELS/AQ,
on wheel found improper resulting in loss
and a gap of 5mm. of wheel
(approx.) was observed diameter.
in flange circular portion.
Checking of wheel profile
was done by “Wear
adopted template”
(RDSO Drg. no. SKDL-
2561 Alt-8).
Bogie & its During check on Tyre Re-profiling done 5
Mech. equip. turning machine profiling at ELS/AQ,
on wheel found improper resulting in loss
and a gap of 5mm. of wheel
(approx.) was observed diameter.
in flange circular portion.
Checking of wheel profile
was done by “Wear
adopted template”
(RDSO Drg. no. SKDL-
2561 Alt-8).

Relay 1) QTD101 timer was in Same attended 41


broken condition. 2)
BPEMS switch not
provided in both cabs.
GR/RGR/CGR !) TFP breather gasket Same attended 41
perished. 2) CGR frame
vertical and horizontal
gear having play. 3)
SMGR air leakage since
plunger to valve
alignment not ok hence
SMGR changed at
ELS/LGD.
GR/RGR/CGR !) TFP breather gasket Same attended 41
perished. 2) CGR frame
vertical and horizontal
gear having play. 3)
SMGR air leakage since
plunger to valve
alignment not ok hence
SMGR changed at
ELS/LGD.
Bogie & its 1. For all connecting same attended 41
Mech. equip. straps, safety slings
deficient. 2. Secondary
vertical clearance no.4)
40, 6) 40 ,7) 42
(standard vale 29-35mm)
Bogie & its Spare screw coupling has Same attended 41
Mech. equip. not been provided in loco
during POH.
Pantograph 1. PT-1 & PT-2 servo Same attended 41
motors replaced since
servo gem RR3 grease
applied by POH shops. 2.
PT-1 & PT-2 both side
plunger boxes replaced
since hard operation. 3.
Both side additional BP
angle cocks replaced
since without vent hole
available. 4. PT-1 & 2
isolating cocks DEC
(spindle cocks) available
in place of AUDCO cocks.

Battery 1. a) Batteries Low Same attended 55


specific gravity. b)
Batteries not picking up.
Auxiliary 1. CP breather clamp not Same attended 55
Motor provided - provided by
ELS/LGD. 2. MVSL-1 one
cable Lug not available -
Lug provided ELS/LGD.

Miscellaneou J - 1 reverser 2 no bits Same attended 55


s were of 1000A in place to
1500A
Transformer 1. 90 stud on TFP short Same attended 55
length. 2. a5, a6 bushes
oil leaking.
Auxiliary MVSL-1 bottom grease Same attended 55
Motor pipe grease not
entering/MVSL-1
changed.
Bogie & its 1. All Brake hanger pins Same attended 55
Mech. equip. lubrication not done. 2
Secondary vertical
clearance No: 1) 46, 2)
45 (std 29 - 35 mm).
Miscellaneou Spare screw coupling not Same attended 55
s received, which was sent
along with Loco while
going for POH.
Pantograph 1. PT-1 and PT-2 servo Same attended 55
motors replaced since
servo gem RR3 grease
applied by POH shops. 2.
PT-1 and PT-2 both side
plunger boxes replaced
since hard operation. 3.
Cab-2 SA9 incoming
pipeline cock rubbing to
body frame. 4. VCD cable
bunching not done
properly. 5. 6 KG feed
valve one fixing bolt not
provided. 6. PT-2 pipeline
routing not done
properly.
Miscellaneou Wheel No1,5,7&9 skid WRP done 434
s mark
Compressor/ QOA drop CP-2 isolated CP-2 changed 16
Exhauster due to all phases earthed
Miscellaneou 1)SMI -234(Reliability 1)1500A 4
s improvement measures reversers
to be taken on CTF/ provided at
Reversors and up ELS/KZJ. 2)New
gradation to 1500amps lug provided and
high capacity CTF/ reconnected.
Reversors)1500A 3)Grease pipe
Rev’s not provided. replaced on shop
2)BPEMS-2 cable no.A701 floor and
lug cut condition. provided back on
3)MVSL-1 NDE side joint loco. 4)Grease
grease leakage hence pipe replaced.
memo issued for shed 5)Vibration
floor attention. 4)MVSL-2 adjustment i.e.
DE side starting point impeller
heavy grease leakage. balancing done.
5)MVMT-2 experiencing 6)Flashed arc
vibration on run & horns replaced
stopping. 6)TM-1, 2&4 all and cleaned
Arc horns flashed badly. thoroughly. 7)B7
7)B7 x B10 pins cables in x B10 pins cables
MU coupler wrongly properly
merged regarding 386 connected in MU
rev.’ modification. coupler.
8)Modified Side bearers 8)Allowed on
not provided. 9)Foot step conditional basis.
bogie base was found Will be attended
removed condition. in major
Miscellaneou Aux10)Middle
- dampingtie bar for
panel Sameschedule.
attended 77
s SIV parallel type provided
instead of series
connection. Series panel
changed.
Bogie & its 1. All Brake hanger pins Same attended 47
Mech. equip. lubrication not done. 2.
Secondary vertical
clearance no.4) 40, 6) 40
,7) 42 (standard vale 29-
35mm)
Miscellaneou Spare screw coupling not same attended 77
s received, which was sent
along with Loco while
going for POH..
Pantograph 1. PT-1 and PT-2 servo Same attended 77
motors replaced since
servo gem RR3 grease
applied by POH shops. 2.
PT-1 and PT-2 both side
plunger boxes replaced
since hard operation. 3.
Both side additional BP
angle cocks replaced
since cocks available
without vent hole. 4. PT-
1 throttle valve replaced
since malfunctioning.

Switch CCPT melting, HOBA OFF. Loco checked in 26


shed and found
CCPT melting due
to cab-2 PSA
switch plunger
was broken and
permanent earth
with cover. PSA
switch changed.
During POH this
switch is not
changed while
this is a must
changed item.

Auxiliary MVSL -1 winding MVSL-2changed 570


Motor burnt(ITT)
Miscellaneou Loco tripping on first It was 118
s notch. acknowledged
that when the
above said
problem was
occoured at that
time BL remains
unlock condition
while cab
changing. As per
circuit when both
cab BL remains in
unlock condition
then auto
regression should
occur but here
loco trip on 1st
notch. On
through checking
it was found that
cab-1 MP
regression
interlock was in
series with MPJ-1
normally open
interlock. When
MPJ-1 throw in
either direction,
Transformer Heavy oil accumulated on Bolt thistightened
interlock & 186
transformer. On further loco allowed on
investigation heavy oil line under
leakage from neck observation.
portion of transformer
found due to bolt loose.

Traction TM-1,3 &4 oil leakage Bolts 32


Motor from axle cap joint. M- tightened ,letter
seal provided condition to to Dy.CEE/KGP lt.
joints at POH No.
WAT/TRS/T/58/3
893, Dt.28-12-14
Pn. Valve IP valve not working IP valve changed 32
by shed, letter to
Dy.CEE/KGP vide
lt. No.
WAT/TRS/T/58/3
893, Dt.28-12-14

Pn. Pipeline BP additional circuit BP Brazzing done 691


gauge upper pipe brazing
burst
Miscellaneou Defects noticed during All bookings to be 3
s IC'0' on 20.01.15 1.PHGR attend.
not working 2.CGR all tips
were old & condemned
size which are replaced
by ELS/BRCY. 3.ZSMGR
panel all clamps were not
provided. 4.GR drain pipe
was not provided 5.On
checking of MTR book of
loco, it is written that
POH of Tap changer was
not carried out, as Tap
changer is revamped in
2011 & not due for POH
schedule though its AOH
was due which could
have been done at DHD.
6.Near SMGR HT
compartment door
missing & all HT
compartment jalli broken
& damaged. 7.Small liner
not provided on axle box
and spring seal cutting
done to keep spring seal
on axle box. 8.CBC height
CBC-1= 1110, CBC-2 =
RPS/RS/DBR 1096.R118 9.All sand
smokebucket C118 & R118 50
changed
Auxiliary During IC inspection, it is MVMT changed 156
Motor found that auxiliary motor by shed, Lt to
(MVMT) both end Dy.CWM/KGP
bearings heavy abnormal vide ltNo.
sound. Fail equipment: WAT/TRS/T/58/1
MVMT Sl No. 587433 98, DT. 22-01-15

Auxiliary During IC'0' schedule Kindly look in to 2


Motor Auxilairy motors the matter & do
physically checked and needful
compared with POH
check sheet. it is
observed that all
Auxilaries was provided
with 18 yrs age &
rewound motors of
M/s.sunbeem, delhi.
Miscellaneou During IC0 inspection All the defects 1
s following defects are were attended in
found. 1.Cab-1 side CBC the inspection.
key base defective.
2.Equalizer set no. 2, 5
and 6 safety bracket lock
plate damaged.
3.Equalizer set no. 4 tie
pin cutter loose and
defective. 4.TM-4 cable
cleat found in broken
condition. 5.Cab-2 Head
light bulb holder
defective. 6.CT of QLA
(ELM) connection
terminal broken. 7.Oil
leakage from GR oil flow
indicator & PHGR bottom.

Traction LSP & wheel not rotating. TM changed by 252


Motor On checking found that shed, Lt to
Traction motor-2 pinion Dy.CEE/KGP vide
broken and armature ltNo.
shaft scored. TM Make : WAT/TRS/T/58/1
CLW, TM Sl No. 5672 59, DT. 20-01-15
Traction Traction motor-2 checked Vide lt No. 252
Motor found that pinion teeth WAT/TRS/T/58/5
broken & armature shaft 65, DT. 05-02-15
scored. to
Dy.CEE/ELW/KGP

Bogie & its 1) Bolster of Bogie-2 Same attended. 51


Mech. equip. bearing having a crack of
540mm length near
centre pivot. 2) In bolter
it is found that the stress
relieving eye hole near
centre pivot at one side
was cut opened by a size
of 270x170mm and
closed the same welding
with a plate.

Bogie & its W.No.12 H/spring bend. Loco checked at 72


Mech. equip. BSL shed and
found W.No.12
H/spring slightly
bend .W/No-12
H/Spring
attended.
Relay Q-51 was in wedged. It relay replaced. 73
was checked and found
relay Q-51's spring
deficient. Hence the relay
replaced.
Traction SLG card defective Card Cahnged 35
converter
(SR)
Pn. Valve 1) IP valve base air Valves changed 1
leakage. 2) VEAD valve Lt to CWM/DHD
leakage. vide ltNo.
WAT/TRS/T/58/1
80, DT. 17-01-15
Relay 1) Q-30 relay inter lock Relays changed 1
damaged/flashed- Relay Lt to CWM/DHD
changed 2) QF-1 & 2 vide ltNo.
relay fixation bottom WAT/TRS/T/58/1
screw broken condition- 80, DT. 17-01-15
Plate changed 3) All
relays safety sealing are
not provided- Seals
provided
Miscellaneou Cab-1 BC gauge needle BC Gauge 1
s bend. changed.Lt to
CWM/DHD vide lt
No.
WAT/TRS/T/58/1
80, DT. 17-01-15

Miscellaneou During IC0 inspection All the defects 2


s following defects are were attended
found:- 1.L1 bottom during the
block bolt housing inspection.
damage. 2.Oil leakage
from conservator 3 way
cock. 3.S-61 NC4 valve
base air leakage. 4.QD-
1+2 setting not proper
5.BPDJ1+2 old fitted.
6.In TK panel U, V, W
bus bar top side sleeve
not provided. 7.All TMs
grease nipples found
deficient.
Axle Box Inner racer of both axle Wheel set 142
box no.11&12 journals changed
were scored .
Traction QOP-2 permanent 1. TM blowing is 135
Motor drop.Loco checked at being done in
ET/TI shed and found every sch and
TM-6 armature was Armature baking
earthed. Loco checked in is being done
shed on dt 09.01.14 and during
found TM-6 armature overhauling. 2.
was earthed . Same TM-6 Tan delta testing
changed. TM make BHEL, for Arm.
Sr. No. 4373251, O/H dt. insulation is being
25.08.14 during POH Also done during
MVSL-2 changed since its overhauling
impeller blade broken.
MVSL make Ranjan, Mfg
10/09, Sr. No. 09.10.600

Traction QOP2 drop, HQOP2 off. In shed checked 172


Motor and found carbon
brush pigtail
uprooted.Rockeri
ng done and
carbon brush
changed .

Auxiliary MVMT-2 Smoke emission. MVMT-2 128


Motor CHANGED.
Traction During Un.sch.visit TM2 TM2 changed. 202
Motor CE side locking bolt
broken, req.to be lifted.
Traction In TM-1 Bottom gear TM1 removed at 128
Motor case lug found crack % shed & during
separated from TM MPT its top gear
stator. case lug also
found crack.
Aux. WRE defective WRE Changed 135
converter
(BUR)
Traction Valve set defective Valve set 76
converter cahnged
(SR)
HT/LT cable 1) DJ tripped with QOP-1 same attended. 52
and QLM . 2) Checked
and found J1-8th bit
flashed.TM1 isolated both
positive and negative
side. 3) On further
checking it is found that
in Ba1 panel,300sq.mm
power cable H21 lug at
sleeve portion was
rubbing to control cable
supporting plate due to
wrong laying and got
flahed due to which
QOP,QRSI & QLM HAS
DROPPED.4) Improper
layout of cable in POH
shops caused QOP
dropping.

HT/LT cable All compressors Lug was replaced 211


continously working due and the cable
to short-circuiting of was repaired.
cable no. 401 & 002. Lug
of cable no. 002 was over
size and it was bare (i.e.
heat shrinakable sleeve
was not provided on the
lug) which damaged the
insulation of cable no.
401.

Miscellaneou Cab-1 notch repeater not Control card 233


s working due to control changed
card defective
GR/RGR/CGR Abnormal sound CGR arc Arc chute 367
chute changed
Sensor (FDU, TM temperature sensor Sensor changed 162
Speed, defective
Pressure,
Temp. OHE/
Voltage)
CBC/Draft CBC defective. There was a 72
gear/TSC crack on outside
of bottom hole of
knuckle pin in
CBC coupler body
of Cab-1 side.
CBC changed.

Miscellaneou 1)TM-1,2,3 – arc horns 1)All arc horns 3


s flashed heavily & smoke replaced &
carbon formed. 2)MPCS cleaned
cab-2 display buzzer not thoroughly.
working. 3)Unmodified 2)Same was
side bearers provided. changed.
4)As per drawing side 3)Allowed on
stopper in tie bar fixing condition basis.
modification not done. 4)Allowed upto
5)Foot steps base not next major
provided. 6)Additional A8 schedule.
cocks w/o vent holes 5)Provided. 6)To
available. be attended in
major schedule.
Gear case Gear case-4 jammed due Gear case bottom 363
to oil hard changed
Miscellaneou Both SPM not working Card changed 16
s due to external card
defective
Auxiliary Block-2 was isolated due MVMT-2 replaced 62
Motor to QOA dropping MVMT-2 during Sch
all 3 phase winding was
dead ground no other
abnormalities observed
dismantling report
awaited this is an off POH
failure of ELW/KPA

HT/LT cable TM-5 isolated. In shed checked 69


and found TM-5
power cable cut
near TM5
junction box.
Miscellaneou STC trouble HBA Out Put Switch changed 333
s Cable no (003)thimble
flashed,melted & cut due
to loose connection at
HBA switch.

Miscellaneou DEFECTS NOTICED TO BE ATTEND. 1


s DURING IC'O' DURING
INSP.SCH. 1)Buffer &
CBC Height More H1-
1085, H2-1110, H3-1095,
H4-1092 CBC1- 1120,
CBC2-1122 2)Cab-2 ALP
bottom window defective.
3)Main bushing earthing
shunt not provided. 4)In
Under frame on W.no 3
Pn. Brake pipe have less
gap. 5)BP/FP angle cock
safety guard arrow
dynamic to be provided
as not provided. 6)FP
pressure cab1-5.8 kg,
Cab2-6.3 kg. 7)L3 copper
nut air leakage. 8)Cab-2
VCD healthy lamp not
glows. 9)CP1 foundation
base welding angle
support welding crack.
10)BC drop 1.0 kg 11)R-
118 busbar with angle
less gap can frame.
12)Corridor light by pass
from BLLM switch.
13)Q51 & QV64 un
Pantograph PT-2 isolate due to 165
broken. As per TLC/RNC
PT-2 broken but reason
could not find out. Same
PT-2 isolated and loco
will come in shed on
LELA. Loco checked in
shed on dt 07.01.15 &
found upper articulation
link rod's strip broken
from joint portion. No
hitting mark found in PT-
2 same panto changed.
Make SIL

SIV SIV internal fault due to Lug was 210


breakage of cable lugs of replaced.
the output cable of sine
filter choke which caused
single phasing. Make of
SIV - HR, Mfg - JAN/13

SIV SIV internal fault due to Lug was 210


breakage of cable lugs of replaced.
the output cable of sine
filter choke which caused
single phasing. Make of
SIV - HR, Mfg - JAN/13

Traction Load stoll. TM-5 isolated. Loco checked in 160


Motor shed and found
Main Pole lead
cut at junction
box. TM-5
changed. TM
fitted during MTR
at DAHOD.
Miscellaneou LOCO RECD.FROM POH- TO BE ATTEND. 3
s DHD AND IC'O' DEFECTS
NOTICED IN SHED. 1)
CBC-1 not lock properly.
3) Buffer no 1,2& 4 bolt
loose. 4) CBC-1 retaining
plate bolt loose. 5) CBC-1
&2 draft gear gap 6)
Buffer and CBC height
more. H1=1102, H2-1118
, H3-1080, H4-1090
CBC1-1127, CBC2- 1085.
7) Lateral clearance.
W/Set2-29.3 mm, W/Set
4 – 9.0 mm , W/Set 5
– 29.1 mm , W/Set 6
– 9.0 mm 8) Hanger
lever no 23 Jam 9) F29
Bus bar hanging. 10)
ESCORT 6 kg feed valve
defective. 11) RS drop
continues. 12) Bp drop
1.2 kg/Cm2 13) Both cab
BC gauge defective. 14)
Cab-1 BP gauge
defective. 15) CTF-2 front
EP valve air leakage. 16)
QVSI-1 defective &
Miscellaneou HornHVSL1
VCDcontacts not
double check Same were 1
s valve clamps deficient. attended, letter
Shunting contactors S3 to Dy.CEE/KGP lt.
&S4 insulators individual No.
play. Cab-2 side BP WAT/TRS/T/58/3
gauge lamp not glowing 893, Dt.28-12-14

Traction QOP-2 drop TM-5 TM-5 changed 584


Motor smoked,TM-5 CE bearing
seized causing armature
down & rubbing with
brush box broken &
armature damaged
Auxiliary MVMT-2 smoked due to MVMT-2 changed 129
Motor Relay Q-100 not pick up
due to wire no E-100
thimble flashed and
hanging in BD C-106 not
proper wedged
Traction TM-5&6 Slightly flashed TM-4,5&6 86
Motor due to surges TM-4 attended
smoked,arc horn
flashed,PTFE broken
Miscellaneou Tripping w/o app.cause Card changed 457
s OutPutCard No-1
defective
ESMON SPM-1 NOT WKG. SPM-1+2 SOME 30
TIMES NOT WKG,
PG CHANGED.

Bogie & its All Wheels found cut and Both bogie WRP 354
Mech. equip. scratch marks done
Miscellaneou 1)MPH oil leakage from 1)MPH changed. 32
s terminal gasket and 2)MVSL-1
equalizing pipe bottom changed.
side. 2) MVSL-1grease 3)Attended.
leakage from NDE & DE 4)Attended
side. 3)MVRF grease 5)Both studs
leakage from NDE & DE changed.
side. 4)Cab-1 side fan 6)Cleats
wings came out from changed.
shaft. 5)TM-1 Big 7)Rubber packing
inspection cover bolt provided.
fixing stud threads given 8)Carbon brushes
up. 6)All Motors Cable changed with one
cleats having gap. 7) All grade(EG105).
TM power cables rubber 9)Copper pipe
packing not done. 8) In brazing done
TM-1 Mixed grade carbon 10)Locking nut
brushes provided(EG provided. 11)New
105+EG8220). 9)SMGR 5 mm Ellen key
incoming air copper pipe bolt provided.
line air leakge due to 12)RPGR
crack. 10)SMGR manual replaced with
drive drum came out, good one. 13)
since locking nut came Copper pipe line
out. 11)Head shaft CGR chd with good
bowel gear fixing 5 mm one. 14)Panel
Ellen key bolt 01 no checked values
threads worn out. ok. 15)Planned in
Miscellaneou 12)RPGR
Cab-2 BP/FPresistance value
angle cock major
Newschedule.
thread 171
s broken due to CRO welded & both
angle cock with
rubber hose pipe
fitted
Transformer TF Oil leakage from Gauge glass -4
gauge glass changed
Vacuum High voltage capacitor Loco checked at 46
Circuit near MPH burnt. angul shed and
Breaker found one
(VCB) capacitor was
burnt of RC net
across VCB.
Same changed.
Miscellaneou Wheel No-1 abnormal Polish cut done 168
s sound due to skid
Miscellaneou HRAVT on 3. Cab-2 ALP Cab fan replaced 157
s side cab fan earthed.
HT/LT cable Cab -1 H/L not working in Cable replaced at 365
bright mode since cable NKJ yard on
no-A-202 from cab-1 SB 17/12/14
to H/L terminal was open
ckt cables rubbed with
metalic portion behind
SPM and got parted this
is bad work man ship
case by POH/PER

Traction During AOH schedule NBC Inner racers 574


Motor dismentalling of TM-5 , it of PE side
is noticed that PE inner bearing have
racer found rotated on tendency of
shaft. During POH new rotation on shaft
NBC bearing provided & due to increase in
dimensiones measured inner diameter of
are as below:- 1) PE inner racer.
bearing seat outer ELS/AQ have
diameter on shaft = highlighted this
150.065 mm, against problem many
standard of 150.048 to times via
150.065 mm 2) PE inner presentations at
racer inner diameter = various meetings
150.010 mm, against & ELS/AQ has
standard of 149.975 to demanded to
150.00 mm, which found provide a
beyond limit permanent pen
mark on inner
racer & shaft for
easy detection of
racer rotation ,
which is not
found in this
case. Hence it
was suggested
via letter
ELS/AQ/T-8
dated
Relay Notch not coming by Relay changed 1
MP&EE Q-52 relay
plunger sticking
mechanically
Axle Box ) AB No.10 has broken. same attended 342
On checking it is found
that 1st coil from the
bottom has broken.
Arno Arno smoke emission. On checking 120
found Arno all
phase earth. Arno
changed. Details
of Arno: Make-
Jyoti, Sr. no.-
3146.
Miscellaneou Both SPM not Working Checked found 238
s normal
Miscellaneou During IC-0 inspection, it Letter to M/s 1
s is found TM Voltmeter Power
(V5) is not working due Engineering
to jammed. Fail Corporation Pvt
Equipment:TM Voltmeter, Ltd./Kolkata and
Make:PEC, Sl No. 15223 CWM/WR/DHD,
vide letter No.
WAT/TRS/T/32C/
66, DT. 02/01/15

Miscellaneou Wheel Set : 1) Axle Box Same provided 36


s Bearings - 09 Nos. Axle
Boxes are provided with
Old ones. 2)MSU bearings
- 11 Nos. MSU’s are
provided with Old ones.

Traction Sandwich mounting same provided 36


Motor assembly provided with
old ones.
Miscellaneou Springs - Primary old same provided 36
s provided
Axle Box 1) AB No.2 thrower was Axle box along 36
rubbing and also inner with thrower and
side bearing inner racer bearings were
was found with groove replaced.
mark. 2) In axle box no.4
, it was found slight
scratch mark on the
thrower and in axle bon
no.6 , it was found that
rubbing marks in the
thrower and clamping
plate was having rubbinb
marks.
Auxiliary MCP-1 no.H0504409 BBL Attended 36
Motor earthed CP-1
No.P0082 /14593 ELGI.
Traction 1) TM-1,3 bottom shunt Same attended. 36
Motor fixing insulator threads
worn out .
Bogie & its All brake hangers Same provided. 36
Mech. equip. connecting straps safety
slings not provided.
Miscellaneou 1)Cab-1 CBC knuckle Attended 36
s changed since nose wed
gauge passing. 2) Cab-1
clevis changed since CBC
not locking.
Pn. Pipeline 1)A9 & SA9 incoming attended 36
pipelines at body entry
point not replaced with
steel pipes by POH shops.

Pn. Valve 1) VEPT-2 valve replaced same attended 36


since continuous air
leaking. 2) B/s additional
BP cocks provided
without vent hole by POH
shops.
Bogie & its During ICO Axle Clamping plate 0
Mech. equip. box.2,4&6 metal content rubbing found in
above limits AB no.02,
Thrower rubbing
found in AB.no.6.
wheel set-3
changed due
journal
defect(wambling
during run test)
observed in
AB.no.5
Miscellaneou During IC0 inspection All the defects 1
s following defects are were attended in
found. 1.SJ-1+2+3 power the inspection.
cable press condition.
2.L6 mobile contact
holder crack. 3.QD-1+2
setting not proper.
Miscellaneou 1) MVSL 1&2 grease pipe 1)Grease pipe 7
s heavy leakage. 2)MVMT- replaced new one
2 vibration on run 3)For provided found
270 sq mm cables 300 sq no grease
mm cable cleats leakage.
provided. 4)EVPHGR coil 2)MVMT-2
not working. 5)A1 to A7 changed. 3)270
link plate modification not sq mm cable
done. 6)MS 386 cleats provided.
modification not done 4)Changed.
(Modification in loco 5)Copper plate
control circuit for MU provided. 6)will
operation max. for three be done in major
locos for 25 kv ac electric schedule. 7)will
locomotive working with be done in major
MPCS as per RDSO's schedule.
specn.No.ELRS/SPEC/MP 8)Tightened.
C-FDS/0001Rev-2-August 9)Allowed up to
2005 ver-2). 7)MS 431 next schedule
modification not done due to out of
(Modification in loco stock. 10)On
control circuit for MU condition basis
operation working of allowed upto next
VEAD valve in trailing major schedule.
locomotive during for 25 11)Welding done.
KV AC Electric 12)On condition
Locomotive fitted with basis allowed
MPSC ver-2). 8)All side upto next major
Brake system bearer fixing
BP Pr. bolts 4.0
Showing slack. schedule.
Another13)SA9
seal 220
(E-70/Knorr) kg/sq. cm as its seal provided.
defective.
EM Contactor CCA was melting since C- C-103 coil 85
103 coil was burnt CCBA replaced at Trip
was normal this C-103 shed JHS on
was provided during POH 09/12/14 loco still
At LKO on line.
MPFDCS DJ tripping and DJ not 205
closed OHE showing
20.5kv As per TLC/ALD
loco failed in ALD div.
due to DJ tripping and
OHE no tension Massage
on FDCS display unit.
Same loco jointly checked
with LI Shri Baba Ram
(LI/CNB) and R.K.Ram
(JE/CNB) at KNS and
concluded that FDCS unit
card defective. Hence
loco will come in shed on
dead condition. Loco
checked in shed on dt
11.12.14 & found FDCS
SCU card was defective.
Same SCU card changed.
Loco sent for trail upto
AGC and back found
normal.Make Stesalit,
Comm dt16.05.14.

Transformer Tracking occurred Short links of TFP 84


between aux bushings of Aux Bushings and
TFP & the terminals of its damping
damping capacitors short capacitor bank
link of a0,& a1 bushings replaced
was flashed at a0
bushing since loose
fitment due to oval size
of hole caused this failure
short link of a7-a8 also
not standard i.e. holes
big and make it oval
shape to match with
bushing studs this is
POH/DHD failure.
Miscellaneou 1)CP-1 inter cooler safety 1)Safety valve 6
s valve continuous air changed.
leakage. 2)CP-1 near 2)Flange union
delivery pipe flange union tightened.
air leakage. 3)MVSI-1 3)Same was
grease leakage. 4)MVSL- attended. 4)Same
2 grease leakage from DE was attended.
side. 5)TM 1&6 both 5)Adjusted and
Brush holders spring provided. 6)All
tension less than changed &
2.6kg/cm2. 6)TM-4 Arc carbon cleaned.
horns badly flashed. 7)All 7)Provided.
power cables (cleats) 8)Same allowed
rubber packing not upto next major
provided (bogie cleats). schedule.
8)Both RSI block 9)Replaced with
damping panel MLR type new one.
capacitors available in 10)Allowed on
place of MSR type condition basis.
capacitor. 9)ETTFP 11)With MS
(lighting surge arrestor) angular modified
stud right round rotating. foot steps are
10)Side bearer provided.
modification not done. 12)Splitted.
11)Footsteps not 13)Allowed up to
provided. 12)Slack next major
adjustor no.1,5, pins split schedule.
pins not splitted. 13)Side
stopper arrangement as
Miscellaneou 1) MVSI-1 grease pipe 1) MVSI-1 grease 3
s leakage. 2) MVSL-2 pipe replaced. 2)
grease pipe leakage. 3) MVSL-2 grease
TM 2,3,4 brush holder pipe replaced. 3)
spring tension less 2.3 to Spring tensions
2.4 kg/cm2. 4) 2 way adjusted brush
cleats &5 way cleats holders provided.
rubber packing not 4) Rubber
provided. 5) In CE & PE packing provided.
end shields inside grease 5) Cleaned &
nipple metal chips and greasing done. 6)
rust formed. 6) Both RSI Same allowed
damping panel MLR type upto next major
capacitor available in schedule. 7) Will
place of MSR type be done in major
capacitor ( during POH schedule. 8)
sch MLR type capacitors Replaced with
are to be replaced with O/H C2 relay
MSR type). 7) MS 431 not valve. 9)
done (Modification in loco Replaced with MS
control circuit for working pipe 10) Deficient
of VEAD valve in trailing clamps provided.
locomotive during MU
operation for 25 KV AC
Electric Locomotive fitted
with MPCS ver-2 8) C2
relay valve heavy air
leakage. 9) RDJ to
strainer Pipe Line braided
Bogie & its PHS on Axle box no.3 Replaced.It is 331
Mech. equip. broken advised that
grouping of
springs should be
ensured to avoid
breakage of
springs due to
uneven height of
the springs. In
general it is
found that all the
primary springs
are colored white
and all the
secondary springs
are colored
Yellow which
does not give any
significance.It is
advised that
springs are to be
replaced as per
TC 123 and
proper grouping
of springs should
be provided with
proper colour
coding duly
RSI block Smoke emission from 8following
nos of telthe
tel 1768
RSI-2 block. Also QOP-2 fuse of RSI-2
dropped. Found 8 tel tel melted.
fuse of RSI-2 melted.
HT/LT cable HQOP-1 "off" for QOP-1 On checking 84
permanent. found cable no.
AG23 from a3
bushing to RSI-1
insulation badly
damaged so
cable changed.
HT/LT cable HQOP-1 "OFF" for QOP-1 After shed arrival 84
permanent. it was checked
found that cable
no. AG23 of 240
sq. mm. from a3
bushing to RSI-1
insulation was
badly cracked.
Same cable
changed.

Control Loco failed on 03.12.14 Informed to 296


Circuit and loss punctuality for CWM/DHD vide
VCB tripped and panto Tech-MTR,
lowered due to BA box Dt.10.12.14.
no.2 cable loose in
thimble, while working in
train no. 13404 in DHN
division.
Miscellaneou BA Box No-2 cable loose Cable secured 296
s loco suddenly trip
Miscellaneou CAB-2 SPM not working Checked found 20
s normal
Miscellaneou Electrical Must Changed During ICo 9
s Items 1 Auxiliary
compressor not changed.
2 MVMT impeller with
duct not changed. 3
MVRH impeller not
changed. 4 All auxiliary
motors not changed. 5
Cab fans not changed. 6
Axial fan for SIV Motor
not changed 7 All
churning fans of SIV not
changed 8 BHRR brush
box to +ve & -ve
insulator lead wire
insulation damage & lug
flashed 9 25KV condenser
bushing not changed 10
All crew friendly cab
meters not changed. 11
VCB ,TFP& other
damping panel not
changed. 12 BL box
complete with switches
not changed. 13 BL box
of driving desk not
changed. 14 RC network
not changed. 15 Cab
EM Contactor heater
Block-2not changed.
was isolated16
. C-106 attended. 78
Checked and found C-106
contacts having flash
marks and observed that
improper closing of
contatcs.
ESMON Both SPM NOT WKG. PG CHANGED 39
DUE TO
DEFECTIVE.
MAKE-MEDHA
Pn. Valve Heavy air leakage from A-9 changed at 29
Cab-2 A-9 . Trip Shed/MGS.
MPFDCS Loco failed on 27.11.14 Informed to Firm 301
and loss punctuality, with copy to
while working in train no. CWM/KPA vide
12105 in BSL division for Tech-52,
VCB tripped with dt.10.12.14.
message on FDCS
“NO tension wait for
OHE voltage and try to
re-closed DJ”. Loco
checked at ELS/JHS and
found that tripping
observed through Q-30
relay due to MPCS was
not getting signal through
SCU unit as SCU unit
defective. Make –
Stesalit, DOC –
30.01.14.
Axle Box Crown of axle box no. -2 258
broken and equilizing
beam shifted and
touching with W/No. -
1.As per TLC/ASN loco
failed at MTPS in ASN div.
due to inner crown of
axle box no. 2 broken
and eq beam no. 2
shifted & touching to
wheel no.2. Same W/set
no.-1 lifted and loco went
ASN/ELS with speed of
30 Kmph.
Miscellaneou Secondary housing bogie Attended. 293
s crack between wheel
no.4&6.
ESMON Out of the three Attended. 24
connectors of the
potentiometer one
connector was not having
proper contact, since
locking mechanism was
ineffective.
Control Reverser not setting from Same attended. 39
Circuit Cab-1 as MP conk coupler
not passing feed.

Auxiliary MVSL-2 motor burnt. Replaced. It is 534


Motor advised that HV
testing for the
auxiliary motors
should not be
done.
ESMON Speedometer received Reported to firm 241
from ELW/BSL with loco M/s AAL, Noida
No. 23394 during POH on dtd. 02/12/14
inspection but failed in
Loco 23661. During
checking found SPM
showing "Self checking"
continously.
HT/LT cable BA-1 H-22 cable not New bolt and nut 33
tightened properly provided.
causing melting of nut
and washer.
SL RDSO SMI No. 240 for Material out of 33
provision of stainless stock at ELS/KZJ
steel stud and cross bar
assembly inplace of mild
steel not carried out

Control MU current limiting Same provided. 33


Circuit display unit not provided.

Auxiliary MVSI-2 heavy jerking Found impeller 33


Motor sound. slacked due to
excess play.
Impeller fan
replaced with
new one.
Auxiliary MVSL-2 NDE side grease Replaced grease 33
Motor pipe deficient pipe on shop
floor and
provided back.
Control Modification sheet To be done 33
Circuit no.386(Rev'1) for MU during major
operation of maximum of schedules
03 locos of MPCS fitted
locos not done
Control Modification in loco To be done 33
Circuit control circuit for working during major
VEAD valve in training schedules
loco during MU operation
of MPCS fitted locos.

Pn. Valve Wiper servo motor 1/1 WSM 1/1 33


not working properly replaced
Bogie & its 1) All Brake hanger pin Same attended 39
Mech. equip. lubrication not done. 2)
All brake hanger
connecting straps safety
slings deficient.
Pn. Pipeline 1) A9&SA9 incoming Same attended. 39
pipelines at body entry
point not replaced with
steel pipes by POH shops.
2) Near control reservoir
to NRV pipe line 3/4"
union heavy air leaking.
3) Cab-1 BC & MR
gauges pipelines unions
heavy air leakage. 4)
VEPT-1 throttle valve
pipeline union heavy air
leakage. 5) CP-2 ULV
continuously air leakage.
6) CP-2 NRV bcack
pressure coming and
VEUL-2 exhaust port air
leaking heavily. 7) Air
dryer to auto drain valve
control pipe air leaking at
T joint near air dryer.
Compressor/ During IA inspection, it is Compressor 48
Exhauster found compressor not changed by shed,
rotating. Fail equipment Lt to Dy.CEE/KGP
details : Compressor, vide ltNo.
Make: Panesar, Sl No. WAT/TRS/T/58/8
354, Mfg: 05/14 6, DT. 08-01-15

Bogie & its Between Wheel no-8 & Bogie 193


Mech. equip. 10 secondary housing no.CLW0404687,
crack.(Housing No.6). 3 inchaser
welding done
Pn. Pipeline RGCP pipe broken.RGCP 497
pipe crack. Same welding
done
Bogie & its Bogie -2 crack between 1) Casted bogie 448
Mech. equip. W/No. 10 & 12.Loco is being provided
attended at ELS/BRC in place of
checked and found bogie- Febricated bogie.
2 fresh hair crack about - 2) Strengthring
2 innch. between W/No plate is being
10 & 12 in loco no 24003. provided in
Same temp. welding critical zon
done w/out loco lifted.

Miscellaneou Train detained between 743


s KRQ-JHS for IBH signal
red and excess
controlling by LP.No Loco
trouble
RSI block Load (3375-T) stalled on 403
1:150 gradient due to
QRSI-2 dropping on
different notches. Same
reset but load could not
hauled. Banker
given.Loco checked in
shed on dt 24.11.14 &
found 8 No. tell-tale fuse
melted, wire no. 211
came out from lug due to
poor crimping hence
LSRSI not glowing. Diode
No. 15,16 were open ckt.
Diode and fuse changed.
Make Hirect, O/H dt
15.10.13 during AOH.

Battery Loco failed for BA voltage Informed to 508


Charger low. During checking it is CWM/BSL vide
(CHBA) found that CHBA Tech-55,
transformer wire dt.09.12.14.
overheated & cut near
thimble due to bad
crimping. It was last over
hauled by ELW/BSL
during POH on 02.07.13.
Make – Light
Equipment, Sl. no.
C/2471.
Battery Loco failed for BA voltage Informed to 0
Charger low. During checking it is CWM/BSL vide
(CHBA) found that CHBA Tech-55,
transformer wire dt.09.12.14.
overheated & cut near
thimble due to bad
crimping. It was last over
hauled by ELW/BSL
during POH on 02.07.13.
Make – Light
Equipment, Sl. no.
C/2471.
CBC/Draft CBC coupler knuckle pin Coupler changed 393
gear/TSC eye hole thickness was & ELW/BSL is
found more (120 mm). being adviced
Also hitting marks were
observed near knuckle
pin eye hole. This type of
coupler is not coupled
with H-type coupler of
coach .
SIV STC not start. Loco checked in 9
shed and found
in SIV not start
and message
given DC-LVD.
On checking and
found DCPT was
defective. Same
changed and
tested ok.
Auxiliary MCP-2 isolate,MCP-2 477
Motor isolated previously in
24032 due to winding
earthed.
Bogie & its Cattle guard broken, Rail 832
Mech. equip. guard bend. Loco
attended at MGS/ELS and
found CAB-2 cattle guard
broken and rail guard
bend due to hitting of
bolder.Same cattle guard
welding done and rail
guard attended
Miscellaneou Line contactor.Loco failed 315
s on dt 21.11.14 in Dadri
yard & found CAB-2 BL
switch I/L not making
cotact some time. Same
I/L shorted in Cab-2
SB(wire No.700-027/2) .
BL switch operation and
checked last done on dt
during IC sch. on dt.
27.08.14

Bogie & its In between W/No. 7 & 9 620


Mech. equip. equlizing beam
crack.Loco checked at
ASN /ELS and found
outer equalizer beam No-
5 was crack near crown
about 2" between W/No
7 & 9 in loco no 23861.
Same eq. beam with
complete set changed.
Also wheel skid. Same
T/T done.
SIV SIV repeatedly tripping Cooling fan 19
with internal fault.Durinf changed
further checking found
SIV cooling is in jammed
condition and not rotating
at all.So its cooling fan
changing done.On further
checking found its NDE
bearing housing got worn
out.
SIV SIV repeatedly tripping Cooling fan 19
with internal fault.Durinf changed
further checking found
SIV cooling is in jammed
condition and not rotating
at all.So its cooling fan
changing done.On further
checking found its NDE
bearing housing got worn
out.

Miscellaneou Air leakage from A-9 loco 406


s placed at TKD.Loco
attended by TKD outpit
staff, checked and found
CAB-2 A-9 leakage. Same
changed. Defective A-9
checked at test panel
ELS/JHS and found
leakage continuously
from emergency position.
same dismantalling and
noticed that one coal
piece found stuck up at
emergency valve seat.
Same removed &
overhauled. Last over
hauled 10.10.13 during
AOH

Arno Arno checked on shop 102


floor found all 3phase
earth Arno failed under
warranty
Axle Box Axle box No-10 hot. Same completed 48
axle changed at
ASN shed
Miscellaneou Electrical Must Changed During ICo 15
s Items 1. VCB damping
panel not changed. 2.
TFP damping panel not
changed. 3. Capacitors of
RC network not changed.
4. Tap changer N-32
(Including SMGR) not
changed. 5. BL box
complete with switches
not changed. 6. Electro-
magnetic contactor not
changed. 7. RC network
not changed. 8. EPC,
C145, shunting contactor
complete shunt assembly
not changed. 9. Reverser
not changed. 11. DBR
grids not changed. 12. All
capacitors other then in
damping panels not
changed. 13. Auxiliary
compressor not changed.
14. MVMT impeller with
duct not changed 15.
MPH not changed 16.
MVMT &MVRH impeller
not changed 17. MVSI,
Miscellaneou MVSL
Roof bar&MVRF
broken not
from 1) Shed staff Sh. 44
s ferrule.As per TLC/BSL 2) Roof bar
loco failed in BSL Div. tightness is being
due to roof bar no. 8 checked in every
flashed broken from sch. and during
ferrule due to loose loco
connection same roof bar superchecking.
changed at BSL/TI shed.
Last checked on dt
05.10.14 during IOH sch.
Miscellaneou Load(5340-T) detained 312
s for notch not progressing
due to J-1 & J-2 not set
properly in leading loco,
section cleared by trailing
loco, further same set
manually and worked. LP
failed to trouble shoot,
booked off to Sr.
DEE/OP/ASN. IA-
09.11.14.Loco attended
by LI/ASN Sh. Devendra
singh and found notches
coming but line
contactors not picking up
in leading loco 24035.
Hence MP-2 I/L polished
but not carbonized & J-1,
J-2 operate manually and
further no trouble. Loco
was normal and no
trouble noticed till dt. As
per TLC/ASN Lp failed to
trouble shoot booked off
to Sr.DEE/op/ASN. As per
CLI/ASN D. Singh leading
loco 24035 reverser J-1 &
J-2 was not throughing
Miscellaneou CCBA propperly which was
fuse deficient with 1224
s holder. As per TLC/DNR
CCBA fuse with holder
missing but reason
couldnot find out. Same
fuse with holder provided
by ELS / MGS. Loco
testing ok.
Axle Box AB no.5 PHS spring Bolt on LSV coil 124
broken. broken spring
provided
Miscellaneou Load (5278-T) stopped 491
s blocking rear point on
gradient 1:200 for excess
application of BRAKE by
LP while entering in CDB
loop further BP late
creation causing late
releasing of load, built
pressure and cleared
section. Bad
enginemanship of LP.
Req. TE-51.68.No loco
trouble
Miscellaneou Reversor J2 drum contact Flashed contacts 119
s no. 4 & finger contact no. changed at
4 flashed badly. Backside ELS/AQ
link Cu strips also found
burnt.
Bogie & its 1) Secondary housing Same attended. 20
Mech. equip. cracked.2) Different
colour coded springs are
being provided in same
axle.
Miscellaneou DJ tripping during notch 2
s regression.Loco checked
in shed on dt. 15.11.14 &
found SMGR stuck up on
1/2 notch. TR-2 staff
control block changed but
same problem occure.
SMGR servomotor
changed and SMGR
working chekced several
time found ok.
Traction TM-1 smoked, TM-1 Sr. DEE/RS/AQ 273
Motor pinion removed at AQ advised vide this
shed. Pinion removed at office letter no
AQ shed due to TM-1 JHS/RS/T-61/AKS
smoked and PE bearing on dt.
seized as per report of
AQ / ELS loco given fit for
5 TM upto home shed.
Loco checked in shed on
dt 25.11.14 and found
TM-1 pinion was removed
but no PE bearing seized
or deflector came out.
Run test done and found
no smoke. Same TM-1
changed.

Miscellaneou HVSI-2 on IIIrd, Slightly 262


s oil leakage near
MPH.Loco checked at JHS
yard & found normal.

Transformer TFP oil leakage .Loco POH/BSL advised 525


checked in shed on dt. vide this office
14.11.14 and found oil letter no
leakage from TFP gauge JHS/RS/T-82/AKS
glass same attended. on dt.
Miscellaneou TLTE.As per TLC/KGP 279
s loco failed in KGP div due
to notches not coming.
Same loco checked in
SRC/ELS and found
nothing.
Arno QOA drop & ARNO 563
smoked .As per TLC/BB
loco failed in Bombay div.
due QOA drop and Arno
smoked. Same loco
checked at ELW/BSL and
found Arno smoked due
to winding earthed. Same
Arno changed. Make
Jyoti, Sr. No. 2192, CNB
rewound 06/05

Traction Loco failed due to poly Letter to 277


Motor glass banding came out Dy.CEE/ELW/KGP
and CE side & pinion end vide letter No.
bearing seized due to WAT/TRS/T/58/3
inner racer slipped. 367, Dt. 18-11-14
Traction Motor S.No.
2556
Auxiliary MVRH checked on shop reported to firm 154
Motor floor found all 3phase M/s Bharat bijlee
earth ltd kolkata on
dtd. 15/11/14

Miscellaneou DJ tripping, TM-5 isolate 498


s & BLCP N/W in loco no
24060.E-1 staff attended
the loco & found nothing
in loco no 23419. but
BLCP not working in
24060 due to wire no 074
at CAB-1 SB of MU
coupler showing ground.
Same wire tapped and
TM-5 isolated due to
QOP-2 drop.

Miscellaneou TM-5 isolate & BLCP N/W 488


s
Bogie & its During ICO it was noticed Attended 0
Mech. equip. that metal content in the
axle box No 9 and 11 was
0.8 and 0.3 as against a
limit of 0.25. Loco was
lifted and on opening the
axle box No. 9, it was
found that clamping plate
was rubbing to the axle
box and in axle box
No.11, thrower was
rubbing to the axle box.

Axle Box 1)The metal content in Both the axle 42


the axle box no.9& 11 boxes were
was 0.8 and 0.3 as changed and
against a limit of 0.25. 2) thrower was
In axle box no.9, it was replaced and
found that clamping plate clamping plate
was rubbing to the axle has been
box and in axle box no.11 machined and
thrower was rubbing to provided.
the axle box.

Traction 1) TM-4 rocker ring not Same attended. 42


Motor rotated.2) Becktol red
paint on rocker ring
surface.
GR/RGR/CGR 1) PHGR oil leaking from Same attended 42
bottom of allen key bolts.
2) Spring washers not
provided for connection
shunt from RGR & A34
cable. 3) Control unit not
O/H properly, coil and
diode plate not changed .
4) 4.3 way cock to MPH
Eq.pipe line rubber
grommet deficient .
Pn. Pipeline 1) VESA-1 pipe line bend Same attended. 42
rubbing with VEAD pipe
line. 2) Both additional BP
cocks without vent cocks
provided by POH shops.
3) Cab-1 LP side wiper
not working properly. 4)
Cab-1 SA9 both supply
and apply cocks hard
operation and Cab-2 A9
apply cock hard
operation. 5) Auto drain
valve replaced since not
working. 6) CP-1
unloader valve heay air
leaking continuously.

Bogie & its 1) for connecting straps, Same attended 42


Mech. equip. safety slings not
provided. 2) All brake
hanger pin lubrication not
done.
HT/LT cable 1) RSI to TFP power Same replaced 42
cable metal cleat
provided.
Battery 1) Batteries electrolyte Same attended. 42
specific gravity less than
1190 & voltage not
picking up.improper initial
commissioning during
POH. 2)Old CHBA
provided. MCBs not
provided.
ESMON Potentiometer leads were Attended. 51
in soldered condition
instead of crimping and
RTV was applied over the
soldering joints. Out of
three connections, one
connection was not
having proper contact.
SMGR SMGR, MG-6/6 valve- 2 MG6/6 valve 10
and 3 air leakage. changed with
new valve.
Miscellaneou High capacity reversor Flashed contact 135
s (J2) , finger contact replaced by shed
no.12 & drum contact no.
06 flashed badly.
Miscellaneou Some time DJ not 2
s close.Loco checked by E-
1 staff Sh. Dinesh Khare
and found DJ not closing
sometimes. After that
QPDJ (Out side relay)
relay shorted and no
trouble noticed. Same
QPDJ relay changed

Bogie & its All wheel skidded .As per 517


Mech. equip. TLC/BRC all wheel skid in
loco no 23381 due to
mistake of loco pilot since
loco braking done
suddeny causing all
wheel skid. Hence resp
goes to loco pilot joint
note made between CLI
& mainatenance staff and
concluded that loco pilot
is responsible for wheel
skidding. Same T/t done
at ELS/BRC

Bogie & its Axle box No.4 excess Journal polishing 303
Mech. equip. metal content in grease done, new
sample. Inner racer of Ab bearing along
No.4 cracked due to with racer
improper journal dia provided.
meter.
Bogie & its Axle box No.4 excess Journal polishing 303
Mech. equip. metal content in grease done, new
sample. Inner racer of Ab bearing along
No.4 cracked due to with racer
improper journal dia provided.
meter.
Miscellaneou CTF-1 Finger no. 4 & Flashed contacts 70
s drum contact no. 4 replaced by shed.
flashed. Contact bedding
found improper.

Miscellaneou CTF-1 finger and Drum attended by shed 70


s contact no 4 flashed.
Contact bedding found
improper
Axle Box During IC inspection, It is Axle box changed 133
found Axle box No-5 by shed, Letter to
inner & outer racer Dy.CEE/ELW/KGP
chipped off. vide letter No.
WAT/TRS/T/58/3
404, Dt. 19-11-14

Aux. BUR1 isolate DC link capacitor 89


converter burst
(BUR)
Pn. Valve Air flow measuring valve Attended. 0
defective. AFI gauges
showing wrong
indication.Rubber
diaphragm bursted.
Traction Smoke emission from 393
Motor TM-4. Axle box no-4 lock
condition.As per TLC/NAG
loco failed in NAG div due
to TM-4 axle jam &
smoked from TM-4. Same
loco attended by BIA
maintenance staff and
found TM-4 P.E bearing
seized and deflector
came out. Same W/set
no -4 lifted and loco
given ready upto ELS/AQ
with speed of 25 kmph
pinion shaft was
unmodified. Last greasing
done 07.05.14. Cardium
compound was less in
G/C no -4. TM make
BHEL, Sr. No 4673750,
O/H dt 01.10.13, Bearing
make PE old Skf, CE New
skf (Germany)

EP Contactor TM-5 isolated due to 220


QOP-2 drop .As per
TLC/ALD TM-5 isolated
due to LSP glowing.Loco
working on same
condition.Loco checked in
shed on dt. 16.11.14 and
found L-5 not picking up
due to coil was open.
Same L-5 changed.
SL RSI-2 isolate due to QOP- 182
2 permanent drop.Loco
checked in shed on dt
07.11.14 & found power
ckt. meggering done IR
value of TM-4,5 & 6 , 200
megha Ohms. SL-2 side
IR value '0' megha Ohms.
SL-2 checked found SL-2
coil No-2 over heated and
ground. Same SL-2
changed. Make CLW, Sr.
No. 4649, Mfg 1999, SL
type SL-30

Miscellaneou TM-3 isolate, SPM-1 762


s N/WLoco checked in shed
on dt 07.11.14 & found
auto regression. TM-3
J/Box and insp. cover
opened and chekced
found ok. Line contactor
checked in LT found L-3
not pick up completly, L-3
visual checked found L-3
roller broken condition
same L-3 changed

Auxiliary MVMT-1 impeller blades MVMT was 315


Motor broken. Details of MVMT- replaced.
1 :- Sr.No.: M 0402719,
Make- BBL,
RPS/RS/DBR During IA inspection, It is Letter to M/s 89
found that RF 3&4 open Stesalit telema
circuit, Fail Electrical Pvt.
equipment :DBR panel, Ltd./Kolkata and
S.No. N-13-061, Make: CWM/WR/DHD,
Stesalit telema vide letter No.
WAT/TRS/T/32C/
3743, DT.
08/12/14
Auxiliary MVMT WINDING NEAR 1) LETTER 78
Motor OVERHANG PORTION WRITTEN TO
BADLY BURNT AND ONE NAWABI
PHASE EARTH AND ELECTRICALS.
OTHER 2 PHASE OPEN LETTER NO
CIRCUIT. MVMT MAKE- LETTER NO
CGL/94, SR. NO. -ACXM EL/TRS/PPIO/1
70834, MTR-20/08/14, DT 24/11/14 2)
R/W-04/07/14 (NAWABI PI TEST WAS
ELECTRICALS) CARRIED OUT AT
1 KV AND THE PI
VALUE BETWEEN
01 TO 04 THEN
IT IS
SERVICABLE. IF
IT IS ABOVE ARE
BELOW THE
LIMIT THEN IT IS
DIRECTED TO
REWOUNDING
OR DS-8 AS PER
AGE.

Miscellaneou CAB-2 cattle guard bend. 71


s Loco checked in shed on
dt 05.11.14 and found
cattle guard ok. nothing
found.
Miscellaneou Notches not coming by 491
s MP & EEC.As per TLC /
AGC notches not coming
by MP & EEC at Kitham &
farah same notches taken
manually by loco pilot
and cleared the section
but again notches coming
automatically no problem
noticed till dt.
SIV STC internal fault, during Letter written to 13
POH, SIV provided but POH/CB
QLA relay not removed
and wrong circuit, same
removed and circuit
corrected.
Miscellaneou During CI sch.oil leakage Spare pipe 140
s noticed from MPH to provided.
radiator pipe joint. draining of one
drum TFP oil
refilling &
filteration & same
topped up.The
loco was
undergone
POH /BSL.
Pn. Valve GR stuck up some POH/BSL advised 723
times.Loco was overdue vide this office
for IA sch., Loco checked letter no
in shed on dt 04.11.14 JHS/RS/T-82/AA
during IA Sch. & found on dt 12.11.14
PRV of SMGR Pr.
reducing gradually upto
Zero while taking
notches. Hence feed
valve changed and pipe
line blowing done.
Testing done ok. After
dismantalling of feed
valve and noticed 5 kg
feed valve pin hole was
broken which made fibre
material in stead of iron
causing air choking.

HT/LT cable QOP-2 dropping due to Bus bar repaired. 113


earthing of busbar no.
AE44 (S43) because of
breakage of the busbar.
Auxiliary VCD not working in both Surge testing is 458
Motor loco, QOA drop in 24032, being done in
LSCHBA not extingushed every major sch.
in 24032.Loco attended
by shed staff & found
VCD working ok in both
loco. MCP-2 grounded
and QV61 I/L carbonised
same cleaned and
LSCHBA working ok.

Auxiliary 1) MVSL-1&2 in coming 1) same 43


Motor cable lug sleeves not provided. 2)
provided. 2) All motors Attended
bed bolts & duct bolts
slack condition.
Traction 1) TM-1 top G/C collar 1) Same 43
Motor old welding crack. 2) TM- weldded. 2) gap
1,,3 Brush holder to adjusted. 3)
commutator gap Changed 4) Same
adjustedsince uneven attended
gap. 3) TM-3 flashed TM-
3 rocker ring rotated
brush holder no.4
changed and 3 nos.arc
horns also changed since
flashed. 4) TM-3 terminal
cover fixing bolt 01no.
threads worn out.

Bogie & its 1) All brake hanger pins Same attended 43


Mech. equip. lubrication not done. 2)
All connecting straps
safety slings not
provided.
GR/RGR/CGR 1) GR contact arm inner Same attended 43
housing spring changed
since spring tension more
than limits 17.5mm. 2)
Spring washers not
provided for journal pin
fixing bolts.
Pantograph 1) PT2 B/s Plunger boxes Same attended. 43
since spring tension less.
2) PT1 servomotor was
not overhauled. 3)
Strainer provided for P1.
4) SS-1 not working
properly. 5)Cab-1 ,2
A9,SA9 ,wiper
horns,isolating cocks hard
operation. 6) For airdryer
mufflers were not
provided. 7) Cab-1 SA9
handle very hard to
operate, 8) Cab-2 LT
horn not working. 9) AFL
not working. 10) Both
cabs wiper rubbing sould
to look out glass and not
working properly. 11) Air
dryer to auto drain valve,
copper pipe line along
with doulble heck valve
not provided. 12) AFMV
defective. Diaphragm
damaged condition.

Miscellaneou J-2 reverser mobile POH/BSL advised 467


s connecting shaft vide this office
broken.Loco chekced in letter no
shed on dt 07.11.14 & JHS/RS/T-82/AKS
found J-2 shaft broken on dt.
same J-2 changed.
Previsouly Reverser shaft
was provided as
unmodified by POH / BSL.
Make BHEL.
Vacuum ICDJ.Loco attended at Sch staff has 487
Circuit NKJ/TI shed and found been counseled
Breaker DJ N/O I/L was
(VCB) carbonized, Same
cleaned and I/L crushing
adjusted, Also P-2
changed since stuck up in
loco no 23419
Pantograph PT-1 damaged due to 527
hitting something.AS per
TLC / Salem PT-1
damaged due to hitting
something same PT-1
changed at ELS/ED
EP Contactor Air leakage from L-5 EP EP valve 12
valve as its top plate changed.
uncoupled.
Transformer Train left NH in SDAH During IC-0 8
Divn/E.Rly and stopped in found ATFEX
section due to smoke found in burnt
emission from HT condition. Same
compartment ,checked replaced with
and found smoke good one.
emitting from ATFEX
transformer, used Fire
extinguisher ,TRS/NH
arrived checked and
isolated ATFEX and train
passed through SNR ar
16.38 hrs
Traction Bogie 1 isoalte Valve set GTO 68
converter burst
(SR)
Compressor/ MCP/CP checked on Shop Reported to firm 647
Exhauster floor found abnormal & CWM/ELW/BSL
noise from CP. MCP/CP vide L. No.
unit not dismantled since BSL/TRS/S/WTY/
failed under warranty ELGI/CP/ELW
dtd. 30/10/14

EM Contactor CCA melting, C-102 coil Letter written to 113


earthed MTR/DHD
Miscellaneou Loco arrived in shed on Informed to 642
s 23.10.14 for AOH CWM/KPA with
schedule. During copy to firm vide
checking it was found Tech-52,
that PU paint peeled off dt.27.10.14.
badly at many places of
the loco body. Firm M/s
Emprise Marketing,
Pn. Pipeline During IC inspection, Letter to 394
found that lot of iron was CWM/L&W
found in all sintered workshop/DHD
bronze filters. vide letter No.
WAT/TRS/T/58/3
068, Dt. 22-10-14

Battery Battery Sr. No 1977 Lug 187


date 10/13, DOC - Mar
14 of bharat battery
failed under warranty due
to voltage less (8.52 V)

CBC/Draft CBC Knuckle was not Firm & ELW/BSL 307


gear/TSC getting coupled due to advised vide lt.T-
infringement of knuckle 80 dated
pin eye hole with coach 29/10/14 to
knuckle due to increased review the
thickness of knuckle pin drawing
eye hole.
Battery During checking found Reported to firm 187
Battery voltage Low M/s Bharat
(8.5Volt) Battery Mfg on
dtd. 03/11/14
Traction Auto regression on 2nd On checking 182
Motor notch. found TM-5 field
open ckt. causing
TM not
responding so TM
changed.
Switch Relay Q-30 and relay Q- Relay Q-30, Q-45 2
45 burnt as cab-1 BLRDJ and cab-1 BLRDJ
switch stuck up. (Enroute micro switch
Failure) changed by POH
Shop/KPA staff.

Pn. Pipe line Cab-1 BP + Cab2 FP & BP All said cock O/H 179
angle cock very hard with kits (AKI)
operation as adjusting and tested Ok
housing cracked.
Compressor/ Loco arrived in shed on Informed to 65
Exhauster 19.10.14 for CP-2 CWM/BSL with
abnormal sound. During copy to firm vide
testing it is found that tech-55 dt,
CP-2 giving abnormal 20.10.14
sound form cranck &
bearing. It was provided
in this loco by ELW/BSL.
During POH on 15.08.14.
Make-ELGI TRC-
1000(UG), S/N-
EMIS960710.
Transformer Loco tripped via QVRH Loco checked and 300
radiator blowing to be found MVRH
done. rotation checked
found ok.
Radiator blowing
done after that
air flow less due
to Radiator
chocked.Radiator
changed and
precautionary
basis MVRH
changed.
Traction Smoke emission from TM-6 changed. 595
Motor TM-6. TM-6 pinion end
bearing seized.
Transformer OIL LEAKAGE FROM TRANSFORMER 214
TRANSFORMER CHANGED
FOUNDATION( NEAR
LIFTING HOOK). ON
LIFTING THE
TRANSORMER FOUND
BODY WALL CRACK
ABOUT 3" FROM
WELDING BELOW
BOTTOM SIDE OF
RADIATOR TO MPH
COCK
Miscellaneou No defect noticed when No action Loco 1
s checked at chitpur yard working normal
by KPA staff & HQOP-2 on line .
kept 'ON' This trouble
was occurred just after
POH sch on 14/10/14by
ELW KPA
Miscellaneou Electrical Items 1. MVSL During IC0- 9
s not changed. 2. TFP 14.10.14
damping panel and other
panels not changed. 3.
BL box of driving desk
not changed. 4. Cab
heaters not changed. 5.
Analog NR not changed.
6. Electro magnetic
contactor not changed. 7.
EPC & C-145 shunting
contactors not changed.
8. Reverser not changed.
9. MU coupler jumper
pins not changed. 10.
DBR girds not changed.
11. C-118 with R-118 not
changed. 12. Modified
1500 Amp. J1 & J2 not
fitted (1000 Amp J1 & J2
fitted). 13. HOM
modification not done.
Mechanical Items. 1.
Cab-2 CBC yoke assembly
having 20 mm gap. 2.
Bow assembly with
plunger of pantograph
not changed. 3. 02 Nos
Traction roof foot
Bogie -1insulator
isolate Valve set GTO 103
converter burst
(SR)
Miscellaneou LSP glowing sander direct Loco checked and 371
s tested from both
cab found notch
progression and
regression is
normal. All line
contractor and
shunting
contractors
operation is
checked found
normal. All TM's
working is
normal.
Operation of
VESA1 and LSP is
normal. QD
setting checked
found QD1-
160amp/128amp,
QD2-158amp/128
amp. Joint note
made. Mal-
operation by LP.

Harmonic Harmonic filter isolated. Wire no 2801 50


filter contactor thimble
broken.
Aux. Auxiliary Converter 2 WRE module 20
converter isolate defective
(BUR)
Miscellaneou CCA melting. On checking 43
s found CP-2
unloader valve
coil shorted.
Same changed
and function
checked found
normal.
SMGR Notch not coming, Letter written to 48
checked found VE-1 valve POH/CB
stuck up .
Auxiliary MVMT-2 abnormal sound. Informed to Dy. 47
Motor During checking found CEE/CB vide
MVMT-2 non load end Tech-54,
bearing defective. dt.03.11.14.
Bearing make – FAG,
6313 C-3. MVMT Sl. no.
MU 902326
Auxiliary During IC inspection, MCP-1 changed, 154
Motor found that MCP-1 Letter to
earthed, Equipment Dy.CEE/ELW/KGP
make: CGL, S.No. HJHM vide letter No.
0310 WAT/TRS/T/58/3
216, Dt. 04-11-14

Arno During IC sch.on ARNO changed. -7


10.10.14 ARNO balancing
ring found crack at 3
places. (Sr.No.A-3076,
Make-Jyoti,DOC-
15.12.01)
SMGR SMGR sun wheel and Sims provided by 1
planetary wheel having shed. Lt to
play. Dy.CEE/LC&W
workshop/DHR
Pn. Valve PRV air leakage from PRV replaced 5
exhaust port
Transformer Modification no.160 not To be done 5
done i.e., TFP neck to during POH
radiator connecting pipe
not provided
Pn. Valve Cab-1 SA-9 valve Old kit replaced 5
provided with old kit with new kit
Miscellaneou Both cabs MU current New units 41
s limit units deficient& provided &
wiring also not available cabling done
Control Both cabs LS group lamp New cables 41
Circuit cabling not available provided & Ls
group lamp kept
in working
SMGR SMGR manual drive freely New manual 41
rotating drive provided
Bogie & its Wheel set-6 Suspension Wheel set no-6 41
Mech. equip. tube grease metal changed
content more (i.e.more
than 2500ppm)
Pn. Valve Both cab wipers not Replaced with 41
replaced O/H material
Transformer Modification no.160 not To be done 41
done i.e., TFP neck to during POH only
radiator connecting pipe
not provided
Traction All TM’s mounting Allowed on 41
Motor pads old material condition basis
provided
Bogie & its All the side bearers old Allowed on 41
Mech. equip. material provided condition basis
Bogie & its Both bogies Center pivot Allowed on 41
Mech. equip. not replaced during POH condition basis

Traction TM-5&6 badly flashed TM-5&6 all arc 5


Motor horns replaced &
cleaned inside
ESMON Both sensors burnt inside Attended / 0
the PG and SPM cable replaced.
defective.
CBC/Draft Cab-1 CBC clevis eye hole CBC changed. 0
gear/TSC oblong.
Auxiliary MVSL 1&2 grease pipes Grease pipe 0
Motor top and bottom grease replaced.
leaking.
Battery Battery electrolyte Attended. 0
specific gravity less than
1160. Improper initial
charging and voltage not
picking up.
Miscellaneou Electrical Items 1. Defect found 5
s MVSI,MVSL & MVRF not during IC0 on
changed. 2. TFP & other 08.10.14
damping panel not
changed. 3. Cab heaters
not changed. 4. Analog
NR not changed. 5.
Electro - magnetic
contactor not changed. 6.
EPC & C-145 shunting
contactors not changed.
7. Finger & Dram
contacts with brass ball
not changed. 8. MU
coupler jumper pins not
changed. 9. DBR girds
not changed. 10. C-118
with R-118 not changed.
11. J1 & J2 of 1000 Amp
provided. 12. a0 & a1
bushing shorting plate
loose. 14. CGR-1
defective due to not
making contact. 15. HOM
modification not done.
Mechanical Items. 1. Bow
assembly with plunger
not changed. 2. All
Transformer Duringflexible shunts
IC-0 not
inspection, TFP changed by 0
TFP QLM dropped and shed.
safety valve blown
Traction During IC-0 inspection, Attended by shed 0
Motor TM-4 power cables staff.
rubbing with bolts
MPFDCS Q30 not pick up. Loco was 63
checked with firm
staff and found
SCU unit was
defective. Same
changed after
that tested found
all operation was
normal. Letter
given to firm.
Joint note made
with firm staff.

Control Both cabs cab meters 24 Control cables 2


Circuit volts control supply provided &
cables not provided Meters inside
lamps kept in
working
SIV Loco made dead & Nothing done 20
directed to home shed by
FTS /BZA. SIV(AAL) was
working normal during
investing in shed with full
load but CH-OC
repeatedly logged i fault
memory from 07/09/14
to 04/10/14 in-OC and
ELD -FT also logged in on
01/09/14 &
07/09/14 .This loco was
dispatched on 11/09/14
by ELW/CB LKO after
POH & successful load
trial. Loco was failed
since Repeated tripping
through QSIT with
messages rectifier fault
on 03/10/14 this trouble
already exists before
dispatching the loco by
LWS CB LKO
SIV Battery charger not IGBT driver card 124
working due to defective replaced
quad IGBT driver card.
Make of SIV : HR, Mfg-
Jan-13
Axle Box AB No.4 and 10 grease WNo:2-4 brake 147
sample metal content hanger changed
more i.e..AB No.4=0.44%
AB No.10=0.40%.Wheel
No. 2 and 4 both sides
brake hangers bend
condition

Sensor (FDU, Error generator in TM TM speed sensor 84


Speed, changed.
Pressure,
Temp. OHE/
Voltage)

Central TM blower MCB open Central Electronic 130


Electronics message I/O card
defectivce
Miscellaneou Selsyn transmitter shaft Replaced 0
s threads warn out
Vacuum Loco failed online due to The tightness of 41
Circuit ICDJ. On checking, it was the check nut
Breaker found that VCB fishbone was adjusted and
(VCB) interlocks were not trouble rectified.
closing due to fully Letter to
tightening of checking Dy.CEE/ELW/KGP
nut of CAM. vide letter No.
WAT/TRS/T/58/3
137, Dt. 30-10-14

Miscellaneou NR not working NR 2 chnaged 8


s
Compressor/ CP-1 giving abnormal Informed to 41
Exhauster sound from cranck & CWM/BSL vide
bearing. It was provided Tech-55,
in this loco at ELW/BSL dt.27.09.14.
during POH on 15.08.14.
Make- Elgi (UG), Sl. no.
960707.
Compressor/ Loco arrived in shed for Informed to Dy. 187
Exhauster IA schedule. During CEE/CB vide
testing it was found that Tech-54,
CP-2 heavy abnormal dt.26.09.14.
sound from cranck. It
was provided during POH
by EL-POH CB shop on
22.03.14. Make –Elgi,
Sl. no. L-6090594.

Auxiliary Loco arrived as dead in MVSL-1 replaced. 555


Motor shed QOA dropping not
expierienced when HQOA
on 0 position and HVSL-1
isolated condition.MVSL-1
all phases IR was
Zero.On dismantiling its
three phase in put cables
insulation damaged and
ground with dome due to
gromet and sleave not
available.Motor & its
winding was normal.This
is a POH KPA
Failure.Motor was under
warrenty.
Compressor/ Loco arrived in shed for Informed to 239
Exhauster IB schedule. During CWM/KPA vide
testing found that CP-1 Tech-52,
abnormal sound as its dt.25.09.14.
coupling spring broken. It
was last over hauled at
POH workshop/KPA
during POH. Make –
Elgi, Sl. no. EJES 440499.

Miscellaneou Auto regression on 1 st Nothing found 487


s notch
Transformer TFP breather gasket Replaced. 0
perished
SMGR SMGR journal pin fixing Attended. 0
bolts spring washer
deficient.
GR/RGR/CGR CGR frame bevel gear roll Roll pin new 0
pin having play. provided & CGR
cam 2&3 play
arrested at
ELS/LGD.
Miscellaneou SHAA - 2 cables rubbing Rubber sheet 0
s to body provided.
Miscellaneou DBR power cables Attended. 0
s rubbing to MVRF body
Miscellaneou RC damping panel cables Cables bunched 0
s not bunched and rubber sheet
provided.
Axle Box All Axle Box cover Attended. 0
gaskets damaged
condition.
Axle Box AB No.3, 4, 9&10 Attended. 0
clamping plane bolts
worn out.
SL SL-2 hood getting Hood replaced 110
abnormal sound from it.
Hence the hood of SL-2
was replaced and tested
found ok.
Harmonic Main power off Contactor 8.1 39
filter base plate
broken.
Miscellaneou SSE/Inspection. Date :- 2
s 18/09/14 22561
/POH/BSL/IC’0’
BOOKINGS. 1)MPH not
replaced 2)MVSI & MVSL
not replaced 3)All end
switch of auxiliary motor
are old. 4)Cab heater are
not replaced. 5)Wiper are
old. 6)DC-DC convertor
old. 7)Flasher light unit &
lamp box are old.
8)Marker light are old
9)VCD reset push button
& foot switch not
replaced.
10)Replacements of filter,
pipe lines, ceramic filter
in DJ & SMGR are old.
11)Isolating cocks &
pressure switches are
old. 12)A9 & SA9 pipe
line old. 13)SJ-1,2,3 all
terminal bottom side
blackish. 14)J-2 tip no
9 ,10 flash mark. 15)CTF-
2 tip no 9,10 flash mark.
16)CTF-3 drum contact
no 11 flash mark &
Miscellaneou MVMT s with impeller & OFF POH 1
s ducts not changed. 2) DEFECTS
MPH not replaced. 3) NOTICED
MVMT & MVRH impeller DURING IC'0'.
not replaced. 4)
MVSI&MVSL not
replaced. 5) Pantograph
bow assembly with
plunger new not
provided/ not replaced.
6) TFP damping panel not
replaced. 7) Twin beam
head light reflector with
holder, gasket & bulbs
not replaced. 8) VCB with
single bottle not
provided. 9) BL box
complete with switches
not replaced. 10) A9
valves not replaced. 11)
Cab heaters are old &
unmodified. 12) Wiper
complete servo motor are
old. 13) Indication panel
old. 14) LP & ALP seat
new not provided. 15) All
pressure switches are
old. 16) Side body filters
Transformer old. 17) IC-0
During Pneumatic panel
inspection , TFP changed by 37
TFP tank bolt oil leakage shed
near radiator and its
foundation. TFP swan
neck back side plate oil
leakage.
Battery During IC-0 inspection, Battery NO-6 was 37
Battery NO-6 low voltage changed by shed.
& low gravity
Bogie & its Abnormal sound from Loco was 0
Mech. equip. under gear due to fitment attended by
of improper D-shackle. Workshop / KGP
Vacuum VCB chattering & QOP 54
Circuit dropping. At shed QODJ
Breaker & PRV setting found
(VCB) disturbed. VCB QPDJ
pressure switch setting
found 4.8-4.4 kg/cm2,
also PRV setting found
slightly less then 5.0
kg/cm2 instead of
standard 5.2 kg/cm2,
causiFor QOP dropping
MVRF commutator, stator
& brush holder found
badly flashed since
neutral axis found
shifted.
HT/LT cable As per T/shed MGS Cable no-A-700 62
reportCCLS melting BP replaced &
reported on line & other cable no-C-
checked found normal On 164,A-362 & w-
shed arrival foud cable no 379/4 secered
A-700 BP at PC two SB with only small
insuletion dameged area insuletion by
flashed & parted since providing the
pressed with PC-2 door heat shrink sleev
supporting plate cable rerouting of
no-C-164 (A-4 cable ) A- cables done to
362 & W-279/4 bunched avoide future
along with A-700 BP also failure
damaged improper cable
bunching during POH at
DHD causd this failure
HT/LT cable At BA-2 P/T,lug parted J/Boxes provided 47
from cable no.A 26(from for allTM
Ba-2 P/t to TM-6 terminal cables,Ba-2 panel
box) since cable melted to TM-6 J/Box-
just behind lug due to 300 Sq/cm2 cable
bad crimping.Insulation A-26 replaced
of near by cables also and A-24,Ea-
damaged due to flashing 25,EA-26 & BA-
and over heating.Hence 26 new cables of
QOP-2 dropped and size 300sq/cm2
smoke emitted.This is a replaced by new
bad maintenance case by one from Ba-2 to
ELW KPA since POH+RC SL-2 and Power
done by ELW/KPA on cable connections
27/07/14.During rectified at Ba-1
POH+RC 300Sq mm TM & 2 P/T.
cable provided directly
from Ba-1 & 2 P/Ts to TM
terminal boxes Without
providing JBs,instead of
2x225S Sq mm cables
from P/Ts to JBs and 300
Sq mm cables from JBs
to TM terminals several
power cables connected
with stress and having
sharp bends in Ba-1 &2
P/Ts.
VCD/ TPWS VCD defective VCD unit cahnged 19
Relay ICDJ problem. Loco checked at 127
MURI and found
ICDJ due to Q-44
not energize,
concerning circuit
checked found
normal. Q-44
changed and
found loco
energize normal.
Defective Q-44
checked at test
bench and found
relay was not
energize due to
its timer PCB card
defective. One
good timer card
fitted in same
relay and
function checked
found normal. On
observation it
seems that Q-44
relay is old and it
was not changed
and serviceable
relay was fitted
Pn. Pipeline Air leakage was from in Inlet during POH
cock of of
Air 92
put isolating cock of air dryer replaced at
dryer since cock ELS MGS on
defective.This is failure of 12/09/14.
ELW DHD.
Aux. Bur3 L/S missing, P/s Bur P/S card 86
converter card defective changed
(BUR)
Aux. Bur3 L/S missing, P/S Card changed 85
converter defective
(BUR)
Aux. Bur1 inverter O/C, RΦ WRE changed. 85
converter WRE 1 GTO short
(BUR)
Miscellaneou SIV(SIEMENS) internal SIV cleaned and 156
s fault lamp was glowing attended by firm
and converter fault & rep,working
blower fault logged in checked found
fault memory.This trouble satisfactory.Patch
was due to rain water work done to
leaked from a hole of cover the hole on
roof hood and entered in roof.
side sIV.This roof hood
was not of this loco and
was changed during POH
(not matching with other
hoods and fixing bolt
holes are out of Position)

Transformer DJ trip . TFP oil spread In shed checked 4


out but no relay target and found
drop. radiator side gate
valve was sealed
in close condition.
Joint note made
with KPA staff

Relay Impossibility to close DJ Informed to 213


& loss punctuality, while CWM/DHD vide
working in train no. Tech-MTR,
14164 in ALD division. Dt.13.09.14.
Loco checked by ALD
staff found Q-44 relay
defective. Q-44 relay
provided in loco during
MTR at Dahod workshop
was found in very bad
condition. N/O interlock
no. 3-4 on MTDJ branch
found not passing supply
due to contact carbonize.
Make- Woama, Sl.
no.7639.
Miscellaneou Electrical Items 1. Double During ICO- 0
s bottle VCB not changed 06.09.14
by single bottle VCB . 2.
Time delay relay timer
not changed. 3. All
flexible shunts not
changed. 4. HOM
modification not done as
per RDSO guide line. 5.
MVRH impeller not
changed. 6. Axial fan for
SIV motor not changed.
7. All churning fans of
SIV not changed. 8. All
door and panel rubber
gaskets of SIV not
changed. 9. DC-DC
converter not changed.
10. Flasher light unit &
lamp box not changed.
11. Foot switch and push
bottom of VCD not
changed. 12. Electro
magnetic contactor not
changed. 13. DBR girds
not changed. 14. All
capacitor other then in
damping panels not
Axle Box changed. 15. VCBfrom
Smoke emission and Wheel set was 55
axle box no. 9 due to replaced.
rubbing between thrower
and axle box housing for
improper clearance.

RPS/RS/DBR RPS FUSE AND CABLE BOLT CHANGED 172


NO.E22 OVER HEATED
DUE TO BOLT THREAD
WORN OUT.
EP Contactor J-2 TIPS NO-8 AND TIPS AND DRUM 172
DRUM FLASHED DUE TO CHANGED.
POOR BEDDING.
HT/LT cable QD-2 NOT OPERATED AS NEW WIRE 172
WIRE NO.154 NOT PROVIDED
PROVIDED FROM HTSB
TO BD.
Traction TM-4 ARCHING HORN ARCHING HORN 172
Motor FLASHED. CHANGED
Control LUG OF a0,a1 RE LUGGING 172
Circuit CAPACITOR UPROOTED. DONE.
Traction TM-1 isolate for QOP-1. On checking 151
Motor found TM-1 earth
so TM changed.

Vacuum VCB tripped with SIV(M/s "SIV" shut down 45


Circuit Siemens) internal fault. due to blower
Breaker HBA off/on got success failure.On
(VCB) and worked up to KGP checking found
station. Fresh Loco given fan coupler was
in loose
condition. Same
tightened and
working of SIV
checked found
OK. DA action
has been taken.
KPA Supervisors
and staffs have
been counselled
GR/RGR/CGR GR NOT MOVE AS CGR-2 CGR-2 CHANGED 264
TIPS TOP BOLT BROKEN. AT ELS/JHS
Compressor/ During IB sch.on New crank shaft 76
Exhauster 01.09.14; CP2 abnormal provided + AOH
sound noticed.jointly kit provided +
investigate with firm new lubricating
rep.M/s.ELGI on 10.10.14 oil provided +
and found water noticed Mechanical drain
in compressor sump and valve provided to
mixed with lubricating avoid water
oil+free end bearing of accumulation in
crank found damaged+oil sump.After
splashier found intact. CP/MCP jointly
checked in
section on test
bench found
normal.
CTF/Reversor J-1 contact no. 2 flashed Contact was 7
replaced
Transformer TFP bushing no. a7 & a1 a0 bushing cable 87
were flashed condition lugging done and
and a0 bushing cable and other cable are
other cables are melted attended.
and cut due to a7
flashing. Hence the TFP
removed from loco for
attention of TFP
bushings.
SIV SIV blower fan making SIV Fan Replaced 3
abnormal sound while
stopping
Auxiliary MPH bearing dry sound, MPH Replaced & 3
Motor oil leakage from terminal leakages arrested
gasket , top dummy nut
& equalizing pipe bottom
side.
Traction TM 1,2,3,4,5 & 6 all arc All arc horns 3
Motor horns flashed badly replaced and
cleaning done
Miscellaneou J-1 was not moving and J-1 replaced. 20
s stuck up at middle since
its fork was broken.This
1000A reverser was not
replaced with 1500A
reverser during POH by
LCW DHD.
Miscellaneou Loco arrived in shed on Informed to 695
s 30.08.14 for AOH CWM/KPA vide
schedule. During over Tech-52,
hauling of wheel, it was dt.10.09.14.
found that Axle no. 4 & 6
non gear side wheel disc
seat is under size i.e
245.25mm and
246.50mm respectively.
(Std. 252.15 mm). These
axles were provided in
this loco during POH at
POH workshop KPA. Axle
no. ID60250636 & HR-
14-29,6xx52089.

Transformer Loco tripped with glowing Bus bar repaired. 42


of LSCHBA lamp
continuously and display
of message "OHE voltage
out of range" on SIV
even though OHE voltage
was 25KV. Input voltage
was not getting from the
auxiliary windings (a0-a8)
due to open circuiting of
a7-a8 winding. On
checking the transformer,
it was detected that bus
bar connected to a8
bushing was flashed and
cut at the bent portion of
bus bar.
Compressor/ Renmoved since 133
Exhauster abnormal noise. Warranty
failure advice to M/s
Trinity House vide this
office letter No
BSL/TRS/S/WTY/ELGI/CP
/ELW dtd 02/09/14
Miscellaneou Flasher light glowing Flasher light 546
s continuously and not control unit
blinking. On checking it changed.
was found two cables
inside Flasher light
control unit got shorted.
Transformer DJ tripped with blasting TFP was removed 82
sound without dropping from the loco and
any relay's target and stud of a1
heavy smoke emission bushing and
from HT compartment short link were
was observed. It was replaced.
detected that short-link
provided between a1 &
a7 bushings was flashed
badly at the bushing a7
due to loose fitment.
Axle Box While working heavy Axle changed at 118
smoke from wheel no. 8. ELS/ED. Wheel
At ELS/ED, found axle set sent to
box bearing seized. LW/PER for
detailed
investigation.
Traction Loco arrived in shed for Informed to 579
Motor IB schedule. On testing CWM/KPA vide
TM-5 pinion one teeth Tech-52,
found broken. TM-5 dt.29.08.14.
armature No.B-148-2144,
Pinion Make - SAN
VCD Loco no. 22551/WAP-4 Informed to 5
arrived in shed on CWM/BSL vide
20.08.14 for IC0 Tech-55,
schedule. On testing VCD dt.25.08.14
not reset by horn-1 due
to pressure relay switch
inter lock found broken.
Relay make – Danfoss,
VCD – Sresalit.

VCD Loco no. 22551/WAP-4 Informed to 5


arrived in shed on CWM/BSL vide
20.08.14 for IC0 Tech-55,
schedule. On testing VCD dt.25.08.14
not reset by horn-1 due
to pressure relay switch
inter lock found broken.
Relay make – Danfoss,
VCD – Sresalit.

HT/LT cable LSP continuously glowing TM-I Armature 13


side cable opened
out from PG
clamp due to
looseness of
cable socket in
PG clamp.
Transformer QLM drop and DGA TFP changed. 65
abnormal.
Miscellaneou Cab 2 DDS screen not DDS screen 86
s working. changed.
Aux. BUR-2 isolated WRE module 73
converter found defective
(BUR)
Traction During IC-0 inspection, 1) vide letter No. 1
Motor Traction Motor No.-1 &5 WAT/TRS/T/58/2
CE bearing gap is 4.0 & 449, Dt. 18-08-14
1.5mm 2) Traction No.-2 to
oil leakage from top axle CWM/ELW/POH/K
cap joints badly and GP
spreading on power
cables 3) Suspension
Bearing oil leakage from
TM No.-2,3,4 & 6 from
bottom axle cap joints
badly

Axle Box During IC-0 inspection: 1) Vide letter No. 1


Axle box high metal (Out WAT/TRS/T/58/2
of range) ferrous content 449, DT. 18-08-
14 to
CWM/ELW/KGP
Traction During IC-0 inspection: Vide letter No. 1
Motor Both CE & PE side wicks WAT/TRS/T/58/2
pads for Traction No-3 449, DT. 18-08-
are deficient and SB-3 oil 14 to
burning smell. CWM/ELW/KGP
Miscellaneou During IC-0 inspection: 1) Vide letter No. 1
s Cab-1 indicator WAT/TRS/T/58/2
sometimes not working 449, DT. 18-08-
2) Cab-2 recorder not 14 to
working due to stepper CWM/ELW/KGP
motor jamming
Miscellaneou J1 over throwing and this Vide letter No. 0
s has resulted loco failure WAT/TRS/T/58/2
on 17-08-14 449, DT. 18-08-
14 to
CWM/ELW/KGP
Pn. Valve C-2 relay choked A9 not Loco checked in -10
working. shed and found
C2W relay valve
choked due to
water entered in
circuit . Same
circuit blowing
done.
Miscellaneou MP handle not come at 0 Reported to firm 24
s position after operate it M/s Saitronik
at "N" position and lock Electrical
plate movement jam. Equipments,
Stick type master Hyderabad vide
controller Sr. No L. No
03140/2B No M-7 Model BSL/TRS/S/Maste
No SMC-27 was provided r
during POH. controller/Saintro
nik dtd 01/11/14

MPFDCS MP handle not come at reported to 24


"O" position after operate CWM/ELW/BSL &
it at "N" position and lock firm M/s Saitronik
plate movement also jam equipment on
dtd. 01/11/14

EM Contactor DJ feed back fail. In shed checked 11


and found C118
aux interlock
crushing less due
to aux interlock
to spindle gap
more.Standard
gap 22mm but
gap checked
found gap is 24
mm. during POH
C118 not
changed . C118
fitted during
POH.

Central Vigilance applied with out Card changed 60


Electronics traction, O slot card
defective
Memotel SPM-2 failed due to Cab-2 SPM 60
stepper motor stuck 3 replaced.
times.
Bogie & its TM3 bottom lug crack TM3 replaced 401
Mech. equip.
Traction QOP-2 permanent drop Informed to 408
Motor while working in train no. CWM/BSL vide
14227 in LKO division. Tech-55,
Loco arrived in shed on dt.29.08.14
17.08.14, TM-6 armature
power coil found burnt.
Arm. No. F 931-6576.

Traction QOP-2 permanent drop Informed to 408


Motor while working in train no. CWM/BSL vide
14227 in LKO division. Tech-55,
Loco arrived in shed on dt.29.08.14
17.08.14, TM-6 armature
power coil found burnt.
Arm. No. F 931-6576.

Auxiliary Loco failed on line on MVSL changed. 164


Motor date 13/08/14 as its
MVSL found burnt,
Ranjan make. during
inspection Sch.on
14.08.14 MVSL1 removed
from loco and checked in
section found its rotation
found jam, its IR value
showing infinitive, windig
continuity showing open
cktd.motor dismental and
check found its NDE side
brg.found broken, i.e
cage broken & ball
seperated(Brg.6306-
C3,Make-NBC),also NDE
side overhung winding
found punctured &
rubbing mark found in
stator and on rotor.
Traction During TM over hauling Informed to 661
Motor TM-1 PE side bearing CWM/KPA vide
racer having deep cut Tech-52,
mark, TM-6 PE side dt.29.08.14.
bearing racer crack at
two place & move on
shaft and TM-3 pinion
one teeth found broken.
TM-1 armature No. PKE
3059-1-95, TM-6
armature No.E607-5334-
7-02, TM-3 armature No.
KPA039-2001, Bearing
Make –SKF & FAG and
Pinion make –SAN.

Miscellaneou TM-4 was isolated due to J-2 F/T no.8 bs 12


s QOP-2 dropped with bar no.H-41
smoke emission J-2 F/T replaced,sarround
no.8 shunt terminal with ings cleaned for
bus bar no.H-43 was carbonisation and
flashed and parted due to given ready after
loose terminal schedule.
connection.This is an off
POH failure of ELW KPA.
Aux. Bur3 L/S missing, P/S Bur P/S card 56
converter card defective changed
(BUR)
Aux. Bur3 L/S missing, P/S Bur P/S card 101
converter card defective changed
(BUR)
SMGR SMGR Aux switch Switches are 175
interlock lno. 15-16 roller replaced.
was broken and dropped.
Its roll pin was in broken
condition. Also found
switch No. 21-22 roll pin
broken and came out
about 50% on one side
from its position.
Auxiliary During checking, it is MVSI-2 changed 0
Motor found MVSI-2 two phase by shed, vide lt
open circuit. Fail No.
equipment: MVSI-2, WAT/TRS/T/58/2
Make: Ranjan, S.No. 7- 650,Dt04-09-14
12-570 to CWM/DHD
Miscellaneou NR not working Digital NR found 167
s defective , same
replaced.
Pn. Pipeline VCD was not Cab-2 horn 124
acknowledging by cab-2 stainer pipe
horn since sufficient line,stainer
pressure not available to cleaned by air
QH due to Stainer choked pressure & VCD
up.Stainer cleaned by air checked found
pressure & VCD checked acknowledging
found acknowledge normal by horn.
normal by horns.This isa
POH failure since all
stainer replaced by POH
shop during during POH
sch at DHD.

Compressor/ CP-1 isolate due to safety Informed to 654


Exhauster valve air leakage while CWM/KPA vide
working in train no. BCN Tech-52,
in W.Railway. On arrival dt.09.08.14.
in shed found that CP-1
HP disc valve suction
spring broken resulting
air leakage from safety
valve. Make –Elgi, Sr.
No. JHS-48/090
Pn. Valve Loco no. 22578/WAP-4 Informed to 34
failed on 04.08.14 for CWM/BSL vide
cab-2 ALP side wiper Tech-55,
servomotor two bolt dt.26.09.14
broken while working in
train no.18101 in ALD
division. Further loco
checked in shed cab-2 LP
side & cab-1 both wiper
servomotors were not
working. Make- Electro
Mech
Sensor (FDU, TFP temperature sensor Sensor changed 12
Speed, defective
Pressure,
Temp. OHE/
Voltage)

Auxiliary MVMT-1 all winding Informed to 174


Motor earth. Star point normal. CWM/DHD vide
Make – SIE, Sr. no. Tech-MTR,
214316. 11.08.14.
MPFDCS "VCB tripped and all pilot Joint with firm 19
lamps extinguished and carried out and
unable to overcome the firm was advised
trouble.checked found to give detailed
MPFDS not functioning. investigation of
Further checked found failure.
MPFDS Power supply card
defective."

Miscellaneou DBR unit deficient Good DBR unit 19


s provided
MPFDCS MPCS unit power supply Card-1 replaced 19
card-1 defective.
Auxiliary 19
Motor
HT/LT cable TFP a3 bushing bottom In shed loco 400
cable burnt. checked and
found a3 bushing
one power cable
flashed near lug.
Power cable
insulation
damaged New
power cable lay
out.

HT/LT cable HQP1 off . QOP1 drop. In shed checked 13


and found TM2
field cable
insulation
damage rubbed
by cleat clip bolt .
Same cable
secured properly
Bogie & its During IA Loco lifted; 44
Mech. equip. insp.31.07.14;Bolster1 Bolster1 crack
crack above TM2. attended.
Bogie & its During IA insp on Loco lifted;Bogie 44
Mech. equip. 31.07.14;Bogie frame2 frame groove
crack above A/B-10 from cutted & crack
old welding. welded.
Auxiliary During IA insp.on MVRH changed. 44
Motor 31.07.14;MVRH which
was provided by POH-BSL
during POH, its codal life
completed.
Miscellaneou During IA insp.on Same welding 44
s 31.07.14;Near MVMT2 done + Cab2 ALP
below SJ & C-118 base side L/O glass
plate crack from old portion found
welding + Cab2 ALP side corodded, so L/O
L/O glass frame badly glass frame
rusted. fabricated &
welded.
Traction TM-4 isolate on line due TM Replaced by 214
Motor to QOP drop. On arrival ELS/BSL.
of locomotive in shed,
found stator IP Coil No. 1
outgoing lead found
parted.
Transformer Loco failed & lost in TFP changed. 27
punctuality on line Informed to
dt.31.07.14 for QLM CWM/DHD vide
drop. TF oil not splashed. Tech-MTR,
Loco arrived in shed on 02.08.14.
01.08.14 found QLM
target dropped, both NR
on ‘0’, TC oil level
at 300C, TFP oil level at
150C from minimum
mark. TFP oil DGA done
found C2H2=
229.17ppm, CH4 = 29.15
ppm, C2H4 = 97.91ppm,
C2H6 = 3.26 ppm, H2 =
150.32 ppm, CO =
36.57ppm, CO2 =
527.41ppm, BDV = 49.80
KV, Acidity = 0.01. TFP
core lifted no abnormality
found. It was last over
hauled at POH
workshop/DHD during
POH. TFP Make –
BHEL, Sr. No. 2010320,
MFG – 1996.

Pn. Pipeline RS pressure dropped and Loco checked in 276


panto lowered. LP build shed and found
up RS pressure through 17.08.14 and
MCPA closed DJ found all pressure
build up timing
taken found
within limit time.
Aux. BUR2 isolated BUR 2 DC link 62
converter Capacitor bank
(BUR) burst
Aux. BUR2 isolated BUR 2 DC link 62
converter Capacitor bank
(BUR) burst
Transformer DGA Abnormal which Advise to firm 4
indicate defect inside vide this office
transformer. Transformer letter No
Sr. No 2800040538 of BSL/TRS/S/WTY/
Make NGEF, Rehab 2013 TFP/DHD dtd
received with loco No 28/07/2014.
23755. (Rehab by M/s
Tribuwan Enterprises,
Faizabad) DGA Report
Date CH4 C2H4 C2H6
C2H2 H2 CO2 22/07/14
36.24 92.96 8.51 5.58 Nil
68 26/07/14 389.14
1340.27 113.34 119.52
Nil 1615.2

Aux. Bur2 inverter fault, R GDU changed 94


converter phase GDU defective
(BUR)
Traction While Wkg.T.No.19037 Loco arrived in 224
Motor betn.palghar & boiser shed on
QOP2 dropped, driver 02.08.14. on
isolated TM5 & work the checking found
train. TM5 CE side
bearing locking
plate 2 nos bolt
broken,also
brg.cover
missing, locking
ring missing,CE
side brg.missing.
New TM
recd.from DHD
on 13.12.13
during MTR-DHD.
St.No.H-
1179,ARM
No.4693-B-2000.
Miscellaneou PHGR oil leakage. During PHGR changed. 72
s checking found PHGR oil Informed to
leakage due to ‘O’ CWM/BSL vide
ring wear out. Tech-55,
dt.01.08.14
Miscellaneou PHGR oil leakage. During PHGR changed. 72
s checking found PHGR oil Informed to
leakage due to ‘O’ CWM/BSL vide
ring wear out. Tech-55,
dt.01.08.14
Bogie & its During TI at KYN shed 01 wheel set sent 377
Mech. equip. found MSU 3 Nos bolts to KYN shed.
were found broken inside Loco lifted &
the body of W.set6 and W/set changed
adjustment washer fallen and wheel
down.staff sent to KYN turning done.
shed for checking the
loco & found MSU
cracked CE side from 1"
T/motor mounting bolt
hole,adjustment washer
missing & allen bolt 03
nos found brken inside.
Traction TM-4,5&6 badly flashed All arc-horns 5
Motor replaced and
cleaned
thoroughly
GR/RGR/CGR PHGR filter to pump pipe New pipe 5
line oil leakage due to provided
pipe diffective
Traction Oil leakage from inlet Pipe changed 91
converter pipe of SR1 welding joint
(SR) portion
Traction TM-4&5 arc horns got Replaced with 37
Motor flashed new one
Relay Loco received with Q44 relay 37
defective Q44 relay, All replaced with
tripping not coming due spare good one
to timer defective
Relay Auto sanders not Q48 relay 37
working, Q48 relay replaced with
defective spare good one
Bogie & its Sand box-03 sand gear Sand gear unit 37
Mech. equip. unit complete not provided
available
Pn. Valve Brake application late A 9 defective 45
Bogie & its Bolster -2 crack Attended. 213
Mech. equip.
Aux. S/E from Bur1, E/F aux Attened and 24
converter ckt, Bur1 DC link 3 nos refitted with
(BUR) cap neck gasket damaged modified

Aux. S/E from Bur1, E/F aux Attened and 24


converter ckt, Bur1 DC link 3 nos refitted with
(BUR) cap neck gasket damaged modified

Aux. E/F aux ckt, Bur3 DC link Attened and 24


converter 2 nos cap neck gasket refitted with
(BUR) damaged modified
Aux. Bur2 GG module current Bur2 GG module 24
converter sensor defective current sensor
(BUR) changed
MPFDCS DJ not holding. On checking 48
found DJ was
closing but not
holding due to Q-
30 not 'ON'. SCU
defective, SCU
replaced by M/s
Stesalit. MPCS
Make - M/s
Stesalit.
Control ON SB BD CABLE NO B JOINT DONE 23
Circuit 720, SB's ONE BOLT WITH JE/DHD ON
THREAD WORN OUT AND DT 24/07/14,
NUT LOOSE DUE TO SAME INFORMED
WHICH CABLE NO B 720 TO AVOID
NOT MAKING PROPER REOCCURENCE
CONTACT AND Q44 NOT IN FUTURE.
PICK UP AND DJ NOT
MAINTAINED.
EM Bogie 1 isolated Traction 59
contactor/Rel converter 1
ay precharging
contactor coil
open
Pn. Valve AFI gauge defectiev AFI gauge 97
changed.
Traction TM-3 require changing Attended. 159
Motor since repeated TM flash.

Auxiliary Loco failed for MVMT-2 MVMT-2 165


Motor smoked. During checking changed.
it was found that MVMT-2 Informed to
winding burst & star point CWM/KPA vide
open circuit due to inter Tech-52, dt.
turn short. Loco was last 22.07.14.
over hauled at POH/KPA.
Make – CGL, Sl. no.-
92363, MFG- 12/2003.
Auxiliary Loco failed for MVRH MVRH changed. 423
Motor smoked. During checking Informed to
it was found that MVRH CWM/KPA vide
all winding earth & star Tech-52, dt.
point ok due to insulation 22.07.14.
failure. Loco was last
over hauled at POH/KPA.
Make – BBL, Sl. no.
9802684, MFG – 1998.

Sensor (FDU, SLG2 Pr oil TFP not ok, Sensor changed 27


Speed, TR2 Pout sensor
Pressure, defective
Temp. OHE/
Voltage)

Transformer Oil leakage from TFP 2 TFP 2 side both 15


side both gate valve gate valve
changed
Bogie & its Loco checked at HWH 323
Mech. equip. shed & found a fresh
crack on bogie-2 frame
between W/No 7 & 9
welding done at HWH
shed with out loco lifting.

Traction TM no.1 NDE side Wheel set no.1 57


Motor suspension tube spacer seperated, all
ring slack and grease spacers ring bolts
leaking. changed,tightene
d MS greasing
done and no
leakages found
SIV SIV tripping and further CT was replaced 21
SIV not picking up.SIV with new one.
fault data downloaded
and found “ G-OC”
fault logged continuously,
Hence related circuit
chopper side checked and
found CT of chopper
defective.
Relay Loco received with Q44 relay 21
defective Q44 relay, All replaced with
tripping not coming due spare good one
to timer defective
Relay Auto sanders not working Q48 relay 21
Q48 relay defective replaced with
spare good one
Auxiliary Loco checked in shed on 54
Motor dt 10.07.14 & found
MVSL-1 winding open ckt.
Non driving end bearing
cage found broken after
dismantaling of MVSL-1.
MVSL-1 make Ranjan,
O/H dt 14.05.14, Bearing
make NBC

Pn. Valve E-70 air leakage Pressure 34


regulator valve
defective
Traction Bogie 1 isolated Valve set GTO 135
converter burst
(SR)
Pantograph PT-1 isolated. Loco directed to 35
H/shed in PT 1
isolate condition
due to upper
tube broken .In
shed checked and
found PT upper
frame
longitudinal pipe
broken .
Complete PT
changed
Bogie & its Bolster No-1 Crack. Attended duly 143
Mech. equip. lifting.
Vacuum VCB was burst due to VCB replaced at 173
Circuit heavy flash over inside ELS BRC on
Breaker VCB 02/08/14
(VCB)
Bogie & its Bolster:Crack at E5 zone Same attended 143
Mech. equip. about 75 mm, same
welding done
Miscellaneou TFP oil leakage from its Bolt was 59
s conservator 3-way cock. tightened.
Pn. Pipeline Air leakage was from BC- BC-1 Flange joint 329
1 flange joint since gasket replaced
gasket damaged this at ELS MGS on
gasket was replaced 08/07/14
during POH on 11/08/13
by POH shop/DHD.
Pn. Valve BP over charging E 70 valve 29
defective
Traction Bogie -1 isolate GTO short , Valve 42
converter set changed.
(SR)
Pn. Valve Air leakage from FP Loco checked at 229
valve. BMG shed and
found out pit due
to air leakage .FP
valve changed
Arno 1) U-PHASE (CABLE NO INFORMED TO 9
965) OF ARNO IS CMM/DHD. 1) AS
RUBBING WITH BOLT PER SHED
(INSIDE THE J/BOX). 2) PRACTICE HIGH
WIRE NO. 966, 967, 546 INSULATION TAP
& 547 UNCOUPLED FROM PROVIDED ON
LUG NEAR SB (3)TK CABLE AND
(BEHIND SWITCH NOMEX PAPER
BOARD). UNMODIFIED PLACED
TYPE TERMINAL BLOCK BETWEEN CABLE
OF ARNO PROVIDED BY AND BOLT. 2)
MTR/DHD & IMPROPER NEW CABLES
LUGGING DURING PROVIDED FROM
MTR/DHD SB (3) TK TO
HVSL 1 & 2,
HCHBA, HVRH
AND SWITCHES
HCHBA, HVSL 1
& 2, HVRH
CHANGED.

Angle A/T-1 not working in 'BR' Cab-1 A/T 65


transmitter/d mode due to 2nd changed. IN-
isplay interlock (Br.mode) not Woama SL. No-
Unit/Switche making contact. 0108
s
GR/RGR/CGR GR oil leakage through its Housing 366
gauge glass due to ‘O’ ring
increasing in oil level. It (BT’s part no.
was detected that small S-1476), gasket
housing ‘O’ ring and bottom oil
(BT’s part no. S- seal were
1476), gasket and replaced.
bottom oil seal were
damaged.
Traction Loco failed for QOP-2 Informed to Dy. 438
Motor drop HQOP-2 off. During CEE/CB shop vide
investigation it was found Tech-54,
that TM-4 armature lifting dt.22.07.14.
bolts broken. It was last
over hauled during
POH/LKO on 21.04.13.
Miscellaneou Resistence of RC network 02 nos. 17
s 22Ω,80nos. (02 nos) Resistence open
ckted.
Miscellaneou Oil leakage and body One no. new 17
s partically damaged. capaciter fitted.
IN-ICAR
HT/LT cable Loco failed on 02/07/14 23
in DIVA-ROHA section of
BB division due to
reverser not set and GR
not progression due to
Q52 via MP+. ON arrival
in shed, loco checked and
found loco was provided
withstick type master
controller during POH.
Conk of earlier existing
conventional type master
controller was not
removed. Its conenction
were not removed from
SB and other end was
wrepped with polythene
but not properly. During
rain, water entered in
conventional conk and
wire No K091,K092 and
GG096 got wrong feed
due to wire shorted.
Transformer Loco failed & lost in TFP changed. 1543
punctuality on line for Informed to Dy.
“Total loss of tractive CEE/CB shop vide
effort” on dt.01.07.14 Tech-54,
while working in train no. dt.18.07.14.
1110 in JHS division
NCR . Loco arrived in
shed on 03.07.14 found
supply not available
across a3-a4 & a5-a6
bushing. TF oil DGA done
found C2H2=
2128.57ppm, CH4
=571.06ppm, C2H4 =
662.31ppm, C2H6
=25.97ppm,
H2=1374.04ppm, CO=
326.48ppm, CO2=
886.78ppm, BDV =
47.7KV & Acidity = 0.04.
TFP core lifted and found
A0 lead disconnected
from its brazing joint &
04 nos top plate support
bolts broken & core
hanging & 01 bolt loose
due to not properly
placed in tank during
Aux. POH/CB.
As per T/SThis
doneresulting
by E1 New contactor 15
converter contactor 52.3/1 not fitted. Make-
(BUR) working properly.Contact SCHALTBAU.
tips slightly flash mark.

Bogie & its Bogie-1 bolster cracked Attended. 145


Mech. equip. at bottom side
Miscellaneou Cab-2 heater bonded. Cab-2 heater 4909
s bonded.
Transformer Oil leakage from 'C' pipe 'C' Pipe changed. 4448
below portion as below
cracked.
Transformer Oil leakage from cab-1 Gate valve 4448
Asstt.Dr.side TFP gate Changed.
valve.
Miscellaneou (11-14) Interlock of New auxiliary 4448
s auxiliary contact for CP-2 contact fitted
MCB permanent open. with CP-2 MCB.
Make-
SCHNEIDER.
Miscellaneou (11-14) Interlock of New auxiliary 4811
s auxiliary contact for CP-2 contact fitted
MCB permanent open. with CP-2 MCB.
Make-
SCHNEIDER.
Traction TM2 inspection cover Inspection cover 327
Motor found in hanging of TM2 winded by
condition. wire by crew. In
shed checked and
found bottom
side bolt welding
broken.
Suspected
external hitting.
Same attended
and found
normal.
Pn. Valve E-70 air leakage Seal Changed 196
Traction ASC1 GBC, SR1 12/3 V2 Gate Unit 5460
converter G/U suspected. changed.
(SR)
Traction ASC1 GBC, SR1 12/3 V4 Gate Unit 5460
converter G/U suspected changed
(SR)
Aux. BUR3 L/S missing, P/S BUR P/S card 5460
converter card defective. changed
(BUR)
Relay Both BLCP was working New model RGCP 18
normal but RGCP was replaced by firm
defective. It 's with old model,
microswitch was stuck up by providing new
in NO position, hence CPs stand and
not working through pipeline.
BLCP. This is the second
failure of micorswitch of
RGCP (new model KBI
make triplate panel).
Previously RGCP replaced
by firm on 25/06/14 in
ELS/NKJ for the same
trouble. Microswitch &
RGCP is failing repeatedly
since under rated is used.

Compressor/ During IA inspection, It is Vide letter No. 29


Exhauster found compressor fly WAT/TRS/T/58/1
wheel heavy slack. Fail 947, Dt. 04-07-14
equipment : Compressor, to
MAke: Anest Iwata, S.No. Dy.CEE/ELW/SER
ML0585, Yr.Mfd. 11/12 /KGP

Miscellaneou 1) Indicator Needle Vide letter No. 48


s stickup, Make: Laxven, WAT/TRS/T/58/2
Indicator S.No. 843 2) 045, DT. 15-07-
Signal Interface unit 14 to
(SIU) smoke emission, Dy.CEE/ELW/SER
Make: Laxven, SIU S.No. /KGP
846 3) Potential
Transformer (PT) was
smoke emission, Make:
Laxven, PT S.No. 846
Transformer TFP oil DGA vales are TFP changed by 0
abnormal, C2H2 - shed, vide lt No.
4.05PPM,CO – 49.67 WAT/TRS/T/58/1
PPM,C2H6 – 5.31 948, Dt. 09-07-14
PPM,CO2 - 939.05 PPM, to
C2H4 - 54.14 PPM,H2 – Dy.CEE/POH/KGP
11.25 PPM, CH4 –
16.01 PPM.
Aux. Bur2 L/S missing, P/S Power supply 5180
converter card defective. card changed.
(BUR)
Miscellaneou (23-24) Interlock of New auxiliary 5180
s auxiliary contact for CP-2 contact fitted
& MCB permanent open. with CP-2 MCB.
Make-ABB.
Pantograph Un loader valve-1, base Attended. 0
incoming nipple broken
condition.
Pantograph Un loader valves isolating Attended. 0
cocks spindle type
provided in place of ball
cocks by POH shops.

Pantograph Cables of VEPT1 and Àttended. 0


RGCP are rubbing with
channel.
Battery In CHBA, input 16A MCB Attended. 0
Charger and output 20A MCB are
(CHBA) removed. Its wiring is
also in removed
condition.
Battery In Battery box no.1, Attended. 0
modified 35A MCB
(Additional CCBA)
removed and old type
porcelain type fuse
provided.
Battery Lead acid batteries of two Attended. 0
different makes provided.
7 Nos ‘starplus’
and 3 Nos ‘Bharat’
make batteries provided,
which are inferior in
quality. Very old lug
dated batteries (i.e., lug
date 02-13-starplus and
12-12 Bharat batteries)
provided.
EP Contactor Fixed and mobile bits of Attended. 0
EMC were replaced with
new bits but their quality
appears to be inferior
since getting bent during
operation and alignment
got disturbed. It is
embossed on fixed bit as
“SDF” and on
mobile bit as
“REFRON”. Due to
this, all EM contactors
had to be replaced with
new contactors during
ICO and caused
additional workload for
LGD shed.

Traction TM2 commutator at one Attended. 0


Motor place (Teflan band
side/brush area) surface
damaged/pressing marks
and brushes chipped off.
Hence TM2 changed
involving lifting of loco.

Transformer TFP silica gel breather Replaced. 0


center mesh deficient &
air path with top plate
mismatched.
SMGR SMGR control block diode Attended 0
plate not replaced/old
one provided.

Pantograph PT1&2 both side plunger Attended 0


boxes replaced at LGD
shed since there is no
spring action.
Pantograph Cab1 side BP metal pipe New pipe 0
at under frame having provided
number of bends.
Pantograph Both side additional BP Same replaced. 0
cocks provided without
vent hole
Pantograph For VESA-1&2, VEPT-1&2 Same replaced. 0
spindle cocks provided.

Pantograph DJ dryer to strainer Attended. 0


rubber hose provided in
place of metal pipe.
Pantograph For both sides FP angle Attended. 0
cocks, safety channel
bracket one side
deficient.
Pantograph Both side BP & FP Attended. 0
pipeline clamps not
tightened and safety
plates not tightened.
Pantograph C145 incoming pipeline Attended 0
routing done zigzag .
Pantograph Isolation cock provided Attended 0
for SS2, same removed
and pipeline directed.
EM Contactor Auto regression due to Contact was 96
flashing of J-1 contact no. replaced
4.
TM/MR NDE side stator winding Stator changed. 5227
Scavenge inturn short near
motor lamination core at 10 'o'
clock position .
Traction 1)Cable layout of TM Attended by 0
Motor No.2 and 5 was ELS/AQ.
obstructing to access TM
inspection covers. Two
power cables from
leftside and two from
right side were blocking
all space around
inspection covers. It was
practically impossible to
open the covers and
check the terminals
during schedule activity.
POH shall follow the
conventional layout of
four cables in single cleat.
TM No. 2,3 and 4 were
flashed. Arc Horn flashed
and insulators became
blackish. 2)TM No.3 one
Brush holders changed
due to heavy flashing.
3)TM No.2 rocker ring
fixing one bolt thread was
found damaged. This was
forcibly tightened by POH
staff.
Transformer Loco failed & lost in TFP changed. 460
punctuality on line dt. Informed to
26.06.14 for QLM drop. CWM/KPA vide
TF oil splashed & oil in Tech-52, dt.
trap changer. Loco 01.07.14.
arrived in shed on
28.06.14 found QLM
target dropped, both NR
on ‘0’, TC oil level
at 300C, TFP oil level at
150C from minimum
mark, Oil in oil trap
changer and oil splashed
on SMGR cover & A-33
bushing. TC and TFP oil
DGA done found C2H2=
3127.40 ppm, CH4 =
1040.13 ppm, C2H4 =
1753.52 ppm, C2H6 =
96.93 ppm, H2 =
1507.88 ppm, CO =
1062.80 ppm, CO2 =
543.24 ppm, BDV = 59
KV, Acidity = 0.02 &
Moisture = 6.20. TFP
core lifted found auto
winding flashed & cut.
(Photo graph enclosed).
Battery It wasCHBA
a)In last over
inputhauled at
and out CHBA changed 3
Charger put, MCB's (16 amps &
(CHBA) 20 amps) not provided.
(b) capacitors and diodes
not replaced, (c) cable
wiring of MCBs not
provided and cables
removed condition. CHBA
grommets are not
replaced and found in
damaged condition.
Auxiliary MVSL-2 impeller broken MVSL-2 replaced. 534
Motor from hub and dropped
down. Two blades also
got parted after
unfastening.
Transformer Oil leakage from cab-2 Ball valve 4696
Dr.Side Ist ball valve. Changed.
Traction ASC2 GBC, Valve set 4776
converter Code-120E/120D, SR2- changed
(SR) 12/3 Valve set V3+4 GTO
short
GR/RGR/CGR Loco failed & lost in CGR-3 changed. 348
punctuality on line for Informed to Dy.
“RGR cable burnt” CEE/CB shop vide
on dt.25.06.14 while Tech-54,
working in train no. dt.28.06.14.
B/PT/8610 in ECR. Loco
arrived in shed on
26.06.14 found CGR-3
fixing Allen bolt melt &
CGR hanging due to Allen
bolt taper fitted resulting
CGR-3 to base having
gap causing over heating
& melting of bolt.

Miscellaneou Loco taken under repair Temperorly 14


s since RGCP chattering rectified by firm
during dropping the by providing
trouble was due to design choke in VEAD Pn
defect of tri plate Pn ckt.Loco is still
pannel (KNORR BREAMSE under firm
INDIA).VEAD valve and attention.
RGCP mounted on same
pipe line having
insufficiant dia,caused
this trouble this pn
pannel was installed
during POH at DHD on
10/06/14.
GR/RGR/CGR CGR-1,2,3 & its operation RGR replaced 188
was normal.But over
heating and smoke
emission noticed from
RGR during notch
progression and
regresetion R-1,R-2 and
engle setting of GR
checked found normal
RGR itself was defective
caused the failures. this is
under warrenty failure of
RGR.
Transformer/ Bonded-All phase short to SRP-1 Changed. 5063
Converter oil ground.
pump
Aux. BUR2 input fuse blown BUR2 fuse 4773
converter changed
(BUR)
Aux. BUR2 input volt not ok GG module 4773
converter changed
(BUR)
Miscellaneou Oil pump not working New contactor 4773
s sometime when one No fitted. Make-
BUR isolate due to 52.6/1 SCHALTBAU.
stuck in sometime.

Auxiliary MVSL-1&2,while attended 0


Motor greasing, grease not
entering in to the bearing
found grease leakage

SL SL-1&2 right side coils attended 0


cables coming from loco
body are in tension and
cable touching with
terminal connectors
Bogie & its All connecting strappers provided 0
Mech. equip. brake hanger safety
slings defficient
Miscellaneou During IC-0 inspection, Soldering done 0
s Cab-2 MP damping unit vide letter No.
soldering worked out WAT/TRS/T/58/1
827, Dt. 27-06-14

Miscellaneou During IC-0 inspection, Tie rod provided, 0


s RSI 1 & 2 corridor tie rod vide letter No.
deficient WAT/TRS/T/58/1
827, Dt.27-06-14
to CWM/DHD

Pn. Pipeline During IC-0 inspection, Cock changed 0


Air dryer incoming cock vide letter No.
vent hole through air WAT/TRS/T/58/1
leakage 827, Dt.27-06-14
RPS/RS/DBR Loco failed & lost in TM-1, QF relay, 443
punctuality on line for RPS cable &
“A-34 bushing power cable
smoked” on changed.
dt.23.06.14 while working Informed to
in train no. 15483 in CWM/KPA vide
NCR. Loco arrived in shed Tech-52,
on 24.06.14 found as dt.28.06.14.
under:  All RPS cable
& cable no. 966 insulation
burnt near A-34 bushing.
 QF relay & its base
burnt.  RF-3 IR value
‘0’ Mega ohm. 
TM-1 armature earth. 
CCRPS fuse melted. 
RF-1 copper bus bar
(Roof mounted DBR) to
PT-1 shunt having
flashed mark on roof due
to less gap. (90 mm).
OHE voltage (25KV)
jumped into power circuit
through RF-1 copper bus
bar from PT-1 shunt
resulting above damages.

Auxiliary During IC inspection, MVMT-2 was 122


Motor MVMT-2 was 3 phase changed by shed,
earthed. Fail equipment vide
details: MVMT, Make: WAT/TRS/T/32C/
CGL, S.No. MKAM1403 1866, Dt. 30-06-
14 to Crompton
GReaves
Ltd/Bhopal &
DyCEE/POH/KPA
Pn. Valve Air leakage from Pr. Air leakage from 627
Regulator of SPB equip. Pr. Regulator of
Manifold due to SPB equip.
diaphragm displaced. Manifold due to
diaphragm
displaced.
Pn. Valve Message in DDS VCB will EP valve 4910
not open due to EP Valve replaced.
defective.
Miscellaneou Cab-2 TM current limiting Replaced with 10
s unit not working new one
Bogie & its Side bearer no-03 New side bearer 10
Mech. equip. cracked provided
Bogie & its Side bearer no-08 Liner replaced 10
Mech. equip. crack,6mm liner provided and new side
and loaded height less bearer provided.

Central Cab1 off, HBB2 L/S CD slot SB card 5309


Electronics missing changed.
Hurth TM 2 & 3 oil hurth Membrane 70
coupling coupling oil leakage Changed
Vacuum Details of failure- VCB VCB changed at 69
Circuit flashed and grounded ELS/AQ.
Breaker through vertical insulator,
(VCB) Puncturing of operating
rod/Discharge of moist air
through relay valve air
pipe line might have
caused the flashing of
VCB insulator, THUS VCB
failure.
EP Contactor J-2 drum burnt due to J-2 replaced. -76
flash over between
contact no. 4 & 5 (Field
of TM-2 & Armature of
TM-3), 8 & 9 [H02
(negative path) of TM-4
& Field of TM-5) of J-2
becuase of less gap
between contacts of
different traction motors.
Details of J-2: Make-
CLW, Sl. No.:
96/97/02/20, Type- 1500
A. LOD- 09.05.14 during
POH. During POH, up-
gradation of reversers
from 1000 A to 1500 A
was carried out, but the
recommended gap
between contacts was
not maintained. Also, up-
gradation has not been
carried in accordance
with RDSO’s SMI No.
0234. Only, finger and
mobile contacts were
replaced and other parts
like Shaft Assly, Fork,
Traction Bearing
Loco Flange,
failed Bush,
on 15.06.14 TM-5 changed. 355
Motor for QOP-2 & QRSI-2 Informed to
drop, HMCS-2 on 3rd , CWM/KPA vide
while working in train no. Tech-52, dt.
12350 at BKO/ALD/NCR. 19.06.14.
During checking it was
found that TM-5
armature cone burnt. TM-
5 changed.It was last
over hauled at POH /KPA
during POH. Make- CLW,
Arm. No. F444-6120-10-
04.
Miscellaneou TLTE due to sticking up MP replaced. 230
s of both reversers because
of availabilty of feed in
both NC-4 valve. It was
detected that MPJ-1 cam
was displaced from its
position due to loosening
of its bottom fixation nut
caused permanent
closing of its normally
closed interlock and
thereby, feeding both NC-
4 valves of both
reversers.

Miscellaneou Cab-1 A/Dr. side desk New 'ZLDA switch 5306


s lamp not glowing due to fitted in cab-1.
micro switch of ZLDA Make-SCHLTBAU.
permanent open.
Compressor/ Compressor assembly CP-2 Changed. 5056
Aux. badly damaged due to
compressor bracket of compressor
side broken on line.
Auxiliary MVSL-2 while greasing, attended 0
Motor grease is not entering
into bearing. Grease pipe
is defective
Auxiliary For MCP-2 safety guard is attended 0
Motor not provided
MPFDCS Reverser trouble, Loco FDCS output card 28
checked in shed on dt. changed.
18.06.14 and found out
put no-10 showing short
ckt, Ckt trace out and
found wire no
D108,C108,B108 ok. No
any wire ground. FDCS
checked and found
output card no-1 channal
no-10 defective same
card changed with spare
one and working checked
found ok. Make Stesalit

MPFDCS Loco checked in shed on 28


dt. 18.06.14 and found
out put no-10 showing
short ckt, Ckt trace out
and found wire no
D108,C108,B108 ok. No
any wire ground. FDCS
checked and found
output card no-1 channal
no-10 defective same
card changed with spare
one and working checked
found ok. Make Stesalit

Transformer Oil leakage from TFP TFP changed. 4793


plate bolt and bushing
due to TFP bushing plate
'O' ring damaged.
Traction ASC2 GBC, (Code-1110E- Valve set 5326
converter 1,110D-15), SR2-12/3 changed
(SR) Valve set V1+2 GTO
short
Pn. Valve Valve spindle assembly Another valve 5302
seating damaged. stem from
section fitted.
Pn. Valve Valve spindle assembly Another valve 5302
seating deformed and stem from
oval shaped. section fitted.
Battery/ One cell of one battery One battery 5326
battery box. showing 'O' volt. replaced.
Miscellaneou AFI gauge glass cracked. Another gauge 4478
s from section
fitted.
Traction ASC1 GBC, SR1-12/3V3 Gate unit 4901
converter Gate Unit defective changed
(SR)
Bogie & its Heavy oil leakage from New Yaw Damper 4792
Mech. equip. Yaw Damper fitted.
Compressor/ Loco arrived in shed on Informed to 445
Exhauster 11.06.14 for IC schedule CWM/KPA vide
with CP-1 bad smell. Tech-52, dt.
During checking it was 13.06.14.
found that MCP-1 IR
value normal but CP-1
inter cooler bad smell.
After dismantling found
CP-1 HP disk valve spring
broken and safety valve
incoming hole carbonized
& choked. It was last
over hauled at POH /KPA
during POH. Make- Elgi,
Sl. no. 5560.

Aux. Bur3 L/S missing, P/S Bur P/S card 4477


converter card defective. changed
(BUR)
Aux. Bur2 L/S missing, Bur2 R GDU changed 4761
converter Φ GDU defective.
(BUR)
Miscellaneou Gear case oil ingress in Attended. 5351
s TM.
SIV During investigation P/T Normal schedule 355
and F/T SIV (ABB) was done, loco
working normal.But working normal
several times internal on line.
earth fault logged in fault
data firm rep checked
and nothing found
abnormal.Hence firm
repaccompanied the loco
and no abnormalities
noticed this failure may
one to some transient
trouble of SIV.

Traction Loco failed on 10.06.14 TM-6 changed. 838


Motor for TM-6 pinion removed. Informed to
During checking it was CWM/KPA vide
found that TM-6 CE side Tech-52, dt.
bearing seized and roller 19.06.14.
badly damaged resulting
commutator grazed. TM-
6 changed. It was last
over hauled at POH /KPA
during POH. Bearing
make- SKF, NJ-324, Mfg.-
2013

Traction TM-3 armature V cone TM changed 366


Motor failed
Bogie & its AB No.3 PHS broken. Attended. 254
Mech. equip.
Relay QPDJ relay defective QPDJ relay 150
changed
Traction ASC1 GBC, Code- Valve set 4880
converter 130E,130D, SR1-13 Valve changed
(SR) set V1+2 GTO short

Traction TM5 top G/C cruse.TM4 Attended. 76


Motor bottom axle cap front
portion crack.
Control LSGR not extinguished. Loco checked by 576
Circuit LSFL always glowing after SSE(outpit )/GMO
sometime become and found normal
normal. . Loco also
checked at Hatia
and found
normal. In shed
loco came on
08.06.14 in
normal working
condition . In
shed loco
checked and
found normal. P2
range was 4.4 to
4.6 both cab BP
showing 5 Kg

Miscellaneou Loco no. 22284/WAP-4 Informed to 441


s checked during super CWM/KPA vide
checking and found that Tech-52, dt.
150 mm2 cable (From 16.06.14.
CGR-1 to A-34 bushing)
over heated and cable
strands cut at CGR-1 end.
During investigation
found cable used
150mm2 and under size
thimble of 120mm2 by
cutting cable strands to
reduce cable dia resulting
over heating. In long
terms these cable strands
may be disconnected
resulting burning and
loco failure. Loco was
POHed at KPA on dt.
23.03.13.
SIV Loco failed second time Firm rep up 10
during exit on 06.06.14 loaded new
since CHBA of SIV not version(version45
working & battery run ) software.Loco
down to 40v.Loco kept under
energised by giving BA observation for
supply,from oither loco two days by
and CHBA of SIV was using it for
working and CHBA shunting
voltage was 108v. After functioning of SIV
2Hrs BA voltage found satisfactory
inereased to 105v.Loco and given ready
kept energized for 4hrs for traffic on
for BAcharging,BAs 09/06/14
checked after 12Hrs
voltage was 100v on no
load and99v with MCPA
working.All BAs were
normal and
healthy.During data
analysys of SIV it was
noticed that several faults
logge in fault memory
regarding INV-1,INV-2&
CHBA, Firm rep. checked
the software of SIV and
noticed that it isold
version (version 44)
Aux. Hence
Bur1 L/S SIV P/S
missing, Power supply 4677
converter card defective card changed.
(BUR)
Traction NSC2 pulsing stop, NSC NSC card 4756
converter card defective changed
(SR)
Arno ARNO stator all three 412
phase earthed.
Arno Arno All Three phase 412
winding earthed.
Aux. BUR2 L/S missing, P/S Power supply 4785
converter card defective. card changed.
(BUR)
Oil cooler Impeller blade broken & OCB-1 changed. 5020
blower unit duct damaged.
Transformer Cab-2 OHE voltage New TFP module 5044
showing 23KVA due to primary voltage
transformer module fitted in cab-2.
primary voltage out put Make- KRISHNA
showing 7.9V. ENGG.
DC-DC Both cab head light not Loco checked at 519
Converter/HL glowing PNBE by MGS
/FL staff and found
24 V supply is not
coming out from
DC to DC
converter . DC to
DC converter
changed. In
shed, DC to DC
converter
checked and
found 24 V wire
solder open out
from common
point from
switch.
Bogie & its Bolster-2 crack. Attended. 166
Mech. equip.
Bogie & its A/Box no.- 6 primary Same primary 108
Mech. equip. spring broken. spring changed at
BMG shed. Loco
checked in shed
and found
normal.
Miscellaneou AFI gauge glass cracked. AFI gauge glass 826
s changed.
TM/MR NDE side stator winding Stator changed. 5043
Scavenge flashed on ovre hand
motor position at 'o' clock.
Compressor/ Loco arrived in shed on Informed to 523
Exhauster 03.06.14 for IA schedule. CWM/KPA vide
During testing it was Tech-52, dt.
found that CP-3 abnormal 13.06.14.
sound due to cooling fan
(CP side) key broken
resulting abnormal
sound. It was last over
hauled at POH
workshop/KPA during
POH. Make – Elgi, Sl.
no. 22466.
Miscellaneou Cab-1 PCLH not working New ZLH switch 5042
s due to ZLH switch fitted in cab-
defective (Micro switch 1.Make-
melted). SCHALTBAU.
SIV Loco jointly checked with K-8 contactor of 87
firm representative of M/s SIV replaced by
SIEMENS and found K-8 firm
contactor was defective representative of
After replacement of K-8 M/s SIEMENS.
contactor loco checked
and found working
normal.

SIV Loco jointly checked with Firm 6


firm representative of M/s representative of
siemens and noticed that M/s SIEMENS has
INV-1,INV-2 and Battery installed the
charger lock message software of
recorded in date since system.
software of system was
not prooerly installed
during commissioning of
SIV at LCWW DHD firm
representative has re-
installed the software of
system After installing the
software loco checked
and found working
normal.
Control Q 100 RELAYS WIRE CABLE IN SB BD 17
Circuit N0.100 IS CONNECTED OF RELAY Q 100
WITH CCA OUTGOING IS REMOVED
WIRE NO 100 IN SB BD, FROM CCA CKT
WITH THIS Q 100 SB AND
PERMANENTLY PICK UP CONNECTED
WHEN BA ON WITH CABLE NO
100 A ON SB BD
OF Q 100 RELAY.

Transformer/ Heavy abnormal sound SRP-1 Changed. 4957


Converter oil due to DE/side bearing
pump cage broken. (Non
Metallic cage.)
Transformer A34 bushing insulator In shed loco 159
burst checked and
found A34
bushing insulator
broken and TFP
oil spread out.
A34 bushing
burst. Flashing
mark on A34
bushing and near
MVRH channel
(energy meter
PT) . Suspected
first insulator
cracked oil
spread near
MVRH channel so
flashing mark
from insultor to
channel causing
insulator burst.
Auxiliary MVMT-1 PE SIDE END MVMT-1 387
Motor SHIELD'S BEARING CHANGED
HOUSING DIA FOUND
EXCESS. ( STD-139.993
TO 140.018 mm , FOUND
140.10 mm) AND
PUNCHING MARKS
NOTICED,
Transformer A34 bushing insulator In shed loco 159
burst checked and
found A34
bushing insulator
broken and TFP
oil spread out.
A34 bushing
burst. Flashing
mark on A34
bushing and near
MVRH channel
(energy meter
PT) . Suspected
first insulator
cracked oil
spread near
MVRH channel so
flashing mark
from insulator to
channel causing
insulator burst.
VCD Loco no. 27273/WAG-7 of Informed to Dy. 253
ELS/CNB failed on CEE/CB shop with
31.05.14 for VCD not copy to firm vide
working. During Tech-54,
investigation it was found dt.14.06.14.
that VCD not reset after
penalty brake from both
cab due to control unit
defective. It was over
hauled during POH/LKO.
Make – Medha, Sl.
no.2284, DOC- 16.06.12.

HL/FL Cab2 side FLCU main FLCU changed. 83


switch not working.
Traction Error techo TM-6,SR-2 H Card changed. 83
converter slot card defective.
(SR)
Traction ASC1 PS fault storage MC GUSP changed 36
converter peri.
(SR)
Traction Dist in converter-1, GUSP GUSP changed. 36
converter defective.
(SR)
Traction NSC2 GBC, SR2 12/2 Valve set 82
converter Valve set V1+2 GTO changed.
(SR) short.
SMGR SMGR was sticking on 1/2 SMGR sector 219
notch since its lever guide pin
compression spring pt. was replaced
no. A-454007 of guide during insp sch.
pin was got jam inside of Working of SMGR
guide pin. during minor sch
& overhauling is
being done
during major
schedule.

Memotel Cab1 SPM not working Slave changed. 49


Auxiliary Loco arrived in shed for Both MVMT 267
Motor IA schedule on 28.05.14. changed.
During checking it was Informed to Dy.
found that both MVMT CEE/CB shop vide
having abnormal sound. Tech-54,
Both MVMT changed. On dt.12.06.14.
further checking found
MVMT-1 non load end
bearing ball sticking and
MVMT-2 rotor defective
as rotor unbalance
resulting abnormal
sound. Both MVMT last
over hauled during
POH/CB on 03.09.13.
MVMT-1 Make –CGL,
Sl. no. 61043 and MVMT-
2 Make – CGL, Sl. no.
91909.

Aux. Bur-1 Life Sign missing. Bur P/S card 34


converter changed.
(BUR)
Aux. Bur-1 inverter fault, RΦ WRE changed. 34
converter WRE both GTO short.
(BUR)
Transformer Spring washers not Attended -31
provided on link plates of
a0-a1, a7-a8 bushes.
This may lead to
loosening of connections.
Miscellaneou 1) MVSL-1 DE side grease 1) Attended on 39
s leakage. 2) CP-2 coupling shop floor. 2)
sound. 3) TM-6 arc horns Coupling spring
flashed. 4) Different broken, new
grade brushes providedspring provided.
in TM-5(EG 3) Thoroughly
9049,EG8220). 5) TM- cleaned with
1,3&6 270 sq mm cablesORION-77 and all
available,300 sq mm arc horns
cleats provided. 6) Cab-1 replaced. 4)
VCD foot switch spindle Same were
deficient. 7) Side bearer
removed ,patina
no-01 fixing bolts slack.
cleaned and EG
8) All side bearers are 8220 batch
old. 9)Sand rubber pad
brushes provided.
not provided. 10) Sand
5) Replaced with
box no-2&5 hose pipes 270 sq mm
deficient. 11) TM-1&6 terminal cleats.
axle cap bolts slack. 12)6) Foot switch
TM-4&5 axle bolts sealing replaced with
not done. good one. 7)
Same were
tightened. 8)
Same allowed on
condition basis.
9) 4 nos side
stopper rubber
pads provided.
Traction NSC1 GBC, SR1 12/2 V2 10)Gate
Newunit
sand 228
converter G/U defective. changed.
(SR)
Miscellaneou Earth fault not defective New 3.9K-2 228
s in control ckt. Due to resistance
3.9K-2 resistance open fitted.Make-RGE
ckt.
SIV VCB tripping frequently Chopper GDU 304
through QSIT (tripped 8 card was
times in same replaced with
place)Every time VCB is good one.
closing but tripping after
some time.Loco arrived
to shed on 22.5.14 in
normal working
condition .SIV fault data
downloaded and found
“Chopper GDU ”
fault logged. Further SIV
Chopper GDU OFC
connectors and electrical
connectors were checked
for any looseness found
normal

Traction NSC2 GBC , SR2 12/2 Valve set 22


converter Valve set V1+2 GTO changed.
(SR) short,
Miscellaneou During IC sch-BG-2 Rubber pipe 157
s rubber pipe crack,RC changed,DAmpin
damping of TFP aux g panel
winding burning changed,Gasket
smell,SMGR air leakage changed,
ner PRV,
Miscellaneou QLM dropped with oil TFP is being 157
s through TFP s/valve.Oil replaced. DGA of
was filled in oil trap TFP is being
chamber.GR was on 32nd taken during
notch.TFP DGA is every IC
negative.Discharge of low schedule.
energy & continuous
sparking inside TFP is
indicated.TFP was
provided by LCWW
DHD.ISCU-1 of M/s
stesalit MPCS blasted due
to flashover inside.MPCS
unit was complete dead
except power supply card
CPU-1&2 card were not
responding at all even
when replaced in other
loco & vice versa.RSI-
1,power diode no 1.2 &
4.3 shorted,power fuse
4.2 & associated tel-tel
fuse blown off. On going
through SIV fault data no
external disturbance from
OHE was noticed.No any
abnormality in SIV wals
recorded tillthe moment
Pn. Valve QLM
E-70 was
valvedropped. On
air leakage Seal replaced 38
MPFDCS Loco failed for J-1 & J-2 Input cad 114
feed back failed. Loco changed.
arrived in shed on Informed to Dy.
26.05.14 found that LSDJ CEE/CB shop with
not glowing and all copy to firm vide
CTF’s automatically Tech-54,
goes in braking side. dt.29.05.14.
Input I-33, I-34 & I-35
status permanent high on
MPCS display. During
investigation it was found
that Input card no. 3
defective, same changed.
MPCS make- ICECPL

Compressor/ Loco failed for CP-1 Informed to Dy. 397


Exhauster safety valve air leakage. CEE/CB shop with
During investigation it copy to firm vide
was found that CP-1 HP Tech-54,
disk valve spring broken dt.03.06.14.
resulting safety valve
permanent blowing. It
was last over hauled
during POH/LKO on
21.04.13.

Compressor/ CP-1 abnormal sound due CP-1 changed. 112


Exhauster to coupling spring Informed to
broken. It was last over CWM/KPA with
hauled at POH copy to firm vide
workshop/KPA during Tech-52, dt.
POH. Make- Elgi, Sl. no. - 27.05.14 with
21791 copy to firm.
Transformer TFP oil leakage. Loco cheked at 703
TATAand found
TFP oil leakage
from TFP corner .
Loco directed to
H/shed. In shed
checked and
found TFP oil
leakage from TFP
corner core
gasket. TFP
under changing.
Detail cause
found afer core
lifting
Traction NSC-2 GBC , SR2 12/3 Valve set 75
converter Valve set V1+2 GTO changed.
(SR) short.
Traction NSC-1 pulsing stop. SR-1 NSC card 299
converter changed
(SR)
Miscellaneou DJ tripped twice, first Flashing CTF1 58
s time via QOP1, QOP2 and 4th & 5th drum
QRSI1, and second time bits and its finger
via QOP1, QOP2 , QRSI1 bits was observed
and QLM , due to improper
bedding of bits
provided by POH
shop.

SIV SIV was not ramping up TFP auxiliary 20


since input voltage was bushing a1-a7
not available ex TFP shorting link was
auxiliary bushing a1- replaced
a7shorting link was
flashed due to loose &
less contact area as one
of the two holes of short
link was eliptical & over
sized.
Vacuum VCB pressure increases PRV changed. 6
Circuit automatically from 5.2 Informed to
Breaker Kg/cm2 to 6.4 Kg/cm2 in CWM/BSL vide
(VCB) regulator due to kit Tech-55,
defective. Make- Areva, dt.28.05.14 with
Sl. no.-1646/L firm.
Vacuum VCB actuating rod crack. VCB changed. 6
Circuit Make- Areva, Sl. no.- Informed to
Breaker 1646/L CWM/BSL vide
(VCB) Tech-55,
dt.28.05.14 with
firm.
Miscellaneou Auxiliary voltmeter Voltmeter 5
s defective as showing changed.
13KV OHE voltage Informed to
instead of 25 KV due to CWM/BSL vide
stuck up. Make-Galaxy, Tech-55,
Sl. no. 5063. dt.27.05.14 with
firm.
Aux. BACH current below 10 Control CT 174
converter amp(BUR-2) changed.
(BUR)
Traction TMB-1 abnormal Sound TMB-1 Changed. 174
motor blower due to NDE side bearing
damaged.
Relay QPH was replaced but Letter is being 328
problem of tripping written to
through QPH still POH/shop.
persisted hence finally
same QPH overhauled &
provided.
SIV SIV Blower abnormal Over hauled 17
sound, fan end shield blower fan
cracked provided
Traction HMCS-I on II TM-1 'V' come 80
Motor punctured. TM-1
changed. TM-1
was fitted during
POH+RC at KPA.
TM Make- Kalyani
Engg. Works. Mfg
year-03/2013
GR/RGR/CGR GR segment angle in GR replaced 0
regression side above
limits (4 to 4.5 degrees)
Auxiliary QOA was dropped MPH changed at 570
Motor through MPH since got ELS BIA on
earthed.MPH changed at 19/05/14.
ELS BIA on 19/05/14
SIV LSCHBA always glowing Loco failed due to 144
and LSSIt permanent battery charger
glowing SIV internal fault not working. LI
Sri P. K.
Tripathi/MGS and
he was reported
sometime battery
charger not
working and once
SIV internal fault
and QSIT drop.
TLC/ALD decided
fresh power
attached at
GAIPURA/NCR.
Loco checked by
LI/TDL at ANVT
and he was
reported
sometime battery
charger not
working. Loco
directed dead to
home shed. In
shed loco
checked and
found sometime
battery charger
not working,
SIV LSCHBA always glowing Loco failed due to 144
and LSSIt permanent battery charger
glowing SIV internal fault not working. LI
Sri P. K.
Tripathi/MGS and
he was reported
sometime battery
charger not
working and once
SIV internal fault
and QSIT drop.
TLC/ALD decided
fresh power
attached at
GAIPURA/NCR.
Loco checked by
LI/TDL at ANVT
and he was
reported
sometime battery
charger not
working. Loco
directed dead to
home shed. In
shed loco
checked and
found sometime
battery charger
SIV SI UNIT INTERNAL not working,
FIRM CHANGED 353
FAULT AND SCR DRIVER COMPLETE
CARD DEFECTIVE RECTIFIER
SECTION AND Y-
PHASE INVERTER
DRIVER CARD

Traction ASC2 GBc, SR2-12/3 Valve set 14


converter Valve set V1+4 GTO changed.
(SR) short, TM-5 J/Box
flashed, G/U OK
Vacuum Pressure increases in VCB VCB changed. 398
Circuit pressure regulator upto Informed to
Breaker 6.4 kg/cm2 instead of 5.2 CWM/KPA with
(VCB) Kg/cm2 as air leakage copy to firm vide
from PRV exhaust port Tech-52, dt.
due to regulator kit 25.05.14.
defective. It was last over
hauled at POH
workshop/KPA during
POH. Make- Areva, Sl.
no.- 5957/L-1.

Traction TM 5DE retaining plate Motor changed 148


motor bolt broken
Pn. Valve CP-1 Unloader cap Another cap 331
defective as rubbing fitted.
marks inside the cap,so,
air leakage
Miscellaneou Skidding sound from Loco jointly 1085
s W.No. 1,2,5,10,12 checked in shed
and found no any
wheel skidding.
WT done at CNB
on 12.05.14. LP
Sri S.B Singh/ALD
previous booking
booked without
any wheel
skidding sound .

GR/RGR/CGR GR head shaft oil leaking oil seal replaced 199


and attended
Miscellaneou Defects noticed during Attended by shed 0
s Commi.-Axle Box No. 11
longitudinal clearance
found 4.5 mm more than
permissible limit.(Std. size
2-4mm)
Traction Defects noticed during Attended by shed 0
Motor Commi.-TM No. 1 Rocker
insulator one number
sleeve found damaged
and torn.
Pn. Pipeline Defects noticed during Attended by shed 0
Commi.-After cooler
protection boxes and
Drain pipe modification
was not provided and
existing modification
removed and not fitted.
Compressor/ Defects noticed during Attended by shed 0
Exhauster Commi.-CP 1+2+3
Deliveri pipe not changed
and wire braided pipe
coupled. This is not to be
provided in future. CP
1+2+3 Deliveri pipe
nozzles were not
provided as metal pipes
were not existing.

Aux. Bur-3 Life Sign missing. card changed. 89


converter
(BUR)
Sensor (FDU, SLG1 Pr oil TFP not Ok TFP sensor 140
Speed, changed.
Pressure,
Temp. OHE/
Voltage)

Sensor (FDU, SLG2 Pr oil TFP not Ok TFP sensor 140


Speed, changed.
Pressure,
Temp. OHE/
Voltage)

Traction ASC1 GBC. Gate unit Gate unit 140


converter defective. changed.
(SR)
Harmonic Earth Fault in Harmonic Relay defective, 33
filter filter Relay changed.
Miscellaneou W.No.12 skidding mark. Loco checked by 1082
s CNB out pit found
W/No. 12 & 9
spot mark. Wheel
turning done.
Due to hitting by
foreign material

Traction Dist in Convt-1, ASC1 Gate Unit 165


converter GBC, SR1 13V1 G/U changed.
(SR) defective.
Traction Dist in Convt-1, ASC1 Gate Unit 165
converter GBC, SR1 13V1 G/U changed.
(SR) defective.
Auxiliary MVRH,W-phase terminal MVRH W-phase 221
Motor lug of winding side lead lead was
was flashed & parted recrimped &
from terminal due to connected.
defective crimp.MVRH IR
& contineuty was ok. C-
107 was ok.
Suspension SB 5 oil nil. SB 4 oil Oil fill up by BMG 547
Bearing (SB) minium shed. In shed
checked and
found in SB4 &
SB5 oil inter
mixing in gear
case.
GR/RGR/CGR Bottom coupling shaft same replaced 2
bevel gear part
no.S1481.7 having play
Traction TM-1,3,4,5,6 each 1 No. insulators 0
Motor shunt fixing insulators changed
thread slipping, old
available
EP Contactor Line contactor shackle attended 0
broken
GR/RGR/CGR . GR coupling tube coupling tube and 0
bottom gear having play pins changed at
so coupling tube and pins ELS/LGD.
changed at ELS/LGD.
HL/FL Cab1 FLCU STD pos not FLCU changed 325
working.
Aux. Bur-2 input fuse blown. Bur-2 input fuse 325
converter changed.
(BUR)
Aux. Bur-2 input volt not ok, GG module 325
converter GG module V4 diode changed.
(BUR) short.
Aux. Bur-3 isolate, S Φ WRE 1 WRE module 233
converter GTO short. changed.
(BUR)
Angle Rear head light not New BLPR New 325
transmitter/d glowing from cab-1 due BLPR switch
isplay to cab-1 BLPR micro fitted in cab-1
Unit/Switche switch defective. Make-
s SCHNEIDER.
Traction QOP1 acted.Found TM1 Arc horn replaced 433
Motor and TM2 arc horn flashed and commutator
and commutator flashed. cleaned. Grinding
stone applied.

Harmonic Harmonic filer connecting Harmonic filter 134


filter bar flashed. resistance
changed.
VCD/ TPWS Vigilance not working due Vigilance unit 14
to unit defective. changed.
Angle Cab-1 hotline not working New 'BLPR' 133
transmitter/d due to micro switch switch fitted in
isplay defective. cab-1.Make-
Unit/Switche SCHALTBAU.
s
SIV Loco pilot informed that Input fuse 174
experienced ICDJ through replaced and
QSIT relay and display found SIV and
showing on MPFDS "Y loco working
phase output current and normal
voltage 0". After kept
HBA OFF and ON, VCB
closed but SIV not
picking up. SIV fault data
downloaded and found
“Input fuse fail”
fault logged continuously.
On checking found SIV
input fuse blown.

Miscellaneou During IB sch-DJ rubber DJ pipe 158


s pipe defective,Under ER changed,Drain
tankleakage from adopter cock
coupling,Cab-2 VCD foot changed,Foot
switch defective. switch changed,

EP Contactor DJ not holding Loco checked by 273


MGS staff at
PNBE and found
C118 interlock
wire no 733 and
739 not making
contact .Same
aux interlock
changed by E2
section at PNBE
and after that
found working
normal.
Equipment
History- C118
EPC type, make
CLW, S.No. -NA
DOFitment & OH
and fitted on
06.08.13 during
POH.
EP Contactor DJ not holding Loco checked by 273
MGS staff at
PNBE and found
C118 interlock
wire no 733 and
739 not making
contact .Same
aux interlock
changed by E2
section at PNBE
and after that
found working
normal.
Equipment
History- C118
EPC type, make
CLW, S.No. -NA
DOFitment & OH
and fitted on
06.08.13 during
POH.

Traction ASC1 GBc, SR1- Gate unit 132


converter 12/3V3G/U defective changed
(SR)
Traction ASC1 GBc, SR1-13V2G/U Gate unit 132
converter defective changed.
(SR)
Traction ASC2 GBc, SR2- Gate unit 132
converter 12/3V1G/U defective changed
(SR)
Central Vigilance activated, O slot O slot card of SB 12
Electronics card of SB track blown. changed.

GR/RGR/CGR GR Segment angle in Attended -9


regression side showing
more than 4degree&
4.5degree which is above
overhauling limit of
3degree
Miscellaneou ICDJ was caused due to BL-1DJ & BL-2DJ 56
s bad contact of BL-2 DJ I/L is bypassed in
switch I/L in VCB coil VCB coil circuit to
circuit ICDJ via DJFB fail restore original
is a misleading message state of circuit.
generated by MPCS since
in this
modification(RDSO/MS/03
84) of providing BLDJ I/L
in VCB coil circuit niether
any feedback is given to
MPCS nor software is
modified to accommodate
this I/L in soft logic.

Transformer/ TR.Pump-2 Oil Efficiency TR.Pump-2 9


Converter oil low. changed.
pump
Aux. Bur3 GG module 3 nos tips changed 9
converter M/F tips Over heated.
(BUR)
Relay Q118 wedged Q118 relay 71
interlock
assembly
defective
Auxiliary Block 1 isolate Block isolate due 112
Motor to MVMT blade
broken
Traction Smoke emission from TM4 NDE bearing 237
Motor under frame seized.
Bogie & its W.No.3 sander pipe Steel pipe 32
Mech. equip. broken hanging and removed and
rubbing with track. rubber hose
provided.
SIV M/s ABB make SIV unit SIV unit main 35
main switch an aux I/L switch aux I/L
cable got uncoupled cable connected
caused SIV not ramping & working of SIV
with fault message found normal.
Rectifier fault/Main switch
fault.
MPFDCS DJ trip via QCVAR, with SCU was replaced 38
display of message- " by the firm.
NO/LOW QCVAR" due
defective SCU. Details of
SCU :- Sr.No. B
50311502, Make- Stesalit

MPFDCS DJ tripping with display of SCU was -23


message- DJ trip due to replaced.
low/no QCVAR. Signal
conditioning unit of MPCS
was defective. Make of
MPCS- Stesalit
Miscellaneou BUS BAR NO. E21 CRACK BUS BAR 290
s DUE TO TENSION CHANGED BY
ELS/BL
Control TLTE, LSB not Loco checked at 25
Circuit extinguished Chandigarh and
found normal.
Loco worked in
short link 54511
with maintenance
staff/UMB. After
passing RPAR,
LSB glowing and
both reverser J1
& J2 came in
centre. After
checking it is
found that feed
was available in
both forward and
reverse coil of
both reverser in
wire no. 012 and
014. After
thorough
checking it is
found that one
spare washer was
lying in between
CTF3 interlock
wire no. A11 and
A13 , same
Auxiliary Loco failed on 29.04.14 washer removed
MVRH changed. 173
Motor for QOA drop, MVRH
smoked. During checking
it was found that MVRH
two phase earth & star
point open circuit. Make-
Siemens, Sl. No. 309829.

Traction Bogie -1 isolate Converter no1 189


converter valve set GTO
(SR) short
Traction Bogie -1 isolated TM winding 189
motor defective
Switch Defects noticed during Attended by shed 0
Commi.-Cab No. 1 and 2
BPQWC112 switch was
not provided on the desk.

Traction Defects noticed during Attended by 0


Motor Commi.-TM No.4 and 6 shed.
was found flashed and
blackish. Power cables
provided to TM No.1 and
6 below the loco body
were old and of less
diameter E-beam cables,
whereas remaining four
TM’s power cables
were changed and
replaced by new bigger
diameter cables. For
standardization ELW
could have replaced all
the six power cables, so
that same size cable
cleats can be provided.
TM 1 and 6 cable cleats
were of big size and
cables are of small size.
Arc horn bracket fixing
bolts two nos. found
broken in TM-2. All the
bolts are of property class
4.6, whereas it is better
to use 8.8 bolts because
broken bolts are difficult
to remove
EM Contactor Defects on Rocker
noticed during Attended by shed 0
Commi.-Reverser at
position J-2 (HCR) drum
Contact No.5 and finger
Contact No. 4 and 10
flashed. In CTF-3 drum
Contact No. 4 and finger
Contact No. 4 and 10
were flashed.
Pn. Pipeline Defects noticed during Attended by 0
Commi.-Pneumatic panel shed.
Cab-2 corridor foot plate
(near) door one ¾â€
pipe was leakage.

Compressor/ Defects noticed during Attended by shed 0


Exhauster Commi.-CP 3 pipe line
found leakage. CP-2
unloaded pipe line was
leakage.
Compressor/ Defects noticed during Attended by 0
Exhauster Commi.-After cooler shed.
protection Box and
channel was found
deficient. In CP-1
Delivery pipe flange male
and female flanges was
not provided and also CP
nozzle were found
deficient.

Pn. Pipeline Defects noticed during Attended by 0


Commi.-DJ Air Dryer and shed.
SMGR PRV changed since
leakage
Compressor/ Defects noticed during Attended by 0
Exhauster Commi.-CP 1+2+3 shed.
Delivery pipes flexible
wire braided provided. It
should be loope type as
per SMI.
Pn. Valve Both cab horn not wkg. Loco checked at 330
GMO & found
Duplex valve
stuck up Duplex
valve Flower
taken out and
loco given fit
without Duplex
valve .( Duplex
valve made
direct). After
arrived in shed
Duplex valve
changed. Duplex
valve changed
ESMON LP informed from TKD Master control 104
that both side SPM's not card replaced and
working.Loco checked at found loco
TS/TKD by M/s Stesalit working normal.
Firm engg. Found both
SPM working normal but
at times beyond 30 KMPH
SPM not working hence
on suspecting basis
master control card
replaced

Pantograph PT-1 was flashing since Leakage was 49


not raising fully due to reectified & loco
heavy air leakage from released for
servomotor pneumatic traffic.
pipe line at roof.
Auxiliary While wkg.on line at MCP changed at 24
Motor WAT, MCP smoked. Loco WAT (Under
sent to WAT shed for warranty)
attention.
Auxiliary 1) MVMT-2 vibration 2) 1) MVMT-2 5
Motor MPH top dummy nut oil properly aligned
leakage 3) Axle box 2) Oil leakage
No.7,9 LC bend iron pipe arrested 3)
air leakage. 4) Axle box Flange gasket &
No. 4, 7 & 9 stay plate iron pipe
bolts slack. 5) All sand replaced. 4) Axle
box covers suitable box No. 4, 7 & 9
gaskets not provided. 6) stay plate bolts
A-9 cam dog rollers pins tightened. 5)
broken. Suitable gaskets
provided. 6) A-9
cam dog rollers
replaced with
good one.

Vacuum Sparking from VCB VST tube burst 128


Circuit
Breaker
(VCB)
Miscellaneou During IB sch-Cab-2 HT Horn diaphragm 128
s horn sound dull,L-5 EPV replaced,L-5 EPV
leakage,RGEB to be changed,RGEB
calibrated,S-62 EPV changed,S-62
leakage from EPV
exhaust,VEPT-2 leakage changed,VEPT-2
from exhaust , cab-1 changed,VESA-
VESA-1 leakage from 1/1 changed,
exhaust.
Oil cooler OCB-1 Bonded-All phase OCB-1 changed. 218
blower unit earthed.
Oil cooler OCB-2 Bonded-All phase OCB-2 changed. 152
blower unit earthed.
Miscellaneou Cab-1 heater bonded. Cab-1 heater 218
s changed.
Suspension All S/B oil spread out. Loco checked by 338
Bearing (SB) GZB and found
SB oil less due to
SB oil leakage .
SB oil fill up. In
shed checked and
found all SB oil
leakage from SB
joint felt back
side . SB3,4,5 &
6 oil intermixing
to be attended
during lifting of
loco.

Battery Conventional type CHBA CHBA HRC fuse 172


Charger failed since it output side replaced working
(CHBA) HRC fuse of 20 Amps was of CHBA checked
already got blown off found ok.
&was rewired with copper
cable strands which
under rated for the circuit
& melted out.

Traction Traction Motor No.4 Traction Motor 340


Motor Pinion Slipped on shaft No.4 changed.
causing LSP.
Traction Traction Motor No.4 Traction Motor 340
Motor Pinion Slipped on shaft No.4 changed.
causing LSP.
EP Contactor LSB glowing and reversor After arrival of 16
stuck UP loco in shed same
tested and found
once J2 stuck up
about 200
operation . J2
taken out from
loco and J2
tested jointly
checked with
SSE/ KPA and
found spring
tension and dip
clearance below
standard
value.Spring
tension about 9.5
kg(std value-
12+_1 kg) and
dip clearance 1.5
mm (std value
2+ .5 mm) .
Suspected trouble
occurred on line
due to less dip
clearance and
contact pressure .
Equipment
History:- Make-
EP Contactor LSB glowing and reversor After arrival of 16
stuck UP loco in shed same
tested and found
once J2 stuck up
about 200
operation . J2
taken out from
loco and J2
tested jointly
checked with
SSE/ KPA and
found spring
tension and dip
clearance below
standard
value.Spring
tension about 9.5
kg(std value-
12+_1 kg) and
dip clearance 1.5
mm (std value
2+ .5 mm) .
Suspected trouble
occurred on line
due to less dip
clearance and
contact pressure .
Equipment
History:- Make-
HT/LT cable TM2 smoke emission . After arrival of 197
loco in shed, loco
checked
thoroughly and it
is found that Ba1
all power cable
and control cable
badly burnt.
There is no any
sign of loose
connection on
power terminal
and reverser
terminal. On
detail checking it
is found that
power cable of
TM2 viz. FF 22,
EF 22, FF 23 &
EF 23 burnt at
entering point of
loco body. All
above cable short
ckt. at entering
point so that
power cable
connection on
terminal badly
Central Cab1 isolate overheated
Central and
Electronic 10
Electronics rack defective

SIV SIV tripping frequently Loco directed to 670


H/shed as
rectifier fault
lamp glowing of
SIV. In shed
checked and
found inverter
GDU card
defective .
Inverter GDU
card changed.
Sensor (FDU, 18.5/1 LEM sensor LEM sensor 143
Speed, defective. changed.
Pressure,
Temp. OHE/
Voltage)

Traction NSC1 GBC,SR1 12/3 V1 Gate unit 143


converter G/U defective changed
(SR)
Traction ASC1 Error BS Mub GBC, Gate unit 143
converter SR1-229 G/U defective changed
(SR)
Traction ASC1 GBC, SR1- Gate unit 143
converter 12/3V1G/U defective changed.
(SR)
Traction ASC1 GBC, SR1-12/3 V4 Gate unit 143
converter G/U defective. changed.
(SR)
Miscellaneou During IB sch-BA no- BA set 108
s 5,7,9 voltage less,BLZLF- changed,BLZLF-1
1 limit switch to be limit switch
changed,CAb-2 BP angle changed,BP angle
cock leakage,ER gauge to cock replaced,RE
be calibrated,GR oil gauge
leakage from bottom changed,GR
side,IP valve not changed,IP valve
working,L-3 EPV leakage changed,L-3 EPV
to be replaced,MVSL-1 ab changed, MVSL-1
sound,PHGR oil changed,PHGR
leakage,HVSI-1 switch changed,HVSI-1
knob broken,QPDJ to be switch
changed,QVRF not pick changed,QPDJ
up,CAb-2 VCD unit buzzer changed,QVRF
not working, changed,VCD unit
changed,
EP Contactor J-1+J-2 not throwing . CTF-1 braking 50
side fixed &
mobile contacts
were badly
flashed & welded
caused reverser
not throwing in
desired direction.
CTF Make - CLW,
Sl. No.
01/02/0114
(1000 Amp.
capacity), Date of
fitmemt during
POH+RC at KPA
on 26.02.14. Dy.
CEE/KPA has
been intimated.

Switch Cab1 BLDJ switch Switch changed 52


defectie
Miscellaneou During schedule, noticed RS51 element 411
s that RS51 element open brazed duly lifting
circuited since reported the roof and
that after taking MPS 1st element.
and 2nd notch, LSP
glowing with AR since
QD2 acting.
Memotel both cab SPM not Stepper motor 61
working due to stepper and out put card
motor and Out put card changed.
defective.
Axle Box AB No-3 grease sample Axle box O/H 165
metal content above done.
limits 0.31%
Transformer/ Converter oil pressure not Converter oil 175
Converter oil OK pressure
pump defective.
Traction ASC 2 GBC Gate Unit Gate Unit 136
converter defective. changed.
(SR)
Traction Error BS mub over load. Gate Unit 136
converter Gate Unit defective. changed.
(SR)
Sensor (FDU, Oil leakage from Tr-1 New "O" ring 34
Speed, temp sensor , as O ring fitted.
Pressure, not provided
Temp. OHE/
Voltage)

Pantograph PT2 isolated. Loco checked at 661


BL found PT2
eyelet
(mechanism assly
eye bolt broken
near servomotor)
rod broken. Same
changed at BL.

Traction Defects noticed during Attended by 0


Motor Commi.-TM-2 brush shed.
holders were found badly
flashed. Front BH spring
melted causing flashing
marks on direct lead
cable on small insulator.
TM-2 Junction Box cover
was bend and fitted on
one bolt only, and
remaining bolts were not
matching with hole. TM-3
one new Brush holder
make ELCO/HWH pigtail
fixing threads werer
found slack. TM-3 rocker
positive insulator threads
got slacked while
removing nut. ELW shall
use standard nuts of M16
on positive/negative
insulators.
SIV Defects noticed during Attended by 0
Commi.-In SIV, AAL shed.
make generic
BCHU,F,LOFC cables
were externally fitted
with drilled in metal plate
and was not secured
properly.
Compressor/ Defects noticed during Attended by 0
Exhauster Commi.-CP 1+2 +3 hoses shed.
flexible metal braided
was provided, it should
be loope type.CP 1+2+ 3
delivery pipe’s nozzles
were deficient.

Miscellaneou Defects noticed during Attended by 0


s Commi.-BP, FP, DJ, CPA, shed.
Rubber Hoses were not
replaced during POH.

Pn. Pipeline Defects noticed during Attended by 0


Commi.-After Cooler shed.
protection box with drain
channel deficient.
Miscellaneou SHAA-2Power cable Temporarily got 50
s No.HH-27&V-27 terminal attended by
lug barrels werw rubbing Providing paper
with cable stiffner& finally packing to
heat shrinkage sleeve got Increase
cut & barrel got earthed electrical
since adequate electrical clearence
clearance was not
ensured during cable
connection

Auxiliary Heavy abnormal noise Adviced to firm 380


Motor from CP vide letter no.
BSL/TRS/S/WTY/
ELGI/CP/ELW dtd
17/04/14.
Compressor/ CP ELGI make TRC 1000 380
Exhauster MN bearer Sr. No L-
1203620 of M/s BBL
make (Mfg April 2012)
was provided in off POH
loco No 23047. Loco
failed on line for
abnormal noise. MCP/CP
removed and test on test
bench found abnormal
noise from CP. This CP
was failed under
warranty.
Traction Bogie 1 isolate Traction 108
converter Converter no 1
(SR) Valve set GTO
short
Compressor/ Loco arrived shed on CP-1 changed. 323
Exhauster 05.04.14 for CP-1
abnormal sound. During
checking it was found
that CP-1 coupling spring
broken resulting heavy
abnormal sound. Make-
Elgi TRC-1000MN, Sl. No.
440549/GDAM1760.

SIV No indication was glowing SIV power supply 95


in SIV display panel SIV connector was
opened cleaned &
refitted working
checked found
normal

Angle Cab-2 vigilance not Cab-2 vigilance 102


transmitter/d acknowledge by paddle paddle switch
isplay switch due to sur clip changed.Make-
Unit/Switche open out. WOAMA SL,No-
s 1648.
Transformer Oil leakage from TFP gate Gate valve 28
valve as top 'O' ring changed.
damaged.
Traction Oil leakage from SR1- Stuchi coupler 27
converter 12/3 stuchi coupling changed
(SR)
Traction All Gate unit connection All Gate unit 27
converter gap less as washer washer changed.
(SR) improper size.
Aux. 6 nos cooling fan 6 nos cooling fan 27
converter abnormal sound/not changed in BUR-
(BUR) working in BUR-2 2.
Transformer/ SRP-1 Abnormal Sound SR-Oil pump-1 27
Converter oil due to DE/Side bearing changed.
pump cage out.
Miscellaneou During IB sch-CBC-1 key CBC-1 operatinig 155
s not go in side ,CTF-2 out handle
side EPV leakage,L- changed,CTF-2
1,5,6EPV leakage,RDJ-2 EPV changed,L-
pipe crack,RGCP to be 1,5,6 EPV
calibrated,S-43 EPV changed,RDJ pipe
leakage from changed,RGCP
exhaust ,TM-3 pinion changed,S-43
rmoved due to pinion end EPV changed,TM-
bearing sized,Through 3 pinion removed
cab-1 horn VCD not at UMB on Dt-
working, 12/02/14 at
ELS/TKD on
arrival ELS NKJ-
TM changed.Horn
strainer body
changed,

RSI block DC bar holding all A letter has been 6


insulators of RSI-2 panel written to M/s
broken panel sl. No. stesali as it is
SL/13/ER/280A. Mfg under warrenty
13.02.13 make- M/S obligation
stealet.
GR/RGR/CGR RGR inner isolator 5 RGR replaced. 44
no’s crack.
Bogie & its Side bearer no.8 rubber Side bearer 44
Mech. equip. crack. replaced.
Auxiliary MVSL-2 impeller rubbing Impeller replaced 44
Motor to duct. with good one.

Switch HVSL-2 switch insulation HVSI- 322


failed partial discharge 1&2 ,HCHBA
started between U & V switches & their
phase contact terminals cables
finaly flashover tracking replaced,Flashed
occurred betweem & overheated
them.Terminal lug of cables at TB SB
cable no 965& 966 also replaced.
got melted the flashed
over at this switch
resulted in tracking in
HVSI-1 terminals of cable
no-B 535& 536&537 at
TB SB terminals of cable
no-N-966 got melted &
parted,Tracking occurred
between terminal lug of
10sq mm cable no A-
982,A983,3sq mm cable
no-A-965& R-966 at
HCHBA switch.

Pn. Valve Air leakage from A-9 Loco jointly 136


notch not progress checked in shed
and found some
time air leakage,
in A9 when
emergency
apply .A9
changed. A9 dis
mental and found
A9 rusted inside .
Control Loco trip on several Loco jointly 46
Circuit notch's. checked by
JE/RS/NDLS Sri
Mahesh Kumar
Bishu and CLI/
TDL Sri Ram
Kumar at NDLS
and it was found
that all operation
of locomotives is
normal.Loco
directed to GZB
shed. Loco
checked at GZB
and it was found
that loco is
working normal
in all respect.
After arrival in
shed loco
checked and
found that all
operation was
normal. Following
parameter was
checked- 1> Mili
volt drop test
done and found
normalvariable
Miscellaneou QR-30 variable sliderring QR-30 [Q118 76
s was not making proper resistance was
contact at resistance replaced,
cylinder ,
Traction Smowas emmited fromm TM-6 pinion 508
Motor G/C-6 since TM-6CE removed & MU
bearing sized due to given 11 TM
breakage of locking bolt working
SIV BA charger not working. Loco checked at 97
HWH found BA
charger was
working normal.
In shed also
checked BA
charger working
normal.
Compressor/ Compressor abnormal Compressor 144
Exhauster sound, Defective changed by shed
Equipment: Compressor, vide letter No.
Make: ELGI, TRC WAT/TRS/T/58/1
1000MNUG, Sl No. EMJS 357, Dt. 08-05-14
960020, Mfd. 01/13 to
DY.CEE/POH/KPA

Miscellaneou Contractor 218 close with New contractor 168


s flashing & milivolt drope fitted.Make-
high. SCHALTBAU.
Auxiliary MPH oil leaking from (MPH changed 0
Motor bottom end shield (MPH
changed).
Auxiliary MVMT-2 driving side end MVMT-2 changed 0
Motor shield cover fixing lug
cracked condition
Auxiliary MVRF top side grease attended 0
Motor pipe deficient, bottom
side grease pipe leakage

GR/RGR/CGR GR regression breaking attended 0


angle showing more than
4 & 4.5
degree(overhauling limit
3.0)
GR/RGR/CGR CGR making angle Universal gear 0
showing more than 4.5 to struck up new
5.0 degree.Universal gear provided
struck up
Transformer TFP drain plug nut head drain plug 0
worn out and oil leaking changed
badly
EP Contactor During checking it was Line contactor 44
found that L-1 line changed.
contactor permanent Informed to
closed. Further checked CWM/DHD vide
found its auxiliary inter Tech-MTR,
lock hanging due to fixing dt.29.03.14.
screw loose and
obstructing the
movement of line
contactor resulting L-1
permanent closed.
Miscellaneou During checking it was All look out glass 44
s found that both cab LP & changed.
ALP side look out glass Informed to
fogy and not visible out CWM/DHD vide
side. Tech-MTR,
dt.29.03.14.
Bogie & its AB.no.11 grease metal Clamping plate 0
Mech. equip. content above limits Attended.
EP Contactor J-1 & J-2 contact flashed. Line contactor 44
During checking it was changed.
found that L-1 line Informed to
contactor permanent CWM/DHD vide
closed. Further checked Tech-MTR,
found its auxiliary inter dt.29.03.14.
lock hanging due to fixing
screw loose and
obstructing the
movement of line
contactor resulting L-1
permanent closed.

Miscellaneou J-1 & J-2 contact flashed. All look out glass 44
s During checking it was changed.
found that both cab LP & Informed to
ALP side look out glass CWM/DHD vide
fogy and not visible out Tech-MTR,
side. dt.29.03.14.
Axle Box During IC0 inspection Thrower hitting 50
found, Axle box-4 high with box rollers,
metallic - 2911 ppm outer racer
chipped off.
Racer & thrower
changed by shed,
vide letter No.
WAT/TRS/T/58/1
042, Dt. 02-04-14
to CWM/KGP

Miscellaneou During IB sch-Air drier Isolating cock 154


s leakage from out going changed,MVT-2/1
vent ,Cab-2Dr side cab changed,VEUL-3
fan not fitted,VEUL-3 to changed,Look out
be changed since heavy glass
leakage from changed,BLVMT-
exhaust,1/2look out glass 2 switch
broken,CAb-2 BLVMT-2 changed,Foot
switch spring tension switch changed,
less,VCD not ack from
cab-1 foot paddle switch,

Pantograph Both CAB-1 &2 side BP Attend 0


angle cock & pipe
protection guarding
deficient
Miscellaneou Both cabs LP & ALP seats Attended 0
s bases are welded
permanently instead of
fixing with bolt &nut.
Bogie & its Bogie-2 bolster Crack at Attended. 0
Mech. equip. eye hole.
Axle Box At Axle Box No. 3 Primary Attended. 0
spring not seated
properly.
Traction SR 2 oil pump having oil MPH to radiator 26
converter leakge pipe changed due
(SR) to crack.
Sensor (FDU, FDU calibration problem. FDU changed. 121
Speed,
Pressure,
Temp. OHE/
Voltage)

Traction Oil leakage from 'L' pipe L' pipe changed. 120
converter below portion as below
(SR) cracked.
Miscellaneou Working Tr. No- 2149 Dn In shed checked 150
s Loco trip via QSIT and found cab1
external earth fault lamp ALP side heater
glowing terminal base
insulator broken
so terminal board
tilted terminal
touched with
body.

Aux. Earth fault auxiliary Bur-3 DC link 238


converter circuit, Bur-3 DC link 1 capacitor bank
(BUR) capacitor gasket changed.
damaged.
EP Contactor At TATA - TM-4 isolated. Over telephone 127
ELS/TATA
intimated that
TM-4 was
isolated due to L-
4 problem.L-4
changed.
Compressor/ Loco arrived shed on CP-2 changed. 479
Exhauster 19.03.14 for IA schedule.
During checking it was
found that CP-2 isolate
due to CP-2 piston ring
defective resulting heavy
oil leakage from breather
valve. It was last over
hauled at POH
workshop/KPA during
POH. Make – Knorr
Bromse, Sl. No.
1106/GMO-10.

Brake system E-70 Seal defective. Seal changed. 85


(E-70/Knorr)

Auxiliary Loco trip via QOA & bad In shed loco 261
Motor smell from H.T checked and
compartment. Block-I found MVMT1
isolated. bonded. MVMT1
changed. MVMT1
dismentalling
done and found
inter turn
insulation failure.
Regarding C101,
C102 not closing
Loco checked
from both cab
found normal.
Auxiliary Loco trip via QOA & bad In shed loco 261
Motor smell from H.T checked and
compartment. Block-I found MVMT1
isolated. bonded. MVMT1
changed. MVMT1
dismentalling
done and found
inter turn
insulation failure.
Regarding C101,
C102 not closing
Loco checked
from both cab
found normal.

Miscellaneou During IB sch-BP-1angle Cock kit 88


s cock leakage,CP-1 replaced,CP-1
delivery pipe leakage,CP- delivery pipe
1 NRV leakage,L-5 EPV changed,CP-1
leakage,HVSI-1 switch NRV changed,L-5
knob broken,QPDJ to be EPV
calibrated,J-2 out side changed,HVSI
EPV leakage,RGCP to be knob
changed,S-42 EPV air changed,QPDJ
leakage,TM-5 crack near changed,J-2 out
bottom lug, side EPV
changed,RGCP
changed,S-42
EPV changed,TM-
5 changed,
Miscellaneou During IB SCH-BP-1 Kit replaced,CP-1 88
s angle cock leakage,CP-1 delivery pipe &
delivery pipe & CP-1 NRV NRV changed,L-5
leakage,L-5 EPV pressure EPV
leakage,HVSI-1 switch changed,HVSI-1
knob broken,QPDJ to be knob
changed,J-2 out sied EPV changed,QPDJ
leakage,RGCP to be changed,J-2 out
changed,S-42 EPV side EPV
leakage,TM-5 crack near changed,RGCP
bottom lug, changed,S-42
EPV changed,TM-
5 changed,
EP Contactor Loco no. 27092/WAG-7 of J-1 & J-2 contact 33
ELS/CNB arrived in shed (2 fix + 2Mobile)
on15.03.14 for J-1 & J-2 changed.
contact flashed. During Informed to
checking it was found CWM/DHD vide
that J-1 & J-2 contact Tech-MTR,
(2fix + 2Mobile) badly dt.15.05.14.
flashed due to contact
force less i.e 10.5 Kgf,
same changed.

EP Contactor Loco no. 27092/WAG-7 of J-1 & J-2 contact 33


ELS/CNB arrived in shed (2 fix + 2Mobile)
on15.03.14 for J-1 & J-2 changed.
contact flashed. During Informed to
checking it was found CWM/DHD vide
that J-1 & J-2 contact Tech-MTR,
(2fix + 2Mobile) badly dt.15.05.14.
flashed due to contact
force less i.e 10.5 Kgf,
same changed.

Bogie & its wheel set-3 gear side wheel set-3 164
Mech. equip. suspension tube grease changed
not entering
Miscellaneou BLCPA not working on Loco checked by 26
s putting BLCPD . Heavy air maint. staff and
leakage from RGCP & CP found CP not
safety valve. MR presure working from
not increase more than 1 BLCPA but when
Kg. BLCPD "ON"
safety valve blow.
ET Maint.
staff/DNR called
at ELS/MGS and
they reported
that air dryer
cock & BP addl.
cock isolated by
bad element at
RJPB. Both cock
made normal by
maint. staff/RJPB
and pressure
build up normal.
No any air
leakage from
loco.

Traction TM-4 cell cracked. Loco checked at 80


Motor BMG shed and
found TM4 MSU
shell cracked and
same welded by
them. In shed
loco checked and
found TM4 MSU
shell badly
cracked. TM4
changed.
Traction TM-4 cell cracked. Loco checked at 80
Motor BMG shed and
found TM4 MSU
shell cracked and
same welded by
them. In shed
loco checked and
found TM4 MSU
shell badly
cracked. TM4
changed.

EP Contactor R118 smoke & C118 Loco checked at 216


contact tips flashed. GMO shed and
found C118 stuck
up due to its cam
displaced. Same
fitted properly.
During normal
schedule
tightness of cam
can not be check
as cam is covered
fully by Aux.
interlock of C118.
Suspected the
cam was not fully
tightened by the
POH/KPA.

Auxiliary Compressor motor burnt Motor changed 368


Motor
Harmonic Harmonic filter isolated Harmonic filter 11
filter gets isolated due
to 8.2 contactor
EP valve spindle
and bucket falling
SIV SIV temparature high. Loco came to 10
ELS/ASN on
17.03.14. On
checking as per
SIV fault data
found " Over
temparature". As
per Firm found
SIV Input chock
problem. Choke
changed on
03.04.14 and
loco tested
normal. Joint
note has been
made with firm.
SIV Make - M/s
Hirect, SIV Sl.
No. 2013
L/258/08

Battery/ BA Box-2 badly damaged BA Box - 2 74


battery box. due to external hitting. replaced.

GR/RGR/CGR Defect noticed during Attended by 0


MTR-GR bottom side loco ELS/AQ
body plate deficient.

Roof Defect noticed during Attended by 0


Equipments MTR-On roof , Main ELS/AQ
misc. bushing cable (A- 33) and
VCB connection link
coupled in one place, it
should be seperated.
Transformer Defect noticed during Attended by 0
MTR-TFP to radiator ELS/AQ
80mm valve was leaking
TFP breather was fitted in
tilted condition
Pn. Pipeline Defect noticed during Attended by 0
MTR-Cab-1, SA-9 ELS/AQ
Incoming- Outgoing
coupling was leakage so
it’s gasket changed.
Switch Defect noticed during Attended by 0
MTR-Cab-1 Driver side LT ELS/AQ
horn switch incoming
adopter and coupling
found leakage.
Miscellaneou Defect noticed during Attended by 0
s MTR-BA-2 Strainer ELS/AQ
outgoing adopter was
leakage and coupling Eye
leakage.
Battery Defect noticed during Attended by 0
MTR-Old battery set ELS/AQ
provided. (November
2009)
Pn. Valve Defect noticed during Attended by 0
MTR-Maintenance of ELS/AQ
Pneumatic valves is not
feasible and during minor
schedule, removal of
valve is problematic.

Pn. Pipeline Defect noticed during Attended by 0


MTR-MR Tank drain cock ELS/AQ
elbow coupling leakage.

Pn. Valve Defect noticed during Attended by 0


MTR-VEPT-2 Throttle ELS/AQ.
valve cap gasket was in
damaged condition.
Pn. Pipeline Defect noticed during Attended by 0
MTR-PT-1 pressure drop ELS/AQ
was more, servometer
incoming Elbow coupling
& Throttle valve were
found leaking , so gasket
changed also its outgoing
coupling was found loose,
same fitted properly.

Pn. Valve Defect noticed during Attended by 0


MTR-Cab-I Driver side ELS/AQ
WSM Benjo connecter
loose fitted and leakage
Pn. Valve Defect noticed during Attended by 0
MTR-A-9 release timing ELS/AQ.
found 20 seconds hence
C3W return choke
adjusted.
Pn. Pipeline Defect noticed during Attended by 0
MTR-KBIL Make Air Dryer ELS/AQ
both towers were not
opened and only cleaning
was done. So Air Dryer
removed during ICO and
overhauling done.
Flexible hose pipe
provided in CP1+2+ 3,
wheras it should have
been copper pipe as per
SMI. BA 1and 2 panel
strainer in the cock
position were reverse
fitted. After Cooler Drain
pipe, modification of AQ
shed was disturbed and
new arrangement done.
Battery Box back side
NRV ½ inch and ¼ inch
pipe were rubbing with
each other. CP 1+2+3
Delivery flange nozzle
male and female
modification was not
done.

EM Contactor Defect noticed during Attended by 0


MTR-C118 and R118 ELS/AQ
asbestos sheet was
deficient.
Bogie & its Defect noticed during Attended by 0
Mech. equip. MTR-All pull rods ELS/AQ
provided in Brake
Hangers were of small
size. (standard size as
per drawing
no.ELW/BSL/4/WAG-
7/002) is 523mm.
Bogie & its Defect noticed during Attended by 0
Mech. equip. MTR-Locking was not ELS/AQ
done to the top bolts of
side bearers and axle
boxes bottom plates All
equilisers, compensating
beams and link plates
provided are unmodified.
Buffer No. (1)-1110mm,
(3)- 1110mm and( 4)-
1114mm height was
more than permissible
limit. Standard buffer
height-1105mm.

Traction Defect noticed during Attended by 0


Motor MTR-TM-2 and TM-5 ELS/AQ.
Power cable were rubbing
with respective TM’s
Junction Box cover due to
cable cleat in under
frame is not located
centrally i. e. shifted on
one side.
EP Contactor Defect noticed during Attended by 0
MTR-C-145 paralleling ELS/AQ
was not done.In EPC (L1-
L6) brazing was not
done.In 2 CGR (AQ
No.1180), Guide was
loose, same replaced. In
all 3 CGR, washers were
not provided, hence
spring came out. Also
CGR guide pin were
changed at AQ since
different types of guide
pins were found
provided.
SMGR Defect noticed during Attended by 0
MTR-SMGR I/L- ELS/AQ
41/42,61/62,83/84
paralleling was not done

Switch Defect noticed during Attended by 0


MTR-Both BL boxes were ELS/AQ
old provided.
Arno Defect noticed during Attended by 0
MTR-ARNO Cable used ELS/AQ
95 mm sq instead of 125
mm sq.
RPS/RS/DBR Defect noticed during Attended by 0
MTR-DBR Bell mount ELS/AQ
removed and non
standard jali was
provided.
Compressor/ Defect noticed during Attended by 0
Exhauster MTR-CP-3 front portion ELS/AQ
not accessible for
maintenance.
RSI block Defect noticed during Attended by 0
MTR-Both RSI DC ELS/AQ
damping pannel value
found less 18 Micro
Farads and 16
MicroFarads.
DC-DC Defect noticed during Attended by 0
Converter/HL MTR-RTPR was not ELS/AQ
/FL provided. Only DC-DC
Converter provided.
ESMON Defect noticed during Attended by 0
MTR-In AUTOMETER ELS/AQ
MAKE SPM, CT & PT of
MEDHA make were found
provided . Further PT also
was found defective .
ESMON Defect noticed during Attended by 0
MTR-In SPM PG junction ELS/AQ
one sensor cable was
found dry soldered. Cab-
1 and Cab-2 SB and PG
junction box earthing
cable not connected. Also
PG to 5 pin connector
was not connected
through SB i. e. direct
cable provided from 5 Pin
connecter.
Transformer Defect noticed during Attended by 0
MTR-TFP and GR ELS/AQ
changed during POH
even though it is
mentioned in C Proforma.
A-34 to CGR 120 sq.mm
cable provided in place of
185 sq.mm.

EM Earth fault not detected New earth fault 73


contactor/Rel due to earth fault relay relay
ay over heated and cover fitted.SL,No-1694
damaged. Make-WOAMA.

Pn. Pipe line Transducer coupler Another coupler 73


defective. fitted.
Traction Bogie-2 isolated Bogie isolate due 9
converter to Pre charging
(SR) contactor plunger
loose.

Aux. NSC2 GBC Gate unit Gate Unit 72


converter defective. changed.
(BUR)
Vacuum VCB tripped & ICDJ. LP Loco was placed 28
Circuit made loco dead & HBA in shed on
Breaker Off/On then loco normal 07.03.14 and
(VCB) and worked. during checking
found the
following :- i) No
trouble from both
cab. Ii) SMGR
operation
checked found
normal. SMGR
pressure- 3.5
Kg/cm2 Drop-
500 gm/notch
Progression time-
11 secs.
Regression time-
10 secs. GR
manual shaft
clearance with
sylsinmotor was
OK. SMGR
interlock 73 : 74
checked found
OK. iii) MV drop
test done found
as below :- Q-
118 – 0.9 mv/
MPFDCS Notch not progress 1.6Locomv/checked
4.8 mv/ 1721
with firm staff
and found VE2
ckt. Getting
permanent feed
from MPCS
redundant card
due to redundant
card defective.
Redundant card
changed.
MPFDCS Notch not progress Loco checked 1721
with firm staff
and found VE2
ckt. Getting
permanent feed
from MPCS
redundant card
due to redundant
card defective.
Redundant card
changed.

Miscellaneou CCA fuse melting Loco checked at 249


s HWH shed and
found cab-1 MP's
4th interlock from
top touching with
MP cover. Same
attended at
HWH.

Miscellaneou CAB-2 ALP side main Hinges replaced. 73


s door all hinge broken.
Battery After passing battery crimping was not 25
voltage showing "0". done properly,
battery box No.3, 7th cell moreover black
cable hanging. Same tape was
removed and looped the wrapped over the
cable. crimped portion.
POH/BSL has
been advised of
the failure and to
take suitable
remedial action to
avoid such
recurrence in
future.

Relay LSCHBA not extingushing QV61 coil thimble 50


worked out
Bogie & its Loco arrived shed on MSU changed. 612
Mech. equip. 20.02.14 for major
schedule. During
checking it was found
that axle no. 6 MSU
having blow hole gear
case side. MSU make -
IND-01, Axle no. -HH-05-
09.
Axle Box AB no8 outer spring Attened 5
shifted . AB 10 outer
spring damaged . Cii8
flashed .
Miscellaneou During IB-CP-1 inter CP-1 safety valve 169
s cooler safety valve not changed,BLDJ
working,BLDJ switch switch
crushing less,S-23 EPV changed,S-23
leakage from exhaust,L-5 EPV changed,L-5
EPV leakage from EPV
exhaust,VEUL-2 pressure changed,VEUL-2
leakage from exhaust, changed,

Suspension During IA inspection, it is Wheel set-1 51


Bearing (SB) found SB-1 metal fused changed with RD
due to gear end stopper wheel by shed,
broken and stopper to vide letter No.
stopper distance is 921 WAT/TRS/T/58/6
mm. 25, Dt. 01-03-14

Miscellaneou Loco failed on 24.02.14 SL-1 number 26


s for QOP-1 permanent plate removed.
drop, HQOP-1 off. During
checking found SL-1
number plate base
welding broken and plate
inserted in between coil &
core along with channel
resulting QOP-1
permanent drop. Make-
CLW, Sl. no.-3429
Aux. Bur1 L/S missing and F slot bur card 94
converter inverter fault. F slot bur changed.
(BUR) card defective.
Angle Cab-1 Vigilance not O/H paddle 94
transmitter/d acknowledge by vigilance Switch Fitted.
isplay paddle switch due to Make-WOAMA SL
Unit/Switche piston switch open & No-2204.
s piston out.
Aux. Bur-1 inverter fault, RΦ WRE changed. 93
converter WRE both GTO short,
(BUR) GDU defective.
Miscellaneou QOP2 drop . HMCS2 on Loco checked at 267
s third. BMG and found
normal . In shed
loco checked and
found normal. IR
value of Block2
found 5mΩ,
voltage apply
permissible notch
found no QOP
drop. ALL TM's,
cable and SL
checked and
found normal.
Loco kept under
observation.
SIV Input voltage out of Loco checked at 139
range. SIV high voltage GZB C101,C102
showing. permanent closed
due to QCON
energige as
getting
permanent feed
from MSU. Loco
directed to home
shed.In shed
checked and
found several
times but not
found any
abnormality but
on precautionary
basis MCU
changed

SIV Input voltage out of Loco checked at 139


range. SIV high voltage GZB C101,C102
showing. permanent closed
due to QCON
energige as
getting
permanent feed
from MSU. Loco
directed to home
shed.In shed
checked and
found several
times but not
found any
abnormality but
on precautionary
basis MCU
changed

Transformer/ Loco having problem of Pump changed 138


Converter oil earth fault in auxiliary
pump circuit due to Converter
oil pump burnt
Battery Battery Voltage low Battery Charger 43
Charger diode punctured.
(CHBA)
Battery Changer not working Charger Changed 43
Charger
(CHBA)
Brake system ACP not working due to PSU Card Card 9
(E-70/Knorr) card defective. All Pn changes.
parameters normal.
Auxiliary Shunter informed that On examination 63
Motor VCB tripped with QOA, of the MCP it is
checked and found found one
smoke from MCP-1 number motor
junction box, hence incoming cable
isolated CP-1 and loco lug parted from
moved to TS/BZA, its cable causing
checked and found CP-1 burning of motor
burnt due to motor due to single
terminal flashed. phasing. Open
circuit of lug due
to improper
crimping during
POH/PER. MCP
was
replaced.Advised
to PER
Auxiliary CP1 burnt due to Open attended 63
Motor circuit of one number
motor incoming cable lug
due to improper crimping
during POH/PER.

Compressor/ Loco no. 27140/WAG-7 of HP disk valve 335


Exhauster ELS/CNB arrived shed on changed.
21.02.14 for Inter cooler Informed to
safety valve air leakage. CWM/KPA vide
During checking found Tech-52,
CP-3 safety valve air dt.25.02.14.
leakage due to HP disk
valve spring broken.
Make- Elgi TRC-1000MN,
Sl. no. JHS-152.
Machine MRB MCB tripped due to Machine room 181
room blower to motor burnt blower changed
Memotel Both SPM not working PG & sensor 8
cahnged
Bogie & its Heavy oil leakage from New Horizontal 7
Mech. equip. Horizontal Damper. Damper fitted.
Traction TM-4 DE Side bearing TM changed. 7
motor (SKF-K) seized & racer
moved & rubbed with
rotor shaft.
Bogie & its Bogie-2 Cross-beam Bogie changed -274
Mech. equip. crack. and loco given fit.

Air Blast DJ not closing by BLRDJ POH shop LKO 111


Circuit since DJ pressure less. E- advised
Breaker (DJ) 1 staff went and checked
found DJ pressure 4.6
Kg/cm2. Same DJ
pressure increased 5.2
kg/cm2. DJ closing
checked found normal.
VCB (SB) Make Alshtom
Pr. Regulator make

EP Contactor While working on line line Loco checked in 41


contactor L4 was isolated shed found line
on 15.02.14 as heavy air contactor servo
leakage from line motor piston
contactor. bucket found
cracked. (Make-
M/s.stesalit
ltd).The
equipment was
failed within short
period of time.

Hurth TM3 hurth coupling Hurth Coupling 21


coupling damaged with membrane
changed
Transformer During ICO found a0-a1 good one 0
studs short in lengh provided
Pn. Valve cab2 HT horn not Defective horn 0
working cone replaced
Traction Defect noticed during Attended by 0
Motor commi.-TM-2 Power cable ELS/AQ.
Terminal connection was
not having gap, can
cause flashing of
Terminals inside Junction
Box. TM-5 rocker lead
bolt were very loose on
front Brush Holder.

Transformer Defect noticed during Attended by 0


commi.-In power cable ELS/AQ.
991,992 at TFP Aux.
bushing side and power
cable D424, D423, EG12,
there was more gap in
between lug and
insulation.
Compressor/ Defect noticed during Attended by 0
Exhauster commi.-CP 1+2+3 ELS/AQ
Delivery flange was
provided with double
gasket and CP Delivery
pipes were flexible pipe,
it should be copper pipes.

Pn. Pipeline Defect noticed during Attended by 0


commi.-After Cooler Drain ELS/AQ.
pipe protection cover
found deficient and after
cooler channel was
deficient.
Miscellaneou During IA sch-CTF-1 CTF-1 both tips 135
s Finger tips no-6 drum tips changed,QH-1
no-5 flashed,QH-1 to be changed,QVSL-2
changed since VCD not changed,J-2 tips
working,QVSL-2 changed,RGCP
defective,J-2 Finger tips changed,
no-3,4 drum tips no-3
flashed, RGCP to be
changed,
Traction Reverser Contact flashed Conatct Changed 34
Motor
EP Contactor Loco arrived shed on L-4 changed. 428
12.02.14 for TM-4 isolate
due to L-4 fix contact
deficient. During checking
it was found that line
contactor L-4 fix contact
deficient and mobile
contact fixing nut
deficient. It was last over
hauled at POH
workshop/KPA during
POH.

Compressor/ Loco no. 22552/WAP-4 of Compressor 224


Exhauster ELS/CNB failed on line changed.
dt.11.02.14 due to CP-1 Informed to
isolate as abnormal CWM/BSL vide
sound. During checking letter no. Tech-
observed CP-1 abnormal 55, dt.12.02.14.
sound from crank side.
CP-1 changed. Make-Elgi,
Sl. no. ELGS 960386

Vacuum VCB (GEC make) cam VCB cam 72


Circuit modification not done. modification
Breaker done.
(VCB)
Miscellaneou During MP operation 72
s progression taking place
during regression. CAM
profile defective, Old MP
provided. Same attended

GR/RGR/CGR GR NOT MOVE AS CGR-2 CGR-2 CHANGED 59


TIPS TOP BOLT BROKEN AT ELS /JHS
EP Contactor Loco no. 27246/WAG-7 of J-1 changed. 39
ELS/CNB arrived in shed Informed to Dy.
on 08.02.14 for DJ trip CEE/CB vide
with QSIT drop, DJ feed Tech-54,
back failed. During 13.02.14.
checking found reverser
(J-I) “U” clamp
and load end mechandus
pin broken due to pin
hole oval. It was the
repeated failure of dt.
03.02.14. Its servomotor
also over shooting. Sl. no.
970460WK.

Angle Head Light not glowing New BLPR Switch 235


transmitter/d from cab-1 due to micro fitted in cab-1
isplay switch defective. Make-Schaltbau.
Unit/Switche
s
Miscellaneou During IA sch-CAb-1 son Buzzer 68
s buzzer not working,CP-1 changed,CP-1
ab sound,Cab-1 FDCS changed,FDCS
display unit to be display unit
changed,NR-1 not changed,NR-1
working, changed,
HT/LT cable Loco no. 27279/WAG-7 of Cable repaired. 7
ELS/CNB failed at GMC Informed to Dy.
NCR on 05.02.14 for CEE/CB vide
QOP-1 drop permanent. Tech-54,
Loco arrived in shed on 07.02.14.
06.02.14 found cable no.
BH-44 of SHA-3 sleeve
cut near thimble due to
rubbing with cable
supporting strip in BA-1,
(figure-1) resulting in
QOP-1 drop. It is
maintenance defect as no
protection is provided
between cable &
supporting strip.
Compressor/ Loco failed on 05.02.14 HP disk valve 526
Exhauster for CP-3 isolate due to changed.
abnormal sound. During
checking found CP-3
safety valve air leakage
due to HP disk valve
spring broken. Make- Elgi
TRC-1000MN, Sl. no. - L-
688.
Miscellaneou Loco trip when BLVMT In shed checked 732
s switch on. and found QVRH
not pickup due to
radiator choked.
Raditor blowing
done but not
success. Radiator
changed.

Miscellaneou Loco trip when BLVMT In shed checked 732


s switch on. and found QVRH
not pickup due to
radiator choked.
Raditor blowing
done but not
success. Radiator
changed.

Miscellaneou Loco trip when BLVMT In shed checked 732


s switch on. and found QVRH
not pickup due to
radiator choked.
Raditor blowing
done but not
success. Radiator
changed.
ESMON Both side SPM not Both side SPM 399
working. not working due
to master mother
board defective.
Master attended
by firm then
fitted same.

TM/MR MR scavenger blower MR scavenger 47


Scavenge having abnormal sound motor changed
motor
Aux. Life sign missing from Electronic rack 8
converter BUR1 defective , same
(BUR) cahnegd
Miscellaneou Loco failed on 02.02.14 Thimble changed. 559
s for MP not responding
while working train no.
N/IRPN at KRCA in W.
Railway. During checking
it was found that SMGR
regression valve VE-2
wire no. 062 thimble
work out resulting notch
not regress by MP.

MPFDCS FDCS not working. Loco 202


placed at ASN shed, Loco
attended at ELS/ASN
checked by M/s Medha &
found normal,Connection
tightness & clearing done
in every Major sch.
HT/LT cable GR was progressing but New cable laid 9
ammeters were not out from cab-2
deviating. While MP was SB to BD.
kept on ‘N’
position, no line contactor
was closing due to non-
availability of feed in
cable no. 144 in BD due
to no continuity in this
cable from cab-2 SB to
BD.
SIV OHE VOLTAGE OUT OF DCCT and MCU 44
RANGE. Card changed at
shed.
SL QOP-2 dropping at times, Internal earthing 121
checked by isolating of SL-2 has
TM4,5 & 6 individually caused QOP
but still QOP-2 dropping. dropping. SL2
replaced and
advised to KPA
Angle Angle Transmitter Angle Transmitter 5
transmitter/d defective cahnged
isplay
Unit/Switche
s
Pantograph Loco arrived shed on PT-2 changed. 384
30.01.14 for IC schedule.
During checking it was
found that PT-2 having
more horizontal play due
to lower arm assembly
bush welding broken. It
was last over hauled at
POH workshop/KPA
during POH. Make –
CCPL, Sl. No. 1982.

SIV SIV fan bearing SIV fan bearing 124


producing unusual sound. replaced at
ELS/RPM.
Miscellaneou SIV bottom side base Same attended in 48
s plate crack & MVMT2 position.
bottom side base crack.
Compressor/ Compressor base CP changed 234
Aux. foundation crack and
compressor broken
Miscellaneou Automatic notch VS-13 diode 34
s progression was replaced
experienced due to short
circuiting of VS-13 diode.

Bogie & its Heavy oil leakage from Old good Yaw 110
Mech. equip. Yaw Damper. Damper fitted.
Bogie & its Inner hanger plate Old good hanger 110
Mech. equip. broken from top plate fitted (FTIL.

Bogie & its Inner hanger plate Old good hanger 110
Mech. equip. broken from top plate fitted
(FTIL).
Bogie & its stud of slack adjuster Old slack adjuster 110
Mech. equip. broken. fitted (mod).

Bogie & its Both brake rod bend. Both brake rod 110
Mech. equip. fitted.
Bogie & its Brake Hanger (slab old good fitted. 110
Mech. equip. side)bend.
Sensor (FDU, Earth fault in control ckt. FDU changed. 110
Speed, FDU defective
Pressure,
Temp. OHE/
Voltage)

Traction TM-3 Speed sensor TM Speed Sensor 109


motor defective. changed.
Miscellaneou During IC0 sch-BA All BA set 27
s voltage come to changed,BLSN-1
zero,BLSN-1 to be changed,Safety
replaced,CP-1 inter cooler vavle
safety valve leakage,All changed,Earthing
programe switch earthing shunt provided,L-
shunt to be provided,L-1 3 changed & rest
to L-6 aux NO inter all line contector
lockdefective,QPDJ to be connection
changed,RGCP to be done,QPDJ
changed,VEUL-2 stuck changed, RGCP
up,U-1 & U-4 to be changed,VEUL-2
changed since niddle changed,U-1 &
stuck up, U-4 changed,

Miscellaneou Loco no. 27273/WAG-7 of F/L control box 129


s ELS/CNB failed on changed.
27.01.14 for cab-2 F/L Informed to Firm
main switch assembly and copy to Dy.
flashed at TDL in NCR. CEE/CB vide
During investigation it Tech-54,
was found that cab-2 25.02.14.
flasher light main
“ON-OFF” toggle
switch burst but not
earthed with body. It was
provided by CB shop
during POH. Make-
Sirveen, Sl. no. 1310210.

Auxiliary During sch.insp.MVSL2 MVSL changed. 42


Motor giving heavy abnormal
sound.(MVSL Sr.No.603-
06, Make-GTR. MVSL
dismentalled & found its
top side bearing cage
found broken(Brg.6306-
C-3,Fag) and rubbing
mark noticed on rotor &
inside stator.
EP Contactor TM5 isolated as L5 arc L5 changed 112
chute fallen down due to
locking arrangement
defective
Bogie & its Top spheri block shifted. Torque arm 195
Mech. equip. replaced with
new spheri block.

Traction NSC2 GBC, Code Valve Set 194


converter 120E/120D, SR2 12/1 changed.
(SR) Valve set V3+4 GTO
short, G/U ok
Machine MCB of MRB-2 tripped MRB-2 changed. 62
room blower sign of single phasing
stator winding burnt.
Bogie & its Bogie-2 crack. Attended duly 89
Mech. equip. lifting.
Roof Grounding not done as BV box changed 241
Equipments BV box (Make : Patra N
misc. Chandra) 3 way cock jam

Bogie & its During schedule wheel set2 half 147


Mech. equip. inspection on 23.01.14; gear changed.
Wheel set2 gear in two
half teeth damaged.
Traction During sch.insp.on TM1 changed. 147
Motor 23.01.14; G/C1 back side
semicircular lining having
gap;Also TM1 lifting lug
broken.
Machine MCB of MRB-2 tripped MRB-2 changed. 61
room blower sign of single phasing
stator winding burnt.
Miscellaneou DUring IC0 sch - Air drier VAlve 35
s duplex leakage,CTF-3 out changed,CTF-3
side EPV leakage,All EPV
programme switch changed,Earthing
earthing shunt to be shunt provided,
provided ,MPS-2 handle HAndle provided,
nor provided,
Miscellaneou Head light not glowing.Loco checked at 610
s NDLS and found
both uint working
normal.
Miscellaneou Head light not glowing. Loco checked at 610
s NDLS and found
both uint working
normal.
Miscellaneou ARNO capacitor bank Capacitor bank 38
s burst cahnged
Traction TM-6 CE SIDE LOCKING TM-6 ARMATURE 39
Motor BOLT WAS NOT EARTHED
PROVIDED FURTHER TM6
DIS-MENTAL
FOUND CE SIDE
LOCKING BOLT
WAS NOT
PROVIDED BY
KPA DURING
POH RESULTING
LATERAL
MOVEMENT OF
ARMATURE AND
EVOLUTE COILS
OF ARMATURE
RUBBING WITH
PROTECTION
JALI. TM6
CHANGED
Traction NSC2 GBC, SR2 12/1 V3 Gate Unit 190
converter Gate unit defective changed.
(SR)
CTF/Reversor J-2 mobile contact no .5 Contacts were -176
& 6, fix contact no. 6 & replaced.
12 badly flashed
condition.
CTF/Reversor J-2 mobile contact no .5 Contacts were -176
& 6, fix contact no. 6 & replaced.
12 badly flashed
condition.
Vacuum Loco no. 22225/WA-4 of VCB changed. 548
Circuit ELS/CNB failed & lost in Informed to
Breaker punctuality on line for CWM/KPA vide
(VCB) “VCB tripped & ICDJ Tech-52,
due to air leakage from dt.06.02.14
VCB chamber” on dt.
18.01.14 while working in
train no. 12402 in ECR.
Loco arrived shed on
27.01.14 found VCB
vertical insulator badly
carbonized from inner
side along with actuating
rod, main control pipe &
outer surface of both
VST. Flashing observed
from auxiliary contact
arm (VST side) to
fishbone mounting base
plate assembly.
Suspected creepage
through actuating rod.
VCB main control pipe
burst resulting air leakage
& ICDJ. Make- Areva
double bottle, Sl.
no.1652/L

Bogie & its This loco has failed due Brake hanger 139
Mech. equip. to brake hanger No.3 changed by shed,
fallen along with "L" clam vide letter
between wheel No. 1 &3 No.WAT/TRS/T/3
and also small pull rod 2C/344, Dt. 05-
broken on 18-01-14. The 02-14 to
failure was due to CWM/ELW/POH/K
improper welding of GP
supporting bracket of
fulcrum pin during
POH/RC/KGP
Auxiliary MVSL-1 burnt since MVSL replaced 88
Motor motor one phase earthed with over hauled
and MVMT 2 abnormal one MVMT duct
sound since duct replaced.
vibration.
Traction QOP1 drop .J1 Loco checked at 61
Motor flashed .TM1 + 3 flashed. GZB and found
tips no. 2, 5, 6 &
12 flashed.
Flashing removed
and TM 1 and 3
also slight flash,
flashing removed
and found
normal. In shed
loco also chcked
and found after
attention of
reversor by GZB,
reversor was
normal. Only
slight groove in
tips no. 6. Same
filing done. TM1
& 3 Arc horn
flashed. ET2 gap
was 105 (no
flashing).
RCAPTFP 1-
44.15, DC
damping 25.6,
Q20 - 860, RPS &
shunting
contactor also
Miscellaneou During IC0 sch-Air drier Air drier O-ring 78
s leakage from I st replaced,EMC
tower,C-107 contact changed,L-3 EPV
pressure less,L-3 EPV changed,MVMT-1
leakage from exhaust, changed &
MVMT-1&2 ab MVMT-2 impeller
sound,QPDJ closed at changed,QPDJ
4.8kg/cm2, J-1 out side changed,J-1 out
EPV stuck up ,Cab-2 SA-9 side EPV
MR drop 1.5kg/cm2 when changed,SA-9
brake applied,S-41EPV strainer body
leakage from exhaust changed,S-41
EPV changed,
Miscellaneou During IA sch-AUto drain Valve 96
s valve leakage,QCON not changed,Contecto
pick up, r changed,

Auxiliary During IA inspection Motor changed 51


Motor found, MPH bearing by shed, vide
sound and oil leakage letter No.
from top bottom cover WAT/TRS/T/58/4
Fail equipment: MPH, 98, Dt. 17-02-14
MAke: SH, S.No. to Dy.CEE/KGP
OP/D1329
Pn. Pipeline Heavy air leakage from Loco checked at 56
Cab1 BP line. GZB and found
air leakged from
cab1 BP angle
cock checknut,
same attended.
Pn. Pipeline Heavy air leakage from Loco checked at 56
Cab1 BP line. GZB and found
air leakged from
cab1 BP angle
cock checknut,
same attended.
Compressor/ Loco no. 27247/WAG-7 of Informed to 303
Exhauster ELS/CNB arrived shed on CWM/KPA vide
13.01.14 for IA schedule. Tech-52,
During checking found dt.14.01.14.
CP-1 safety valve air
leakage due to HP disk
valve spring broken. HP
disk valve changed.
Make- Elgi TRC-1000MN,
Sl. no. 25181.

Vacuum VCB (Make:BT) not CMD card 100


Circuit maintaining and changed
Breaker chattering as CMD card
(VCB) defective
Miscellaneou During IB sch-CP-1 inter CP-1 inter cooler 140
s cooler safety valve to be safety vavle
replaced,QH-2 to be changed,QH-2
replaced,RGCP to be changed,RGCP
changed,TM-2 earthing changed,TM-2
wire broken. shunt provided,
Miscellaneou Axle box-10 liner drop,L-5 Liner provided,L- 124
s EPV leakage from 5 EPV changed,
exhaust,
MPFDCS FDCS (MEDHA) output FDCS Output 56
Card defective. Card replaced at
ELS/RPM.
Auxiliary MVSI-1&2 power cables MVSI-1&2 10
Motor rubbing with body.MVSL- removed and
1 grease pipe leakage. cables
secured,MVSL-1
grease pipe
replaced with
new one
Vacuum VCB PRV air leakage. VCB PRV 10
Circuit changed.
Breaker
(VCB)
Miscellaneou During IA sch-MVT-/2 MVT-1/2 81
s switch broken,CP-3 NRV changed,CP-3
geakage ,QVSL-2 replay NRV
to be chaged,VEUL-2 air leakage,VEUL-2
leakage, air leakage .
Bogie & its Bogie-2 bolster eye hole Attended 2
Mech. equip. crack.
Bogie & its Bolster-2 crack Attended duly 214
Mech. equip. lifting the loco
Miscellaneou Loco no. 22552/WAP-4 of Inter lock 190
s ELS/CNB arrived shed on changed.
08.01.14 for IC schedule Informed to
found LSB indication not CWM/BSL vide
properly functioning. letter no. Tech-
During checking found J- 55, dt.09.01.14.
2 (reverser) auxiliary
inter lock not working
properly as its roller
jammed. Make-PMI

Axle Box During IC inspection Axle Box-1&2- 129


found Axle Box-1- High Wheel set-1
metallic- 1939ppm Axle changed. Axle
Box-2- High metallic- Box-7 - Inner
1184ppm Axle Box-7- Racer slightly
High metallic- 1511ppm chipped off. Axle
Axle Box-8- High metallic- Box-8 - Inner
2303ppm Axle Box-9- Racer slightly
High metallic- 5596ppm, chipped off Axle
Thrower rubbing Axle Box-9 - Axle box
Box-10- High metallic- changed Axle
1154ppm, Thrower Box-10 - Chipping
groove formed Axle Box- done. Axle Box-
11- High metallic- 11 - Inner Racer
1335ppm Axle Box-12- & outer racer
High metallic- 1544ppm Slightly chipped
off. Axle Box-12-
Axle box changed
vide letter No.
WAT/TRS/T/58/1
42, Dt. 14-01-14
to CWM/KGP
Traction During IC Sch.Axle Box- Loco lifted; TM5 127
Motor 10 spacer ring rotated & motorised wheel
metal content set changed.
0.036,0.032 found.TM5
PE-0.024 & CE-0.026
found.
Miscellaneou J-1 in sie EPV J-1 in side EPV 98
s defective,SIV (AAL) changed,SIV
power supply card & power supply
connector to be replaced card & RFU
since bust,VCD main unit changed&
not provided & coupler connector
also not provided, provided,MAin
unit of VCD
provided,
Pn. Pipeline 16) As per CLW drawing attended 0
No. 03/1/34/35, 04 Nos.
of Main Reservoirs (140
lts each) and 01No. Main
Reservoir of 203 lts
(totally 760lts capacity)
are required for working
of WAP-4 locomotive. But
loco No.22214 was
turned out from
MTR/DHD with total main
reservoir capacity of
560lts only, i.e MR-3 tank
of 203lts capacity was
not provided and pipe
line was directed/re-
routed. Due to non
availability of MR3 tank,
BP recharge time will be
high.
Pn. Pipeline Body cutting is excess on Attended. 0
path way of corridor on
both sides. Pneumatic
pipe lines are laid
through this cut portion.
This will lead to entry of
heavy dust and foreign
material into the
locomotive. Instead of
cutting loco body, holes
could have been made to
run the pipe lines.
Pn. Pipeline Tri-Plate Pneumatic panel Advised to 0
was provided on the edge CWM/DHD
of the Transom. Pipe line
laid out to the panel
hindering the movement
of personnel in the
corridor as well as space
constraint is there for
attending the pipe line
and panel equipment
problems

Pn. Pipeline VEPT-1, VEUL-1,2 and 3 Advised to 0


incoming pipe line CWM/DHD
strainers are not
accessible for
maintenance due to
elevated provision of
compressor-1&2
Pn. Valve All CPs individual safety Advised to 0
valves are provided CWM/DHD
behind the Tri-Plate
Pneumatic panel.
Accessibility is not there
for checking and
maintaining safety valves
Pn. Valve All CPs individual safety Advised to 0
valves are provided CWM/DHD
behind the Tri-Plate
Pneumatic panel.
Accessibility is not there
for checking and
maintaining safety valves.

Pn. Pipeline Near wheel no.3, BC pipe Attended 0


is very close to wheel
flange and may hit the
wheel flange on run

Pn. Pipeline Near wheel No.09 brake Attended 0


hanger, BP pipe of
additional isolation cock
was routed above the
bogie frame. There is a
very little gap between
pipe and bogie. During
vertical oscillations bogie
frame may hit and
damage the pipe.
Pn. Valve D1 emergency brake Attended. 0
valve (RS) provided in
place of maintenance free
01” AUDCO make cut
out cock in spite of
mentioning in C proforma
for retaining the same.

Pn. Valve As per CLW drawing No. Attended 0


03/1/34/35, safety valves
are to be provided
without any isolating
cocks. But in this loco,
safety valves, (SS1 & SS2
) were provided with
isolating cocks which is
against safety norms
Pn. Valve As per CLW drawing No. Attended. 0
03/1/34/35 Duplex check
valve is to be provided
directly on the pipe line
without isolating cock.
But in this loco, Isolating
cock was provided to
Duplex check valve which
is not required (closure of
this isolating cock will
lead to isolation of wipers
which is violation of safe
working

Auxiliary Third CP was provided to Advised to 0


Motor increase the compressor CWM/DHD
capacity. However, in
locos with vertical DBR ,
by providing third
compressor the total area
gets congested. Due to
which, there is no
accessibility for
maintenance of BA1
panel.

Auxiliary CP 1& 2 are located such Advised to 0


Motor that there is no CWM/DHD
accessibility for
maintenance like bed
bolts checking / replacing
etc
Auxiliary CP-2&3 cooling fans are Advised to 0
Motor present towards corridor CWM/DHD
pathway and unsafe for
persons who are moving
in corridor for checking.

Auxiliary Inspection of MVMT1 Advised to 0


Motor impeller is not accessible CWM/DHD
for checking its condition.
Auxiliary Cab-1&2 fans are high Attended 0
Motor speed (2550rpm) fans
which may cause
inconvenience to LP &
ALP.1320rpm fans are
convenient.
Auxiliary Arno foundation bed one Attended 0
Motor side welding was not
done.
Miscellaneou Very small passage is Advised to 0
s available to go to back CWM/DHD
side of BA1 panel.
Miscellaneou Excitation transformer Advised to 0
s (ATFEX) is located such CWM/DHD
that it is infringing for the
maintenance of CTF3 and
MVMT2
Miscellaneou MVSL 1&2 top mesh Attended 0
s found to be cut at several
places and is not having
enough strength.

Miscellaneou In cable trenches for Advised to 0


s clamping the power and CWM/DHD
control cables metallic
clamps were provided
instead of SRBGF clamps

EP Contactor C118 (EM contactor) is Advised to 0


provided in place of S118 CWM/DHD
(EP contactor). Since all
LGD based locos having
S118 (EP contactors),
S118 is only have to be
provided as C118 (EM
contactor ) spares are not
available.

Miscellaneou LP and ALP seat Advised to 0


s assemblies are provided CWM/DHD
inconveniently. There is
no adjustment for
rise/lower the position.
Miscellaneou Cab-2 driver side main Attended. 0
s door and Cab-1 assistant
side corridor door hinges
are in broken condition.

Miscellaneou Both cabs floor is Attended. 0


s provided with checkered
sheet without much
support arrangement at
the bottom which is
delicate and may damage
at any time
Bogie & its Bogie-2 bolster eye hole Attended 0
Mech. equip. crack
Axle Box AB No.2 &5 primary attended 0
helical spring seats are
not seated properly
Axle Box All axle box stay plates Attended 0
are provided with double
nut instead of castle nut
& split pin.
Miscellaneou All brake hangers Attended. 0
s connecting strapper nuts
provided from inside
instead of providing it
outside.
Bogie & its GC No.4 bottom collar Attended. 0
Mech. equip. bush came out & bolt is
found to be slack.
Bogie & its Centre pivot 1&2 dust Attended. 0
Mech. equip. covers not provided
Battery Old Battery boxes were Advised to 0
not replaced with new CWM/DHD
battery boxes
Gear case Gear Case 5 crack Gear Case 19
Changed
Gear case Gear Case 5 crack Gear Case 19
Changed
Compressor/ CP3 two nos. foundation New bolt 219
Exhauster bolt broken as misaligned provided and
alignment done
HT/LT cable T.K Panel cable no. 460 Terminal block 0
terminal block broken. changed by shed,
vide letter No.
WAT/TRS/T/58/1
94, Dt. 20-01-14

Pn. Valve Air flow measuring valve Air flow 0


continuous air leakage. measuring valve
changed by shed,
vide letter No.
WAT/TRS/T/58/1
94, Dt. 20-01-14

Miscellaneou Cab-II side LP side Wiper RGCP changed by 0


s motor not working. shed, vide letter
No.
WAT/TRS/T/58/1
94, Dt. 20-01-14

Miscellaneou IP cock sensing coil Sensing coil 0


s deficient. provided by shed,
vide letter No.
WAT/TRS/T/58/1
94, Dt. 20-01-14

DC-DC All heaters and DC-DC Earthing shunts 0


Converter/HL converter earthing shunts provided by shed,
/FL deficient. vide letter No.
WAT/TRS/T/58/1
94, Dt. 20-01-14

Miscellaneou CTF-2 shaft pin broken. Shaft Pin 0


s changed by shed,
vide letter No.
WAT/TRS/T/58/1
94, Dt. 20-01-14
Miscellaneou L6 arc chute locking unit Arc chute unit (L5 0
s spring jamming & L5 arc & L6) were
chute not properly sitting. changed by shed,
vide letter No.
WAT/TRS/T/58/1
94, Dt. 20-01-14

Vacuum ICDJ online at RYD-BCHL, VCB pressure 0


Circuit on checking found VCB regulator setting
Breaker pressure regulator setting was 5.2Kg/cm2
(VCB) has found to be was changed by
4.6Kg/cm2 , where as it shed, vide letter
should be 5.2Kg/cm2 VCB No.
make: ALSTHOM(GEC) WAT/TRS/T/58/5
43, Dt. 14-02-14

Battery Battery Voltage low Charger 141


Charger transformer
(CHBA) secondary
winding cable
thimble worked
out
Battery VCB not closed CHBA secondary 136
Charger winding cable
(CHBA) came out from
thimble. CHBA
changed
Auxiliary MVSI 1&2 abnormal MVSI 1& 2 20
Motor sound since grease pipes changed
or non standard.
Auxiliary MVSL-1 earthed. MVSL-1 changed. 20
Motor
SIV SIV blower fan fault and SIV blower fan, 20
SIV charger fan SIV charger fan
transformer burnt and transformer and
SIV U&V phase GDU SIV U&V phase
cards defective, GDU cards
Replaced
Auxiliary CARBON BRUSH PIG- CARBON BRUSH 24
Motor TAIL BROKEN FROM LUG IS NOT
PROPERLY
FITTED CAUSING
PIG TAIL GOT IN
TENSION
RESULTING
BROKEN &
TOUCHES

Pantograph ACPT mechenism assly As per Rly Board 22


insulator provided of M/s letter No.
Vishal Malleable 2004/Elect.(G)/11
3/2 dtd 22/06/12
has banned the
M/s Vishal
Malleable for
preventing
failures
Traction TM1,3 all arcing horn TM 1,3 cleaned 21
Motor flashed and all arcing
horn changed
Arno ARNO junction box Epoxy cleat 21
wooden cleat not provided
provided
Auxiliary MVMT2 junction box MVMT2 junction 21
Motor terminal block loose box terminal
block tighten
MPFDCS ICDJ OUTPUT CARD AT BL ON 292
DEFECTIVE 13/01/14
DURING
CHECKING
FOUND AT THE
TIME OF
BATTERY ON ,DJ
CLOSE AS
OUTPUT NO. 0 &
4 OF MPCS IN
ON POSITION
INSTEAD OF OFF
POSITION DUE
TO DEFECT IN
OUTPUT CARD.
OUTPUT CARD
CHANGED THAN
LOCO WORKING
NORMAL.
Miscellaneou During IC0 sch-CTF-2 F/T CTF-2 lifting bolt 15
s no-2,4,9,12 lifting bolt provided,HL-1
not fitted,HL-1 both holder
holder to be changed,J-2 changed,D/T &
D/T no-1,2 F/T-no-2,7,8 F/T both
flashed,Sander no-7 changed,Sander
broken,All programme changed,EArthing
switch earthing shunt to shunt
be provided,cab-1VCD provided,VCD
warning LED not unit changed,U-1
working,U-1 meter to be changed,
chaged since stuck up,
Miscellaneou While working T.No. At TS/BZA, C101 60
s 11020 between DWP- contactor bits
KYM, DJ tripped with QLA changed and
and QOA acted. QOA Capacitor bank of
resetted. Further loco MCP-1 also
moved to TS/BZA.As per changed.
ELS/BZA, one of the
Capacitor in the capacitor
bank of MCP-1 electrolyte
leaked and caused
shorting of supply to
ground which further lead
to flashing of C101
contactor. Since C108 is
mounted on the same
mounting frame of C108,
contacts of C108 also got
flashed.

Miscellaneou Cab1 ALP seat broken Seat welded 170


s
Battery/ Battery Voltage low Battery Charger 70
battery box. TFP secondary
output cable from
winding flashed
and cut.
Traction Bogie 1 isolated Central 204
converter Electronics Power
(SR) supply and FLG
card changed

EP Contactor TM-4 isolate and U5 not 112


working due to L-4 not
pick up since its servo
motor air leaking.
Auxiliary MCP / CP checked on 143
Motor shopfloor found heavy
abnormal noise from CP.
On dismentling of CP by
firm representative m/s
Trinity found Compressor
crank case bearing rusty.

Traction Loco no. 27093/WAG-7 of Informed to 604


Motor ELS/CNB visited shed CWM/KPA vide
many times for TM Tech-52,
failure. Loco received dt.23.12.13.
after POH/KPA giving
repeated failure as under:
TM-1 carbon broken due
to high ovality.
Commutator segments 03
nos. out. Hence TM-2
changed on 10.04.13.
TM-2 armature locking
bolt broken. Axle no 2
MSU crack. TM-3 all
carbon changed on
10.06.13 due to high
ovality at ELS/JHS. TM-6
carbon broken due to
ovality high, same
changed on 11.11.13.

Transformer/ SR oil pump burnt Oil pump 135


Converter oil changed
pump
Traction OFF POH . TM1 isolated In shed checked -2
Motor due to QOP1 , QRS1 and found TM1
drop. arc horn flashed
and also V-cone
& riser
overheated
Traction OFF POH . TM1 isolated In shed checked -2
Motor due to QOP1 , QRS1 and found TM1
drop. arc horn flashed
and also V-cone
& riser
overheated
Roof PT-2 base insulator came replaced 0
Equipments out from cementing
misc. portion.
GR/RGR/CGR During Ico found CGR to provided 0
RGR cable connection
bottom flat flashers
deficient.
Switch ZSMS switch defective same changed. -31
since 113-114 interlock
continuaty not coming.
Pn. Valve ULV1&2 not working. replaced 0

Pn. Valve ) Cab-2 A9 hard replaced 0


operation.
Bogie & its During IC all wheel sets All wheel sets 162
Mech. equip. found less daimeter replaced
Compressor/ While working on line MCP changed. 311
Exhauster atJHS, MCP smoke
noticed. Loco checked in
shed found MCP showing
3 phase earthed.( Under
warranty)

ESMON Loco no. 22684/WAP-4 of Letter to 390


ELS/CNB failed on CWM/KPA with
19.12.13 in train no. copy to Dy.
8101 at TDL/NCR for CEE/Loco/NCR &
both cab SPM not ED/RDSO/LKO
working. Loco arrived vide letter no.
shed on 21.12.13 found 230-Elet/RS/CNB/
SPM male & female Tech-52,
coupler burnt. Sl. no. : dt.23.12.13.
MRT-922/1239/05/2006
Make :Medha
Compressor/ CP-1 developing CP replaced 58
Exhauster abnormal sound since CP withed
bearing worn out. . overhauled
compressor.
GR/RGR/CGR RGR left side bottom Insulator was 43
back side white insulator changed by shed
crack vide letter No.
WAT/TRS/T/58/1
46, Dt.01/01/14
to Dy.CEE/KPA

Bogie & its Bogie-II measurements Bogie frame 43


Mech. equip. abnormal. changed by shed
vide letter No.
WAT/TRS/T/58/1
46, Dt.01/01/14
to Dy.CEE/KPA

Axle Box Axle box no. 10 High Thrower & racer 43


metallic due to changed by shed
equipment badly rushing. vide letter No.
Racer chipped. WAT/TRS/T/58/1
46, Dt.01/01/14
to Dy.CEE/KPA

Pantograph Panto-2 actuating rod Insulator 43


insulator defective. changed by shed
vide letter No.
WAT/TRS/T/58/1
46, Dt.01/01/14
to Dy.CEE/KPA

VCD/ TPWS VCD not working VCD switch -62


defective
CBC/Draft CBC open out due to lock LP checked at 28
gear/TSC pin not fitted properly. Koderma and
found CBC
opened due to
lock pin open out.
Same fitted with
help of porter,
suspected pin not
fitted by ALP/ET
at GAYA during
attachment of
loco.

CBC/Draft CBC open out due to lock LP checked at 28


gear/TSC pin not fitted properly. Koderma and
found CBC
opened due to
lock pin open out.
Same fitted with
help of porter,
suspected pin not
fitted by ALP/ET
at GAYA during
attachment of
loco.
Miscellaneou Loco no. 27089/WAG-7 of Letter written to 409
s ELS/CNB arrived shed on CWM/KPA with
16.12.13 for IC schedule. copy to
During checking found Dy.CEE/Loco/NCR
loco body PU paint and
“Peeled off” badly ED/RDSO/LKO
at many places & surface vide letter no
exposed all around the 230-Elect/RS/CNB
loco. It is repeated case /Tech-52 dt
as mentioned in 20.12.13
reference. Loco detained
for 4 days for attending
the same as firm has not
given proper response.
Further the quality of
work done is very poor

Gear case Gear case 3& 5 top boss 1


crack.
Bogie & its Bolster 1&2 less gap 1
Mech. equip. between loco body &
bolster
Miscellaneou Corridor no 2 all foot 1
s plate having more gap
especially cab-1 side
behind ALP
Relay P-6 relay not provided. 1

Compressor/ MCPA/CPA foundation not 1


Exhauster proper.
Traction In TM-4 big split 1
Motor found,QOP-2 dropped on
line.
Traction TM-1 , 5 th holder holes 1
Motor slack , thread worn out.
Miscellaneou All heaters bottom 1
s without modification
provided
Miscellaneou RS gauge defective 1
s
Miscellaneou Air dryer switch (HAD) 1
s not available.
Miscellaneou Pneumatic panel support 1
s not provided
Pn. Pipeline Cab-1 & 2 BP FP angle 1
cock not in arrow
dynamic shape and
protection BP angle cock
not properly.
Compressor/ 3 CPs provided, but only 1
Exhauster four tanks existing in
loco.
Battery New Battery set not 1
provided, in POH always
new battery being
provided.
EM Contactor CTF 1000 A provided, 0
modified not provided
Traction TM-5 flashed 8nos arcing 0
Motor horns melted.
Traction TM-4 one nylon insulator 0
Motor stud threads worn out

SMGR SMGR vibrating during 0


manual operation
Miscellaneou During IA sch-MVT-1/1 MVT-1/1 137
s not working ,Cab-1 CPU chaged,Display
display light not unit
glowing,CAb-2 FL unit changed,FLCU
buzzer not working,L-6 changed,L-6 EPV
EPV leakge form changed,VEUL-1
exhaust,VEUL-1 stuck up changed,
to be replaced,
Miscellaneou During IC0 Sch-CAb-2 BL switch 74
s BLRDJ and BLDJ switch changed,Rest
stuck up,CBC-1 screw hook provided,Kit
coupling rest hook not replaced,CP-2
avl,Both cab BP angle NRV
cock leakage,CP-2 NRV changed,MVMT-1
leaakge,MVMT-1 changed,QVRF
vibrating,QVRF to be changed,
changed,
CBC/Draft CBC height more CBC-1 : -1
gear/TSC 1118 mm, CBC 2 :- 1103
mm
HT/LT cable MPCS CABLES NOT MPCS INPUT AND 1
CONNECTED WITH LOCO OUTPUT CABLES
CABLES OF I-69,I-92,I-
84,O-36,O-41,O-
41 ,O-23 ARE
NOT CONNECT
WITH LOCO
CABLES CAUSING
LOCO NOT
SYNCHRONIZATI
ON IN MU. SAME
CABLES
CONNECTED
WITH LOCO
CABLES THAN
NORMAL.

Traction TM-4 CE side locking TM-4 replaced at 125


Motor plate broken. (Make : ELS/RPM.
BHEL / 4673203)
GR/RGR/CGR During Ico found PHGR Same replaced -8
oil flow indicator oil
leaking
Miscellaneou During IC0 sch-J-2 slow J-2 S/M 13
s operate,J-2 F/T & D/T changed,J-2
no-6 flashed,TM-6 to be drum tips no-6
replaced since heavy changed,TM-6
flashing,L-5 EPV to be changed,L-5 EPV
changed,CTF-2 out side changed,CTF-2
EPV to be changed,VEF EPV changed,VEF
not working in DBR changed,
mode,
Miscellaneou During IA Sch-L-1 EPV L-1 EPV 91
s leakage from exhaust,L-2 changed,L-2 EPV
EPV not pick up,J-2 some changed,J-2 In
time stuck up on lower side EPV
side,S-42 EPV leakage changed,S-42
from exhaust,VEPT-1 top EPV
side coupling changed,VEPT-1
leakage,CAb-1 ALP side changed,Wiper
wiper deficient, arm provided,
Angle Angle Transmitter Angle Transmitter 123
transmitter/d Defective changed
isplay
Unit/Switche
s
EP Contactor L3 mobile base cracked. In shed checked 491
and found L3
mobile tips holder
crack. Same
chanaged.Make-
ELCO S.no.
ELCO/EE/15/5/9

EP Contactor L3 mobile base cracked. In shed checked 491


and found L3
mobile tips holder
crack. Same
chanaged.Make-
ELCO S.no.
ELCO/EE/15/5/9

EP Contactor L3 mobile base cracked. In shed checked 491


and found L3
mobile tips holder
crack. Same
chanaged.Make-
ELCO S.no.
ELCO/EE/15/5/9

GR/RGR/CGR Tap changer top oil seal Attended by 291


part No. S 1434, tap shed.
changer found gasket
part no. S 1102 defective,
same replaced.
SMGR Loco no. 22252/WAP-4 of Letter written to 313
ELS/CNB failed on CWM/KPA vide
10.12.13 due to RGR letetr no 230-
burnt while working train Elect/RS/CNB/Tec
no. 12419 at ETW in h-52 dt 12.12.13
NCR. Loco arrived in shed
on 11.12.13 found GR
main drive shaft bevel
gear( BT Part no. A-
1926) dis-engaged from
shaft due to breakage of
roll pin size 8X45 mm (BT
Part no. A-1929.1) . GR
shaft became free &
switching angle of GR
disturbed. Hence GR
stuck up in between
notches and RGR became
red hot & burnt. Single
roll pin of 8X45 was
provided by POH/KPA
instead of double roll pin
(8X45 & 5X45) causing
breakage. SMGR position
was on ‘0’ while
GR remained stuck up in
between notches, hence
tripping of Relay Q-44 not
Transformer/ found.due to
MCB tripped TRP-1 changed 18
Converter oil winding problem. done on
pump 10/12/13.
Suspension Smoke seen from GC-5, Attended at shed 423
Bearing (SB) due to SB-5 PE side & informed
bearing metal out. CWM/POH/KGP
for the above
failure & for N/A.
Traction During IB inspection Changed vide 104
Motor found TM-2 CE side wick letter No.
pad spring broken at WAT/TRS/T/58/4
bend portion. 067, Dt. 16-12-13
to
Dy.CEE/ELW/BSL
HT/LT cable QOA drop, HQOA on Cable changed. -18
‘0’. 2.5 mm2 cable
no. 966 showing earth at
TK panel. Further
checked found cable no.
966 other end lying open
& rubbed with MVMT-2
channel. Hence both
spare cables removed
from TK panel

HT/LT cable QOA drop, HQOA on Cable changed. -18


‘0’. 2.5 mm2 cable
no. 966 showing earth at
TK panel. Further
checked found cable no.
966 other end lying open
& rubbed with MVMT-2
channel. Hence both
spare cables removed
from TK panel.

EP Contactor J-2 contact no. 6 & 12 TM brush box 42


flashed due to flash over and commutator
inside TM-6 and improper cleaned. Arc horn
bedding of contacts. TM- gap adjusted. J-2
6 carbon brush box contact no. 6 &
flashed and rocker ring 12 replaced.
was in blackish condition.

MPFDCS Checked and found FDCS FDCS changed 17


mal-functioning. from M/s.STL
make to
M/s.MEDHA make

Traction Dist temp sensor TFP, D Same card 11


converter slot SR card defective changed.
(SR)
415V  MCB (11-14) interlock of New auxi 10
auxiliary contact for OCB- interlock fitted
1 MCB permanent open with OCB-1 MCB
Traction NSC1 GBC, SR1-227/3 Gate Unit 166
converter Gate unit defective changed.
(SR)
Traction While working TM-1 Arc horns 63
Motor experienced that DJ replaced at
tripped with QOP-1, ELS/RPM.
QRSI-1 acted. HMCS-1
kept in II
position.Checked and
found TM-1 Arc horns
flashed.
EP Contactor J-1 Reverser Bits flashed J-1 Reverser 63
condition. flashed bits were
replaced at
ELS/RPM.
Traction GC no-05 smoke,TM-5 TM-5 changed in 154
Motor pinion bearing seized and IB schedule.
deflector came out.
HT/LT cable CCLS melted, HOBA kept 28
on "OFF" & worked the
train, cable No. Z-211
from SB RSI-2 BD
showing earth. Q-51 NC
I/L not passing feed.
EP Contactor J2 welded so block 2 Loco checked at 182
isolated. BMG/shed and
found shaft
broken. Reverser
changed.

EP Contactor Heavy air leakage from Loco checked at 333


L3 BMG/shed and
found L3
servomotor
gasket damaged.
Gasket changed
and found
normal.
Compressor/ COmpressor of Loco No 126
Exhauster 23115 failed on line on
30/11/13 due to heavy
abnormal noise from
compressor. Compressor
not dismentaled since
failed under warranty.
MCP Sr. No LIAM 0705,
Make ELGI, Mfg -
09/2012. Compressor Sr.
No ELFS-960343, Make -
ELGI, (Mfg - 11/2012)
TRC 1000 MNUG

GR/RGR/CGR QLM dropped RGR & BA After arrival of 529


box smoke. loco in shed
checked and
found RGR burnt
& QLM dropped.
01 no. base
insulator of RGR
cracked. SMGR
found on
‘0’ notch.
Regarding RGR
burnt & QLM
drop following
parameters
checked and
founds :- a>CGR
operation
checked and
found normal.
b>GR checked
and found
normal. c>SMGR
working checked
and found – (i)
SMGR pressure
3.2 kg. (ii) SMGR
dropping 500 gm.
(iii) SMGR timing
10.8 second
Vacuum VCD aux. switch knob get Loco attended by 82
Circuit rubbed with front side NKJ T/shed Aux.
Breaker moving bracket. switch changed.
(VCB)
Auxiliary MVMT1 having vibration MVMT changed. 141
Motor sound
Auxiliary MVRH smoked. MVRH changed. 26
Motor (Sr.No.647407,DOC-
1993)
Transformer Oil leakage from same attended. 91
transformer neck portion.

Traction TM-4 Arm. No. AT-493 TM changed & 191


Motor grounded. informed to
CWM/POH/DHD
vide L.No.
PPIO/23/279,
dtd. 03/12/13
Transformer During IC-o inspection on TFP removed 0
26-11-2013, it is found from loco and
Transformer tank crack at welding done,
A33 bottom side. Fail vide letter No.
equipment details: WAT/TRS/T/58/4
Transformer, Make: CGL, 068, Dt. 16-12-13
S.No. to Dy.CEE/KGP.
V7101/10(VF7401/10)
Miscellaneou Some times both SPM PS card changed 63
s was not working, due to by BZA shed &
PS card was defective. Informed
CWM/POH/KPA
for the above
failure & for N/A.
Traction TM-3 evolute portion TM-3 changed . 180
Motor burnt.
Traction J-2 reverser finger tips Attended by 140
Motor No. 3, 4 & 10 having shed.
flashing marks, due to
TM No. 5 brush holders
and arcing horns were in
flashed condition.
Relay C-145 on test bench at C-145 replaced. 122
ELS/NKJ, found main
contact gap piston and
cam travel was less.
Axle Box Axle box No.7 inner Attended by shed 251
crown broken. & Informed
CWM/POH/KGP
for the above
failure & for N/A.
Auxiliary MVSI-1 producing MVSI-1 replaced 105
Motor unusual sound. at ELS/RPM.
SMGR GR stuck up GR interlock no 101
83-84 defective
SIV M/s.Hirect make SIV SIV Motor 20
motor LP side abnormal Bearing changed
sound.
Control while closing BLVMT CP QCON not in 20
Circuit Contactor not opening. circuit same was
Provided.
Control C145 not closing. 917 cables not as 20
Circuit per circuit same
provided.
Compressor/ CP-2 coupling alignment CP replaced. 20
Exhauster not properly (hub to hub
groove not matching &
coupling spring broken
condition)
Auxiliary MVSL-1 grease pipe MVSL-1 changed. 20
Motor leakage.
Bogie & its AB-11 grease metal Racer rotated 164
Mech. equip. content more hence wheel set
changed.
Miscellaneou During IA sch-CP-2 VEUL-2 152
s unloader vavle changed,CTF-1
leakage,CTF-1 out side EPV
EPV air leakage from changed,MArker
exhaust,CAb-2 ALP side light glass
white marker light glass changed,J-1
broken,J-1 inner EPV Inner EPV
leakage from exhaust, changed,Sander
Sander no-5 broken, no-5 changed,
Miscellaneou QVSI-2 to be replaced,S- Changed,S-53 100
s 53 slow drop & leakage EPV changed,TM-
from top,TM-3 earthing 3 earthing shunt
shunt not avl, provided,
Relay Loco No 23151 failed on 68
line on 19/11/2013 at
NGP-AMF section of NGP
division due to DJ not
holding and getting
tripped while starting
auxiliaries. DJ tripped
through Q118 relay.
Same hold by putting
HVSL-1 on IIIrd position.
On checking of loco at
trip shed BSL found
QVSL-1 relay defective.
Removed QVSL relay
checked on test bench
and found its diaphragm
was defective (old aged)
Sr. No of QVSL - PS
44614 Make - Switzer

GR/RGR/CGR During ICo, GR oil BDV Contact roller and 13


found 28.5KV. GR opened contact roller
and on visual inspection, housing changed.
found that inner contact During POH, new
roller outer rolling head Contact roller and
having pit marks and contact roller
caused scratches housing provided.
throughout the inner DyCEE/LW/PER
peripheral while roller advised the firm.
rolling. Also found outer
roller housing having
crack on its head portion.

Bogie & its W.No-6 slack adjuster 02/nos. broken 62


Mech. equip. stud broken. bolt replaced with
new one.
Oil cooler OCB-1 Bonded All phase OCB-1 changed 60
blower unit earthed.
Angle Pixy button not working Same changed. 60
transmitter/d
isplay
Unit/Switche
s
Transformer Loco failed while working Transformer 107
passenger train in replaced at
Chennai Division due to LW/PER. Firm
Transformer oil splashed. advised to supply
Transformer core was the replacement
lifted at LW/PER and oil.
found auto winding DyCEE/LW/PER
flashed at tapings No. 14 advised for
& 15. During joint corrective action.
inspection by
SSE/ELS/AJJ &
SSE/LW/PER found only
three cooling pipes are
provided instead of four
and also end of the pipes
are not dummied. This
causes no spraying of oil
in the winding & resulted
to poor cooling.
Transformer was filled
with inhibited
Transformer oil supplied
by M/s Gandhar Oil
Refinery India Ltd.,
Mumbai. The failure may
be due to rejected oil
supplied by M/s Gandhar
Oil Refinery India Ltd.,
Mumbai/ poor cooling of
Traction Loco No 23654 failed on both brush holder 70
Motor line on line on 14/11/13 replaced
due to QOP2 and QRSI2
drop. On arrival of
locomotive in shed found
TM6 brush holder No 6
spring split pin broken
and carbon brush was
hanging and touching.
Also brush holder No 5
axle fixing hole was oval,
hence both brush holder
replaced.

HT/LT cable CCPT fuse was melting, Wire changed 61


due to SWC wire [Teflon and proper lay
type] No. C-SWC out done to avoid
insulation damaged, due rubbing with pipe
to rubbing with pipe line. Informed
union coupling, having CWM/POH/BSL
sharp edge, which for the above
resulted wire flashed and failure & for N/A.
parted, due to HOBA
switch was in off position.

SIV SIV blower fan abnormal SIV fan changed. 164


sound.
MPFDCS DJ TRIP WITH MESSAGE AT BL ON 311
ON DDS QLM DROP BUT 19/11/13 CHECK
PHYSICALLY QLM NOT FOUND DJ TRIP
DROP WITH MESSAGE
"QLM DROP" BUT
PHYSICALLY QLM
NOT DROP. MPCS
MALFUNCTIONIN
G FOR QLM
DROP. FIRM
REPREENTATIVE
COULD NOT
ABLE TO
ESTABILISHED
ROUTE CAUSE
OF THE
PROBLEM.
PRECATIONARY
RELEVENT
INPUT, OUTPUT
& CPU CARD
CHANGED. LOCO
GIVEN READY
FOR SERVICE

Vacuum Main Power off VCB changed due 20


Circuit to defective
Breaker
(VCB)
Miscellaneou During IA Sch- FL-2 FL unit 76
s continuous glowing,Q- changed,Q-119
119 to be changed,QTD- changed,QTD-
101 to be changed,J-2 101 changed,J-2
drum tips no-4 with tips changed,PG
finger tips flashed,Both changed,
SPM not working,
Traction TM-3 armature earthed All Traction 198
Motor and all Traction motors Motors changed.
overheated.
Relay QOP erratic operation QOP changed, 1
vide letter No.
No.
WAT/TRS/T/58/3
834, Dt. 22-11-13
to CWM/KPA
Relay QVSI-1 shorted condition QVSI-1 changed, 1
vide No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA
Miscellaneou Cab-2 flasher light unit Cab-2 flasher 1
s mains LED not glowing light unit mains
LED changed,
vide No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA
Miscellaneou Cab-1 head light glass Cab-1 head light 1
s broken glass changed,
vide No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA
Miscellaneou Cab-1 ALP side white Cab-1 ALP side 1
s marker lamp glass broken white marker
lamp glass
changed, vide
No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA
Pn. Pipeline S63 shunting contactor Pipeline changed, 1
incoming pipeline crack vide No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA
Miscellaneou C-145 with Archute burnt C-145 with 1
s Archute changed,
vide No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA

ESMON Speedometer pulse Speedometer 1


generator defective. pulse generator
changed, vide
No.
WAT/TRS/T/32C/
3834,Dated 12-
12-2013 to
CWM/KPA
Miscellaneou Compressor -2 foundation CP-2 Foundation 48
s bolt 1 No. broken bolt 1 No.
changed. vide
ELS/VSKP's letter
No.
WAT/TRS/T/58/3
834, Dt.22-11-13
to
CWM/KPA/R.Rly
Miscellaneou MVMT-2 pillar foundation MVMT-2 pillar 48
s bolt 2 Nos. threads worn foundation bolt 2
out Nos. provided.
vide ELS/VSKP's
letter No.
WAT/TRS/T/58/3
834, Dt.22-11-13
to
CWM/KPA/R.Rly
Bogie & its Bogie-2 (between wheel Cutting and 48
Mech. equip. No-9x11 bottom new welding done.
crack about 3 inches vide ELS/VSKP's
letter No.
WAT/TRS/T/58/3
834, Dt.22-11-13
to
CWM/KPA/R.Rly
Axle Box AB-12 High metallic 92 Racer & thrower 48
mg. Thrower rubbing. changed. O/H
Inner racer chipped off. Axle box fitted..
vide ELS/VSKP's
letter No.
WAT/TRS/T/58/3
834, Dt.22-11-13
to
CWM/KPA/R.Rly
SIV SIV internal fault, Complet rectifire 16
section changed,
SIV SIV(AAL)not working with Out put ZCT 88
full load and triping with changed
message external earth
fault to be attended,

Traction TM Rotor (DE) three no TM changed. -47


motor rotor bar broken & out of
position.(POH).
Traction While working 12625 exp TM-6 replaced at 324
Motor between WL-BPQ section ELS/ED. Also the
QOP-2 acted 3 times. failed TM-6 de-
TM-6 isolated and worked brazing done and
further.Checked at new cable
ELS/ED on 09.11.13, brazing done.
found TM-6 IP link cable
flashed and cut. Further
motor dismantled and
found in yoke 10 o'clock
position IP open at
10&11 joints. De-brazing
done and new cable
brazing done. Also
noticed the core bolts
were in slack condition.
Same tightened well.
Traction During IB inspection Springs changed 104
Motor found TM-2 CE side wick by Shed, vide
pad spring broken. TM letter No.
S.No. 1754 TRS/T/58/58/391
1, Dt. 07-11-13
to
CWM/CLW/KGP
Auxiliary MVSI2 fan blade broken. MVSI changed. 34
Motor
Auxiliary MVSI2 fan blade broken. MVSI changed. 34
Motor
Miscellaneou During IC0 Sch- U-5 U-5 EPV 10
s meter 100 volt less changed,
showing ,
Bogie & its Inner hanger plate Old good hanger 110
Mech. equip. broken from top plate fitted.
Battery Lead acid battery Replaced 0
10V/75A one no
defective. Its 1st cell low
gravity and not pick up.
Its “+ve” lug also
crimped loosely
Bogie & its PHS broken on AB No.1 Replaced 0
Mech. equip.
Bogie & its Primary helical spring No 546
Mech. equip. 7 bearer Sr. No GBD
02.10 L0.13 DL 37 white
of M/s GBD Pvt Ltd of
Mfg year Feb 2010 found
broken from top second
coil.
Auxiliary During AOH inspection, Motor changed 343
Motor motor has failed in surge by shed, vide
testing Fail equipment : letter
MVMT, Make: BBL, S.No. No.WAT/TRS/T/5
M1203389 8/4069, Dt. 16-
12-13 to
Dy.CEE/DHD
Air Blast DJ tripping due to QOA Attended by 55
Circuit shed.
Breaker (DJ)
Traction Traction motor armature vide No. 37
Motor PE side poly glass band WAT/TRS/T/58/3
(1/2 round) came out 871,Dated 22-11-
and PE bearing inner 2013 to
racer over heated. CWM/DHD

Angle Selector switch stock off Angle Transmitter 20


transmitter/d due to throttle Am changed.
isplay locking excess play and
Unit/Switche sometime not locking
s properly.
Traction Loco checked in shed on Same CB Pig Tail 69
Motor 01.11.13 ,TM-4,5,6 changed.
visiually checked found
TM-5 01 no CB pig tail
found broken.Last O/H
01.11.13
Pn. Valve Air leakage from Complete 80
Pneumatic valve Pneumatic panel
changed
Traction During IC0 schedule Informed to 45
Motor checking found TM-5 CWM/KPA vide
isolate as TM-5 pinion Tech-52,
teeth broken. TM-5 dt.06.11.13.
changed. Pinion make -
KPC ,Mfg. 12/2009
SIV SIV internal fault, one Material failure. 91
cable of DC link sensor Staff counseling
open out from terminal done to check the
lug of DC link bus bar. cable delicately.
Crimping of terminal lug
was normal. It is
suspected strands
gradually cut behind
terminal lug due to
repeated pulling during
schedule inspection.
Miscellaneou During IA-CTF-1 out side CTF-1 EPV 79
s EPV leakage,SMGR inter changed,SMGR
lock wire no-72/82 to be inter lock
checksince GR stuck changed,Wiper
up.Cab-1both wiper arm arm provided.
not working,
Bogie & its on line, SR1 oil pressure Pressure sensor 18
Mech. equip. not ok. changed.
Aux. Bur-1 inverter over Same changed. 17
converter current,SΦ GDU defective
(BUR)
Auxiliary MCP-1 winding continuity replaced 0
Motor open ckt
Auxiliary MVRF winding 3 phase replaced 0
Motor earthed.
Auxiliary MVMT-1 DE side grease attended 0
Motor pipe defective grease not
entering
ESMON The double sensor pulse attended 0
generator was removed
and single sensor PG
provided during POH due
to which the SPM display
was flashing "sensor-2
faulty"
Miscellaneou During IC0-Axle box-4 Axle box-4 liner 46
s leteral liner drop,Cab-1 provided &
BLRA switch welded,BLRA limit
defective,MVT-2/2 switch switch
broken,Both cab CBC split changed,Switch
pin & traggle patti to be changed,Both
provided,Center pvt-1 CBC split pin &
liner crack,Hood no-2 taggle patti
earthing shunt not avl,In provided,Center
BD board programme pivot-1 liner
switch earthing shunt to welded,Hood-2
be provided,G/C-1 earthing shunt
breather broken,Hand provided,BD
brake not working,Both board switch
SPM not working,ZQWC earthing shunt
some time not provided.G/C-1
working,VCD unit-2 breather provided
helthy LED not & welded,Hand
glowing,WSM leakage brake
from adjusting screw in replaced,SPM
cab-1 Dr sdie,Cab-2 Dr recorder &
sdie WSM arm not avl. indicator
changed,ZQWC
switch
changed,VCD
LED
changed,WSM
adjusting screw
Miscellaneou During IC0-All axle box replaced,Cab-2
Axle box 88
s not sealed,MVT-1/2 one sealed,Seprator
seprator broken,CBC-2 changed,CBC-2
operating handle handle new
deficient,BP-1 gauge provided,BP-1
earthed to be replaced,L- gauge
5 aux inter lock calibrted,L-5 inter
broken,MPS-2 handle lock
deficient,QVSI-1 to be changed,MPS
replaced since some time handle
stuck up,RGCP to be provided,QVSI-1
changed,Side glass no-22 changed,RGCP
broken, changed,Side
glass changed,
Suspension Suspension Bearing (SB) TM-3 & 4 36
Bearing (SB) No. 3 & 4 metal fused. removed. vide
our ELs/VSKP's
letter No.
WAT/TRS/T/58/3
683, Dt. 17-11-
2013 to
DY/CEE/POH/KPA

Aux. BUR 2 DC link Processor card 76


converter overcurrent changed
(BUR)
Auxiliary MVSI-2 abnormal sound. MVSL-2 changed. 187
Motor During checking found Informed to Dy.
MVSI-2 non load end CEE/CB vide
bearing cage broken. Tech-54,
MVSI-2 changed in GZB 06.12.13.
shed. Make – GTR, Sl.
no. 09-11-711, DOC -
11/2009.
HT/LT cable Loco failed due to R118 Loco checked at 629
smoke HWH and it is
found that
QCVAR not pick
up due to wire
no. 967 showing
open ckt. from
TK panel to
QCVAR. On detail
investigation it is
found that faulty
wire was twistly
jointed and
tapped behind
SBTK and
bunched on
stiffener in TK
panel. This
twistly joint could
not be checked
during minor
inspection
because this
faulty wire
bunched with
other wires R118
& C118 working
checked, found
Auxiliary Loco no. 27243/WAG-7 of Letter normal.
written to 193
Motor ELS/CNB failed at GZB in Dy.CEE/CB
NR on 25.10.13 for MVSI- Shop/LKO vide
2 abnormal sound. letter no 230-
During checking found Elect/RS/CNB/TEc
MVSI-2 non load end h-54 dt 06.12.13
bearing cage broken.
MVSI-2 changed in GZB
shed. MVSL-2 make :
GTR MVSI-2 Sl. no. : 09-
11-711 DOC : 11/2009
SMGR SMGR control block, up Attended at shed 0
valve spindle stuck & informed to
up,resulted automatic CWM/POH/BSL
notches increased. SMGR for the above
control block & control failure & for N/A.
cylinder replaced at Trip
shed ET.

HT/LT cable CCLF -2 fuse was Gauge light fuse 243


melting, due to wire No. was replaced.
F-186/2 showing ground
(which exists from gauge
SB to cab-2 SB).
Traction TM 4 & 6 winding Motor changed 3
motor inductance differ
EP Contactor L-6 'C' clamp flashed due L-6 and 'C' clamp 23
to improper bedding / replaced.
inadequate tightness.

Relay HVSL2 on III, LSCHBA In shed loco 490


permanent glowing. checked and
found QVSL2
deficient. QVSL2
fitted. Battery
charger working
normal, for
precautionary
measure CHBA
changed.
Miscellaneou During IC0- CP-2 NRV CP-2 NRV 7
s leakage,In BD board all changed,Earthing
programme switch shunt
earthing shunt not provided,BG
fitted,Both Bg -Bg to shunt
body earthing shunt not provided,DJ PRV
fitted,DJ PRV gauge to be gauge
calibrated,Cab-2 A/side changed,Marker
white marker light light
fluctuating,VESA-2 copper changed,VESA-2
pipe clamp to be pipe clamp patti
provided,J-2 both side provided,J-2 out
slow working,RGCP to be side EPV
replace,Cab-1 gauge light changed,RGCP
switch not working, changed,ZGL
switch provided,
HL/FL CAB-1 all pilot lamp not DC-DC converter 9
glowing due to 24V DC- changed.
DC converter defective.
Out put voltage not
showing.
Miscellaneou During IA inspection TM wick pad 56
s found TM-1 CE side wick changed, vide
pad spring broken at letter No.
bend portion. Failed WAT/TRS/T/58/3
Equipment details: TM 258, Dt. 23-10-13
Wick pad , Make: Mallick to Dy.CEE/BSL
felts
Traction TM-4 isolate due to Informed to 105
Motor abnormal sound in DUG- CWM/KPA vide
BQR section in Bilaspur Tech-52,
division SECR, while dt.31.10.13.
working in train no.
BRN/E. Loco arrived in
shed on 29.10.13 found
TM-4 pinion teeth
broken. TM-4 changed.
Pinion make - KPC ,Mfg.
12/2006
Traction During IA inspection Changed vide 56
Motor found TM-1 CE side wick letter No.
pad spring broken at WAT/TRS/T/58/4
bend portion. 067, Dt. 16-12-13
to
Dy.CEE/ELW/BSL

Traction Loco no. 22539/WAP-4 of Letter written to 523


Motor ELS/CNB failed on CWM/BSL with
17.10.13 in between copy to
CNB-CPA at KM -68/46 Dy.CEE/Loco vide
for QOP-1 drop & TM-1 letter no 230-
smoked while working in Elect/RS/CNB/Tec
train no. 14228. On h-55 dt 25.10.13
arrival in shed on
20.10.2013 found TM-1
armature power coil burst
near cone & band
open.Armature No. : A86-
2095-9-96 Make : CLW
Armature DOC :
13.02.1997
Traction Loco no. 22539/WAP-4 of TM-1 changed. 523
Motor ELS/CNB failed on Informed to
17.10.13 in between CWM/BSL vide
CNB-CPA at KM -68/46 letter no. Tech-
for QOP-1 drop & TM-1 55, dt.25.10.13.
smoked while working in
train no. 14228. On
arrival in shed on
20.10.2013 found TM-1
armature power coil burst
near cone & band open.
Arm. No. A86-2095-9-96,
Make - CLW
Miscellaneou L-1 ,3 & 4 Mobile contact Changed, vide 24
s lateral play. Fail ELS/VSKP's letter
Equipment make: No.
Stesalit, S.No. B-954 WAT/TRS/T/58/3
351, Dt. 28-10-
2013 to
CWM/LWS/DHD
Miscellaneou L-6 Arc-chute unit fixation Changed, vide 24
s defect Fail equipment ELS/VSKP's letter
make: Stesalit, S.No. B- No.
2474 WAT/TRS/T/58/3
351, Dt. 28-10-
2013 to
CWM/LWS/DHD
Miscellaneou Tie Rod deficient. Changed, vide 24
s ELS/VSKP's letter
No.
WAT/TRS/T/58/3
351, Dt. 28-10-
2013 to
CWM/LWS/DHD
Miscellaneou TC-118 make New Changed, vide 24
s Supreme S.no. 484/6/99 ELS/VSKP's letter
a) Main contact gap more No.
than 18mm b)Axiliary WAT/TRS/T/58/3
contact crushing less c) 351, Dt. 28-10-
Arc-chute not sitting. 2013 to
CWM/LWS/DHD
Miscellaneou T.K.Panel SB cable No. Changed, vide 24
s 456 terminal broken & SB ELS/VSKP's letter
(Middle) crack. No.
WAT/TRS/T/58/3
351, Dt. 28-10-
2013 to
CWM/LWS/DHD
HT/LT cable Heavy flashes occurred Due to loose 42
and effected to VCB connection of
middle /top insulator and CHT cable-same
RF roof bus bar. Heavy tightened.
surges passed in QF relay
via RF cable. Hence QOP-
2 dropped.
Auxiliary MVSL-2 inter-turned short MVSL replaced by 66
Motor insulation failure. Shed.
MPFDCS GR was not progression, RGAF & RGEP 329
due to FDCS showing changed.
wrong message of RGAF
pick up, so RGAF one
wire isolated
HT/LT cable ICDJ was experienced Cable lay out 4
due to no continuity in done.
cable no. 723 from SB-2
to ZPT-2.
Relay VCD not working since QVCD relay 17
QVCD relay defective. replaced at
ELS/RPM.
Traction TM-4 Arc horns flashed. TM-4 Arc horns 539
Motor replaced.
Switch HVSL-1 & 2, HPH, HCHBA Cable attention 22
terminals burnt & done and HPH,
blackish and cable from HMCS-II & HVSL-
TK panel to switch board 1,2 replaced.
became hard due to
looseness of contact
wires in switches.
Compressor/ Abnormal sound from CP-1 replaced. 152
Exhauster crank shaft of CP-1.
HT/LT cable CCPT melting again & In shed loco 8
again HOBA OFF. checked and
found wire no. E
202 from SBBa 1
to SBBa 2
showing bonded.
New wire lay out.
Letter given to
KPA.

HT/LT cable CCPT melting again & In shed loco 8


again HOBA OFF. checked and
found wire no. E
202 from SBBa 1
to SBBa 2
showing bonded.
New wire lay out.
Letter given to
KPA.

Traction Traction Motor-1 Arc Traction Motor-1 14


Motor horns flashed. Arc horns
replaced.
EP Contactor J-1 bits flashed condition. J-1 reverser 14
flashed bits
replaced.
Bogie & its Loco no. 27139/WAG-7 of Informed to 422
Mech. equip. ELS/CNB failed on CWM/KPA vide
12.10.13 due to wheel Tech-52,
no. 1&2 brake hanger dt.14.11.13.
badly jammed. Loco
arrived in shed on dt.
13.10.13 found brake
shoe to wheel gap less i.e
10mm. Alignment of
brake hanger was not
proper resulting hanger
bent and bushes got
loose causing hindrance
in releasing the brake
blocks.
Traction QOP-2 was dropping, due TM changed & 144
Motor to TM No.4 Sr.No. 3693, Informed to
CLW make field showing CWM/POH/DHD
grounded. for the above
failure & for N/A.
MPFDCS DJ was not closing from Attended by 94
leading cab No.1, due to shed.
FDCS Medha make input
card No.3 defective.

Miscellaneou During IA inspection, changed vide 39


s suspension bearing pump letter No.
No.6 fixation bolt thread WAT/TRS/T/32C/
1 No. worn out. 3252, Dt. 24-10-
13 to CWM/KGP
Traction TM6 S.No- 092-7979-94 TM changed 158
Motor Inter pole open
SMGR Condenser bushing (M/s The complete 16
BT, Part No-S- condenser
1601)Punctured.RPGR bushing and
M/s BT part No.S-2160) RPGR assembly
partly flashed and replaced.
blackish.
Traction NSC1- 0078 error MUB SLG1 , PPA988 47
converter B01 card
(SR) defective
Traction TM blower fan rubbing Motor changed 59
motor blower with body

Traction TM-6 IP open circuit Traction Motor 159


Motor changed
Miscellaneou During IB-Some time DJ DJ switch 143
s aux inter lock stuck changed,Horn O-
up,Cab-2 A/sdie HT horn ring
leakage,RSI-1 Tel-tel fuse changed,RSI-1
cover to be tel-tel fuse cover
provied,Sander no-7 provided,Sander
broken,CAb-1 RS valve to no-7 provided ,RS
be O/H, valve O/H,
SMGR SMGR MG 6/6, valve no. Attended at Shed 25
4 inside rubbing marks, & informed M/s.
which resulted push rod BT. vide letter
was stuck up some time. No.
ET/TRS/Tech/HQ,
dtd. 07/10/13.

Battery/ One cell of one One monoblock 72


battery box. monoblock showing 0.5 replaced.
volt.
Aux. Bur-2 inverter fault, SΦ WRE changed. 72
converter WRE 1 GTO short.
(BUR)
Aux. Bur-2 inverter fault, RΦ GDU changed. 72
converter GDU defective.
(BUR)
MPFDCS False message of QCON CPU card 27
stuck up and no OHE changed.
tension showing in DDS,
due to CPU card
defective.
Axle Box Axle box no-1 crown Axle box housing 60
broken. end equalizer
sent to HWH.
Same fitted by
HWH.
HT/LT cable QOP-2 permanent. Loco checked at 474
ASN and found
TM5 one power
cable rubbing
with Junction
box. Same
attended at ASN.

Compressor/ CP abnormal sound Changed due to 42


Exhauster coupling free.
Brake system B.P Showing 5.3kg1cm2 Control card 17
(E-70/Knorr) in both cab due to control changed.
card defective.
Aux. Bur-2 DC link capacitor Same changed. 16
converter bank value low as neck
(BUR) burnt, one capacitor
defective, one resistance
defective
[Method Oil leakage from Radiator Check nut 46
error 0] to TFP pipe line outlet tightened
valve check nut.

Bogie & its Primary Helical spring No 642


Mech. equip. 15 (Helical spring No GBD
05.10L036 DL35 Yellow)
of M/s GBD Pvt Ltd,
Deharadun of
Manufacturing year May
2010 coil effective top
side second coil broken.
EM Contactor Smoke emission from C-118 & R-118 33
ARNO & HT changed.
compartment. C-118
contact tips was in
welded condition and R-
118 overheated.
Miscellaneou During IC0-MVT-1/1 MVT 21
s bearing sound,CTF-3 out changed,CTF-3
side EPV stuck to be out side EPV
replaced,Both BG changed,Both Bg
earthing shunt not earthing shunt
fitted,MPH 1/2'' coupling provided,MPH
leaakge,QPH relay to be coupling gasket
changed,J-2 inside EPV replaced,QPH
leakage,J-2 finger tips relay changed,J-2
no-1,3,5,8,10 lifting bolt insdie EPV
not avl,RGCP to be changed,J-2 F/T
calibrated,S-31EPV lifting bolt
leakage from exhaust,2/1 provided,RGCP
side rubber pad no-4 top changed,S-31
& lower safety patti not EPV changed,Side
avl ,VCD main unit to be rubber pad safety
provided,UA-1 showing patti provided &
15kv, welded,VCD main
unit
provided,VCD
changed,UA-1
changed,

Switch Cab1 BLVMT switch Replaced 28


defective
Auxiliary MCP winding earthed Replaced 0
Motor
HT/LT cable TM1 FF cable outgoing Replaced 0
from junction was over
heated at lug
HT/LT cable TM2 A cable out going Attended & 0
from junction overheated replaced
at lug
Oil cooler OCB-1 All phase earthed. OCB-1 changed 13
blower unit (Single phasing)

Pn. Valve AIR DRYER AIR LEAKAGE AIR DRYER 125


AS DESICCANT FOUND CHANGED
IN FINAL FILTER
Pn. Valve S-11 air leakage & stuck EP valve 0
up. changed.
Miscellaneou L2 arc chute loose. tightened 0
s
Miscellaneou CBC-1125 & CBC-2 1120 adjusted 0
s ht.
Bogie & its Buffer NO.2 fixing bolt tightened 0
Mech. equip. loose.
Bogie & its CBC-2 draft gear gap Adjusted 0
Mech. equip. notice.
Bogie & its Brake block NO.21 adjusted 0
Mech. equip. touching with flange.
Miscellaneou Cab-1 & 2 HT horn sound Diaphragm 0
s dull. changed.
Miscellaneou Cab-1 & 2 both main tightened 0
s door hinges loose.
Miscellaneou Cab-1 & 2 both main tightened 0
s door hinges loose.
EP Contactor TM2 ISOLATE DUE TO S 33 CHANGED 123
LSP - S33 CONTACTOR AT BL
MECHANCALY STUCKUP
IN CLOSE CONDITION
Auxiliary Loco no. 27139/WAG-7 of Informed to 407
Motor ELS/CNB failed on line on CWM/KPA vide
27.09.13 for MCP-3 Tech-52,
smoked in TATA-ROU dt.12.10.13.
section at S.E.Rly while
workings train no
.E/M/P/EXP/KUN. Loco
arrived in shed on
09.10.13 found MCP-3
winding burst as one
phase earth. MCP No. L-
1112824, Make - BBL
Miscellaneou During IA insp;.ET2 rod New ET provided. 176
s thread worn out.
Miscellaneou During IB-AFI AFI gauge 132
s malfunctioning,A-3 CHT changed,CHT
bushing to be replaced replaced,New
since top insuletion got hing
burnt ,2/2main door hing provied,MPCS out
broken,MPCS put card no-1
Malfunctioning,PT-2 changed,PT-1
Servo motor Servo motor
leakage,Sander no-1 changed,Sander-
bracket not avl,VCD not 1 bracket
working through Horn in provided,QH-1&2
both cab,VCD not changed,Foot
working from foot switch
switch,CAb-1A-3 glass changed,A-3
loose, meter dome
changed,

Relay Q44 chattering As per TLC LKO 855


ICDJ due to Q44
chattering loco
failed and on way
of MGS
Pantograph PT2 not working loco checked in 489
shed and found
mechanism assly
insulator broken
in middle. One
collar with sloted
bar side and rest
in servomotor
side neither
found any foreign
material on roof
nor any cracked
marks on
insulator.
Mechanism assly
insulator
changed.

Bogie & its Bolster-2 crack Attended. 108


Mech. equip.
Auxiliary MVSL1&2 grease leaking Attended duly 0
Motor taking on to shop
floor
Vacuum VCB base plate one side VCB replaced 0
Circuit corner found crack
Breaker
(VCB)
Relay QVMT relay defective QVMT relay 31
changed
Miscellaneou QV-62 relay foundation tightened -7
s loose.
Suspension SB-6 Metal out journal 113
Bearing (SB) Scored of wheel no.06 &
wheel ste 04. Road
guage found less than
15995.5 & wheel set
no.02 Root wear 06mm &
flange wear 03mm. all 3
wheel sets changed at
ELS/ET.
Traction Rear loco no.21143 QOP2 Loco arrived in 24
Motor dropping shed on
permanently ,kept 24.09.13. TM
HQOP2 to OFF position checked in
and RSI2 isolated . As per section, TM
logbook between LMK- removed and
MAM DJ tripped same dismantled on
closed and worked up to 26.09.13, found
JKT. After JKT worked armature coil
with MU loco 23355 up to burnt and
THDR. At THDR loco earthed. This loco
21143 checked and QOP2 is equipped with
permanently dropping & M/s STESALIT
both loco DJ not closingmake MBFDS, as
then BA off and tried with data logged
rear loco.DJ closed and ‘DJ tripped
worked with rear due to QOP2
loco .HQOP2 made off dropped” and
worked up to BJG and at “C145 stuck
BJG block 2 isolated. up”. MBFDCS
Loco checked at RTM jointly checked
shed, TM-4 showing with firm
earthed, TM-4 isolated by representative
HMCS-2 on 2nd. RSI-2 and found
block made normal. normal. DBR not
in service hence
C-145 made
dummy to avoid
Battery wrong feed
Battery voltage 30 volts. Material to
failure 112
under warranty
Miscellaneou CCPT melting even HOBA Same attended. 40
s off condition. ZSMGR to
SMGR cable 051 I/L No.
61-62 cable damaged
due to rubbing with
EVPHGR pipe line
clamping plate.

Auxiliary MVMT-2 deflector plate MVMT and MVSL 138


Motor abnormal sound and Changed.
MVSL-1 DE&NDE side
grease leaking.
Miscellaneou During IB-CTF-2 double CTF-2 servo 186
s strock up side jam & out motor & out sdie
side EPV stuck up, G/C-1 EPV
top gutka crack,RGCP to changed,G/C-1
be calibrated,TFP & GR top gutka
silica gel to be replaced, welded,RGCP
changed,Silica gel
changed,
SIV SIV some times not SIV control cable 97
picking up on run due to of 702 card
SIV control cable of card connected
No. 702 card loose in properly in
connector X4. connector X4.
Miscellaneou HMCS I on 3rd due to HMCS 1 on III 458
s QOP1 drop. due to QOP1
drop In shed
checked and
found normal,
Loco observed in
line and found
normal.
Miscellaneou After passing MCN, DJ Increased 25
s tripped via QOP1, QRSI1 clearance
and QLM. Checked RSI1 between bus
block, TFP oil level and bars.
HT compartment, found
normal. Reset the relays
and worked further.TM1
brush holder assembly 1,
2 & 3 flashed. Arc horns
also flashed. J1 7th bit
both drum and finger,
CTF 1 4th & 5th drum
and finger bits flashed.
Also noticed that H21 and
F21 bus bars flashed and
melted at one location.
Also flash over took place
between E22 & H21 at
one location.The
clearance between bus
bars was less than 8 mm.
The insulators which
were removed duly POH
are not provided again
causing less clearance.

Traction TM3 end shield 03 no TM changed. 170


motor bolt broken
Miscellaneou Gear case no. 2+4+6 oil In shed loco 43
s leakage. checked and
found gear case
no. 2+4+6 oil
leakage .G/C no.
1,2,3 oil inter
mixing.
RPS/RS/DBR DBR element for TM1 DBR isolated 258
showing earth
Miscellaneou Cab 1 ALP seat broken Same attanded 111
s
Miscellaneou During IA-Axle box-4 Axle box-4 liner 167
s horn face liner crack,CP-1 welded ,CP-1
Ab sound,G/C-6 dummy copper pipe
cap deficient,L-3 EPV replaced,G/C-6
leakage from cap provided,L-3
exhaust,MSU-5 EPV
crack,PHGR isolate,HVRH changed,MSU-5
to be replaced since weldiing
slip,QPDJ to be done,PHGR
calibrated,J-2 In side EPV changed,HVRH
leakage,TM-2,4 nose pad switch
liner crack,Cab-2 wiper changed,QPDJ
working but not cleaned, changed, J-2 EPV
changed,TM-2,4
liner
welded,Wiper
blade changed,
Suspension Oil leakage from gear loco checked at 300
Bearing (SB) case no.4 ALD and found
Gear Pump
gasket broken.
Same changed at
ALD by MGS
staff. In shed
loco checked and
found normal.

Compressor/ MCP-1 was smoked due MCP-1 replaced. 289


Exhauster to Motor winding IR=1
and cooling fan was
giving abnormal sound.
Compressor/ MCP-1 was smoked due MCP-1 replaced. -76
Exhauster to Motor winding IR=1
and cooling fan was given
abnormal sound.
Suspension G/Case 2 oil leakage. Loco checked & 221
Bearing (SB) found G/C no 2
oil intermixing
SB-2 giving in
G/C 2 so loco to
be lifted. After
TM taken out in
shed it is found
PE cell burnt &
CE and metal out.
Wicks pad burnt.
Axle J/scored as
SB-6 metal
out.G/case-2 oil
mixing. TM2
opened and new
good felt fitted in
SB, then same
bearing fitted
with same TM2.

Axle Box Wheel no-1 Axle box Loco was 13


clearance more. lifted,wheel set
separated from
bogie and
clearance
adjusted,kept
within limits.
Battery SIV CHBA ammeter Ammeter 13
Charger needle fluctuating. changed.
(CHBA)
Auxiliary MVSI-2 abnormal sound MVSI-2 changed. 13
Motor since grease pipe
defective.
Arno Abnormal sound from ARNO changed. 20
ARNO
Traction Oil leakage from L pipe having oil 31
converter Converter leakage, same
(SR) replaced.
Auxiliary MVSIV abnormal sound MVSIV changed 10
Motor since bearing damaged. with good one
VCD VCD not working and VCD main unit 15
cables removed changed
condition.
Bogie & its Bogie-II crack not Bogie-II changed 15
Mech. equip. attended at POH. at KZJ.
Traction TM-4 metal content TM-4 changed. 15
Motor more.
Miscellaneou 1)TM-4 PE side metal IC-0 defects 17
s content 642 PPM, which
is very high since loco
worked only for few
days-TM-4 changed
2)BPEMS switch not
provided in both cabs and
QEMS connections not
given in BD-board.Both
cabs BPEMS switches
provided. QEMS
connection given in BD
board. 3)Between wheel
no:10,12 near vertical
damper bracket no.8
bogie cracked.Bogie
replaced
Sensor (FDU, As per DDS TR2 oil pr not P out sensor 45
Speed, ok, changed
Pressure,
Temp. OHE/
Voltage)

Sensor (FDU, As per DDS TR2 oil pr not P in sensor 45


Speed, ok. changed.
Pressure,
Temp. OHE/
Voltage)

Brake system Some time BP not BP sat valve 58


(E-70/Knorr) charging due to BP coil fitted.
No-16 stuck up.
EM Contactor E.M.Contactor C-102 coil E.M.Contactor (C- 503
short and coil insulation 102) Coil
got burst on coil top replaced.
portion.
Miscellaneou During-IA CP-1 delevery Serviciable pipe 100
s pipe brust,HL-2 not provided,HL bulb
glowing in dimmer changed,Horn O-
mode,CAb-1 A/side HT ring changed,L-3
horn switch leakage,L-3 EPV
EPV leakage from changed,RGCP
exhaust,RGCP to be changed,S-53
calibrated,S-53 EPV EPV
leaakge from changed,VESA-
exhaust,Cab-2 VESA-2 2/2 changed,Pipe
leakage,Both cab Dr sdie provided,
wiper flexible pipe crack.

EM Harmonic filter isolate Contactor 8.1 92


contactor/Rel stuck up.
ay Contactor
changed.
SL QOP-1 permanent drop, Informed to 415
block no.1 isolate at GZB CWM/KPA vide
in NR. On arrival in shed Tech-52,
found SL-1 cable no. A- dt.16.09.13.
15 sleeve flashed and
cut. Further checked
found SL cleat dia 33 mm
and cable sleeve dia 30
mm resulting sleeve loose
causing flashing &
melting. SL-1 outer coil
also bounded. Make –
CLW.
Traction After passing Derol C107 interlock 7
Motor message C107 feed failed sometime not
and 6th notch DJ passing feed.
tripping. Another loco Interlock box
27243 provided. TM3 & changed and loco
TM5 isolated as QOP 1 & found normal.
2 dropped . Loco checked The C107
by BRC staff at Ratlam TI interlock box was
shed on 05.09.13 and provided by POH
found C107 feedback shop KPA during
sometime not coming and POH. During POH
DJ tripping after 6th the adjustment of
notch. The loco was C107 contactor
equipped with FDCS, and I/L box
hence Firm Stesalit rep crushing was not
also checked the loco at done properly
RTM and no any problem and this was the
noticed from FDCS side. reason of failure
On further checking, of loco within
noticed that C107 very short time of
interlock sometime not POH. This aspect
passing feed. Interlock was also not
box changed and loco checked during
found normal.(Joint ICO inspection on
report enclosed). The 31.08.13.C107
C107 interlock box was interlock box
provided by POH shop changed and
KPA during POH. During adjusted by BRC
POH the adjustment of staff at RTM. On
Gear case SMOKE EMISSION Loco was 79
NOTICED FROM GEAR checked at BSL
CASE NO-6. Shed and found
W/Set-6 PE side
MSU bearing
seized due to
wheel set locked.
As per SSE/MOH
shop BSL grease
not found in MSU
PE side bearing.
W/Set 6 changed
at BSL.
Equipment
History W/set no-
36.16 TAOCHI(62
teeth) provided
by POH/DHD .
MSU No.-KM
138.08.12
KPI.Make-KM
supplied by M/s
KPI
HWH .Bearing
GE/NGE make
–SKF new
bearing.

Miscellaneou HB2 panel smoked Coupler X K 67 12


s E01 flashed and
pin melted
causing short
circuit
Vacuum VCB not closed. SR1 W slot card ( 62
Circuit PPA 177 A01)
Breaker defective
(VCB)
Transformer a5 bushing oil leakage. TFP changed . 90

Roof In coming Roof bar no-4 Roof bar no-5&6 90


Equipments separated from its changed,ET-1
misc. position and ET-1 changed
flashed.
Control While working T.No. One cyclic check 33
Circuit 17209, LP reported ICDJ started to check
with message QPDJ all locos for
defect, could not be proper cable
trouble shooted & aked securing &
for RE. Loco was checked shorting at BD
at TS/BZA, found cable panel especiaaly
no. c052 lug cut at in POH/ MPCS
additional QPDJ SB locos. The check
caused no feedback introduced in ICo
supply to MPCS. Cable after POH in this
lug changed at TS/BZA & respect for
found working normal. particular cable
During POH+RC at specific & all
LW/PER, wiring done for other similar
external QPDJ and cables locations.
were shorted by DyCEE/LW/PER
providing extra SB with advised to fix up
shorting link (external the responsibility
QPDJ not available). The for the failure
cable was secured in the and to take
clamp at tight position & corrective action
vibration of the panel including proper
caused lug broken due to looping at BD
strain. The shorting can panel.
be done at BD panel.

Auxiliary Driver Experienced LSP MVRF changed, 2


Motor glowing due to TM-4 was Vide letter No.
not responding. Loco WAT/TRS/T/58/2
allow to work with 5 TMs 801, Dt.07-09-13
in service in up direction.
Again, This loco failed on
account of QLA dropping.
On checking found that
AC MVRF 3 phase
earthed. Fail equipment
details: ACMVRF, S.No.
CLW/05321/055, Make:
DRI
Miscellaneou Driver Experienced LSP NC4 valve 2
s glowing due to TM-4 was changed, vide
not responding. Loco letter No.
allow to work with 5 TMs WAT/TRS/T/58/2
in service in up direction. 801, Dt. 07-09-13
Again, This loco failed on
account of QLA
dropping . On checking
found that AC MVRF 3
phase earthed. NC4 valve
of line contact No.4 was
not closing due to
sometimes coil showing
open circuit. Fail
equipment details: NC4
valve, Make: Precitech,
Make: 8664

Miscellaneou During IC0-MVT-1/2 MVT-1/2 75


s switch broken, Both CBC changed,Rest
screw coupling rest hook hook
not fitted,CTF-1 not provided,EPV
moving since outer EPV changed,L-3 Arc-
stuck up in pick up chute
position,L-3 Arc chute changed,New
loose ,MR safety valve cock provided,PT-
isolatiing cock to be 1 throttle valve
provided,PT-1 throttle kit replaced, CP-3
valve to be O/H,CP-3 pipe chaged,J-1
delivery pipe crack,J-1 EPV changed,VCD
outer EPV leakage from main unit
exhaust,VCD faulty & By changed,
pass message showing &
VCD not working,
Roof Heavy Flash from the Roof bars , 89
Equipments Loco Roof and VCB Insulator and
misc. tripped.on examination Earth shunt was
found in Trailing Loco replaced
27730/KZJ Roof Bar No.
4 separated from its
position and ET-1
Flashed. Roof Bar
secured and PT-1
isolated. During IC-0
schedule checked found
Roof bar no-5 flashed
heavily, foreign material
rubbing marks and
broken. Insulator No.5
petticoat broken and CHT
to VCB earth shunt
flashed. Also observed
flash marks on roof bar
no-6 and some foreign
material rubbing marks.

SMGR Loco no. 27256/WAG-7 of - 362


ELS/CNB failed on
02.09.13 while working in
train no. E/Box in ALD
division for “when MP
put on ‘N’ full
notch automatically
comes some time & not
regress to zero when
putting MP on ‘0’.
During checking found
SMGR control block
cylinder piston stuck up
due to piston jam as its
‘O’ ring swelled.

Miscellaneou Near RSI2 tube light not tube light out of 0


s glowing. stock.
Miscellaneou Cab2 ALP side main door Lock repalced. 0
s lock defective.
Pn. Valve SS2 EPVL air leakage. EP valve 0
changed.
Pn. Valve Cab2 SA9 air leakage. SA9 changed. 0

Miscellaneou PT1 one foot insulator PT1 foot insulator 0


s broken. changed.

Bogie & its Hanger lever on W.No.10 Same welding 0


Mech. equip. chair welding crack under done.
frame (bottom)

Bogie & its On W.No.8 inside strap Gap maintained. 0


Mech. equip. less gap.
Bogie & its On W.No.1,3,4,6,9,10 & Adjusted. 0
Mech. equip. 12 inside strap touching.

SMGR RGR smoking and SMGR ATTENDED BY 0


stuck up.GR lantered POH.
gear pinion rubbing with
support plate caused
jammed operation and
SMGR stuckup resulting
into RGR smoking.
Compressor/ During IB schedule Informed to 140
Exhauster checking found CP-2 CWM/KPA vide
coupling spring broken Tech-52,
and grease seal missing. dt.30.08.13.
CP no. – 440153, Make
- Elgi TRC-1000MN.

Miscellaneou During IC0-CBC-1 not Lock lift 5


s locking properly,HL-1 Dr changed,HL bulb
sdie bulbnot working in changed,PG
dimmer mode,PG not fitted,HVMT-1
fitted,HVMT-1 switch switch
defective,MR safety valve changed,Isolatini
isolating cock leaakge, g cock changed,

Miscellaneou Eq.set-1 rubbing bogie Adjusted 0


s frame on AB-3.
Miscellaneou CBC height more CBC1- Adjusted 0
s 1115,CBC2-1085.
Miscellaneou G/C-6 back side Gap maintained 0
s semicircular lining having
gap.
Miscellaneou G/C-5 bottom Boss Welding Done 0
s support crack and long
Boss welding crack.
Miscellaneou G/C-2 top air vent cap cap provided 0
s broken.
Miscellaneou TM-5 Axle cup bolt Axle cup bolt 0
s No.5,6,8 loose. tightened
Miscellaneou SB-1,3 oil leakage from Leakage arrested. 0
s brg. joint.
Miscellaneou BP drop continuous. Made normal. 0
s
Miscellaneou L3 EP valve heavy air EP valve 0
s leakage. changed.
Pn. Valve Both FP gauge 5.7 Gauge changed. 0
kg/cm².
Miscellaneou Both cab VCD not VCD made 0
s working. normal.
Miscellaneou MPH to Radiator joint Oil arrested. 0
s bottom side oil leakage.
Miscellaneou TM-5 heavy flashing mark TM5 cleaned. 0
s all carbon brush holder
badly flashed.
Miscellaneou CP-1 VEUL pipe U/C Leakage arrested. 0
s leaking.
Miscellaneou A9 application time C3W changed. 0
s 12” second C3W
changed.
Miscellaneou Both BP angle cocks Leakage arrested. 7
s check nut leaking.
Miscellaneou Both BP additional cock Leakage arrested. 0
s check nut & U/C leaking.

Miscellaneou A4 meter defective. Meter changed. 0


s
Miscellaneou PT-1 lowering time less. Adjusted 0
s
Miscellaneou HT-2 strainer U/C Leakage arrested 0
s leaking.
Miscellaneou Cab-2 side U/C both horn Leakage arrested. 0
s leaking.
Miscellaneou WSM-1 not working Made normal. 0
s properly.
Miscellaneou MR-1 U/C leaking. Leakage arrested. 0
s
Miscellaneou Auto drain U/C leaking. Leakage arrested. 0
s
Miscellaneou WSM-3 pipe benzo bolt Leakage arrested. 0
s leaking.
Miscellaneou WSM-3 pipe benzo bolt Leakage arrested 0
s leaking.
Traction Earth fault in DC link Earth fault relay 17
converter changed.
(SR)
SL During IC Sch;SJ1 SJ1 removed & 127
shaking badly. base
strengthening
done.
Traction Bogie 1 isolate SR 1 Voltage 4
converter sensor found
(SR) defective.
Suspension SB-3 oil leakage from SB- SB -3 replaced. 309
Bearing (SB) 3 oil pump fixation bolt
and SB oil mixing with
Gear case oil.
Transformer/ Traction Converter no 1 TFP1 oil pump 79
Converter oil isolate burnt
pump
Memotel Both SPM not working PG found 3
defective.
Bogie & its Crack in MSU of wheel no Chnanged 290
Mech. equip. 4 ( 5HR-208)
Auxiliary *At BL on 6/9/13 MVMT- LETTER 44
Motor 1 ,U phase Earthed. * WRITTEN TO
One coil burnt from MTR/DHD
overhang position .
Bogie & its AT BL ON DATE 28/06/13 BOGIE CRACK 234
Mech. equip. 7"HAIR LINE CRACK WELDED
BETn W/NO. 9-11

Auxiliary MVMT-2 abnormal sound. MVMT changed. 88


Motor
Transformer QLM drop TFP DGA 52
abnormal
Compressor/ Burning smell came from Changed at 29
Exhauster MCP-1 junction box.Failed ELS/ET.
MCP-1 is under warranty
and last provided during
POH on 26.07.13

Battery Battery charger not CHBA removed 14


Charger working. and cleaned and
(CHBA) RCC card
changed in IC-0
schedule.
Battery Battery voltage showing All batteries 14
less voltage. changed.
Miscellaneou 1No. ARNO bush badly Noted for 0
s crack attending next
inspection, vide
letter No.
WAT/TRs/T/58/3
011, Dt. 16-09-13
to Dy.CEE/BSL

Relay QTD105 relay timer QTD105 timer 0


defective relay
changed,vide
letter No.
WAT/TRs/T/58/3
011, Dt. 16-09-13
to Dy.CEE/BSL

Traction TM-5 Arc horns melted TM-5 Arc horns 0


Motor condition were changed
with new, vide
vide letter No.
WAT/TRs/T/58/3
011, Dt. 16-09-13
to Dy.CEE/BSL
Miscellaneou J1 servo motor non- Servo motor 0
s modified changed, vide
vide letter No.
WAT/TRs/T/58/3
011, Dt. 16-09-13
to Dy.CEE/BSL

Miscellaneou HHF filler to Air dryer one Flexible pipe was 0


s metal pipe was provided provided, vide
instead of flexible pipe letter No.
WAT/TRs/T/58/3
011, Dt. 16-09-13
to Dy.CEE/BSL

Miscellaneou BC2 piston cap broken BC2 changed, 0


s vide letter No.
WAT/TRs/T/58/3
011, Dt. 16-09-13
to Dy.CEE/BSL

Traction TM bellow was not TM bellow 0


Motor stitched and was simple changed, vide
pasted with gum. The letter No.
bottom side also coming WAT/TRs/T/58/3
out from joint. this bellow 008, Dt. 26-09-13
M/s Bombay Leather to CWME/BSL
Industry, Mumbai and
manufactured in 2012.

EP Contactor QOP-1 and QOP-2 drop Informed to 159


on higher notch. During CWM/KPA vide
checking found Line Tech-52,
contactor L-4 name plate dt.23.08.13.
worked out and fallen
down on power
connection resulting QOP
dropped. L-4 name plate
riveted one side instead
of both side, resulting
worked out. Make –
Stesalit, MFG.:10/2011.
Traction TM 2+5 smoke emission TM 2+5 changed. 89
Motor due to metal fuse
accumulated due to wick
pad spring tension less.

Traction Traction Bogie-2 off Valve set GTO 10


converter burst
(SR)
Pn. Valve J1 EP valve air leakage. EP valve 120
changed.
MPFDCS LSCHBA continous glow. MPCS make - 72
CPU card defective Steslit CPU card
changed by firm
Miscellaneou During IC0- GR silica gel Silica gel changed 9
s to be changed,UBA meter ,UBA meter
low voltage showing, changed,

Auxiliary MCPA abnormal sound MCPA replaced 75


Motor Bearing defective.
SMGR SMGR cover inside air "O" ring replaced 106
leakage,found SMGR
cylinder no-1 "O" ring
crashed condition
Miscellaneou Unsch-Arno to be Arno 94
s replaced since ground,C- changed,Soft
118 timer to be were changed by
adjusted,Cab-2BP angle firm,New gasket
cock isolate due to provided, QVMT-
leakage.QVMT-2 stuck up 2 changed,QVSI-
due to leakage,QVSI-1 to 1 changed,Shock
be replaced since not pick up cover
up,Horizontal shock up provided,SPM
cover drop,SPM-1 memory card
memory fault indication errased,,
glowing,
Sensor (FDU, DDS message of ASC-1 TM speed sensor 140
Speed, Error Techogenerator found defective.
Pressure,
Temp. OHE/
Voltage)

Central FDU fan not working FDU changed 63


Electronics
Auxiliary MVSL1&2 grease pipes Attended duly 0
Motor leaking taking on to shop
floor
GR/RGR/CGR At GR double pole bush , Replaced 0
contact ring connector
threads warn out
Miscellaneou Cab1&2 horns dull sound Attended 0
s and wiper rubber blades
worn out
Miscellaneou Digital NR not working. Loco checked at 52
s HWH and found
wire no 169
connected on
terminal in BD
with sleeve.
Sleeve removed
and found NR
working normal.
HT/LT cable Cab-1 head light not Control cable 509
working. During changed.
investigation 05 nos Informed to
control cables (2.5 sq. CWM/BSL vide
mm, 750 volt) found letter no. Tech-
flashed & cut with sharp 55, dt.20.08.13.
edge under BL-1 box
resulting head light not
working. Cable make –
Nicco, 750 volt HR-
1200C, MFG -2011.
Relay D/E BLRDJ switch In shed loco 11
defcetive. cheked and found
ACQCVAR
resistance
terminal
connnection cut.
New resistance
fitted.V07-434-
ABB- Dt. of fit-
12.08.13 during
POH
Bogie & its Cab2 CBC lock lifter Same welded. 117
Mech. equip. defective.
Compressor/ During IC-0 on CP/MCP-2 18
Exhauster 16.08.2013 at TKD, replaced in shed.
cooling fan of CP/MCP-2
found slack. This TRC-
1000 compressor (Sr. No.
ELGI/ML 0590/MBAM
4269 (CGL) was provided
on 06.07.2013 during
POH at KGP.

Traction TM-6 cone burnt. Arm. TM-6 changed. 6


Motor No. 744-01-1606-1659-5- Informed to Dy.
95, DOC- 30.01.96 CEE/CB vide
Tech-54,
21.08.13.
Miscellaneou During IA schedule Informed to 287
s checking found loco body CWM/KPA vide
PU paint “Peeled Tech-52,
off” badly at many dt.27.08.13.
places & surface exposed
all around the loco.

Compressor/ MCP-1&2 abnormal sound MCP-1&2 and 27


Exhauster and MCP-3 motor Compressor-3
(Seimens make) touching changed.
to CP elbow.
Miscellaneou MP-1 not proper working MP-1 changed. 116
s due to following reasons: Informed to Dy.
 Lever worked out.  CEE/CB vide
Axle pin lever bolt worked Tech-54,
out upside by which lever 20.08.13.
came down.  MP
handle tapper pin loose.
 Cam no. 3 loose.
Neumax paper not
provided.
Miscellaneou QOP-2 drop HMCS-2 on 259
s Iind,'Loco checked in
shed on dt 15.08.13
power ckt IR value
checked found ok.
TM4,5,6 visually checked
found normal. -ve
charging of TM 4,5,6
done on 16 notches
found normal. TM-4
rocker rotated found
normal.
Bogie & its Primary helical spring No Advised to firm 530
Mech. equip. 6 bearer Sr. No GBD vide this office L.
05.10.L035.DL.35 of M/s No
GBD Pvt Ltd top side BSL/TRS/S/WTY/
second coil broken under Primary Helical
warranty. Spring/G.B/ELW
dated
07/09/2013.
Bogie & its Wh.No- 5 slack adjuster New Slack 59
Mech. equip. stud broken. adjuster stud
fitted.
Traction Bogie-1 isolate SLG1 Processor 4
converter card found
(SR) defective
Traction Bogie-1 isolate SLG1 Processor 4
converter card found
(SR) defective
Miscellaneou During IC inspection: TM- The same was 146
s 5 CE side Wick pad spring changed with
broken. new wick pad,
vide letter No.
WAT/TRS/T/58/2
583, Dated: 16-
08-2013 to
Dy.CEE/BSL
Bogie & its Slack adjuster deficient. Same fitted. 57
Mech. equip.
MSU with Axle no 11 Temp high MSU bearing 65
Bearing seized
Traction TM-3 changing. Attended at 264
Motor ELS/ET.
HT/LT cable LP informed that while oco arrived to 64
using RB DJ tripped. On ELS/LGD with
examination found ADDL HOBA in OFF on
CCBA, CCBA, CCLS and 13.08.13. Loco
CCLSA fuses melted. was examined
Same renewed but again and found that
CCBA melted. Hence kept Cab-1 FLPCB
HOBA in off. connecting strip
in flashed
condition. On
further
examination it is
found that
connection screw
of cable no.003
(positive
terminal) touched
to FLPCB body
and flashed. It is
also found that
this screw is
provided without
split and flat
washers. Due to
non availability of
fasteners fixing
screw projected
out of the
connecting strip,
Traction ''HMCS-2 on IInd, TM-4 56
Motor isolate, Loco checked in
shed on dt 12.08.13
power ckt. meggering
done IR value found ok.
Movement done on TM
4,5,6 found normal.
TM4,5,6 visually checked
TM 4,5 found ok. One
welding rod found in side
TM 6. TM 6 flashed also
welding rod flashed. TM 6
rocker rotated and found
ok. Same welding rod
removed and TM 6
cleaned.

EP Contactor CHECKED AT BL ON LETTER 148


13/08/13 J1 SHAFT WRITTEN TO
BROKEN FROM INSIDE POH/LKO
DRUM. SHAFT CHECKED
IN LAB REASON OF
BROKEN IS FATIGUE &
RUPTURE.
Control CAB1 MPEEC FAILED NO ABN. 69
Circuit NOTICED
Miscellaneou D/E SPM not working. In shed cheked 220
s and found RT9
indicator needle
driving gear was
worn out .So new
SPM fitted.RT9
s.no. 941484
make- AAL Dt of
fit 01.01.13

Suspension GEAR CASE-2 SMOKED TM-2 BEING 23


Bearing (SB) AT PEV STATION AT REMOVED AT
15.00 HRS. ON ELS/BSL.
09.08.2013. IN ELS/BSL,
TM-2 SUSPENSION
BEARING WHITE METAL
FOUND RUN DOWN.
Miscellaneou Unsch-QPDJ feed back These works not 83
s not taken, BL & BLDJ done by
interlock in DJ circuit ELW/KPA
modification as per
RDSO/SMI/348 not done,

Bogie & its Gear in two half no.2 Attended at 166


Mech. equip. loose. ELS/ET.
Compressor/ Air Leakage from CP Delivery pipe 56
Exhauster delivery Pipe burst, same
replaced.
Auxiliary Tripping on 6th Notch MVRH found 152
Motor earth, Same
replaced.
RPS/RS/DBR * TM-1 cables showing *Drive has been 215
earth * further check started for proper
found TM-1 showing securing &
earthed through MVRF insulation of
cable from
terminal end to
avoid repetition
of the same.
Traction QOP-1 drop while Informed to 165
Motor working train no. GD in CWM/KPA vide
JHS division on 07.08.13, Tech-52, dt.
hence TM-1 isolate. 10.08.13.
During checking found
TM-1 brush box no. 6
insulator broken resulting
commutator grazed.
Make- CLW, Stator no. -
4673123 Arm. No. - H
494-5229-1-2002.

Pn. Pipeline BC gauge pipe line air Metal putty 159


leakage under foot plate provided as rusty
in corridoor 1
Relay STC internal fault during Same replaced 53
checking found "SIV with double unit
rectifier fault" message coil WOAMA type
displayed on screen and relay and working
was showing "DC link checked found
voltage high" and STC working
"inverter fault". But no normal.
abnormality noticed on
STC. Further QSVM relay
checked found single unit
coil relay provided
(during POH) and was
defective. QSVM sr. No.
25165, Make : WOAMA,
TYPE: Single coil unit

Miscellaneou Brake Cylinder No.1 not New piston with 24


s releasing properly. spring provided.
Miscellaneou During IA-B/Cly no=4 B/Cly bolt 109
s bolt missing,Cab-2 provided,Unit
display unit glass changed,DJ
deficient,DJ piston shaft replaced,G/C-3
defective to be breather
replaced,G/C-3 breather provided,O/H
broken,Both cab BP FP gauge
gauge light not provided,LED
glowinig,CAb-1 LSCHBA & panel
LSDJ one-one LED not changed,Holder
glowing,CAb-2 LSGRT changed,J-clamp
holder defective,Pull rod changed,RGCP
no-3 J-clamp bend,RGCP changed,TM-6
to be calibrated,TM-6 earthing shunt
earthing shunt open, providedm

Miscellaneou I/L not making contact. Aux .I/L Changed 22


s in
Telemechanique
SIV MVSIV Bearing sound. Bearings 32
changed.
Auxiliary MPH terminal gasket & MPH changed in 32
Motor dummy nut heavy oil IC-0 sch.
leakage noticed .
Pn. Valve RGAF defective. RGAF replaced 152
and found
working normal.
Miscellaneou Unsch-Auto regretion is CPC card 60
s also coming via AFL due changed,CBC
to system knuckle
malfunctioning,CBC-2 provided,CPC
knuckle not fitted,ICDJ- card changed &
VCB locked is also DJ megnet valve
reported from line on tightness done,
fault data analysis it is MPCFDS saft
noticed that DJ feed back were changed by
become high even before firm
closing DJ,MPCFDS giving representative,QL
wrong messagewhen A relay
regretion through Q-50 removed,QVRF &
as bracking fault SWC MVRF wire
operated,QLA relay to be bunching done,
removed,QVRF & MVRF
wire to be bunch properly
siince hanging condition,
Miscellaneou Unsch/IA-MPCFDS data Data down 74
s to be down loaded,OP loaded,OP card
card no-2 OP LED no-2 attended by
blinking some times in firm,MPCFDS soft
locoenerziged condition were changed by
to be attended,During Q- firm,QOP-1&2
50regration MPCFDS and QOA
giving false message calibrated,QVRF
SWC operated breacking lug changed,J-1
fault to be rectified,Both & J-2
QOP & QOA relay torget changed,Side
not droping and DJ not rubber pad no-2
triping while erathing safety patti
fault in power aux ckt to welding
be attended,QVRF one done,Side rubber
cable secured out from pad pad no-4
lug new lug to be provided,
provided and connected
properly,J-1 &J-2 to be
attended for flashing
between all F/T with
D/C,BG to body side
rubber pad no-2 safety
patti broken,BG to body
side rubber pad no-4
missing,

Suspension SB oil mix in gear case Attended at 55


Bearing (SB) no.6. ELS/ET.
Pn. Valve Train arrived GDR PF-2 at Loco checked at 35
00.15hrs, loco pilot FS/BZA and
reported while found in SS-2
approaching GDR MR some foreign
dropped to 6kg/cm2 and material
found SS-2 blowing obstructing the
continuously tried to valve causing
arrest but not successful. struck up in open
LP asked for relief loco at condition. SS-2
00.30hrs. RE 28405/ removed and
incoming ATP arrived sent to ELS/BZA
GDR at 00.40hrs for further
detached and attached investigation.
on top at 01.15hrs train
ready and left at 1.35hrs,
DET-80”.GDR-RT KI-
119” BPQ-+85”

Pn. Pipeline GR stuck up. In shed loco -68


checked and
found ceramic
filter element
choke hence
proper air
pressure not
available at out
pit of ceramic
filter .Filter by
passed.
Pn. Valve While working between Loco was 33
ODUR-GDR section SS2 checked at
struck up in blowing TS/BZA and
condition. MR and FP found inside SS2
pressure dropping ( MR safety
rapidly. Section cleared valve) a foreign
with less air pressure. At particle was
GDR tried to dummy SS2 available. It
but could not succeed. caused un
Hence asked RE. seating of the
spindle and air
leakage in SS2
safety valve.
Hence loco
directed to
LW/PER for
thorough
cleaning of
pneumatic pipe
line.

VCD VCD not working. VCD main unit 540


defective. VCD
changed.Make-
Stesalit sno.-
B2503121111 Dt.
Of Com-15.09.12

Axle Box Axle box no. 11 CE side Attended at 6


thrower free. ELS/ET.
EP Contactor L-3 EP coil defective. L-3 EP coil 148
replaced at
ELS/RPM.
Vacuum While working in Bilaspur POH /DHD, as 38
Circuit division LP reported VCB VCB not tested
Breaker not closing and FDCS properly before
(VCB) message “ICDJ fitment in loco.
through DJ feedback VCB changed in
fail.” Loco arrived in shed.
shed on 31.07.13 in dead
condition. Loco checked
and found VCB not
closing, though the 110V
control supply & Air
pressure normal. VCB
removed from loco and
jointly checked with
SSE/MTR During checking
it was noticed that
magnet Valve operated
shop DHD as failed within
very short time after
POH. normally but VCB
not closing. Magnet valve
assly changed then VCB
working normal. On
further checking the
defective main valve by
dismantling, it was
noticed that its Valve
stem AREVA part
CBC/Draft no.52604005
CBC not openfound 0.5 Attended at BIA
as lock 174
gear/TSC lifter broken
HT/LT cable Loco no. 27141/WAG-7 of New wire 186
ELS/CNB failed on provided.
24.07.13 for PT-1 not Informed to
raising & DJ not closing CWM/KPA vide
some time, while working Tech-52,
train no. N/KOTA at ALJN dt.13.09.13.
in NCR . On arrival in
shed found wire no. D-
712 from ZPT-2 to SB-2
not showing continuity
due to break.
SL QOP-1 drop and smoke Informed to 209
from SL-1 while working CWM/KPA vide
train no. E/RC-03 at KUR Tech-52,
in EC0R . Loco checked at dt.13.09.13.
KUR by maintenance staff
found smoke emission
from SL-1. Block no.1 put
isolated. On arrival in
shed found SL-1 cable
no.A-11 & A-15 flashed
and cut just before
sleeve. Further checked
found SL cleat dia 33 mm
and cable sleeve dia 30
mm resulting sleeve loose
causing flashing &
melting

Auxiliary SIV not working due to MVSI 1 found 137


Motor external earth fault earth, same
replaced
HT/LT cable Train passed ABU @ Loco checked at 6
11.55 hrs, between ABU- ELS/ED, found
AVD, LP noticed smoke HMCS-1 and 2 in
from truck -2.Train 1 position and
stopped after passing BA-2 panel E-25
AVD home @ junction, J-2, 4th
11.58hrs,Train arrd AVD bit bus bar DE-25
@ 12.20hrs RE and cable EE-
27389/KZJ left TI @ 25(RPS) not
12.15 hrs, attached on tightened
top @ 12.35hrs and train properly, terminal
left @ 12.47hrs or 53” overheated and
late. Train arrd ED @ cable insulation
19.25 hrs, both locos damaged. Also
detached and 22627/ED BE-25 and CE-25
attached and train left @ (TM-5 junction
19.45 hrs or 85” late. box) field cable
Summary AC Loco insulation
Direct . damaged due to
slackness of DE-
25 bus bar
terminal.

HL/FL Cab 1 Flasher Light not Flasher Light 113


working. Hood found
defective, same
replaced.
Transformer During ICo inspection, TFP Changed, 0
1)a3,a5 & a6 bushes oil vide letter No.
leakage 2)A34 bush WAT/TRS/T/58/2
insulator top side oil 496, Dt. 05-08-13
leakage and check nut/ to
lock plate deficient 3)TFP Dy.CEE/POH/KGP
bottom dummy drain
plug oil leakage &
dummy unit sealing
deficient 4)a0 bush oil
leakage
Auxiliary During ICo inspection: MVMT-1 0
Motor MVMT-1 heavy vibration changed, vide
and bearing sound letter No.
WAT/TRS/T/58/2
496, Dt. 05-08-13
to
Dy.CEE/POH/KGP

Arno During ICo inspection: ARNO changed, 0


ARNO heavy abnormal vide letter No.
sound WAT/TRS/T/58/2
496, Dt. 05-08-13
to
Dy.CEE/POH/KGP

Miscellaneou During ICo inspection Cleaned & Arc 0


s TM-5 Smoke emission horns changed,
and all Arc horns melted vide letter No.
and brush box no-6 WAT/TRS/T/58/2
flashes 496, Dt. 05-08-13
to
Dy.CEE/POH/KGP

Miscellaneou During ICo inspection: Gear case no-1 & 0


s 1)Gear case no-1 bottom 6 felts provided
felt deficient gap & CCF vide letter No.
throwing 2)Gear case no- WAT/TRS/T/58/2
6 bottom felt worn out , 496, Dt. 05-08-13
gap & CCF throwing to
Dy.CEE/POH/KGP

Miscellaneou During ICo inspection: Axle cap gasket 0


s TM-2 oil leakage from top changed, vide
& bottom axle cap joints letter No.
WAT/TRS/T/58/2
496, Dt. 05-08-13
to
Dy.CEE/POH/KGP
Suspension During ICo inspection: All TMs bearing 0
Bearing (SB) (1) SB Nos. 2,3 & 4 metal changed for over
powder in SB oil (2) SB-5 size (Spilt gear
pump gear case bucket changed & S/B
un coupled due to sliding pump changed)
plate not proper welding
and gear wheel worn out
(Nylon) Split gear
damaged. Bearing metal
pieces found in SB oil
(3)SB-6 pump driving
spindle step formed and
housing hole bore formed
SB no-6 metal pieces and
powder found in SB oil

Bogie & its During ICo inspection: Crack welding 0


Mech. equip. Bogie-2 between wheel done
No-8x10 top re-crack
about 4’’
CBC/Draft During ICo inspection: Cab1 side CBC 0
gear/TSC Cab1 CBC shank bottom shank changed,
fixation hole blow hole. vide letter No.
WAT/TRS/T/58/2
496, Dt. 05-08-13
to
Dy.CEE/POH/KGP

Compressor/ During ICo inspection: CP-1 changed , 0


Exhauster CP-1 abnormal sound vide letter No.
during CP working due to WAT/TRS/T/58/2
fly wheel slack. 496, Dt. 05-08-13
Compressor was kept on to
shop floor for warranty Dy.CEE/POH/KGP
attention. S.No. ML0620,
Make: Anest Iwata
mothersun Ltd, Mfg
11/12
Pn. Valve During ICo inspection: Changed with 0
Feed valve air leakage another valve,
due to diaphragm vide letter No.
punctured .Middle gasket WAT/TRS/T/58/2
expanded , inside 496, Dt. 05-08-13
‘0’ ring edge cut. to
Dy.CEE/POH/KGP

Battery During ICo inspection: BA Batteries 0


No 2 & 7 negative changed, vide
connection terminal crack letter No.
condition. WAT/TRS/T/58/2
496, Dt. 05-08-13
to
Dy.CEE/POH/KGP

Vacuum VCB DJ coupler was Attended by crew 35


Circuit uncoupled & showing DJ on line, after
Breaker feed back failed. arrival at ET
(VCB) through checking
has been done.

Bogie & its Strap assly.touching with Adjusted. 10


Mech. equip. 'J' bkt.on W.No.2,3,6,8,9
& 11.
Suspension SB-3 metal out & wheel Attended at 62
Bearing (SB) set no.3 CE side journal ELS/ET.
scored during IC
schedule.
Compressor/ CP-1 inter cooler safety Informed to 418
Exhauster valve heavy air leakage, CWM/KPA vide
hence CP-1 isolate on Tech-52, dt.
21.07.13.During checking 25.07.13.
found CP-1 HP disc valve
suction spring broken
resulting safety valve
continuous blowing. HP
disc valve changed.
Make- Elgi, Sl.no.-
440068.
Battery All pilot lamp not BA crate no.5 533
glowing.BA voltage not internally open
showing. circuit.BA voltage
105 V on OFF
load and On load
showing '0' Volt.
Battery
chnaged.Make-
KEC BA. LUG
date 08/11 CD-
6/12
Gear case TM-5 & TM-6 flashed on Informed to 273
20.07.13. During CWM/KPA vide
investigation found gear Tech-52, dt.
case no. 5 & 6 oil 20.08.13
splashed and inserted
inside TM, due to felt
worn out.
Pn. Valve Feed valve heavy air Informed to 119
leakage. During checking CWM/KPA vide
in shed found feed valve Tech-52,
sealing ring Pt. no 2019 dt.30.08.13.
burst. Make - Escort

Miscellaneou Cab2 FL hood found same changed. 108


s defective.
EP Contactor TM5 isolate. L-5 arc L-5 arc chute 43
chute supporting spring changed
assembly was broken.
SIV SIV external fault & 4
ICDJ,Loco placed at
ELS/CNB. Checked by M/s
Hirect repersentative and
found SIV input fuse was
blown off .Same fuse
replaced, Make Hirect

Suspension SB oil pump gasket torn Gasket replaced 362


Bearing (SB) out.SB 1+3 oil excess & all bolts
leakage from axle cap. tightened.
VCD VCD lamps continuously VCD main unit 71
glowing main unit changed
defective.
Traction In IA schedule found TM- TM-5 changed 71
Motor 5 V cone burnt
SIV SIV fan abnormal sound SIV fan changed 71

Vacuum DJ not closing due to air DJ changed at 384


Circuit leakage from DJ box. ELS/ET.
Breaker
(VCB)
Miscellaneou During IA -Cab-1 FL unit FL unit 59
s buzzer sound low,CBC-1 changed,CBC
not proper fitted,Cab-1 FL new provided,FL
switch defective,Hand changed on Dt-
brake chain uncoupled, 3/7/13 at
2/2look out glass BRC,Hand brake
crack,MVRF to be attended,Look
replaced since IR value out glass
0.2 mega om,MVRH changed,MVRF
heavy ab sound,Radiator isolated,MVRH
gasket broken,RGCP to check found in
be calibrated,Sander pipe side rubber
no-8 broken,SW-1 switch gasket same
not working both cab SW removed then
to be changed, check found
ok,Radiator new
gasket provided,
RGCP
changed,Sander
pipe no-8
changed,SW-1
switch new
provided,

Miscellaneou CP1 motor side welding done. 84


s foundation leg crack. Also
base plate crack.
Bogie & its During IB Sch.;Bolster1 Bolster changed. 84
Mech. equip. crack above TM2.
Bogie & its Gear case No.5 & 6 Gear case No.5 & 84
Mech. equip. bottom side having gap. 6 replaced.
[Method C-118 N/C contact failed. 29
error 12029] Loco checked in shed on
dt. 15.07.13 C-118 N/C
interlock found spindle
some times not closing
properly.C118 Aux switch
some time sticking up
due to Aux switch shaft
was bend
condition. .Causing switch
spindle not open ckt.
properly. Same Aux
switch assly. changed
switch make Plastometal

Transformer Loco arrived shed on Turret changed. 84


14.07.13 for IA schedule. Informed to Dy.
“OFF” IA testing CEE/CB vide
found QLM drop & TF oil Tech-54,
splashed. During 25.07.13.
investigation found turret
insulator burst resulting
QLM drop.

Auxiliary During IA schedule MVSL-2 changed. 84


Motor checking, MVSL-2 found Informed to Dy.
jammed due to load end CEE/CB vide
bearing balls sticking. Tech-54,
Make – GTR, Sl. no. - 04.09.13.
10-01-832, DOC -
01/2010
MPFDCS All pilot lamp glowing 226
after removing BL
Key.Loco checked in shed
on dt. 18.07.13 & found
FDCS CPU card's slot was
defective,Make Stesalit
VCD VCD isolated & all pilot 226
lamp glowing after
removing BL key.Loco
placed at TKD outpit
checked & found hand
brake not working AFI
defective VCD isolated
and all pilot lamp glowing
after removing BL
key.Loco chacked in shed
on dt. 17.07.13 and
found hand brake chain
bolt was uncouled
causing hand brake was
not working .AFI working
was OK.
Miscellaneou Unsch visit-2/2 rail guard RAil guard 115
s & cattle guard bend,G/C- attended,G/C-2
2 breather broken,L-3to breather
be replaced since having welded,L-3
flashing & play,L-2 changed,L-2
contect to be cleaned changed,J-1
since slightly flashed ,J-1 S/Motor heavy
S/Motor heavy leakage to leakage,BLRDJ-1
be changed,Add BLRDJ-1 attended,
to be attended since
stuck up in 'ON' position,

Auxiliary MVMT-1 abnormal sound MVMT-1 was 282


Motor from bearing driving end. changed.
Fail equipment details:
MVMT-1, S.No.
N8/146594, Make:
SIEMENS

Aux. Life Sign Missing from GG module of 9


converter BUR2, resulting isolation BUR2 found
(BUR) of bUR2 defective, same
replaced.
EP Contactor Smoke emission from same attended. 66
HTC. Due to welding
C145 contactor in closed
condition.
Switch After passing neutral Loco checked by -84
section Cab light GMO and found
extinguish and BP addl. CCBA
pressure dropped. defective. Addl.
CCBA changed.
Traction V cone burnt in TM2-3 Motor Replaced. 30
Motor
Traction TM-5,6,isolated due to 363
Motor QOP-2 permanent drop &
block-2 isolated. Hence
block-2 isol. By crew.Loco
chacked in shed on dt.
19.07.13 and found TM5,
6 IR value OK above 10
mega ohm, RF cable IR 0
mega ohm of TM-4,5,6
same cable ddisconected
from RF and checked
found cable IR OK. After
sepration of cable all RF
showing IR 5 mega ohm.
TM-5,6 visually checked
found OK.RF-6 checked
from Top side roof found
slightly one grid shorted.
Reason was gap in
between RF unit & MVRF
unit since gasket burnt
same attended by E-1
and TR-4 & DBR isolated.

Traction TM1 & 6 arcing horn Same replaced. 0


Motor melted.
Traction TM2,3,4 & 5 BHRR teflon Same cleaned. 0
Motor sleeve found blackish.
Miscellaneou CP1 motorside frame Welding done. 0
s channel having hair line
crack.
Bogie & its Strap assly.inside less Adjusted 0
Mech. equip. gap on W.no.4,7,9 & 11.
Bogie & its On W.No.3,10 strap changed. 0
Mech. equip. assly.jam noticed.
Bogie & its CBC1 draft gear having Adjusted 0
Mech. equip. gap.
Miscellaneou PRV foundation not Provided 0
s provided.
Miscellaneou RGR LH side top insulator New Insulator 0
s broken. provided.
Miscellaneou Both side BP/FP angle New modifed 0
s coc safety guard as it is guard provided.
not in arrowdynamically
shape.
Miscellaneou CP1 foundation base Welding done. 0
s motor side hair line crack.

Bogie & its Gear case No.5 & 6 Gear case No.5 & 80
Mech. equip. bottom side having gap. 6 replaced.
Axle Box During IC schedule on Wheel set 162
11.07.13 noticed that No.6(Sl.No.72587
Axle box No.11 metal BSL) replaced.
content was more
(064%). On dismantling
the axle box it is
observed that inner racer
(Outer side) rotated and
the journal size was
reduced to
149.98mm.The above
wheel set failed due to
improper interfernce
fitment of axle box
bearing.
Miscellaneou CP1 foundation base welding done. 79
s crack.
Auxiliary MVSL1&2 grease pipes Attended duly 0
Motor leaking taking to shop
floor
Traction HMCS 2 on II due to NC- L-4N, NC-4 321
Motor 4 air leakage. replaced.
Traction Traction motor-2 checked Traction Motor - 358
Motor found that negative shunt 2 was changed.
flashed and cut after
crimping point. Fail
equipment details :
Traction Motor - 2, Sl.No.
3662( Single potted)

Pn. Valve Air drier not working Female 167


connection of
solenoid coil of
Air drier showing
make/brake
causing
sometimes tower
not working.

Miscellaneou During shunting loco 22


s derailed BG-I all wheel
and Bogie-2 three no
wheels at BSP Yard.Due
to mistake of shunter
(Crew) since he was over
look the signal,Hence
reponsibility goes to crew
Same loco placed at
ELS/BIA for checking of
derailment parameteer.
As per loco log book.
Loco derailment
parameter checked in
ELS/BZA found normal
(10.07.13)

Traction SR-2 12/3 valve set V3 Advise to firm. 600


converter V4 GTO short.
(SR)
SIV SIV not pick up. In shed checked -170
and found can
error fault logged
in fault memory.
Battery charger
changed after
that SIV working
normal. In this
loco previously
BA charger given
trouble with can
error changed on
16.05.14

Miscellaneou During IA sch-CP-2 safety CP-2 safety vavle 107


s valve cap unsealed,CTF-1 new
drum tips no-6 finger tips provided,CTF-1
no-6 flashed mark, Cab-2 drum tips &
BP gauge to be changed finger tips no-6
since wire short,PT-1 pan changed,Cab-2
boken,AFL not glowing BP gauge
from cab-2 but AFL calibrated,PT-1
working,J-1 drum tips no- pan replaced,AFL
5,6 & finger tips no-11,12 LED changed,J-1
flashed mark,Sander no-5 drum tis & finger
sand pipe & ejector body tips
not fitted, changed,Sand
pipe & valve
provided,

Vacuum ICDJ & VCB flashed at VCB changed at 2


Circuit BPL. Loco return back to BSL shop.
Breaker POH/BSL for attending.
(VCB) During checking at BSL
shop found VCB
interrupter short. Make
– Areva double bottle
Traction LSP GLOW TM1 ISOLATE 37
Motor
Miscellaneou During IA-CP-2 CP-2 foundation 110
s foundation bolt loose,SB bolt tightened,SB
door uncoupled,Both cab door
all look out glass water coupled,Look out
leakage,PHGR not glass RTV
working,Cab-2 A/side provided,PHGR
side glass no- isolate,In side
3,4,5,6,8water glass RTV
leakage,SPM showing full provided,SPM
memory,UA-2 meter card errased,UA-
stuck up, 2 changed,

VCD VCD not working. VCD checked & 515


found normal.
Traction Gear case no.5 bulging. Attended at 467
Motor TM-5 changing since ELS/ET.
pinion locking bolt drop
and thread.
Miscellaneou Unsch-CAb-2 Ammeter to Cab-2 Ammeter 92
s be replaced since changed,G/C-2,6
showing excess cardium topped
reading,G/C-2,6 cardium up,L-3
less,L-3 contact to be attended,QD-1
cleaned&Arc-chute to be changed,RPS-1
replaced,QD-1 to be fuse
replaced since contact changed,RPS-3
gap very less,RPS-1 HRS fuse
fuse to be replaced since changed,VCD
melted,RPS-3 HRC fuse paddle switch
to be replaced since welding done,
blown off,Cab-2 VCD
paddle switch welding
broken,

HT/LT cable TM3 isolated due to LSP, cable changed 12


L3 not closing as cable
No.C138 of 'A' coupler
not passing feed.

Compressor/ CP3 abnormal sound & CP3 coupler 12


Exhauster cooling fan found loose. greasing done,
same tightened.
Miscellaneou During IC0-All axle box All axle bolt 28
s not sealed,CP-2 sealed,CP-2
cibrating,Cab-1 BC LED foundation bolt
not glowing,PG not tightened,BC
fitted,LSRSI continuous gauge calibrated
glowing,RSI-2 one tel-tel provided,PG
micro switch to be provided,LSRSI
replaced since burnt,TM- attended,RSI-2
1 upper cover nut bolt fuse replaced,TM-
not fitted,L-4&6 aux inter 1 cover bolt
lock stuck up to be fitted,L-4&6 inter
changed,CVD working but lock
not reset,VEPT-1 to be changed,VCD
chagned since heavy reset switch
leakage,U-1 to be set at changed,VEPT-1
zero,Cable no-A-011 changed,U-1 zero
insuletion damaged, set,Cable no-A-
011 new
provided,

Miscellaneou During IA sch-Air drier SB Air drier next wire 129


s one wire broken,BL box-2 provided,BL box-
A/side bulb fuse to be 2 A/side bulb
changed,CTF-2 out side changed,CTF-2
EPV leakage from out side EPV
exhaust ,2/1 foot step changed,2/1 foot
not fitted,Nose pad no-4 step new
liner crack,TFVT cover provided,Nose
open & fuse defective,S- pad no-4 liner
33 EPV stuck up, welding
doneTFVT new
fuse provided &
cover fitted,S-33
EVP changed,

Auxiliary Block -2 isolate MVSL-2 burnt, so 56


Motor MVSL-2 changed.

Axle box with Abnormal sound Axle Box no 4 67


Bearing abutment ring
rubbing with
cover. Abutment
ring changed.
Bogie & its CBC1 found jam. CBC changed. 86
Mech. equip.
Miscellaneou During IC0-CAb-2 A-9 A=9 foundation 85
s foundation leakage from attended,Cab fan
BP pipe adopter,MVT- provided,CP-3
1/1,1/2 not fitted,CP-3 atteded,SB & NR
presure not door coupled,One
maintaining,Cab-1 SB & shunt
NR door uncoupled,Cab-2 provided,Horn
hood & body middle attended &
earthing shunt not fitted diphragm
to be provided,Cab-1 HT tightened,MPH oil
horn direct & cab-2 LT leakage
horn sound dull,OIl arrested,P-1
leakage from MPH lower changed,PHGR
gasket,P-1switch to be isolate,QPDJ
changed,PHGR changed,Both
isolate,QPDJ setting side glass
5.5kg/cm2,Corridor-1 changed,SPM-1
side wall glass no-3,5 card errased &
broken,SPM-1 memory SPM-2 changed,
full & SPM-2 some time
not working,

Miscellaneou Unsch-Air drier Air drier 86


s Isolate,DBR to be Attended,DBR
replaced since grid no-3 changed,G/C-2
open,G/C-2 breather breather welding
broken,CAB-2 LSGR one done,LED-1 panel
LED glowing ,Cab-1 changed,LED-2
LSCHBA one LED panel
glowing,2/2 sand pipe changed,Sander
not avl,TM-3 to be pipe
replaced since heavy provided,TM-3
flashing, changed,

Traction QOP1 drop. TM2 clipper bolt 173


Motor broken.
Miscellaneou water leakage from both RTV applied. 64
s cabs L/O glass & main
door.
HT/LT cable STC external fault Cable secured. 11
appeared since cab
heater cable touching
with heater body & got
earth.
HT/LT cable DJ tripped with QOA All RA fuses are -7
dropped permanently. being isolated
CCRA-1 & 2 removed by during monsoon
LP and worked.Cab-1 LP & summer
side & ALP side RA wire precaution,
rubbed with stiffner Further CCRA-
causing QOA dropped. 1&2 fuse
cartridge are also
removing.Also
wire no362 at BL
box-1&2 is being
isolated.

Miscellaneou TM-6 isolated. Cab1 spm In shed checked 172


s not working. and found TM6
field side one
cable cut near Jn.
Box by miscreant.

Miscellaneou Unsch-CTF-1 drum tips CTF-1 drum tips 35


s no-4 & finger tips no- & finger tips
3,4,5 flashed,GR oil changed,GR oil
less,J01 drum tips no-2 & topped up,J-1
finger tips no-7,8 drum tips no-2
flashed,RGCP to be finger tips no-1,7
calibrated,SMGR is stil changed,RGCP
stucking beyend 32 notch changed,SMGR
SMGR to be replaced & New
replaced,SPM-1 full control block
memory showing, changed,SPM-1
data down
loaded,
Miscellaneou U/IA sch-BL box-2 Dr BL box-2 bulb 94
s side bulb fuse,CBC-2 rest changed,CBC-2
hook end,CAb-1 BP angle rest hook
cock leakage,CP-1 changed,Cab-1
pressure pipe line BP angle cock kit
leakage from changed,CP-1
coupling,CTF-2 drum tips pipe line gasket
no-4 & finger tips no-4,5 changed,CTF-2
flashed,CTF-2 inner side drum tips no-4
EPV to be replaced,G/C-5 finger tips no-4,5
breather broken,LC-2/2 changed,CTF-2 In
holder defective,L-1 EPV side EPV
air leakage,MCPA safety changed,,G/C-5
vavle air leakage,MPH oil breather welding
leakage,PT-2 throttle done,LC-2/2
valve leakage from holder
screw,PHGR speed changed,L-1 EPV
less,CAb-2 MR+BC pipe changed,MCPA
to be replaced,J-1 drum safety vavle
tips no-6 & finger tips no- changed,MPH
6 flashed,RGEB tightness
defective,TM-6 cable done,PT-2
cleat bolt missing,MV-4 throttle valve
valve to be O/H,HVRH gasket & O-ring
switch tension less in 'O' changed,PHGR
to '1' position, speed
attended,MR+BC
serviceable pipe
Aux. BUR- isolate. provided,J-1
Auxiliary 80
converter Converter no-2
(BUR) WRE module
found defective.
Traction Traction Motor-3 IP coil Traction Motor - 13
Motor No 1 & 6 link cable cut 3 was changed.
after brazing point. Fail
equipment details:
Traction Motor - 3,
Sl.No.Mod-36,(Single
potted)
Bogie & its Bogie-2 crack back side Attended at 482
Mech. equip. of brake hanger no.9 in ELS/ET
bottom.
Transformer X'mer dust proof gasket New gasket 0
having gap back side. provided.
Miscellaneou Most of BD panel wires Wire secured. 0
s open condition.
Pn. Valve S32 EP valve air leakage. S32 valve 0
changed.
Miscellaneou Both cabs carpet not Provided. 0
s provided.
Pn. Valve VEPT1 magnet valve Leakage arrested. 0
bottom side air leakage.
Miscellaneou Cab1 LP side coridoor attended 0
s door hinges broken.
Bogie & its Centre pivot2 oil leakage attended 7
Mech. equip. from pipe.
Traction TM-5 arc horns flashed. TM-5 changed. 11
Motor
Battery BA voltage less BA se1 19
battery fail in capacity
test
Bogie & its CBC1 knuckle lock Same replaced. 73
Mech. equip. broken.
Bogie & its Wheel no 9-11 secondary Same set right 2
Mech. equip. spring not fitted properly. after lifting of
locos
Traction QOP1 dropped, LP make TM changed. 113
Motor HQOP1 OFF at PLO, LP
isolated TM1 on run. TM1
armature showing
permanent bonding.
Make CLW, SL no. 5059-
19 date of fitment
21/02/2013.
Miscellaneou HQOP1 + 2 off. J1 panel same welded and 37
s cross bar supporting tested normal.
fixation rod broken and
touching with RS element
in BA -1 panel.
Traction TM-2 and TM-3 Arc horns TM-2 & TM-3 Arc 415
Motor flashed. horns replaced at
ELS/RPM
Miscellaneou Axle no.6 left side W.No.11 309
s P/H/Spring broken. P/H/Spring found
broken. In shed
loco checked and
found spring
changed at HWH
with good spring.

GR/RGR/CGR GR angle is more in Gr replaced and 3


progression side 4.5 attended
degrees
Transformer After passing neutral TFP changed. 69
section QLM dropped
with TFP oil splashed,
safety valve of TFP blown
out and oil accumulated
in breather. Particulars of
TFP- Make- M/S BHEL, SL
NO. 2008242. year of
manufacture - 1993

Arno Arno terminal block Informed to 107


broken in two pieces. CWM/KPA vide
Arno terminal block Tech-52, dt.
changed. Make: Jyoti Sl. 19.06.13.
no. : A-3424.
Traction QLM dropped with QOP-1 TM-2 changed. 35
Motor & QRSI-1 at MDP n ASN
Division. At ELS/ASN,
found resiglass binding
worked out in TM-2
armature. G/case-2 also
found broken. In shed,
found TM-2 pinion teeth
worn out.
Traction QLM dropped with QOP-1 Loco yet to arrive 35
Motor & QRSI-1 at MDP n ASN in shed.
Division. At ELS/ASN,
found resiglass binding
worked out in TM-2
armature. G/case-2 also
found broken.

Auxiliary MVSL1&2 grease pipes Attended duly 0


Motor leaking taking on to shop
floor
Transformer A8 palm clamp is having Replaced 0
crack
GR/RGR/CGR GR contact Gr,SMGR and 0
angle( regression side) is CGR unit replaced
above limits & CGR gear
jumping, SMGR hard
operation since crank
shaft gap less
Suspension SB-3 WMRD SAME CHANGED 8
Bearing (SB) DURING IC-0
Traction TM-6 Center Gear Teeth Same attended 8
Motor Broken
Transformer All terminals on bushing Same tightened. 8
found loose during IC-0
on 08.06.2013.
Transformer All bolts of MPH bend Same tightened. 8
pipe found loose during
IC-0 on 08.06.2013.
Vacuum i. VCB pressure is 5.0 i. Pressure 8
Circuit kg/sq. cm. instead of 5.2 adjusted. ii. Panel
Breaker kg/sq. cm. ii. Capacitance replaced. iii.
(VCB) value of VCB panel found Support provided.
45 micro farad. iii.
Support not provided to
VCB air pipe.

SMGR Wire No. 122 at SB of Same re-lugged. 8


SMGR found uncoupled
from lug.
Suspension i. RC in PE side SB found i. SB-2, 3 5 & 6 8
Bearing (SB) to be about 10 times changed after IC-
higher than the standard 0.
value in SB-2, 3 & 5. ii.
Gear in two half
foundbroken on wheel
set 6.
Traction PE side end shield of TM- Attended by 8
Motor 4 having hole causing providing M-Seal
coming out of grease. after welding on
the hole.
DC-DC Plastic switches provided Plastic switches 8
Converter/HL during POH on flasher replaced with
/FL lights. metallic switches
during IC-0 on
08.06.2013.

Traction Old sleeves have been Allowed in same 8


Motor provided on insulators of condition.
rocker ring in all TMs
except TM-3.
SIV SIV fan abnormal sound SIV fan changed 9
and Some times SIV and in fault data
tripping through QSIT. SIV chopper
''over current
fault'' logged
hence On
precautionary
measure GDU
card changed.
SIV SIV fan abnormal sound SIV fan changed 9
and some times SIV and in fault data
tripping through QSIT. SIV chopper over
current fault
logged hence on
precautionary
measure GDU
card changed.
EP Contactor L-3 line contactor top L-3 block 2
side block & base flashed replaced and L-3
& melted, due to mis- replaced.
alignment and loose in
base, resulted L-3 not
working properly & LSP
glowing.
Control While working 16327 exp Cab-1 MPJ to 315
Circuit between ERN-KPY cab-1 SB, B 009
experienced DJ tripping cable replaced
frequently due to CCPT and secured.
fuse melting even after
kept HOBA in OFF
position. Train stopped at
KPY and informed to
TLC/TVC and asked RE.
Found cab cable bunch to
cab-1 MP to cab-1 SB
badly rubbed with the
Pneumatic pipe line
securing clamp and
insulation of cable B 009
got damaged and earthed
causing CCPT melting.
Due to continuous
rubbing of the cable and
insulation damaged, flash
over took place in
between the cable
conductor and securing
clamp causing the wire
no. B 009 got open
circuited.

Traction QOP1 drop, TM2 isolate TM changed. 176


Motor
EP Contactor L-3 contactor top side Attended at 2
block & base flashed and ELA/ET
melted, due to mis-
alignment and loose in
base, resulted LSP
glowing.
Traction TM2 isolate TM2 armature 35
Motor dead earth.
Pn. Valve CAB2 A9 HEAVY AIR A9 CHANGED AT 28
LEAKAGE FROM BODY BINA/BPL/WCR
Miscellaneou During IB sch-CBC CBC- 143
s operating handle bolt attended,Holding
missing,Center pivot no-2 plate
holding plate cract,RGCP changed,RGCP
to be calibrated,HVSL-2 calibrated,HVSL-2
inter lock to be cleaned, inter lock
cleaned,
Arno ARNO smoked on line , Loco plan for 19
shed for ARNO
changing,
Miscellaneou MR safety valve Valve 105
s blown,FL-2 unit spair fuse replaced,FL-2
defective,MVMT-1&2 unit fuse
vibrating,J-1 out side EPV provided,MVMt
leakage from exhaust, greasing done,J-1
out side EPV
changed,
Traction TM1 smoke. TM 1 armature 91
Motor earth.
Bogie & its Wheel no 10 inner brake New Bush 88
Mech. equip. hanger bracket bush provided.
deficient
Auxiliary Loco was failed online MVMT-1 194
Motor due QOA dropped with Changed, vide
tripping, smoke emission letter No.
from MVMT-1. After WAT/TRS/T/58/2
testing found all phase 062, Dt. 29-06-13
earthed. Fail equipment to CWM/DHD
details: MVMT-1, S.No.
747059, Make :HBB
SIV QSIT drop After arrival of 376
the loco in shed,
during checking
found that there
is heavy play in
cooling fan
housing. SIV
change due to
cooling fan not
available SIV-
make- AAL No-
OB1800706003
Dt of fit-
17.07.07
SIV QSIT drop After arrival of 376
the loco in shed,
during checking
found that there
is heavy play in
cooling fan
housing. SIV
change due to
cooling fan not
available SIV-
make- AAL No-
OB1800706003
Dt of fit-
17.07.07
Miscellaneou CTF-1 out side EPV to be CTF-1 out side 18
s replaced since stuck up in EPV changed,C-
brake mode,DBR to be 145 & DBR
isolate since MVRF IR isolate,TM-1
less,TM-1 to be replaced changed,
since Armature IR-
0.5mega om,
CBC/Draft CAB1 CBC COUPLER NOT ATTENDED AT 178
gear/TSC OPEN GMC TI SHED
MPFDCS C118 & R118 BURNT. MPCS CHANGED 150
MPCS (STESLIT) BOTH
CPU CARD GIVING
DIFFERENT DATA
Bogie & its Gear case No.5 top bolt Gear case bolt 42
Mech. equip. loose & bottom gear case tightened.
came down.
Relay LP informed that VCB QSIT relay base 4
tripped 5 times through fixing slack and
QSIT found on SIV attended by
Rectifier fault lamp TS/BZA. .Loco
glowing after resetting arrived to shed
QSIT every time able to on dt: 08.06.13
overcome the trouble. and Relay was
checked found no
abnormality
Miscellaneou During IA sch-CP-3 inner CP-3 foundation 64
s side foundation bolt bolt
loose,CTF-2 out side EPV provided,CTF-2
leakage from EPV
exhaust,G/C-2 breather& changed,G/C-2
dummy broken, HL-1&2 breather welding
dimmer bulb not done,HL bulb
working,MP-1 spring changed,MP-1
tension less,B/side NR attended,NR bulb
bulb to be changed,PHGR changed,PHGR
not working,CP-3 delivery changed,CP-3
pipe line leakage,Rail delivery pipe
gaurd 1/2 bolt loose,Air changed,Rail
leakage from cab-1 SA- guard tightness
9,Cab-2 ALP side sand done,SA-9 O/H
pipe missing,TM-1 to be done,Sand pipe
replaced since armature provided,TM-1
ground,L-2 EPV leakage changed,L-2 EPV
from exhaust,Wheel no- changed,J-
7,9 one J-bracket bolt Bracket bolt
missing, provided,

Auxiliary MPH abnormal sound 89


Motor from bearing. On
dismantling found TATA
make bearing was
provided which was been
removed. (MPH SL no.
OP/D1123)
Relay LP informed that VCB Same attended 4
tripped 5 times through
QSIT found on SIV
Rectifier fault lamp
glowing after resetting
QSIT every time able to
overcome the
trouble.QSIT relay base
fixing slack
Traction Bogie-1 isolate ASC1 type 115
converter PPB988 card
(SR) found defective
Transformer TFP safety valve was TFP changed. 165
blown on line. On lifting
TFP core, it was found
that auto winding batch
No.10 came out &
winding was damaged
due to press plate bolts
were loose condition. TFP
S.No. 2800043573, Make:
NGEF
Compressor/ CP-1 having unusual CP-1 replaced at 339
Exhauster sound ELS/ET.
Miscellaneou R118 smoke. Checked and 482
s found some time
C118 stuck - up
& R118 smoke.
R118 & C 118
changed.R 118-
Make- Salton
electrics No-
04109 C118-
Make- Rotomac
Eletrical Electrical
Ltd No-
99590/94/10/82
dt of O/H-
06.02.10
Miscellaneou During IC0- found BL BL box bulb 13
s box-1 ALP side bulb changed,MVT-1/1
fuse,MVT-1/1 not changed,RA
working,Both RA to be isolated,CP-2
isolated,CP-2 inter cooler inter cooler
safety valve leakage,HL-2 safety valve
focus poor,MCPA changed,MCPA
vibrating ,MVMT-2 tightness done,
vibrating,MVSI-1 direction MVMT-2
wrong ,QVSI-1 relay to tightness done,
be calibrated,HL focus MVSI-1 direction
not proper, changed,QVSI-1
relay changed,HL
focus poor same
attended,

Traction QOP-2 dropped TM-4 Loco checked in 319


Motor isolated at ELS/CNB since shed on date
armature earthed. 17.06.13. TM-4
armature found
earthed same TM
changed.
Miscellaneou QOP1 dropped and MS nut removed. 21
s smoke emission from J1
cable, since MS nut was
present in between shunt
and copper bar.
EP Contactor While working On checking 55
T.no.12961, Speed not found L4 bottom
increasing on line. foundation block
found flashed as
fixing bolt loose,
L4 changed.
EM Defect noticed during Attended by 0
contactor/Rel comm.-No crushing in all ELS/AQ
ay 03 nos. pre charging
contactors.
Miscellaneou Defect noticed during Attended by 0
s comm.-BLPR1&2(Head ELS/AQ.
light)switch was old
provided.
Transformer Defect noticed during Attended by 0
comm. oil was not ELS/AQ.
changed during POH.
Transformer Defect noticed during Attended by 0
comm.-TFP safety valve ELS/AQ.
drain pipe was bend.
Transformer Defect noticed during Attended by 0
comm.-TFP safety valve ELS/AQ.
drain pipe was bend.
Sensor (FDU, Defect noticed during Attended by 0
Speed, comm.-Oil leakage was ELS/AQ.
Pressure, noticed from SR-2
Temp. OHE/ pressure sensor.
Voltage)

Miscellaneou Defect noticed during Attended by 0


s comm.-Both cab foot ELS/AQ.
switch base plate was
without welding so bolts
were loose and not
tightening and were
freely moving for which
base plate was removed.

Miscellaneou Defect noticed during Attended by 0


s comm.-UBA meter was ELS/AQ.
defective. Both BL
connector found loose as
‘O’ ring found
deficient.
Traction Loco attended at 318
Motor ELS/CNB and found TM-4
isoleted due to QOP-2
drop sinceTM-4 armature
earthed. On date
17.06.13Loco working on
5 TM.Loco cheked in
shed at 17.06.13 during
IA shedule and found
TM-4 Armature found
earthed.
Axle Box Axle box no. 1 lateral Attend at ELS/ET. 5
clearance less, Axle box
no. 11 longitudinal
clearance less.
Axle Box Axle box no.1 lateral Attended at 8
clearance less. ELS/ET.
Traction Bogie-1 off. Traction 109
converter Converter voltage
(SR) sensor defective,
same replaced.

Battery (1) All battery has One battery 3


completed service life of changed
3 years and one battery
positive terminal slack
from inside of battery.
Battery make - Bharat,
Sr. No. 138 Lug dt
02/2010 Comm Dt
06/2010. (2) QF relay
deficient even after loco
equipped with DBR.
Suspension SB-6 Metal out and wheel Attended at 333
Bearing (SB) set no.6 PE & CE journal ELS/ET.
scored.
Auxiliary Loco arrived shed on MVMT-1 35
Motor 26.05.13 for running changed.
repair. During checking Informed to Dy.
MVMT-1 heavy abnormal CEE/CB vide
sound. Make – CGL, Sl. Tech-54,
no.- ACXM 70685 29.05.13.

Traction QOP-1 drop, HMCS-1 put Informed to 464


Motor on 3rd . Checked found CWM/KPA vide
TM-2 cone burnt & brush Tech-52, dt.
box no. 3 carbon pigtail 08.06.13.
out. Make-CLW, Sl.no. A
473-1825-4-96

MPFDCS Loco attended at FDCS CPU card 176


GZB/output by M/s replaced with
stesalit and found FDCS new one during
CPU card was defective. under warranty.
MPFDCS GR SLUGGISH MP/EEC PRECAUTIONARY 113
NOT RESPOND,RGR IN PUT CARD
OVERHEATED.,NOT NO-3 (i-35 DJ
REHAB.BY POH/LKO.AT FEEDBACK
BL ON 27/5 CHECKED FAILED )MPCS
FOUND NORMAL, MAKE STESLITE.
SUSPECTED MPCS
PROBLEM AT THAT TIME.

MPFDCS ICDJ Loco checked at FDCS CPU card 176


GZB out pit by M/s replaced with
Stesalit FDCS CPU card new card by
was defective. Firm,Further
complete unit is
replaced by Firm
since so many
failures were
given by previous
unit.
Traction TM3 isolate TM3 carbon 22
Motor brush condeming
size and rocker
lead partialy
melted.
Miscellaneou ARNO ab sound,B/Cly no- ARNO greasiing 37
s 2 leakage from done,Gasket
flange,CDC-1&2 drain changed,CDC-
cock to be changed,PT- 1&2 drain cock
1&2 isolating cock to be changed,PT-1&2
changed,L&T cock to be isolating cock
changed,CTF-3 inner EPV changed,L&T
leakage from cock
exhaust,G/C-3 breather changed,CTF-3
broken,L-5 Aux inter lock inner side EPV
to be changed& changed,G/C-3
connection to be breather
done,RGCP to be welded,Inter lock
changed,VCD main unit changed &
display not glowing,VEPT- connection
1 coil loose,VESA-1 coil done,RGCP
loose , changed,VCD
attended,VEPT-1
coil
tightened,VESA-1
coil tightened,

Miscellaneou Unsch- Heavy air leakage R-6 valve 70


s from AFI valve,CP-3 changed,CP-3
delivery pipe not attended,CP-1
fitted,CP-1 foundation bolt tightness
bolt loose & vibrating,CP- done,CP-3
3 direction wrong,HL-2 connection inter
single beem,L-5 aux inter changed,HL-2
lock to be changed,VCD bulb changed,L-5
faulty indication showing Aux inter lock
& internal relay faulty changed,VCD
suppressed faulty data to main card&
be down loaded,VCD aditional
internal relay fault production card
showing both unit fault changed & diode
lamp not glowing,VCD provided in VCD
internal fault, power card input
supply,Main card
changed,VCD
relay changed
but no put right,
Traction TM-3 armature earthed. TM-3 changed 312
Motor Equipment details: TM-3
armature No. EN 25-A-
203/07(3609)
Miscellaneou C-118 aux inter lock Cover 6
s cover to be provided, All provided,TFVT
fan not working TFVT to new
be changed,MVT-2/1 not provided,MVT-2/1
working,CTF-3 out side changed,CTF-3
EPV leakage,RGCP to be out side EPV
calibrated,RGEB to be changed,RGCP
clibrated,Cab-2 VCD ACK changed,RGEB
padel switch to be changed,VCD
replaced since CCPT switch changed,
melting ,
Bogie & its Bogie-2 crack Attended at 52
Mech. equip. ELS/ET.
HT/LT cable DJ tripped with QOA drop Control ckt. Wire -38
permamently. Same No. 966/1 &
trouble shooting by crew 966/2 at switch
and HQOA put on zero. board & 362 at
Further CCRA-1 & 2 BL box 1 & 2 is
removed, then reset QOA being isolated
and working OK. during mansoon
summer
precaution.
MPFDCS AT BL ON 23/05 CHECK MPCS FIRM 657
FOUND R-118 REPRESENTATIV
OVERHEATED & STRIPS E CALL FOR
MELTED. ARNO OK & C- CHECKING.
118 WORKING IN LT
FROM BOTH CAB
NORMAL. ON DATE
FAULT DATA SHOWING "
C-118 NC INTERLOCK
FAIL " BUT LOCO IS IN
WORKING WHICH SHOW
THAT MPCS
MALFUNCTION BECAUSE
IN CASE OF C-118 NC
INTERLOCK FAIL DJ
OPEN. MPCS-STESALIT.
PROVIDED DURING MTR.

HT/LT cable On dt. 22.05.13, the All EMC three 607


above loco was under IC phase cable
schedule at ELS/JHS, the insulation found
insulation of three phase crack in TK panel.
cable found poor in TK The POH and
panel. recabling was
carried out on
date 23.09.11.at
POH/BSL.

Auxiliary On dt. 21.05.13, the loco Loco checked in 171


Motor no.24003 failed at UDN shed on date
station in BOMBAY(WR) 22.05.13. and
Div. for MVMT-1 smoked. two phase
winding found
earthed due to
motor side one
lead parted from
lug. The motor
movement was
free. The POH of
the loco was
done on date
01.12.11.
Vacuum VCB not working. VCB VST short, 82
Circuit VCB changed.
Breaker
(VCB)
EP Contactor Bogie frame2 50mm Groove cutted 46
fresh crack above helical and same welded
spring-5/2 in Zone-32. in position. Bad
workmanship by
DHD workshop.

Bogie & its During IA insp;.Hand Loco lifted;Hand 46


Mech. equip. brake not working as brake pulley
pulley bracket broken. bracket welding
done.
Bogie & its During IA insp;.Gear case Loco lifted;Gear 46
Mech. equip. 1 & 6 top boss crack. case 1 & 6
changed.
Miscellaneou Unsch-Brake hanger no- Tiebar 126
s 23-24tie bar patti changed,Center
bend,Center pivot no-2 pivot plate
holding plate crack,CP-2 welding done,CP-
air leakage from delivery 2 flange gasket
pipe coupling,HCHBA changed,HCHBA
switch defective,RPS switch
gasket came out,SPM full changed,RPS new
memory showing,Wheel gasket
no-11,12 brake cross provided,SPM
tiebar is bend ,TM-1 memory card
BHRR to be moved & changed,Wheel
check sine severalSB no-11,12 tie bar
pigtails out to be changed,TM-1
replaced, rocer ring move
& corbon brush
broken found
same changed,
Traction Bogie-2 off due to DC link Traction 139
converter Over Voltage. Converter no 2
(SR) Analog I/O board
type UAB514B33
defective, same
replaced.
Auxiliary Loco arrived shed on MVMT-2 27
Motor 18.05.13 for running changed.
repair. During checking Informed to Dy.
MVMT-2 heavy abnormal CEE/CB vide
sound. Make - ABB Sl. Tech-54,
no.- 732293, Mfg.1997. 22.05.13.

Transformer During commissioning, Attended at 0


these defects TRS/AQ
noticed.Power cable of
bushing cut was more in
length. More strands
were visible between lug
and cable.New EIPL
vertical Main bushing
cable provided, on roof
main bushing cable were
more in length,since sag
on cable.

Roof Defect noticed during Attended by 0


Equipments commissioning-RF block ELS/AQ.
misc. 1&2 were found short
and RF block need to be
removed for attention.
RPS/RS/DBR Defect noticed during Attended by 0
commissioning-RF block ELS/AQ.
1&2 were found short
and RF block need to be
removed for attention.
Pn. Valve Defect noticed during Attended by 0
commissioning-Wiper ELS/AQ.
motor sets were not
replaced.
Pn. Valve Defect noticed during Attended by 0
comm-Pantogragh-1 was ELS/AQ
not raising for sometime.
So PT-1 was changed
and also PT-1 servomotor
bucket was changed.
Miscellaneou Defect noticed during Attended by 0
s comm.-After cooler ELS/AQ
protection plate was not
provided. After cooler
foundation joint gaskets
were not replaced.
Relay Defect noticed during Attended by 0
comm-QLM relay setting ELS/AQ
found 7.8A. No timer
replaced of Timer relays.

Miscellaneou Defect noticed during Attended by 0


s comm-BA panel -1,2,3 ELS/AQ
strainer and isolating
cock was wrongly fitted.
SIV As per TLC/BPL loco i) Power supply 64
failedin BPL div.due to card changed by
CHBA not working same M/s Siemens
loco attended at ET/TI under warranty.
shed by M/S Simence and ii) MTR/DHD and
found one capacitor of M/s Siemens
power supply card inside advised vide this
CHBA of SIV was burst. office letter No
Same PS card JHS/RS/T-82/AA
changed,Make Siemens on dt 21.05.13
Comm. Dt 12.03.13
Transformer Oil leakage fron TFP gate Gate valve 97
valve. changed.
SIV On dt. 15.05.13 the loco loco attended at 64
no 24044 was failed on ET/TI shed by
line in BPL Div. due to M/s SIEMENS
CHBA not working. . representative &
reported one no.
capacitor of
power supply
card found burst
inside CHBA of
SIV. Same power
supply card
replaced with
new card by firm.
Miscellaneou Cab-2side clavis handle Clavis handle 117
s not provided ,CBC-2 baby provided,CBC-2
coupler handle baby coupler
broken,1/1 corridor door welding
top hing broken,MVMT- done,Door hing
1&2 running warm,PHGR welded,MVMT
not working,VEUL-not greasing
working wire no-B-087 done,PHGR
open from BD changed,VEUL
board,Corridor no-2 one new wire
window glass broken, provided,Window
glass changed,

Aux. Aux Converter isolate BUR1 card rack -7


converter cahnged
(BUR)
Bogie & its Bolster no.2 crack Attended at 515
Mech. equip. ELS/ET.
EM Contactor C-118 & R-118 smoked. C-118, R-118 & 268
Checked found C-118 Arno changed.
fixed & mobile contacts
having 40% bedding at
one side with flash mark.
It seems that C-118 stuck
up in closed position
resulting R-118 burnt.
Arno also over heated. C-
118 make – New
supreme, Sl. no. 185,
Mfg. 12/1996
EP Contactor Loco failed on 15.05.13 L-2 complete 29
at “BRD” in NGP assembly &
division SECR Railway, auxiliary interlock
while working in train no. changed.
LELA due to TLTE with Informed to
GR progressing but POH/KPA vide
ammeter not deviating. Tech-52,
Checking on line found L- dt.22.05.13.
2 smoked. Loco arrived in
shed on 18.05.13 as dead
found L-2 arc-chute burnt
& CTF-1 auxiliary
interlock (Wire no.030-
031) not passing supply
resulting line contactor
not closing & ammeter
not deviating. L-2
complete assembly &
auxiliary interlock
changed. Arc-chute
Make- SCS (Mark on arc-
chute TKD/1471).

Compressor/ Loco arrived in shed on CP-2 HP disc 29


Exhauster 18.05.13 as dead. During valve changed.
testing of loco found CP-2 Informed to
intercooler safety valve POH/KPA vide
air leakage due to HP Tech-52,
disc valve badly chocked dt.22.05.13.
as metal contents found
on valve surface. CP-2
make – Elgi, Sl. no.-
440153 MCP-2 no. IHAM
0768.
Battery One Battery No.5 having Battery replaced 5
voltage 8V and Specific with good one
gravity 1180 make:Exide
Lug date:2/13
S.No:20660.
Traction TM-6 all carbon Informed to CWM 363
Motor condemning size & vide Tech-55, dt.
pigtails out due to 01.07.13.
excessive wear.
Commutator ovality
checked found excess i.e
0.09mm. Make –CLW,
Sl. no. 791-103-826-M-
31.
Bogie & its Brake Cylinder no 9 Brake hanger 126
Mech. equip. jammed inner bush
worked out
HT/LT cable The supply cables Attended 3
connected between MVSL
duct terminal and MVSL
motor terminal box were
excess in length and laid
very close to blower fan.
These cables were
rubbing to fan; damaged
insulation and caused
earth fault
GR/RGR/CGR 1.Oil leaking from PHGR Defective 3
filter unit heavily from GR/PHGR
dummy nut (Pt No. S 31 ) replaced
due to filter cover thread
damaged. 2.GR arm was
having more play i.e., 10
mm in between notches
(i.e., half notch) due to
bottom bevel gear (Part
no S-1481.7) holes
oblonged and free on
coupling shaft (pt No. S-
1481.5). The roll pin set
(Pt No.S-1481.1 and S-
1481.2 (8x45, 5x43)
were also worn out
causing more arm play.
The GR unit was
rehabilitated during April,
2012 (4/12) by M/s BTIl
Ltd.,/Baroda and still
under warranty.

Suspension SB-3 CE side wicks pad SB-3 CE side 49


Bearing (SB) spring broken. wicks pad
changed
Axle Box Axle box-3 bogie hole welding done 49
inside crack -1 ½â€
Gear case Gear case-6 bottom felt Gear case-6 49
came out and CCF bottom felt
throwing badly. changed
Traction Loco failed on 07.05.13 TM-2 & TM-6 141
Motor at “BPL” in WCR changed.
Railway, while working in Informed to
train no. 12627 due to CWM/KPA vide
QOP-1 & QRSI-1 drop. Tech-52, dt.
HMCS-1 put on 3rd. Loco 11.05.13.
arrived in shed on
08.05.13 and found TM-2
brush box badly flashed
& brush box no. 2,3 pig
tails overheated &
worked out. Armature IR
value 5 M ohm.
Commutator grazed &
carbon condemned size.
TM-6 carbon wear rate
high due to ovality high.
Make – CLW, Sl. no.
8942 & H-2635

Miscellaneou 1 Oil leakage from gear Attnded. 0


s case no 1, 2 &6. 2. Old
CBC coupling provided. 3.
CBC height more than
limit.
Traction Bogie-1 isolate SR fibre optic 87
converter card found
(SR) defective.
Auxiliary Loco failed on 05.05.13 CP-1 changed. 290
Motor at “ETW” in NCR Informed to
Railway, while working in CWM/KPA vide
train no. 12451 due to Tech-52, dt.
CP-1 smoked. Loco 11.05.13.
arrived in shed on
10.05.13 and found MCP-
1 IR value normal &
working also normal but
bad smell coming from
motor. MCP-1 changed.
MCP-2 has already been
changed at GZB shed on
09.04.13 due to load end
winding burst. Make - Elgi
TRC-1000MN, Sl. no.
440234, MCP-1 no.
0401549

SIV SIV cooling fan motor 1) Both DE&NDE 379


jammed due to NDE side side bearings
bearing (FAG make) replaced with
seizure, its cage broken new 6004 2Z/C3
and winding earthed. FAG SKF imported
make SIV cooling fan bearings. 2)
bearing provided at ELW/BSL has
ELW/BSL during POH . As been advised of
per Rly Bd. Lr.No: the failure.
EL/1.2.9.1 dt: 13.02.2009
cooling fan of Siemens
make SIV falls due for
over hauling every
4.5years and the bearing
are to be replaced with
new bearings of 6004-
2Z/C3 model of SKF
make only during over
hauling.
Miscellaneou Axle box no.2 P/H/spring Spring changed 123
s broken. at HWH shed.
EP Contactor Smoke from BA panel. Attended by shed 3
Line contactor -1 arc & ELW advised
chute dropped. All control
cable of BA panel burnt.
All shunting contactor
badly overheated and its
NC-4 valve burnt. all
shunting contactor air
pipe line melted

Miscellaneou Unsch-AFI defective,Arno AFMV base 115


s ab sound, BL box both tightened,Arno
bulb fuse,MVMT-2 ab greasing done,BL
sound,U-5 zero to be set, box bulb
changed,MVMT-2
greasing done,U-
5 zero setting
done,

Auxiliary Loco no. 22284/WAP-4 of MPH terminal 41


Motor ELS/CNB failed on block changed.
03.05.13 in between
“ALD-TDL” in NCR
division, while working in
train no. 12403 due to
heavy oil leakage from
MPH terminal. Loco
jointly checked at
“AF” with SLI/TDL
& SSE/TDL found heavy
oil leakage from MPH
terminal block. Loco
directed to home shed as
dead.During checking in
shed found MPH terminal
block broken two side.
Make- Flow well, Sr. No-
08060358, DOC- 2008
Auxiliary Loco failed on 03.05.13 in MPH terminal 41
Motor between “ALD- block changed.
TDL” in NCR division, Informed to
while working in train no. CWM/KPA vide
12403 due to heavy oil Tech-52, dt.
leakage from MPH 08.05.13
terminal. Loco jointly
checked at “AF”
with SLI/TDL & SSE/TDL
found heavy oil leakage
from MPH terminal block.
Loco directed to home
shed as dead. During
checking in shed found
MPH terminal block
broken two sides. MPH
terminal block changed.
Make - Flow well, Sl. no.:
08060358, DOC-2001.

Gear case During Coaching Loco lifted; 31


inspection it was noticed During lifting it
that TM6 gear case top was noticed gear
side having more gap and case bolts not
CCF leaking badly. matching with
the bush of TM6,
hence TM
replaced.
SMGR Q-53 relay base wire was SMGR was 30
loose due to poor replaced.
crimping.
Pn. Valve AFI aguge defective AFI gauge 121
changed.
Relay On dt. 30.04.13, the loco Loco received in 27
no.24523 failed at shed as dead on
CKP(SER) Div. due to GR date 12.05.13.
not regress by MP & EEC. and up relay base
in GANJ make
SMGR found
defective hence
complete SMGR
changed.
SMGR On dt. 30.04.13, the loco Loco received in 27
no.24019 failed at shed as dead on
CKP(SER) Div. due to GR date 12.05.13.
not regress by MP & EEC. and up relay base
in GANJ make
SMGR found
defective hence
complete SMGR
changed.
CBC/Draft CBC-1 draft gear FAS make draft 92
gear/TSC defective. gear fitted.
Traction TM-5 Speed sensor TM Speed sensor -207
motor defective. (U/M) changed.
Miscellaneou RGCP to be calibrated,L-1 RGCP changed,L- 40
s EPV leakage,CP-2 inter 1 EPV
cooler safety vavle changed,CP-2
leakage,BD board all inter cooler
switch earthing shunt not safety vavle
avl,After cooler drain pipe attended,All
broken,Cab-1 U-2 switch earthing
voltmeter stuck up, shunt
provided,Broken
adopter
changed,U-2
calibrated,
Miscellaneou Unsch-DJ PRV to be DJ PRV 111
s replaced,L-5 EPV leakage changed,L-5 EPV
from exhaust,QLA relay changed,QLA
to be removed,QPDJ to relay
be calibrated,SPM-2 removed,QPDJ
memory full calibrated,SPM-2
showing,CAb-2 VESA-2 memory card
leakage from base, changed,VESA-2
changed,
Miscellaneou DurinG IC0 following Attened. 0
s defects have been
noticed. 1. Pan -2 EP
valve gasket found in
damaged condition. 2.
Auto limiting valve stem
and pin found broken. 3.
Oil leakage observed
from damapers. 4. Gear
case no 4 & 2 having oil
leakage. 5. On wheel no
8 brake hanger pin not
fitted properly. 6. Buffer
length found less of all 4
buffers
Compressor/ CP1 HEAVY ABNORMAL CP CHANGED 43
Exhauster SOUND. MOTOR DE SIDE
FAN LOOSE MAKE :
AERNEST IWATA
Transformer QLM drop & no oil TFP changed. 20
splashed. On arrived in
shed on 29.04.13 found
QLM target drop & no
any oil splashed. Both
cab NR on 29th notches.
TFP & TC oil DGA
checked & found normal.
GR & XLPE turret visually
checked found normal.
QLM relay setting and
QLM circuit current
normal. Loco tested on
LT/HT found also normal.
Make – NGEF, Sl. no.
2800060023, DOC –
2001.

Traction Oil leakage fron OIl leakage 25


converter Converter no-2 observed fron L
(SR) pipe of converetr,
same replaced.
Miscellaneou CP-1 unloader vavle CP-1 unloader 64
s def,RGCP vavle
defective,A/box-10,12 changed,RGCP
leteral liner crack,All axle changed,A/Box-
box bolt not sealed,BG 10,12 liner
crack on top side of H/S- welded,Axle box
14,CP-2 vibrate due to bolt sealed,BG
foundation bolt crack
broken,CTF-3 front EPV attended,CP-2
leakage from foundation bolt
exhaust ,1/2 corridor new
door top hing broken,All provided,CTF-3
hood earthing shunt not front EPV
avl,C-105,C-107 double changed,Corridor
strock H/Brake not door hing chaged
working ,CP-1 NRV & welded,All
leakage,QVMT-2 hood earthing
defective,Sander no-4 shunt provided,C-
pipe broken,Corridor no-1 105,C-107
side glass no-12 attended,H/Brake
broken,2/2 sunvisor glass attended,CP-1
broken,VEPT-2 coil NRV O/H
loose , provided,QVMT-2
changed,Sander
no-4 pipe
changed,Corridor
-1 side glass no-
12 changed,2/2
Auxiliary MVRH bearer Sr. No sunvisor
Advise to 98
Motor 9907228 of BBL make ELW/BSL vide
failed on 28/04/13 due to this office letter
MVRH smoke. Loco No
checked and found MVRH BSL/TRS/PPIO/T-
open circuit. 42D dated
07/05/2013.
MPFDCS Auto regression . Loco Same card 48
placed at KGP /TI Shed, changed during
checked by M/s Stesalit under warranty.
and FDCS CPU-2 card
was defective, Make- M/s
Stesalit Comm. 08.03.13.
EM Contactor While working 12521 C118 aux switch 136
express ICDJ replaced.
experienced, found Q118
not picking up and the
same was wedged and
worked further.C118 aux.
switch interlock moving
contact plate hole bigger
size and thrust spring
pushed inside and caused
poor contact.

MPFDCS BOTH CAB LSCHBA & CPU CARD 41


LSGR, LSRIS FLICKING CHANGED BY
ON RUN. CPU CARD FIRM STESLIT
DEFECTIVE
Traction TM-4 pinion teeth TM-4 changed & 186
Motor broken. Loco failed on Informed to
24.04.13 at “VSKP” CWM/KPA vide
in ECoR Railway, while Tech-52, dt.
working in train no. 13.05.13.
08562 due to TM-4 pinion
teeth broken in two
pieces & stuck up gear
causing axle no.4 locked.
TM no.- D-247-4229,
Pinion make – SAN,
Pinion Mfg. -05/2012

SIV SIV wire No.C0031 and C0031 & X003 0


X003 incoming battery PVC tape applied
wire inside SIV as and lugging done
insulation damaged. and made
normal.

Miscellaneou Cab1 dr.side sand box Patch work done. 0


s having hole.
Auxiliary Block -2 isolate. MVMT-2 all 45
Motor winding earth.
Traction QOP1 drop. TM1 cable cut 36
Motor and flashed.
Traction Bogie-2 isoalte ASC2 mprocessor 110
converter card changed.
(SR)
SL Loco no. 27176/WAG-7 of SL-2 changed. 39
ELS/CNB arrived shed on
20.04.13 after POH/KPA
for IC0 schedule with
QOP-2 drop. During
checking in shed found
SL-2 coil supporting block
open & entangle between
coil to MS channel
causing QOP-2 drop,
other blocks also loose.
Make-CLW, Sr No-
CNB/SL-2/176

SL Loco no. 27176/WAG-7 of SL-2 changed. 39


ELS/CNB arrived shed on
20.04.13 after POH/KPA
for IC0 schedule with
QOP-2 drop. During
checking in shed found
SL-2 coil supporting block
open & entangle between
coil to MS channel
causing QOP-2 drop,
other blocks also loose.
Make-CLW, Sr No-
CNB/SL-2/176

GR/RGR/CGR GR oil leakage due to GR Bolt changed. 336


bottom dummy plug bolt
thread worn out.
SL QOP-2 drop. SL-2 coil SL-2 changed. 35
supporting block open & Informed to
touches with MS channel CWM/KPA vide
causing QOP-2 drop. Tech-52, dt.
Make –CLW, Sl no. 06.05.13.
CNB/SL-2/176.
Switch While working 12680 exp Initially BL2DJ 10
between CBE-ED DJ is switch changed,
not able to close from but again
cab-2. Informed to TLC. problem existed.
Loco checked at ELS/ED Hence BL2 box
on 20.04.13. While changed and
checking DJ is not closing tested found
from cab-2 both HT and working normal.
LT. At that time wire no.
722 getting supply and
wire no. 723 not getting
supply. BLDJ switch in
cab-2 side checked, no
continuity between
722&723 at times.

Traction TM-3 isolated.Gear case Loco checked at 304


Motor no.3 cracked. NKJ shed and
found G/C no 3
top boss crack
welding done at
NKJ. In MGS
shed loco
checked and
found G/C no 2,
3, 5 & 6 top bos
re crake. G/C
changed.
EM Earth fault not detected. 02 Nos. New 46
contactor/Rel earth fault relay
ay fitted on 89.2 &
89.5. Make-
Krishna Engg.
Suspension SB-2 metal out. Attended after 323
Bearing (SB) lifting.
Auxiliary On dt. 17.04.13 loco was Loco checked in 445
Motor failed on line in shed on dt.
DHANBAD Div. due to 22.04.13. and
heavy abnormal noise found that MVSL-
from MVSL-1 1 D.End bearing
cage broken. The
bearing was
provided during
POH at BSL make
M/s SKF
sr.no.6306C-3.
on dt.
28.01.12.advise
to POH/BSL vide
letter
no.JHS/RS/T-
82/AA
dt.25.04.13.
EP Contactor J-2 12th bit flashed. J-2 12th bit 519
replaced at
ELS/RPM.
Traction Traction Motor-6 Arc Traction Motor-6 519
Motor horns flashed. Arc horns
replaced.
Switch Cab No.1 PVCD switch PVCD switch 75
make Saitronic, terminal replaced by new
base screw was one.
uncoupled, due to base
thread was slacked and
stick up between wire No.
700 terminal & its base
screw.

VCD Cab-1 PVCD switch base 75


terminal base screw eas
uncoupled, due to base
thread was slacked and
stick up between wire
no.700 terminal.
Transformer Oil leakage from Radiator-1 44
Radiator-1 at bottom tinz changed.
Miscellaneou During IC0-Cab-2BC-1 BC gauge 31
s niddle drop,C-102 double changed,C-102
stroke,Center pivot-2 not attended,C/Pvt-2
proper fit,CP-1&3 fitted proper,CP
unloader vavle coil unloader vavle
loose,BD board earthing coil tightened,BD
shunt to be board earthing
provided,HOM leakage shunt
from exhaust,J-1 5 notips provided,HOM
busbar walded & flashing attended,J-1 tips
mark,Both RSI back side attended,Both
cover not fitted,1/2 sand RSI cover
pipe broken,TM-4 provided,Sander
replaced due to V-cone pipe changed,TM-
out, 4 changed,

Miscellaneou Unsch-MPH to be MPH 98


s replaced since tow phase Changed,HPH
ground, HPH to be new provided,
replaced since contect
no-2 between cable no-
966-481 not making
contact.
Traction Bogie-2 isolate. ASC-2 processor 12
converter card defective,
(SR) same cahnegd.
Auxiliary Loco no. 22533/WAP-4 of MVMT-1 7
Motor ELS/CNB arrived shed on changed.
13.04.13 after POH/KPA
for IC0 schedule with
MVMT-1 abnormal sound.
During checking in shed
found MVMT-1 duct
welding approximate
500mm found crack.
Make-CGL, Sr.No-91261,
DOC-1998
Auxiliary MVMT-1 abnormal sound MVMT-1 7
Motor due to duct welding changed.
approximate 500 mm Informed to
crack. Make – CGL, Sl. CWM/KPA vide
no. 91261, DOC – Tech-52, dt.
1998. 06.05.13.
Control CCPT MELTED HOBA AT TKD CAB1 28
Circuit OFF.
VCD CCPT melting, HOBA OFF, Foot switch 28
cab-1 foot paddle switch changed
of VCD acknowledge. On
checking found foot
switch flashed and loose
from its foundation.

Axle Box Axle Box- 4,9,10 &11 Axle box 4,9,10 114
high metallic &11 changed.
60mg,200mg,180mg &
80mg respectively
Suspension 1) SB 1&5 metal fused 2) 1) SB 1&5 114
Bearing (SB) SB No.2,4 &6 CE side bearings changed
wicks springs broken 2) SB No.2,4 &6
CE side wicks
springs changed

Bogie & its Center pivot no.2 oil Attended at 249


Mech. equip. leakage from dummy ELS/ET
plate.
Traction TM-6 pinion teeth TM-6 changed. 90
Motor broken. Make – CLW, Informed to
Sl. no. C-59-3043-2-98 CWM/KPA vide
Tech-52, dt.
06.05.13.
SMGR SMGR NUMBER PLATE NUMBER PLATE 68
SHOWING 2 NOTCHES ADJUSTED
LESS THEN ACTUAL
Auxiliary QOA drop, MCP-2 MCP-2 changed. -102
Motor smoked. During checking Informed to
MCP-2 load end winding CWM/KPA vide
burst. It was original Tech-52, dt.
motor & last overhauled 06.05.13.
on 17.07.12 during
POH/KPA. Make –
Siemens, Sl. no. 201867,
DOC -02/2002.

Auxiliary MVSI2 fan loose. MVSI2 changed . 130


Motor
Auxiliary MVSL1 grease nipple MVSL2 changed 130
Motor broken.
Control In BD board SB wire 386
Circuit no.180 showing ground
resulted CCLS melting
after QRS relay pick up.
Control In BD board SB wire 386
Circuit no.180 showing ground
resulted CCLS melting
after QRS relay pick up.
Bogie & its Wheel no 11 inside brake Brake hanger 157
Mech. equip. hanger bush worked out. bush changed.

Bogie & its Wheel no 11 inside brake Brake hanger 157


Mech. equip. hanger bush worked out. bush changed.

Control In BD SB spare wire No. Same Attended. 21


Circuit 180 showing grounded,
resulted CCLS melting
after QRS relay pickup.
Auxiliary Loco no. 22225/WAP-4 of MCP-2 changed 263
Motor ELS/CNB failed on at GZB shed on
08.04.13 at “AJR” 11.04.13.
while working train no.
2561 due to QOA drop &
MCP-2 smoked. During
checking at GZB shed
found MCP-2 winding
burst.Make- Siemens, Sr.
No- 201867, DOC-
02/2002
Pn. Valve Feed valve defective. Feed valve 509
replaced.
HT/LT cable QOA drop, HQOA on Cable changed. 41
‘0’. 2.5 mm2 cable
no. 966 showing earth at
TK panel. Further
checked found cable no.
966 other end lying open
& rubbed with MVMT-2
channel. Hence both
spare cables removed
from TK panel.

HT/LT cable CCLS melting. Wire no. I- Cable isolated. 35


214 earth in cab-2 SB of
MU coupler, same
isolated.
Traction HMCS-1 on 3rd. TM-2 TM changed. -24
Motor smoked & B/box flashed.
3 nos armature segment
burst at the location of
1200 angular distance.
Make – CLW, Sl. no.
CGM-123-SKE-152.

Traction TM-1,2 Carbon brush pig TM-1,2 Carbon 345


Motor tail cut. brushes replaced.

Pn. Valve Heavy Air leakage from 009-044 seal of 0


E-70 valve coil no 19.valve was disturb
and not bset
properly.
Pn. Valve Heavy Air leakage from 009-044 seal of 0
E-70 valve coil no 19. valve was disturb
and not bset
properly.
Miscellaneou C-118 main contector to C-118 77
s be chaged,CP-3 unloader changed,CP-3
valve leakage,C-118 RC unloader vavle
network to be changed,C-118
changed,VEUL-1 coil to RC network
be changed, changed,VEUL-1
changed,
Compressor/ CP-1 having unusual CP-1 changed at 280
Exhauster sound ELS/ET.
Miscellaneou Unsch-A-9 leakage, O/H provided , 86
s
Traction SR-2 main contactor SR main 64
converter cross bar broken, so both conatctor
(SR) contactor not close changed.
together.
Miscellaneou RGCP to be RGCP 15
s changed,VEUL-1&2 to be changed,VEUL-
changed since leakage, 1+2 changed,BL
BL box-1 bulb fuse,Oil bulb
leakage from convertor changed,Convert
T-joint,Hand brake or T-joint
modification to be attended,H/brake
done,CP-1 pipe coupling modification
oil leakage, done, CP-1 flange
changed,
Compressor/ CP-2 leakage ,CP-3 Cp-2&3 tightness 11
Exhauster vibrating done
Miscellaneou CTF-2 S/Motor CTF-2 S/Motor 11
s leakage,Nr-1 bulb tightness
fuse,QVRF defective,SPM- done,NR bulb
2 not working ,All NC-7 chnged,QVRF
valve coil loose , changed,SPM-2
changed,NC-7
valve tightness
done
SIV SIV having internal fault MVRH erath, 23
same cahnged.
HT/LT cable HMCS-1 on 4th, TM-3 Same cable 43
ARM cable H-23 cut & attended
flashed due to rubbing
Miscellaneou 29/03/13 During IA- QVMT-2 75
s QVMT-2 changed,J-
defective,Wheelno-9,11 bracket bolt
J-bracket bolt provided,Window
missing,Cab-2 ALP side glass changed,
window glass broken,
Traction Loco no. 27691/WAG-7 of TM-2 changed. 289
Motor ELS/CNB failed on
27.03.13 in train no
R/TKD at MSRP-MTJ in
KOTA division WC RLY.
for TM-2 isolate. During
arrival in on 29.03.13
found PE side bearing
siezed as roller having
groove mark due to lapes
of bearing clearances
during POH/KPA. New
bearing FAG make
provided by POH/KPA
during POH.
Traction TM-2 defective due to TM-2 changed 68
Motor BBCR
DC-DC Both side head light not DC to DC 289
Converter/HL glowing converter
/FL defective
Memotel Both SPM not working PG found 131
defective.
Memotel Both SPM not working PG found 131
defective.
Bogie & its Gear Case -3 top boss New bolt 102
Mech. equip. bolt loose. provided.
Transformer TFP oil leakage OIl leakage 130
observed from
Pipe , same
cahnged.
Transformer TFP oil leakage OIl leakage 130
observed from
Pipe , same
cahnged.
Traction SR1 oil leakage. SR1 L typeoil pipe 44
converter having oil leakage
(SR) , same pipe
replaced.
Bogie & its TM4 MSU one bolt loose. New Bolt 202
Mech. equip. Provided.
Transformer TRANSFORMER OIL ATTANDED AT 50
LEAKAGE TATA
Sensor (FDU, Disturbance temperature Sensor changed. 19
Speed, Sensor TFP.
Pressure,
Temp. OHE/
Voltage)

Traction Disturbance temperature 'D' slot SR card 19


converter sensor TFP. 'D' slot SR changed.
(SR) card defective.

RPS/RS/DBR Loco no. 27247/WAG-7 of Circuit made 5


ELS/CNB arrived shed on corrected.
21.03.13 for IC0
schedule. During
checking found RPS fuse
by-passed as cables are
not connected after fuse.
Make- DRI
GR/RGR/CGR Conservator tank oil Conservator tank 1
leakage due to welding done
conservator tank crack
near RGR supporting
collar
Transformer 1) a5 bush connecting TFP changed. 1035
bus bar crack & flashed
2) a4 bush connecting
bus bar slight crack 3)
TFP core bolts were slack
4) One core bolt was
crack 5) Fallen bottom
bolt inside due to
looseness
Aux. BUR-2 DC link over 'F' slot Card 18
converter voltage. 'F' slot card changed.
(BUR) defective.
Miscellaneou Unsch-Bushing A-33 to Bushing 62
s be changed,1/2 corridor changed,Door
door hing broken,MVMT- hing welding
2 smoked,PT-1 broken, done,MVMT-2
changed,PT-1
changed,
Miscellaneou During IA sch RGCP some RGCP 71
s time not working,CAb-2 changed,Window
LP side window glass glass
broken,EMC C-105 changed,EMC-C-
crushing to be 105 attended,L-3
increased,L-3 Arc-chute arc-chute
defective,J-1 spring lever changed,J-1
to be changed spring lever
changed,
Memotel Both SPM not working SPM changed 78
Vacuum VCB stuck up VCB changed. 124
Circuit
Breaker
(VCB)
Miscellaneou CP-2 unloader valve coil CP-2 unloader 70
s short,EMC-105 seprator valve
broken,L-5 aux inter lock changed,EMC-
to be chnged ,L-6 EPV 105seprator
leakage from exhaust,C- changed,L-5 aux
108 flexible shunt to be inter lock
provided ,J-1 EPV changed,L-6 EPV
leakage,All switch changed,C-108
earthing shunt not fitted, changed,J-1 EPV
chanegd,All
switch earthing
shunt provided,
Traction TM2 CE side grease TM2 changed. 0
Motor having Fe content
Pantograph PT1 defective PT1 Transverse 31
flexibility excess
Bogie & its Wheel no 6 primary Spring changed 254
Mech. equip. spring broken
Traction TM2 CE bearing having TM changed 0
Motor Fe content
Pn. Valve Cab-1 SA-9 defective and Cab-1 SA-9 487
air pressure not replaced.
exhausted in both trucks
due to isolating cocks are
provided without vent.

Pn. Pipeline Air leakage from MR 1 MR tank air 7


tank leakage atended
Traction Bogie-2 isolate. SR-2 Primary volt 46
converter primary volt module module changed.
(SR) defective.
Bogie & its Wheel no 8 brake hanger Bush provided 10
Mech. equip. bush worked out
Bogie & its Cab 2 horizontal damper Damper changed 33
Mech. equip. defective
DC-DC Head light not working DC to DC 191
Converter/HL converter
/FL defective
RPS/RS/DBR RF1 burnt & PT1 push Atended 6
rod broken
Traction TM1 CE end cailer broken TM changed 127
Motor broken
Miscellaneou During IC0- BA panel- Holder 51
s 1holder defective,BL box- changed,Bl box
2 alp side bulb fuse,PHGR bulb
leakage,1/2 rail guard changed,PHGR
bend,J-1&2 Servo motor tightness
loose from done,1/2 rail
foundation,Sander-5,6,8 guard attended,J-
missing, 1&2 foundation
tightened,Sander
provided,

Miscellaneou Both side SPM not Loco checked at 109


s working. HTE and found
PG defective .PG
received by
MGS .PG changed
at HTE . Make-
AAL S.No- PG-
0297412 fitted on
19.09.11
ESMON Both SPM not working PG defective 1

Central FLG-2 Life sign missing, FLG Card 38


Electronics FLG card defective. changed.
Traction TM- 2,3,5 & 6 oil leakage Attend at ELS/ET. 11
Motor from axle cap joint
gasket.
Vacuum Loco no. 27201/WAG-7 of VCB changed. 53
Circuit ELS/CNB failed on
Breaker 05.03.13 in train no
(VCB) BOX/E/KUR at KGP /ER
for impossibility to close
DJ. On arrival in shed on
13.03.13 found VCB
actuating rod assembly
(part no. 5160000)
broken. It is must
changed item of POH as
per TC-21. Make Areva
D/B, Sr No-6290, DOC-
02/1999
Traction Bogie 2 isolate SLG2 card 211
converter defective
(SR)
Miscellaneou Wheel No-1&2 slkidded. Wheel turning 86
s done at MGS.
Axle Box During IC0 inspection at Loco lifted & axle 9
ELS/CNB, found axle box box changed.
no.5 having ferrous
content in grease 6288
ppm/gm. & axle box
no.10 having ferrous
cotent 3874ppm/gm.
Miscellaneou PU paint badly 'Peeled M/s Emprise 66
s out' through out the loco Marketting, LKO's
body. representative
attended on
dt.05.03.13 at
ELS/CNB.

Miscellaneou PU paint badly 'Peeled M/s Emprise 66


s out' through out the loco Marketting, LKO's
body. representative
attended on
dt.05.03.13 at
ELS/CNB.
Suspension SB-6 WMRD at BSL. TM-6 with W/Set 1
Bearing (SB) provided at TKD
on 11.04.13 as
removed at
ELS/BSL.
Transformer DJ tripped with heavy POH/PER has 153
sound and observed been advised of
smoke from HT the failure.
compartment. TFP
auxiliary winding a1 and
a7 studs connecting link
plate melted at
connection portion of a1
stud and also observed
that all fasteners
connecting a1 stud also
melted and the control
cables in the vicinity of
a0, a1, a7 and a8 bushes
melted.The following
irregularities noticed: 1.
Fixing nut was not
provided but only check
nut was provided. 2.
Spring washer was not
provided on top side of
the link plate.Due to non
provision of fixing main
nut and spring washer ,
the existing check nut
became slack on run and
resulted in flashing/
melting of a1-a7
Compressor/ connecting
CP-1 to belink plate at
changed Changed, 9
Exhauster
Miscellaneou VESA-2/2 jam,VESA-2/1 VESA-2/2 9
s base to be changed,L-5 changed,VESA-
EPV leakage,Shunting 2/1base
contactor S-43 EPV changed,L-5 EPV
leakage ,MPS-2 handle changed,S-43
deficinet, EPV changed &
MPS-2 handle
provided.
MPFDCS Auto reg. with C-107 Same card 92
chattering,Loco jointly changed with
checked in shed on dt new one by M/s
03.03.13 with M/s STESALIT.
Stesalit & found FDCS I/P
card no 4 was defective
since I/P channel No 48
was permanent high.

Miscellaneou MCP-1 direction wrong,L- CP-1 connection 9


s 5 EPV leakage,Cab-2 MPS changed,L-5 EPV
handle not avl,S-43 EPV changed,MPS
lekakage,CAb-2 VESA-1to handle
be change with provided,S-43
base,VESA-2/2 jam, EPV
changed,CAb-2
VESA-1 changed
with base,VESA-
2/2 changed,
EP Contactor Auto regression via QD1 Line contactor 288
through TM3. L3 Line was overhauled
contactor mobile bit fixing at ELW/BSL
bolt (back side) broken during POH.
and bit dis located. Line ELW/BSL has
contactor bottom bit been advised of
fixing bolt breakage is the failure.
suspected due to
improper tightness.

Pn. Valve loco no. 27690 (WAG-7) Auto drain valve 260
of ELS/CNB arrived shed changed.
on 27.02.13 for IB
schedule. During
checking in ELS/CNB,
found Auto drain valve air
leakage. Sr. No-580.H,
Model No-580.H6

Memotel Niddle stuck on 40 KMPH Full set SPM 30


of cab-2 (Master) due to replaced.
PT motor defective.
Miscellaneou MPH oil leakage due to MPH to Radiator 221
s MPH to radiator pipe line pipe line flange
flange joint gasket oil joint gasket
leakage. changed.
Vacuum VCB defective VCB isolator 167
Circuit broken
Breaker
(VCB)
Aux. Auxiliary converter no 2 BUR2 R phase 16
converter isolate WRE module
(BUR) defective
Axle Box During IC0 inspection at Axle box 12
ELS/CNB,found axle box changed.
5 & 12 having metal
content in grease as 5410
& 4390 ppm/gm. As per
Joint note made with
SSE/KPA, it was due to
different make
components mixed &
resulting rubbing mark on
axle box thrower.
Miscellaneou G/C-1,6felt burnt,Center G/C felt 178
s pivot no-1&2 liner changed,C/Pvt
crak,safety brake hanger liner welded,
no-14 base pin safety Safety pin
patti not avl., provided &
welded
Aux. Bur-1 input fuse blown. Bur-1 input fuse -272
converter changed.
(BUR)
Compressor/ CP-1 to be changed. CP-2 CP-1 changed. 78
Exhauster & 3 intercooler safety (Provided no.
valve not working. 960040, Make
ELGI). CP-2 & 3
Intercooler safety
valve changed.
Miscellaneou Q-51,Q-20,RGCP to be Q-51,Q-20,RGCP 78
s changed,BLRDJ not changed,BLRDJ
working,Window glass limit switch
broken,Wheel no-4 brake changed,Window
adjusting cutter pin glass
broken,One J-bracket bolt changed,Cutter
missing,Top slack pin welded,Bolt
adjuster no-4 Top side provided,Tunion
tunion plate pin bolt plate pin
welded condition,Center changed,C/Pvt-2
pivot no-2 housing plate housing plate
crack,SMGR i changed,SMGR
inter lock
changed,VEUL-3
changed,B/Cly-4
bucket changed,
SL SL-2 mounting bolt head Bolt changed 36
broken
SL SL2 mounting head bolt Bolt changed 36
broken
Brake system Air leakage from PBU-7 OH unit fitted. 22
(E-70/Knorr) joint portion due to
external HWH by stane.
Axle Box Axle box no 7 bearing Axle Box no 7 3
cage reviet broken changed
Axle Box Axle Box no 7 bearing Axle Box changed 3
cage broken
[Method Loco MVRH changed at 28
error 500] no.27141/WAg-7/CNV Electric Loco
failed on 16.02.13 at ALD Shed, Kanpur.
in N.C.Railway for MVRH
smoked during on load in
coaching train.During
checking, found 'Middle
winding cable worked out
from thimblejust after
crimped joint of
motor.MVRH motor
make-CGL, S.No.92081
Auxiliary MVRH smoked in ALD div. MVRH changed at 28
Motor of NCR, as it's middle ELS/CNB on
winding cable worked out 19.2.13.
from thimble just after
crimped joint of motor.
MVRH make "Crompton
Greaves Ltd."
sr.no.92081.

Bogie & its Helical spring No 17 Sr. 413


Mech. equip. No GBD 05.10.L036 DL-
35 yellow (Mfg 05/2010)
inefective coil broken.

Miscellaneou A3 meter to be set A-3 zeor set,U-2 38


s zero,U-2 zero to be setting done,CBC
set,CBC screw coupling handle fitted,
clavis upper handle not
fitted,
Compressor/ Loco no. 27139/WAG-7 of CP-2 changed. 186
Exhauster ELS/CNB failed on
14.02.13 in train no. N/E
at BRWD/ER for CP-2
isolate. On arrival in shed
on 11.03.13 found CP-2
HP disc valve suction
spring broken & entangle
inside the valve. Make-
Elgi TRC-1000MN, Sr No-
440091, MCP-2 No-KIAM
4867
Compressor/ Loco no. 27139/WAG-7 of CP-2 changed. 186
Exhauster ELS/CNB failed on
14.02.13 in train no. N/E
at BRWD/ER for CP-2
isolate. On arrival in shed
on 11.03.13 found CP-2
HP disc valve suction
spring broken & entangle
inside the valve. Make-
Elgi TRC-1000MN, Sr No-
440091, MCP-2 No-KIAM
4867
Sensor (FDU, Temperature difference in TM 3 sensor 125
Speed, TM changed
Pressure,
Temp. OHE/
Voltage)

Traction QOP drop TM1 earth , same 283


Motor changed
Miscellaneou Cab-2 heater fan Heater changed. 63
s jammed.
Angle Cab-2 cab activating key Old good cab 62
transmitter/d switch changed due to activating key
isplay key freely moving & switch fitted in
Unit/Switche upper portion came out. cab-2. Make-
s Patra & Chandra
Sl. No-50/10/10
GR/RGR/CGR GR shaft free GR shaft changed 244

HT/LT cable Loco failed at BSL div for Same attended 71


QOP-2 dropped & HQOP- and informed to
2 kept off.Loco checked POH/KPA.
at ELS/JHS on date
15.02.13. RCAPTFP-2
panel one LT wire was
rubbing with side jally
since gap between
damping panel and jally
found less.
Bogie & its Bufer length less. Bufer overhauling 0
Mech. equip. done.

Bogie & its Buffer length less Attended 0


Mech. equip.
Central FLG1 0110 S18 processor FLG2, DDA2 card 83
Electronics to SLG2 defective
Compressor/ Loco no. 22252/WAP-4 of CP-1 changed. 5
Exhauster ELS/CNB “Off
POH/KPA” failed on
05.02.13 at GZB/NR for
MCP-2 smoked. On arrival
in shed found MCP-2 all
winding earth. Hence
complete unit changed.
After MCP-2 changing,
same unit fitted in loco
no. 27299/WAG-7 on
18.02.13 as CP-1. Loco
no. 27299/WAG-7 arrived
shed on 24.03.13 for IA
schedule During checking
found CP-1 HP disc valve
suction spring broken &
entangle inside the valve.
Make-Elgi TRC-1000MN
CP-1 No- 440039, MPC-1
No- 59756

HT/LT cable ARNO cable burnt. On ARNO changed. 260


checking found Arno 'V'
phase (middle) cable cut
at terminal coil side by
melting due to loose
crimping of lug causing
cable and lug melted and
broken.
Traction TM-6 Sr. No 092-4037, 221
Motor Armature No G-773-
7690-9-92 was received
with loco No 23477 as
TM6. This loco was off
POH+RC from loco works
/PER on 27/06/2012.
Loco has failed on line on
03/02/2013 due to
armature overhang
damaged and also stator
MP & IP coil dama

Battery Some times charger was -- 73


Charger not working due to GDU
(CHBA) card was defective.

Arno ARNO smoked in SR ARNO changed & 37


Railway. ARNO checked cables attended
in ELS/AJJ, found phase at AJJ/Shed.
cable 965,966 & 967
burnt and ARNO winding
short. ARNO make-'Jyoti'
Sr.No.A-3323.

Auxiliary MCP-2 smoked. On arrival MCP-2 changed 2


Motor in shed, found MCP-2 all in ELS/CNB.
winding earth. Make-",
Crompton Greaves
Ltd.",Sr. No.HFAM3263.

VCD VCD Isolated due to main VCD main unit 165


unit defective. changed.
Memotel Speed difference in PT motor 32
between digital & analog replaced.
8 KMPH due to PT motor
defective.
Suspension SB-4 oil leakage from SB- Attended. 347
Bearing (SB) 4 fixation bolt.
SIV On dt 01.02.13 the above Informed to 64
loco was failed in BZA CWM/KPA/ER
Div. due to SIV(SIEMENS vide letter
MAKE)internal fault. Loco no.JHS/RS/T-
checked at ELS/BRC 82/MH Dt.
Inverter -1 assembly 15.02.2013 The
found defective same SIV warranty will
changed by M/s SIEMENS be expired on
since under warranty. may 2013 and
the loco was
received after
POH on date
29.11.12 please
look into the
matter regarding
warranty of
SIV(SIEMENS).

Transformer TFP 3 nos. core bolts TFP changed 971


broken. Their locking
plates are also came out
and one locking plate
went inside of tank and
touched between auto
winding with tank. Also,
oil circulating pipe
supporting bracket
welding worked out. Fail
equipment details: TFP,
S.No.

Bogie & its Buffer length less Buffer 0


Mech. equip. overhauling done.

Vacuum VCB not closing VCB changed due 18


Circuit to vacuum tube
Breaker short
(VCB)
Vacuum VCB not closing VCB changed due 18
Circuit to vacuum tube
Breaker short
(VCB)
Vacuum VCB dfective VST short 49
Circuit
Breaker
(VCB)
SIV On dt 28.01.13 the above Advise to 20
loco was failed in BZA CWM/BSL/Central
Div. due to DJ tripping Railway & M/s
via QSIT and SIV internal Hirect DELHI vide
fault. Loco checked at letter no
ELS/BZA by M/s HIRECT, JHS/RS/T-82/MH
the R phase IGBT of dated 15.02.13.
Inverter found defective
same new IGBT provided.

SIV On dt 28.01.13 the above Informed to 117


loco was failed in BZA CWM/ELW/KPA
Div. due to SIV(SIEMENS ER vide letter
MAKE)internal fault. Loco no.JHS/RS/T-
checked at ELS/BZA on 82/MH Dt.
date 05.02.13, DC link 15.02.2013
earth fault showing
continuously in SIV data,
Inverter -1 assembly
found defective. New
inverter-1 assembly prov

Traction V cone of TM No H7212 268


Motor burnt.
VCD VCD not working due to Changed. 252
VCD main unit power
supply card defective.
Auxiliary MVMT M/s. Siemens MVMT replaced 301
Motor Sl.No.N8/139751 Date of
rewound at DHD 03-03-
12 failed due to winding
earthed
EM Contactor Loco C-118 & R-118 4
no.27141/WAG-7/CNB changed & re-
failed on line due to R- wiring done.
118 & C-118 while
working train no."BTPP"
in MGS-ALD on
23.01.13.While passing
"PRE" neutral section, DJ
opened & QOA drop with
smoke in corridore. Loco
checked in shed on
24.01.13 as dead and
Axle Box Axlefound C-118
box no.8 &
ferrous Axle box changed 5
content observed "Out of at ELS/CNB.
Limit", i.e. in 2 gm.
grease, metal content
found 6333 ppm, where
in limit 1250 ppm(max).
After stripping, found axle
box thrower & journal
thrower step dia face
heavy rubbing with each
other. Axle box make-F

Miscellaneou U/IC0 found 1)VEUL-3 1) VEUL-3 9


s leakage ,2) Lugs of cable changed,2) Lug
no GH-27,HH-27,BH- chaged,3) cable
46,CH-46 at BA-2 PT to connected
be replaced since over properly
heat, 3) Busbar from BA-
2 PT to SH TM-4 to be
provided and cables to be
connected properly.

VCD VCD isolate VCD changed 19

Auxiliary MVRF stator winding 3 POH/PER has 57


Motor phases earthed. Same been advised of
was replaced the failure
Pn. Pipeline On 20/01/2013 reported 3
DJ was not closing due to
heavy air leakage near DJ
box. During attention of
loco at f/shed noticed
incomming air pipe was
broken near it thread
piece, causing failure of
loco.

Traction Earth fault in traction TM-1 changed 27


Motor motor-1, armature failed and armature
in H.V testing. sent to NKRD for
(Rewinding stator No. FRW.
1014 Armature No.
CNB/556. This traction
motor overhauled at DHD
during MTR in Dec. 12)

Traction Earth fault in traction TM-1 changed 27


Motor motor-1, armature failed and armature
in H.V testing. sent to NKRD for
(Rewinding stator No. FRW.
1014 Armature No.
CNB/556. This traction
motor overhauled at DHD
during MTR in Dec. 12)

Pn. Pipeline On 20/01/2013 reported 3


DJ was not closing due to
heavy air leakage near DJ
box. During attention of
loco at freight shed
noticed DJ incoming air
pipe was broken near it
thread piece, causing
failure of loco.

Bogie & its Near H/Spring no-3,6,12 Welding done 376


Mech. equip. To side BG frame crack
Miscellaneou J-2 drum tips no-1,2 & J-2 changed 376
s finger tips no-2,8 flashed
EP Contactor L-4 EPV leakage from L-4 EPV changed 170
exhaust
Auxiliary MVMT2 abnormal MVMT replaced -277
Motor sound.since MVMT duct with overhauled
vibration. one
HT/LT cable Cab 1 heater blower Heater blower 13
earth changed
SMGR Loco checked at Trip Attended. 353
shed, ET and found that
first notch tripping
coming from both cabs.
During checking found
SMGR make ABB / BT /
Mfg. 01/1983, Sr. No. HA
1833614, last O/H. on
28/01/12 during POH
sch. at KPA, its guide pin
part No. A4540.4,
A4540.6 fou
Traction TM1 end cover damaged In shed checked 160
Motor and found TM-1
pinion removed
by ELS/BMG due
to commutator
end Armature all
three bolt broken
and armature
shifted.
Equ.Make-CLW
St.No-9945 Arm
No.- 7757-10-98-
8611 Fitted
During POH-
07.08.12

Traction TM1/3 commutator badly Motor changed. 257


Motor flashed. TM3 interpole
brazing joint open.
Miscellaneou Cab-1 sander not working New Cab-1 37
s due to Paddle switch tips paddle switch for
not making contact. sander fitted.
Make-WOAMA Sl.
No-2922
Traction Traction motor-1 Traction Motor -1 221
Motor ‘EF’ open circuit. was changed
On checking found that
‘F’ cable flashed
and cut after brazing
point at MP coil. Fail
equipment details:
Traction Motor - 1, Sl.No.
4815( Single potted)

Vacuum Loco failed due to ICDJ Auxiliary interlock 12


Circuit after passing neutral of VCB fitment
Breaker section. On checking was not align
(VCB) found Q-118 not pickup properly as
LP operated Q-118 operation was
manually and loco hard and cam
worked. Make- Alsthom arrangement was
(Areva) also very tight so
less degree of
movement was
observed. Due to
this auxiliary
interlock was not
operated fully
causing ICDJ
sometimes. Letter
given to
Vacuum ICDJ DJ Aux interlock 12
Circuit not operated,
Breaker with DJ closing
(VCB) opening due to
wrong fitment
Auxiliary interlock
of VCB fitment
was not fitted
properly as
operation was
hard and cam
arrangement was
also very tight so
less degree of
movement was
observed. Due to
this auxil

Bogie & its On dt 11.01.13 the above After lifting 268


Mech. equip. loco was failed at LDH in Bogie-1 and
FZR Division, due to bogie-2 side
leakage in joint coupling bearer & other
of brake cylinder no.4, damages
hence bogie-1 isolated. attanded
Loco received in shed on informed to
date 15.01.13. Cab-1 POH/DHD vide
Driver, A/Driver & Cab-2 letter
A/Driver side side bearer No.JHS/RS/T-
loading paid 82/MH Dt.
18.01.2013
Compressor/ CP-1 (1080 LPM) tyre CP-1 changed. 14
Exhauster coupling (Part No. Informed to
RR1000-18) burst & CWM/KPA & copy
cooling fan fly wheel to
(Part No. CMRD Dy.CEE/Loco/NCR
0152RR1000-51) crack at & M/s Anest
both end from jam bolt. Iwata for
Make-Anest Iwata, CP no. warranty
ME 0649, MCP no. LCAM replacement on
4933. dt.11.01.13. Joint
note made on
dt.12.01.13.
Compressor/ CP1 oil filter oil leakage Filter changed 93
Aux.
compressor
Axle Box AB no 11 bearing cage Axle Box and TM 28
reviets broken and TM4 V changed.
cone heated.
Vacuum VCB in side Air Leakage VCB changed. 236
Circuit after DJ (VCB) closing
Breaker From EP valve Exhaust
(VCB) port.
Compressor/ CP1 oil filter oil leakage Oil filter changed 93
Aux.
compressor
VCD II) Cab-2 VCD Not Wire provided by 7
working:- Trouble ELS/BSL
shooting done and found
(MP on ‘O’
Position), Logic not
existing. On further
checking found Cab-2 SB
to Cab-1 SB one wire
defficient. Same spare
wire provided with diode
and VCD working
checked found normal

ESMON Cab-2 SPM (Indicator) after provision of 7


not working:- Found SPM new card SPM
card coupler two nos wire working checked
uncoupled from soldering found normal

Pantograph PT-2 not raising,Loco Both panto graph 41


failed at CNB in ALD servomotor
division.Loco checked at bucket
CNB shed, PT-2 changed.Informe
servomotor dis mental d to CWM/KPA
and bucket size of vide letter no
servomotor found less i.e. JHS/RS/T-82/RDB
202 mm make CCPL. The dated 11.01.13.
standard size of bucket is
205 mm.
Transformer Found TFP sr.no. Informed 157
2005132, Stesalit CWM/POH/ vide
repaired it’s a-5/a- L.No.
6 winding showing open ET/TRS/PPIO/24/
circuited. Also tapchanger 19, dtd.
sr.no. IB-30165372 BT 15/01/13.
repaired its oil seal part
No. S-1434 ( which is a
must change item of
POH) gasket was found
defective. TFP/GR
removed from lo

Traction Loco 22322 was Traction motor 17


Motor undergone POH at replaced and loco
ELW/PER in December given for service
'12.During ICo on
28.12.12 it is noticed that
in Traction motor No:3,
brush holders 03 nos.
flashed. Same replaced
and loco given for
service. Again the same
Traction motor flashed on
line on 08.01.13. H

Traction Repeated flashing of TM replaced. 17


Motor Traction motor Coils of proper
3(S.No.H1424). Traction polarity are being
motor was withdrawn provided.
from service.On
dismantling defective TM
found IP3,IP4 &IP5 are of
same pole coils(same
polarity coils).

Transformer/ MPH-C-1 winding open POH advised. 15


Converter oil circuit.
pump
Suspension SB-3 untouchable heat. Wheel set no-3 277
Bearing (SB) SB-3 oil pump removed changed and
and checked found 250 wicks pad
gram metal fuse further changed.
checked found SB-3 G/C
side wicks pad burnt.
Bogie & its Compound throwing from Both bogies have 51
Mech. equip. gear case No. 1, 2 & 5 been replaced
due to improper with motorized
fitment/testing bogies on 05-01-
13.

RPS/RS/DBR Found DBR No. Informed 86


WCR/41590/0042/DRJ CWM/POH/KGP,
fitted with three phase vide L.No.
AC MVRF its RF grid No. ET/TRS/PPIO/24/
2 & 3 was burnt. DBR 10, dtd.
replaced. 09/01/13.
Miscellaneou At T/Shed NKJ-1)Cab-1 1) Glass changed, 30
s ALP side window glass 2) Earthing shunt
broken 2) Earthing of all change,
program switch in not
proper
Bogie & its Bogie No. 1 cracked at 03 The bogie has 4
Mech. equip. locations inside of the been replaced at
hole at pedestal portion ELS/BZA.
at axle box no. 3 & 4.
(These are old cracks not
welded during MTR)

Gear case Gear case no.3 fitment Gear case no.3 4


improper due to which replaced
compound throwing on
wheel. Wool felt was not
fitted with rivets and
came out from its groove,
compound leaking
through the gap
SIV VCB tripped with SIV SIV cooling fan 27
internal fault.SIV cooling replaced
fan earthed.SIV make
SIEMENS,Sl.No.02q0270/
SCD

Traction TM-2 bearing seized. PE TM changed. 59


Motor side bearing roll badly
worn out. New bearing
PE side provided during
POH, Make- FAG of 2012.
Armature no. J 655-9021-
5-8, DOC – 01.01.08.

Vacuum Q-100 wedge due to all VCB changed. -301


Circuit auxiliary not working.
Breaker Some time supply not
(VCB) coming at relay base due
to (wire no. 229-100)
supply not passing at
VCB contact as contact
no. 12-13 shifted one
side. VCB make - Areva
Double bottle, Sl. no.
6290/L.
Miscellaneou During IC0 schedule, - 0
s following defects are
noticed. 1. All connection
strap gap not maintained.
2. All connection strap ,
stopper gap 4-6 mm not
maintained. 3. Canb2
knuckle pin split pin not
provided. 4. Axle Box no
3 & 9 adopter bolt losse.
5. All main
Miscellaneou During schedule Atended 0
s inspection ( IC0)
following defects are
observed. 1. Cab1 CBC
draft gear side 15 mm
gap. 2. Axle guid link
2,3,6,9,11,12 bolt found
loose. 3. Cab1 assistant
side and Cab2 driver site
yaw damper oil leakage.
4. Gear case no 1 oil
drain plug
Vacuum Impossibility to close DJ. VCB changed. 20
Circuit VCB QPDJ setting wrong
Breaker i.e. 5.0 kg/cm2 cutin
(VCB) instead of 4.6kg/cm2 and
VCB gauge pressure also
showing 5.0kg/cm2.
QPDJ make- Indfos, VCB
make-Scheinder(Areva
S.B.), VCB Sr. no. 32503.

Vacuum ICDJ occured in section QPDJ setting 20


Circuit TKD-AGC of AGC/Div adjusted at ELS
Breaker while working in train CNB on dt.4.1.13.
(VCB) no.PAY,load-5239T,due
to QPDJ setting found
wrong as cut-in found 5.0
kg/cm2 instead of
4.6kg/cm2, as gauge
setting already
5.0kg/cm2.VCB make-
Scheinder(Areva), single
bottle, Sr. no.32503,

Bogie & its Bogie No. 1 frame Bogie No. 1 shell 4


Mech. equip. cracked near axle box No. was replaced at
3 & 4 inside of the holes ELS/BZA.
pedestals. (These are old
cracks not welded during
MTR)
Bogie & its New crack of 3 inch Loco was lifted at 6
Mech. equip. length noticed on lifting ELS/BZA and
pad of bogie-II at Brake welded the crack.
hanger no.20 which was
welded at LW/DHD. (It is
due to improper welding
of lifting pad at LW/DHD)

GR/RGR/CGR GR oil was leaking Ball valve 0


through 3way ball valve replaced.
assembly(Part
No.S3434)due to damage
of fixing threads caused
by wrong fitment. GR
S.No.DHD/2012/02,
revamped by M/s BT in
Nov.'12. Ball valve
S.No.:BT/03-12/029

EM Contactor Arc chutes and separator Same provided. 0


were not provided in EM
contactors.

Transformer Oil leakage from TFP-2 Gate valve 108


driver side gate valve. changed.
Traction RSI-2 isolate as QOP-2 Found TM-6 37
Motor drop. arcing horn
broken same
changed at TKD
on 30.12.12.
Vacuum Loco was failed online VCB changed, 3
Circuit due to VCB vacuum Vide lt No.
Breaker interrupter with insulator WAT/TRS/T/58/9
(VCB) broken condition. 6, Dt. 05-01-13
to CWM/DHD,
while advised for
pursuing M/s BTI
for replacement
against warranty
Pn. Valve FP Pressure not D-24 Valve 218
Increasing more than 5.0 replaced.
Kg/Cm2 due to D-24
valve Defective
Malfunctioning.
Miscellaneou W/n- 1 & 2 skidded. Loco checked and 35
s found all wheel
skidded. WT
done. Mal
operation.
Vacuum Loco was failed online VCB changed, 369
Circuit due to VCB vacuum Vide lt No.
Breaker interrupter with insulator WAT/TRS/T/58/9
(VCB) broken condition. 6, Dt. 05-01-13
to CWM/DHD,
while advised for
pursuing M/s BTI
for replacement
against warranty

Compressor/ Heavy air leakage from CP-1 HP valve 186


Exhauster CP-1. CP-1 HP disc valve changed.
suction spring broken.
Make-ELGI, TRC-
1000MN, CP no. 3522,
DOC-20.06.12.
GR/RGR/CGR QLM drop with GR oil CGR-1 & GR taps 126
splashed. Both NR stuck changed.
up on 19th notch, GR on
'0' and GR oil splashed
with QLM drop. GR oil
DGA done found BDV-
20kv, H2-730.41ppm,
CO-249.47ppm, CH4-
1887.46ppm, CO2-
364.46ppm, C2H2-
8088.46ppm, C2H4-
5946.05ppm, C2H6-
540.91ppm, acidit
Transformer TFP auto winding flashed TFP taken out for 161
repairing.
Miscellaneou 1. Both bogie end V-ring All defects and 0
s housing old welded and deficiency
unmodified housing attened before
provided. 2. Wheel no loco sending on
8/11/12 axle guide bolt line.
lose. 3. All lok out glass
old fited 4. Bogie-1 body
end retaining plate bolt
locking not provided.4.
Bogie-1 body end
retaining plate bolt lo

Vacuum DJ inter lock defective + VCB changed. 34


Circuit LSDJ lamp not glowing.
Breaker
(VCB)
HT/LT cable CCA melting. Wire no. Cable repaired. 143
U401 pressed between
rotating switch board and
side wall causing wire
insulation damaged
resulting CCA melting.

Miscellaneou Loco was failed due to Servo motor 360


s servo motor roller pin changed, vide
broken. Failed equipment letter No.
details: Servo Motor for WAT/TRS/T/58/3
CTF-3,Sr.No. HBF-3-266, 844, Dt. 19-12-12
MFd. dt- June-11 to CWM/DHD

Miscellaneou 1.Axle Box 9 & 10 spring All defects and 0


s chair seat not set defeciency
properly and having gap. attended .
2. All connection strap
sealing defecient. 3. Cab2
CBC draft gear rear side
gap about 15 mm. 4.
Cab2 old coupling
provided. 5. 4 no MSU
bolt found loose. 6. Both
Cabs CBC locking plate d
Traction TM4 isolate due to field TM changed 127
Motor open circuit
Central FLG10110 SS18 FLG2 DDA2 card 29
Electronics processor SLG2. changed.
Battery Battery voltage showing Loco attend for 24
Charger 60 Volt, loco checked at the same trouble.
(CHBA) ELS/SRC and found CHBA
outgoing cable of S.N.-LE/333/84,
capacitor bank is flashed OH during POH
and cut from lug. on 18.11.12, Bad
workmanship of
KPA shop, Letter
given vide this
office no.
TRS/MGS/E4
Rest/32, dt.
22.12.12

Miscellaneou During Sch 1)QPDJ to be 1) QPDJ 65


s calibrated ,2)QVSL-1 changed,2) QVSl-
defective,3)CP-2 inter 1 changed,3) CP-
cooler safety valve 2 I/C safety valve
leakage ,4) All GR tips changed,4) GR
are loose 5) All earthing tips tightened,5)
shunt are not provided 6) all earthing shunt
Cab-1 HL deflector provided ,6) HL-1
broken. deflector
changed,

Sensor (FDU, Bogie-II isolate. TM5 temp. 61


Speed, sensor changed.
Pressure,
Temp. OHE/
Voltage)
Pantograph PT-2 isolate,Loco checked Both PT 67
at GMC out pit and found servomotor
PT-2 servomotor Jam bucket
same made free & PT-2 changed,and
working normal. Loco informed to
checked in shed on dt POH/BSL vide
09.12.12 After letter No.
dismantling both panto JHS/RS/T-61/PD
servomotor, dimension of M Dted
servomotor bucket found 10.12.2012
201.80mm of PT-1 and
200.80mm of

Bogie & its On wheel no.7 outer pull Pull rod changed. 156
Mech. equip. rod broken
Relay Loco failed due to QPR-2 Loco could have 292
coil over heated and its worked with
armature stuck up inside proper wedging
and Q-51 permanently of Q-51 relay. To
energized, hence TLTE. overcome this
problem ELS/BIA
has suggested to
provide HPAR
switch similar to
as provided in
FDCS base loco in
agenda item
listed no.-09 in
35 MSG meeting.
However it was
not
recommended.
Traction On every arrival of Loco TM changed. 43
Motor No. 23053 Off POH/KGP
it is observed that, its
TM-6 Commutator
becoming smokey since
IC0 04-12-12. MS/194
was not been carried out
at your end during POH.
TM-6 having double coil
type MP & IP coil as non
modified TM provided in
Loco 23053 during POH.

MPFDCS After passing Neutral Loco jointly 66


Section, notch not checked and
progressing and LSB found input
continously glowing with channel 31 ( 15
message on MPCS No point) of IP
(Steaslit make) " CTF not Card ( No 2) was
setting propely in traction defective. same
side" changed by OEM

Vacuum ICDJ, Vacuum loss. DJ not closed, 14


Circuit VCB changed.
Breaker VCB make -
(VCB) Areva, S.N.-
38975/L-1/09/10,
Letter given vide
this office letter
no. TRS/MGS/DJ
& SPM/31, dt.
18.12.12
HT/LT cable Smoke emission from HT Burnt cables 1463
compartment due to 15 removed and
nos. of power cable fresh cables
insulation burnt under provided. POH/
CTF-3. On checking at KPA advised.
BRC shed found, power
cables under CTF-3 in
HT2 got burnt due to
insulation failure.
Underwent third POH at
KPA on 27.11.08 &
recabling was not d
Miscellaneou POH off ex LKO 1) LSDBR 1) LED-1 panel 6
s one LED not changed,2)
glowing,2)VEPT-2 VEPT-2
leakage,3) QPDJ to be changed,3) QPDJ
calibrated setting is changed,4)QTD-
5.8kg/cm2 4) C-105 time 105
to be set, 5) QVRF not changed,5)QVRF
fitted, 6) DBR grid no-5 provided, 6) DBR
open ckt,7)RC network grid changed,7)
defective, RC network
attended ,

SIV SIV (AAL) not picking up New lug provided 73


with message in the cable & re-
“Input voltage out fitted.
of range". At BRC shed
checked and found out
put cable of ACPT-1
loose. New lug provided
in the cable& re-fitted.
Traction DJ tripped with QOP-2 The failed Arm of 107
Motor dropped permanently for the TM sent to
TM-6 earth. At BRC shed NKRD for
found TM6 burnt behind rewinding.
Commutator riser
(BBCR).
EP Contactor S-12 roller bearing S-12 changed. 188
broken.
Traction Bogie-2 isolate 12/2 Valve set 166
converter Gate unit
(SR) defective. Gate
unit changed.
Traction Bogie-II isolate. SR2 W slot card 106
converter changed.
(SR)
EP Contactor L-6 connection of fixing Line contactor 16
bolt melted and fallen changed.
down
Auxiliary MVRH Sr.No. 655464, Attended. 143
Motor Siemens make, all three
phase of motor winding
showing grounded.
Traction Bogie -2 isolate Valve set 12/2 162
converter V1, V2 GTO
(SR) short. Valve set
changed.
Traction Bogie -2 isolate Valve set 12/2 162
converter V1, V2 GTO
(SR) short. Valve set
changed.
Traction Bogie -2 isolate Valve set 12/2 162
converter V1, V2 GTO
(SR) short. Valve set
changed.
Traction HQOP-1 off TM1 armature IR 185
Motor value less. TM1
changed.
Armature S.
No.744-01-2857-
3054
SIV Siv snubber capacitor of Invertrer module 108
inverter module burst changed.
Traction TM5 pinion side grease Pipe chnaged 3
Motor pipe crack
SIV Siv snubber capacitor of Invertrer module 108
inverter module burst changed.
Roof HOOD DEFECTIVE HOOD CHANGED. 0
Equipments
misc.
Switch AUXILIARY SWITCH OF CRUSHING 0
VCB CRUSHING LESS ADJUSTED
Miscellaneou Both Brake Cylinder Gauge Changed 49
s gauge defective
Vacuum At GMC yard, DJ open VCB CHANGED 292
Circuit then ICDJ & on display
Breaker showing DJ trip via
(VCB) feedback fail.VCB
pressure switch defective.

Auxiliary MVMT2 abnormal sound. MVMT-2 7


Motor changed.
Auxiliary MVMT2 abnormal sound. MVMT-2 7
Motor changed.
Auxiliary MVMT2 abnormal sound. MVMT-2 7
Motor changed.
MPFDCS R-118 smoked, due to C- Attended. 316
118 pickup during HBA
on, since FDCS card
trouble..
Bogie & its Bogie-2 body side Retaining plate all 38
Mech. equip. retaining plate all bolt bolts fitted at
broken. TKD.
Aux. Bur2 isolate, inverter WRE changed 55
converter fault, RФ WRE both GTO
(BUR) short
Auxiliary RSI-2 isolate. MVSL-2 MVSL-2 changed. 106
Motor winding earth & impeller
jammed. MVSL non load
end bearing cage broken
resulted rotor rubbed
with stator, hence
winding damaged. Make-
SH, Sr. no. D12596,
DOC-05/2011.

Traction QOP-1 drop. TM-3 'V' TM-3 changed. 75


Motor cone burnt. Make-CLW,
Sr. no. 6942-301.
Traction QOP-1 drop. TM-3 'V' TM-3 changed. 75
Motor cone burnt. Make-CLW,
Sr. no. 6942-301.
Bogie & its W. No.6 inner side pull Pull rod fitted. 175
Mech. equip. rod deficient.
Compressor/ Abnormal sound from Coupling spring 117
Exhauster compressor broken
VCD VCD healthy lamp not VCD main unit 102
glowing due to VAD main changed
unit defective.
EM Contactor R118 burnt & C118 R118 & C118 102
contact flashed. changed & new
fitted.
Miscellaneou VCD isolat. BPVG switch 25
s defective.
Pn. Pipeline BP pressure dropped for Presently drain 266
applied wooden wedge cocks of low
on after cooler drain height after
cock, fallen on run, same cooler are being
applied again pressure made dummy.
built and worked. The Further, location
loco met with incidence of such after
of CRO on line which coolers will be
caused breakage of after relocated at some
cooler drain cock and more height to
same was not reported avoid damage
by due to external
hit.
EP Contactor HEAVY FLASHING IN L1 EPC CHANGED 349
CONTACTOR AS FIXING
BOLT LOOSE
Traction QOP2 drop. TM5 commutator 170
Motor scored.TM5
changed.

SIV SIV internal fault. M-2100 M-2100 card 130


card defective. Make- changed.
DIE/TCD, No. 02L0030,
DOC- 08.08.03.

Miscellaneou During SCH-1)RGEB 1) RGEB 4


s settinig is 2.8/4.4kg/cm2 changed,2)New
2) BG-1 bogi to body shunt
shunt broken,3)Cab-2 Dr provided,3)WSM
sdie WSM not working changed, 4)Q-
4)RQ-20 res one wire 100 replaced,
soldering open,
Relay QCVAR burnt. QCVAR Relay changed. 181
relay contact no.6 & 10
bakelite burnt & creeped
with relay yoke. Make-
ABB PC-8, DOC- 2010,
Sr. no. BIO721

Suspension TM-1 and TM-3 SB 's Attended. 160


Bearing (SB) having oil leakage from
gasket and friction bolt.
Miscellaneou 'Both CAB heater blower Loco attended at 271
s not working, QOA ELS/CNB,
permanet drop. checked CAB-2
hot air blower
thermo switch
wire insulation
found cut due to
sharp edge.
Same wire
attended and
condenser
provided in both
blower heater.
Auxiliary QOP-1 drop due to DC MVRF isolated. 221
Motor MVRF earth. Make-KEC.
EM Contactor MPCS display showing C- C-118 auxiliary 223
118 N/C contact failed. interlock
Loco checked in shed & changed.
found C-118 not moving
freely due to its axial play
was 'NIL', same adjusted
& C-118 overhauled.
Auxiliary interlock also
changed due to its
contact tips having
groove marks & setting d

Traction QOP-2 permanent drop. TM-4 changed. 235


Motor TM-4 BBCR. Arm no. 744-
01-1563.Make-CLW.
Aux. BUR2 isolate. BUR2 T phase 77
converter WRE changed.
(BUR)
Switch During checking found Attended. 19
while MPJ thrown, BPEMS
switch operated after
Neutral Section. The
BPEMS switch was fitted
during POH at KPA and
located very close to MPJ
handle. As per MPCS
data, emergency switch
was operated from
14=09 to 14=29 on
17.10.2012. Als

EM SB contactor flashed Contac 130


contactor/Rel
ay
Bogie & its W. No6 outer pull rod Outer pull rod 156
Mech. equip. broken. changed.
Miscellaneou TM-1 flashed and J-1 TM-1 flash 46
s contact Flashed. attended and J-1
contact changed

Traction TM-1 Flashed. Same Flashed 46


Motor contact changed
and given fit for
Normal Service.
Miscellaneou Cab-1 Buzzer very poor New Buzzer 95
s sound. fitted. Make-
WOAMA Sl. No-
1503
EP Contactor L-5 negative line L-5 negative line 239
contactor having flash contactor
mark and blackish changed. L-5
overhauled at
POH/KGP.
Pn. Pipeline RDJ copper pipeline RDJ copper 85
found cracked near check pipeline changed
nut of air filter due to and extra
extra strengthen support strengthen
removed during POH. support re-
modified and no
oscillation of
greating frame
insured during
run.
Compressor/ CP-1 & CP-2 abnormal CP-1 & CP-2 154
Exhauster sound due to free end changed.
main bearing 6310 of
crank shaft found badly
rusted & having excess
play in both CP. Middle
connecting rod of both
crank shafts also found
excessive play. Crank
shaft no. 110680/Dec./11
& 110837/Dec./11. CP
make-

Miscellaneou L-5 EP valve replaced. L-5 EP valve 205


s replaced.
Miscellaneou During Sch 1) U-2 1) U-2 6
s defective,2) All 3 CP un changed,2)All
loader valve leakage 3) three un loader
RGCP defective,4) G/C-4 valve changed 3)
top bass crack RGCP
changed ,4)G/C-4
changed ,
Auxiliary Found, MVMT-1 Sr. No. Informed 105
Motor 182314, make NGEF, CWM/POH/KGP
Dome No. S-364, make vide L.No.
ACCO, mfg. 10/2011, ET/TRS/PPIO/24/
new impeller blade was 153, dtd.
broken. 15/10/12.
Traction During B/L SLG1 L/S SLG Card 9
converter missing, SLG card changed.
(SR) defective
HT/LT cable Cab-1 head light not Attended. 14
glowing.Outstation
Report (BRC): Wire no.
242F shows earthed
found one wire without
no. in SB-2 connected
with F242. Same
removed & tapped after
then F242 become
normal. DC-DC converter
changed both side Head
Light working normal.
She
EP Contactor CTF-3 badly flashed & CTF-3 circuit 42
LSB glowing due to CTF-3 corrected & CTF-
stuck up. CTF-3 goes to 3 changed.
braking side when MP put
on 'P' due to wire no. E-
906 connected with wire
group 905 causing SMGR
I/L by passed.

Central FLG1 A/T fail & FLG1 L/S Card changed 25


Electronics missing
Traction NSC1 GBC, SR1 12/1 Valve set 7
converter valve set changed (washed
(SR) valve set fitted)

Axle Box Axle Box 6 & 9 racer Atended 263


crack
Transformer TFP Radiator pipe found TFP Radiator 46
cracked & TFP oil spread changed.
out from cracked portion.

Battery CHBA not working due to GDU card 74


Charger CHBA GDU card changed.
(CHBA) defective.
Vacuum CCDJ MELT. VCB CMD VCB CHANGED 569
Circuit CARD DEFECTIVE
Breaker
(VCB)
SMGR Air leakage from Puppet Loco checked in 10
valve. shed and found
SMGR puppet
valve rubber
defective.Complet
e valve changed.

HT/LT cable HT-1 compartment HT cable 202


channel support welding changed.
broken & shaking badly
resulted RF roof mounted
cable insulation damaged
and touched with channel
causing QOP-1 drop.
Cable insulation provided
& channel welding done
by ELS/CNB staff.

Auxiliary Block -2 isoalte due to MVSI2 changed 17


Motor MVSI2 smoke.
Auxiliary Block -2 isoalte due to MVSI2 changed 17
Motor MVSI2 smoke.
Traction Found QOP-2 was Same attended. 52
Motor dropped, due to TM-5
armature showing
grounded & badly
carbonised. Failed TM-5
armature was last
overhauled at POH/KGP,
which failed within 52
days.
Miscellaneou POH fitment. Abnormal TMB-1 changed. 13
s sound due to bearing
defective.
6312/C3/SKF/IND.
EM Contactor On checking found C-118 Changed. 41
Auxiliary Interlock not
making contact due to
operating plunger base
crack.
Traction TM3 isolate. Gear case Hence TM3 54
Motor No.3 top side TM lug hole changed.
badly worked out and
bottom side having gap

Traction TM3 isolate. Gear case Hence TM3 54


Motor No.3 top side TM lug hole changed.
badly worked out and
bottom side having gap

Traction SR1 12/1 GTO short. SR1 12/1 GTO 47


converter short.Valve set
(SR) changed.
VCD VCD Healthy Lamp not On Checking, no 59
glowing. trouble found.
Pn. Valve BP not creating due to Cut out cock 57
one cut out cock provided Rectified.
between the pipe line of
MR4 & AFMV which was
wrongly- provided that
cock was close due to
external hitting.

VCD VCD isolate. Unit changed. 17

EM Contactor OFF POH loco, C-118 & C-118 & R-118 21


R-118 burnt. C-118 changed.
contact flashed & welded
resulting R-118 smoked.

Axle Box Axle Box no 10 outer Changed 6


racer crack.
Traction QOP-2 drop, TM-6 TM-6 changed. 226
Motor isoalte. TM-6 evolutes coil
damaged due to CE side
stainer broken & entangle
with evolutes coil. Arm
no.
121SKE-164/HE24737,
Stator no. H-8841, Make-
CLW.
Traction TM-1 brush box no. 5 TM-1 changed. 117
Motor insulator bolt broken
resulting brush box dis-
balanced & rubbing with
riser causing segments
damaged. TM-1 inter pole
no. 3 all fixing bolts
broken. Stator make-
CLW, Sr. no. 9006,
insulator make- Mica
Mold.
HT/LT cable HQOP1 OFF. Loco Same cable lay 44
checked in shed and out in shed.
found TM6 cable no- H26 Letter given to
insulation damaged and POH shop.
getting earthed.
Traction TM-3 stator IR zero. IP POH advised. 51
Motor coil potting found
cracked.
Transformer TFP oil leakage. Leakage from 69
conservator 'T'
joint attended at
NKJ/TI shed on
12.09.12.
SMGR SMGR reducing valve SMGR reducing 313
heavy air leakage from valve changed
exhaust port. SMGR
pressure showing
8.5kg/cm2 in gauge.
SMGR plunger assembly
part no. PT-RMX-PL of
Siemag make, Mfg.
01/2012 found defective
as its metallic bonded
rubber seat got uprooted
due to poor bonding. T

Battery LSCHBA not glowing, MCB changed. 112


Charger charger not working, MCB
(CHBA) defective.
Battery BA charger not working, MCB changed. 112
Charger due to MCB was
(CHBA) defective.
Switch At KGP checked found Proper 340
TLTE from both Cab, on maintenance of
further checked found main cylinder
trouble in ZSMGR I/L , greasing being
Wire No. 051 feed not carried out in IC
passing, 2 to 3 times schedule and
manually operate then proper pickup,
normal. dropout voltage
of VE1, VE2 is
being taken in IC
schedule
EP Contactor J-1 shaft broken. Reverser (J-1) 111
Reverser (J-1) not setting changed.
in MGS division on
09.09.12. On arrive in
shed on 18.09.2012,
found its load end shaft
broken. Reverser Make-
CLW, Sr. no. 0203/6065.

Traction ASC2 PS fault storage SR1 12/3 V3 V4 93


converter GBC. GTO short.
(SR)
Suspension SB-6 PE side bearing Informed 73
Bearing (SB) metal out and journal CWM/POH/KPA
scored. Failed SB-6 was vide L.No.
last O/H. at POH/KPA ET/TRS/PPIO/26/
during POH sch. in Jun- 189, dtd.
12, which failed within 73 01/10/12.
days.
Axle Box AB -10 thrower damaged Attnded. 23

RSI block RSI-1 isolate. C-105 pick-up 13


time adjusted at
TI/NKJ. RSI-1
found normal.
Miscellaneou Cab-2 BPFA switch stuck Cab-2 BPFA 55
s off position as its holder switch changed.
found defective.
Miscellaneou Cab-2 BPFA switch stuck Cab-2 BPFA 55
s off position as its holder switch changed.
found defective.
Compressor/ CP-3 having abnormal CP3 Changed 6
Exhauster sound.
Vacuum Found VCB PRV was Same attended. 68
Circuit defective. Valve &
Breaker diapharagam assembly
(VCB) sluggish, so PRV mal-
functioning.
Traction TM-2 isolated due to Axle no. 2 & TM- 76
Motor abnormal sound. Axle no. 2 changed.
2 bull gear curved &
damaged. Make-KPC,
08/1999, Drg. no.
15N17CROMU2 SKDL
437264067450, Sr. no.
962.
Traction TM-2 isolated due to Axle no. 2 & TM- 76
Motor abnormal sound. Axle no. 2 changed.
2 bull gear curved &
damaged. Make-KPC,
08/1999, Drg. no.
15N17CROMU2 SKDL
437264067450, Sr. no.
962.
Traction QOP-2 drop & HMCS- 2 TM-4 changed. 184
Motor on 4th. TM-6 found
normal but TM-4 evolute
coil damaged due to PE
side strainer broken &
entangle with evolutes
coil and PE side bearing
jammed, grease also
found blackish. Arm no.
A-265-1231-9-95, Stator
no. H-5433, Make- CLW.

HT/LT cable CP-1 not working in Auto Loco attended at 140


mode. One cable from SB MGS. POH
to BLCP through BL conk advised.
was parted.

Miscellaneou CTF-1 "U" fork broken. CTF-1 Changed. 36


s
Miscellaneou J-1 required manual Reverser -1 36
s operation changed.
EP Contactor J-2 contact No.5 and 6 Contact changed. 107
fdlashed.
Traction QOP drop.TM5 interpole TM changed. 161
Motor open
Traction QOP1 drop, HQOP1 OFF, TM3 ventilation 71
Motor on checking it is found net fitted. TM
ventilation net broken make- CGL, S.N.-
due to external hitting. 2072241/41, OH-
14.06.12 fitted on
14.07.12
ESMON Both SPM master unit Master unit 33
defective. Changed.
SMGR Air leakage from SMR PRV channged at 22
PRV ELS/MGS on
26.08.12
Traction QOP drop TM3 flashed, 26
Motor Flahed removed
Traction Loco jumping on 2nd TM-1 changed. 8
Motor notch. TM-1 pinion cut on
line due to PE side
bearing seized. Arm no.
E265-492-870-05-04,
Stator no. H-8945, Make-
CLW, Bearing make & no.
NBC, NU-330.

Traction Loco jumping on 2nd TM-1 changed. 8


Motor notch. TM-1 pinion cut on
line due to PE side
bearing seized. Arm no.
E265-492-870-05-04,
Stator no. H-8945, Make-
CLW, Bearing make & no.
NBC, NU-330.

Pn. Valve BP pressure drop excess. Both CP NRV 75


overhauling done.

Traction ASC GBC. SR212/1 V2 gate 16


converter unit defective,
(SR) same changed.
ESMON Both SPM not wkg.some Master unit 27
times SPM speed fallen to Changed.
0kmph and raise
automatically due to
rebooting of master unit
Traction SMOKE FROM TM5 GEAR Inner race bond 483
Motor CASE. HLCS PUT ON test with shaft is
POSITION '3'.TM2,5 started. Old
ISOLATE bearings are to
be phased out
Pantograph Panto defective. Panto I I let Rod 3
let rod broken changed.
Transformer TFP oil not visible. TFP oil raised. 14

Traction Main field open circuit in 530


Motor stator Bo H-4131
ESMON Cab-2 SPM not working. Cab-1 recorder 31
SPM working checked mother board
fount as per data dow3n changed.
load, sometimes slave
showingh disconnected.
Cab-1 recorder mother
board defective, same
defective. Card
no.060/327-01/06, Make-
AAl-Z, SPM no. TZM
0307024, DOC- 07/2003.

ESMON Cab-2 SPM not working. Cab-1 recorder 31


SPM working checked mother board
fount as per data dow3n changed.
load, sometimes slave
showingh disconnected.
Cab-1 recorder mother
board defective, same
defective. Card
no.060/327-01/06, Make-
AAl-Z, SPM no. TZM
0307024, DOC- 07/2003.
Bogie & its Bogie-I bottom side Bolster changed. 91
Mech. equip. bolster crack.
MPFDCS FDCS power supply card, Attended 268
fuse F-2 (Rating = 2.0
amp.) was in fused
condition, which resulted
out put supply to wire No
044 was not available

Traction Earth fault CGP and GBC, SR-1 12/3, V1 V2 65


converter B-I solate. and 13 V2 GTO
(SR) short..Vale set
changed. 12/3
M/s BTIL
BLOCNNEC-8009-
074 13 M/s
NELCO 35998002

Traction A33 burst and TM1 A33bushing 17


Motor isolated. changed and TM1
V cone burnt

Traction A33 burst and TM1 A33bushing 17


Motor isolated. changed and TM1
V cone burnt

Central Main power off CEL-2 power 62


Electronics supply card
defective
Miscellaneou SPM, A-16 and SIU unit -- 265
s was defective.
Transformer QLM drop. TF oil TFP changed. 143
splashed. TFP auto
winding flashed. C2H2-
626ppm, H2-196.6ppm,
C2H4-330ppm & BDV-
31.6KV. Make-Bhel, Sr.
no. 2010329, DOC-1997
Transformer QLM drop. TF oil TFP changed. 143
splashed. TFP auto
winding flashed. C2H2-
626ppm, H2-196.6ppm,
C2H4-330ppm & BDV-
31.6KV. Make-Bhel, Sr.
no. 2010329, DOC-1997
Axle Box Axle Box no 1 having Fe Axle with axle 6
content 0.921. Bearing Box changd
Jamed
Miscellaneou QOA drop Heater earth 79
s
Aux. BUR-3 inverter fault, 'S' WRE changed. 22
converter Phase WRE both GTO
(BUR) short.
Miscellaneou "Train started Late from Joint checking 2
s HWH due to Late arrival done by
of E/Rake and Loco SSE/TRS/KGP &
coupling trouble at HWH. CLI/KGP found
At HWH while detaching KGP End
the working Loco from TC(Transition
HWH End(NB: No Screw Coupling)
Banking Loco was heavy rusty, the
provided in this case) LP Shackle adjusting
could not uncouple the handle having
Loco from Train due to hammering mark
coupling jamm on its both end.
Staffs from
POH/KGP also
attended but did
not give any
remark in Loco
Log Book. Lubri

Transformer TFP oil leakage from silica TFP oil reduced 1


jel due to TFP oil and found
maximum. Letter given to normal.
POH shop.
Aux. BUR-3 isolate due to WRE changed. 19
converter inverter fault. BUR-3
(BUR) ‘S’ Phase
WRE both GTO short.
Auxiliary QOA dropped & MCP-2 MCP-2 changed. 141
Motor smoked. MCP-2 winding
burst & star point opne
circuit. Make-CGL, Sr. no.
GHAM 2839 & dt. of mfg.
2007.
Traction QOP1/2 drop due to TM3 TM changed 63
Motor CE resiglass band open

Auxiliary Block-2 isolated due to MVSI-2 changed. 163


Motor MVSI-2 burnt. Checked
and found all phase open
circuit.
MPFDCS C-118 open before arno SCU unit 165
start. MPCS signal changed.
conditioning unti
defective. MPCS make-
Stesalit, DOC-15.02.12.
Bogie & its Outer connection strap Conical rubber 147
Mech. equip. on wheel no 7 broken. pad and
Conical rubber thrust pad connection strap
of axle box no 7 crushed changed
resulting into breakage of
connection strap. Make of
conical pad- M/s PRV,
which is not RDSO
approved source.

Traction Bogie-1 off, NSC-1 GBC, Valve set 14


converter SR1 12/2 valve set V3+4 changed.
(SR) GTO short.
Traction Bogie-1 isolate. NSC-1 Valve set 12
converter GBC SR-1 12/2 V3+V4 changed.
(SR) GTO short.
Traction QOP-2 & QRSI-2 Following 565
Motor dropping repeatedly. LP practices started:
put HQOP-2 in off 1. End Shield
position but smoke being removed
noticed from under during major OH
frame. Isolated block-2 for visual
and worked. Checked and checking of
found TM5 CE side bearing. 2. Ultra
bearing seized. sound bond test
of bearing Inner
Race started to
detect whether
I/Race is rotated/
loose.

HT/LT cable Smoke from HT near POH adviced. 12


MPH cable. On checking
found A-4 terminal over
heated and all four cable
overheated.Cable no.
GC24 over heated anf lug
came out due to
improper crimping.
Traction Bogie-1 isolate. NSC-1, Valve set 9
converter GBC. SR-1 12/2 V3+V4 changed.
(SR) GTO short.
Traction Bogie-1 isolate, NSC1 Valve set 9
converter GBC, SR-1 12/2 valve set changed.
(SR) V3+4 GTO short, Gate
unit ok.
Miscellaneou Cattle guard and BP & FP 02 nos. 62
s pipe broken due to dash B/cylinder and
with truck. 02 nos. some pipe line
B/cylinder and some pipe and loco body
line damaged. same repaired
and fitted.
Central Main power off, ASC-1,2 HBB2 processor 44
Electronics NSC-1,2 error. crystal defective,
same provided.
FBV1-2 and HBB2
processor
changed.
MPFDCS SMOKE FROM R118 C-118 and R-118 352
changed
Transformer TFP oil leakage from TFP Loco allow by 60
dummy plug due to PNBE up to MGS.
external hitting. Make-
BHEL
Bogie & its Found Bogie no.2 make Attended. 88
Mech. equip. CLW, S.No 2850, crack
between wheel no. 7 & 9,
top side of helical spring
no.11 about 210 mm.
long and front wall about
175 mm. long. (Zone =
C-32).
HT/LT cable MA SET START . OST VSMA diode and 451
TRIP. VSMA-1 DIODE lug to check
CONNECTION during every
UNCOUPLED inspection and
heavy schedule.
Pn. Valve BP pipe burst same BP pipe & angle 121
changed at AGC. BP cock cock changed.
not opened then C&W
staff tried with
hammering resulted BP
hose cut near chucknut
causing heavy air
leakage. Make-SONI
(AAR-M-601/76) Lot no.
55A-11/2008 provided
during POH/BSL on
27.03.12. BP angle cock
checked
Pn. Valve BP pipe burst same BP pipe & angle 121
changed at AGC. BP cock cock changed.
not opened then C&W
staff tried with
hammering resulted BP
hose cut near chucknut
causing heavy air
leakage. Make-SONI
(AAR-M-601/76) Lot no.
55A-11/2008 provided
during POH/BSL on
27.03.12. BP angle cock
checked
HT/LT cable TM-2 cable burnt at TM-5 cable 39
junction box in under changed.
frame due to loose
connection. It was only
checked in POH. Make-
Unicab, 1500V, Size-
300mm2
Bogie & its Bogie-1 crack between Bogie frame 60
Mech. equip. W.No. 4 & 6. changed.
Traction TM-1 banding worked TM-1 changed. 60
Motor out.
Suspension TM-6 isolated as SB Motorised wheel 60
Bearing (SB) WMRD. set changed.
SIV SIV internal fault. M-1300 Master 13
card defective,
same changed.
Pn. Pipeline 1. 1/2" MS pipe was All the above 2
provided for BP defects attended
incoming / out going near by ELS/LGD.
the panel instead of 3/4".
Hence brake releasing
time has increased
beyond the limits. (>12
sec). 2. Pipelines are
provided with multiple
welded joints even for
shorter length at different
plac
Axle Box AB- 3 racer crack Attended 138
Axle Box AB- 3 racer crack Attended 138

HT/LT cable Found in RSI-1 one Same attended. 102


damping wire rubbed
with hinges channel,
caused insulation slightly
damaged, hence QOP-1
was dropping on higher
notches. Sleeve was
provided in damping
wire. RSI-1 was last O/H
& provided at POH/KGP.
So it is a off POH failure
case.
Vacuum UL NOT DEVIATE. VCB Warranty failure 236
Circuit open circuit. Intrupter
Breaker open ckt.
(VCB)
Traction QOP1 drop. TM1 TM1 armature 26
Motor armature bonded. bonded due to
spider ring crack.
TM1 changed. TM
stator no- H-
3977, Arm. no- J
114-8617-12-07

ESMON SPM pulse generator Changed. 86


defective.
Traction TM-3 armature earth due TM-3 changed. 30
Motor to balancing weight
broken & entangle inside
TM. Make-CLW, Stator
no. 4674329, Arm no. D-
456-4387-1-2000.

Traction TM-3 isolate. TM-3 changed as 5


Motor resiglass banding
worked out.

Miscellaneou TM-6 BHG damaged. Same changed 5


s during IC-0
RSI block RSI-1 smoke emission Loco is directed 7
and found following. 1. to KGP work shop
RSI-1 HRC fuse no-17 as dead condition
burst. 2. RSI-1 HRC fuse for RSI-1 smoke
connecting to E-10, E-11 emission.
& E-15 cracked. Heating Checked and
mark and carbon found RSI-1
deposited. 3. Heating connection E-10,
mark on surrounding E-11 & E-15
cables and metallic cover. found loose
4. RSI-1 12 tail-tail fuse connection at bus
blown. Also same fuse bar. Same RSI-1
holder flashed. 5. QRSI-1 & RSI-2 panel
found in dropped attended and
condition. given fit after HT
& LT.

Relay HVSI -1 on IIIrd QVSI-1 relay 29


changed
Axle Box AT RTM staion, during At BRC shed, 12
loco checking by TRS jointly checked
staff found wheel no-11 with POH rep and
excess temp. Fresh loco found axle box-
given. At BRC shed, 11 radial
jointly checked with POH clearance less
rep and found axle box- (0.03 against
11 radial clearance less 0.16mm).
(0.03 against 0.16mm). POH/BSL agreed
POH/BSL agreed to to counsel
counsel concerned staff concerned staff
who ov who overhauled
the A/Box.
Relay HVSI -1 on IIIrd QVSI-1 relay 29
changed
Traction Found TM-1 Sr.No. 6428/ Attended. 232
Motor Arm. No. D 359/8241
was showing grounded.
After dismantling. It was
found that conductor
came out from armature
roter slots. Failed TM-1
armature was received
from TMW/NKRD on dtd.
21/10/10. This armature
is off POH/DHD.

Transformer TFP oil splashed without POH adviced. 25


QLM on checking found
tap no.31 and 32 inter-
turn short, flashed and
tracked with tank. TFP
no. 280055559 NGEF
make.
SMGR Notch not coming. SMGR SMGR control 182
control lever journal pin lever journal pin
pt. no. A4518 broken. changed.
SMGR make-ABB, yrs. of
Mfg. 1995, SMGR Sr. no.
40D95910.

Auxiliary MVRH Sr.No. N8/145057, Informed 190


Motor make Siemens, Mfg. CWM/POH/KPA
1988, having unusual vide L.No.
sound due to NDE side ET/TRS/PPIO/26/
fan locking pin was loose 149, dtd.
and locking pin was 23/07/12.
damaged.

Pn. Valve CCA melted due to coil VEUL-1 changed. 106


shorted of VEUL-1
Vacuum VCB (Make-AREVA Single 1. POH/ BSL rep 145
Circuit bottle) smoke emission jointly checked
Breaker noticed. At BRC shed, the failed VCB
(VCB) severe flash over marks and agreed to
noticed on bottom counsel the
insulator, actuator rod concerned staff
punctured, moisture who overhauled
found on shunts of top the VCB. 2. Extra
insulator (VST) RTV sealant is
mechanism. During POH being applied
improper application of from outside the
RTV sealant betw insulators joint
during OH of
VCB. 3. A rubber
grommet
provided by OEM
to cover the ope

Auxiliary MCP Sr.No. 440469/L- Informed 747


Motor 0900219, BBL make CWM/POH/DHD
grounded. vide L.No.
ET/TRS/PPIO/23,
dtd. 23/07/12.
HT/LT cable Cable No. G-12 of RC Wire No. G-12 25
network 27 pressed and taped.
flash mark with MVSL jali,
same insulation cut wire
No. G-12 taped.
HT/LT cable Cable No. G-12 of RC Wire No. G-12 25
network 27 pressed and taped.
flash mark with MVSL jali,
same insulation cut wire
No. G-12 taped.
SIV SIV internal fault. SIV fan changed. 50

GR/RGR/CGR Loco checked at ELS/NKJ, Attended. 228


reported RGR two fins
found over heated. It is a
failure case of RGR grids.
SIV SIV internal fault. On Defective DCPT 16
checking it is found DCPT changed and
defective. found normal.
SIV make - AAL
S.N.- OB
1800210012
Auxiliary MVMT -2 smoked. NO Motor changed 53
Motor NGEF-12232934
Transformer/ Aux. conv No.2 off. SR1 oil pump 22
Converter oil impeller found
pump free. SR1 oil
pump changed.
Make:Plumet S.
No 19972 doc:
25/07/97
Auxiliary MVMT-2 S/E with QOA MVMT-2 145
Motor drop changed. No.
12232934 Make
HGEF received
from POH at DHD
on dt. 09.05.12
during IC0

Axle Box AB- 3 racer crack Atended 138

Auxiliary MVMT Sr.No. 162331310, MVMT changed. 181


Motor NGEF interturn short.

Vacuum DJ tripped with DJ feed Rectification:- 179


Circuit back fail.An auxiliary Spare contact put
Breaker contact in VCB Aux. in service.
(VCB) Contact unit is broken at
cable no.12 and 13
Normally Open Interlock
which is in the circuit of
I-35 input of MPCS. As
this input I-35 became
'OFF' due to non
availability of feed from
VCB
MPFDCS DJ tripping Checked at AQ TI 18
shed by company
staff.
Hurth Gear case No.4 hurth Membrane 16
coupling coupling oil leakage. changed.
DC-DC Head light not working on Material being 477
Converter/HL run due to DC-DC procured for
/FL converter (Signatron replacing
make) faulty. At BRC input/output
shed, out put switch of switches of DC-
DC-DC Converter found DC Converter
defective. This during every
“GE” make major OH sch.
toggle switch was Indent No.
provided on 20.06.2009. SSE/RS/177/12
DC-DC converter switches dtd 11.09.12, Qty
were being replaced on 300.
cond
Control While putting MP on "N" At BRC Shed 267
Circuit position, notch troubleshooting
progressing for quick
automatically. LP and LI progression of
cleaned the MP & Q52 notches when MP
contact then normal and put on
worked. At MGS loco “N”
tested several times but carried out. No
now by putting MP on any abnormality
"N", notch not progress noticed.
continuously. Relay Q-52 Following work
changed as precaut carried out as
precautionary
measure: 1)
Relays Q46 &
Q52 replaced
along with their
base. 2) VCD
main unit
replaced

Compressor/ Abnormal sound coming Same defective 4


Exhauster from CP2 LP valve. On valve changed
checking CP it is found and found
that CP2 LP (RH) disc normal. Make-
valve defective. ELGI,
S.N.-TRC/1000-
MN440078
Traction TM-2 + 4 isolated. TM2 ventilation -313
Motor net broken TM4
one MSU tube
bolt broken due
to this TM4
isolated. TM4
checked found
normal repeated
trouble since POH

SIV QSIT drop due to fan SIV blower motor 23


fault showing. cooling fan
bearing changed.

Battery Loco checked by SSE/Trip Same ateended. 209


Charger shed/ NKJ reported CHBA
(CHBA) was not working due to
its out put HRC fuse
having 15 amp. capacity
was in fused condition,
same replaced. Failed
CHBA was last provided
at POH/KPA in Dec-11,
which failed within 209
days.

HT/LT cable A-33 bushing on roof Bushing changed 2


burst due to loose at by POH/KPA staff
ASN. at ASN Shed.

SMGR GR sticking due to air In shed 21


leakage from SMGR precautionary
mechanical valve. Make- measure all
ABB mechanical valve
changed & pipe
line blowing
done.
SIV SIV internal fault and Attended by 144
smoke from RSI-2. Block- representatives of
2 isolate and train M/s Medha Ltd.
worked upto Goregaon at BCT TI shed.
with single bogie. R1-R2 resistance
found open,
same changed
and loco given fit.
(Warranty failure)

SMGR air leakage from Valve changed 23


mechanical valve of
SMGR.
Pn. Pipeline Heavy Air Leakage from T- type strainer 87
Horm Pipe Line below the and Nipple
isolting cock at Driving changed
Cab 1
MPFDCS Loco checked at 204
ELS/Gomo reported that
FDCS its CPU power
supply card was not fitted
properly. Same replaced
and loco given ready. It
is a failure case of FDCS
(Stesalit make).

SMGR Not not progressing by Defective Panel 35


MP & EEC. NO Interlock ( replaced by New
Wire No 049 & 051) not AC-MT Panel.
making contact.
Traction Tripping with QOP-1 & 1. Method of 565
Motor QRSI-1 dropping for analysing wear
sparking from TM-1 due rate modified.
to pig tail brush holder Instead of
no. 5 cut. Same isolated average, max
and worked. At BRC shed wear rate taken
found TM-1 brush holder to weed out TMs
No.5 carbon brush pig tail with high wear
broken due to eccentric rate, i.e.
wear. Ovality found high >6mm/10,000km
(i.e. 0.2mm inst due to increased
AOH periodicity
from 12 to 18
months. 2. Use of
Acetone for
comm cleaning
started.

Relay Notch not coming by MP Relay Q20 32


& EEC due to rely Q-20 checking in
(Make RR industries section in every
HWH) defective. LP off POH loco
worked with manual during IC'0'
control of GR. At BRC started and
shed, thin strands of wire included in the
found inside Q20 stuck IC'0' check list.
up between contacts.
Relay was provided
during POH and was
sealed with seal pro

Relay QCVAR relay PCB flashed. Relay changed. 122


Make-ABB, Sr.no. V06-
293, DOC-2006.

Miscellaneou TFVT not working. TFVT changed as 14


s both cabs fan not
working. NR-2
also changed as
not working.
HT/LT cable While closing DJ found ET-2 changed. 57
flame comes from A-32
cable (Near ET-2) on roof
of loco. Checked and
found ET-2 flashed and
A-33 bushing cable
insulation near
termination burnt.
Battery After GTE-ND neutral CHBA ammeter 453
Charger section LP experienced DJ terminal
(CHBA) not closing. Panto connection is
lowered, cab & marker being checked
lights off and MCPA not properly during
working. Checked and every sch. Insp.
found CHBA ammeter
positive cable no. X-003
loose and flashed over at
ammeter connection
terminal causing battery
supply n
Pantograph During IC0 found heavy PT changed. 4
play in middle articulation
assly. No any work done
by POH/KPA except
planing. It found AM-12
upper articulation pan.
CCPL No. IR 03 H 1556

Pantograph Heavy play in middle Both pantographs 6


articulation assembly of changed.
both Pantographs.
Traction TM No. 3 Sr. No. 5529 PE Informed to 428
Motor side new FAG india CWM/POH/KPA
bearing radial clearance on 11.06.12 &
was less = 0.16, so TM TM changed.
PE side bearing seized on
line.
Control Cab No.1, wire No. 580 Same attended 117
Circuit (negative wire) at BL-1
switch interlock was
showing open circuit.
Failed cable was last
checked during POH sch
in Jan-12.
SIV QSIT drop at Bhopal.Loco MCP-2 changed 2
return to BSL, and found by BSL shop.
MCP-2 winding eart.

SIV QSIT drop at Bhopal.Loco MCP-2 changed 2


return to BSL, and found by BSL shop.
MCP-2 winding eart.

Pn. Pipeline 1. 1/2" MS pipe was all the above 3


provided for BP defects attended
incoming / out going near by ELS/LGD
the panel instead of 3/4".
Hence brake releasing
time has increased
beyond the limits. (>12
sec). 2. Pipelines are
provided with multiple
welded joints even for
shorter length at different
plac
HT/LT cable MVSI-1 incoming cable Cable changed 172
no 966 insulation cut and and ckt checked
flashed. Which cable found ok.
getting earth with MVSI-1
body.
Pn. Pipeline Found A-9 port No. 5 Attended at 180
pipe line broken inside ELS/ET.
threaded portion of tri
plate (SIL make). Failed
tri plate was last provided
during POH sch at BSL on
dtd. 18/11/11
Transformer TFPSr.No. 6003466, TFP changed and 138
BHEL/1995, all gasses informed to
found in increased CWM/POH/DHD
order,suspected winding on 19.06.12
internal defect, caused
QLM dropped
HT/LT cable Smoke from HTC Loco checked at 122
observed. DJ opened and UMB by RSO staff
loco shut down. and found
Potential
transformer of
SPM (mounted
near a0-a1
bushing) SB
burnt due to
loose connection.
Wires insulation
on PTs SB found
melted. One wire
coming from a1,
a7 broken from
middle.

Traction QOP2 and QRSI2 TM 5 changed. 29


Motor dropped. BBCR on TM-5
Armature.
SIV Control card A-710 Card changed. 274
defective.
Axle Box 1. Two no rivet of outer Loco lifted and 0
bearing of axle box no attended
m9 found in broken
condition. 2. Radial
clearance of AB no 2 &
10 found 0.30 which is
beyond limit.
Transformer TFP safety valve blown. TFP changed. 253
As per DGA report
suspected arcing inside
TFP.
Auxiliary MVMT-1 not working and MVMT-1 285
Motor found burning smell. changed.
Further MVMT-1
meggering done and
found 1 phase open and
2 phase earth. C-105
checked and found
contact no 966 and 967
heavy flashed. Further
MVMT-1 changed and
normal testing done.
Checked found rotor
moving freely.
Traction TM-3 drawing more TM-3 changed. 74
Motor current.
HT/LT cable At 20.35 hrs passed Loco attended at 152
BHTK. At 22.00 hrs GZB shed and
arrived KOI. 70" extra in found in BA-1
b/sec. LP Sh. panel, copper link
Maheshchand/BSP no. HT-21
reported, after passing connected cable
BHTK experienced ICDJ. no. BH-2211 (of
Check found smoke from TM-1) burnt and
contactor panel. LP disconnected due
isolate block-1 & train to insulation
worked upto KOI by one damage. Cable
block. Fresh EP 23833+2 changed.

Axle Box Axle box-2 hot gear case .... 312


cardium nil. Loco checked
at KYN shed found axle
box-2 outer racer loose
and inner racer crack,
inner bearing cage
broken.As per POH check
sheet new NBC bearing
was provided.
Relay Sparking observed from Loco checked at 109
Q-30. ALD and found
and found Q-30
burnt. Relay Q-30
changed . Q-30
make: Woama.

Traction Found TM-3 Sr.No. 1725 TM changed. 289


Motor its IP showing grounded
internally. This TM (SC)
recd. with same loco ex.
NKJ on 10/12/01. POH
sch. of this TM was
carried out at BSL on dtd.
13/07/11. So it is a off
POH/BSL failure case
Pantograph PT-1 isolated due to PT-1 Servomotor 339
actuating rod moving bucket changed
free. Checked and found
PT-1 raising and lowering
timing is ok and working
normal. But sometimes
PT-1 operations slow at
the time of lowering and
observed slightly jerk in
servomotor operation.
So, PT-1 servomotor
checked and found its
bucket defective.

Switch Notches not coming by Loco checked at 35


MP. SE/NKG arrived on GZB shed and
loco & operate switch given fit after
ZSM 2-3 times changing ZSMS
switch.
Vacuum ICDJ. Loco attended at 100
Circuit GZB shed and
Breaker found DJ
(VCB) pressure
regulator
pressure between
4.7 to 5.2 kg/cm2
hence pressure
regulator
changed

Traction QOP-2 dropping 1. TMs with 163


Motor repeatedly due to TM-6 C/Brush w/rate
flashing, LP isolated >6mm/10000km
block-2 & worked upto being replaced &
BRC. At BRC shed TM-6 earmarked for
commutator found providing only in
flashed, arcing horn goods locos. 2.
found flashed due to TM comm.
carbon brushes under grinding insitu
size (17 mm) & pigtails started.
broken as wear rate of
carbon brushes was very

Auxiliary Smoke emission from MVMT-2 155


Motor MVMT-2, QOA, and QLA changed. Letter
dropped.MVMT-2 sent to ERS-
meggered found POH/KGP.
– all phase earth.
Winding also flashed.
C106 and Aux. control
circuit are found normal.

Traction QOP-2 drop due to TM-6 TM-6 lug guard 74


Motor lug guard melted as loose changed.
connection & oversized
i.e. 33mm & sleeve under
size i.e. 28mm causing
cable not fitted properly
in lug guard.
Auxiliary SMOKE FROM MVRH. MVRH changed 291
Motor ONE LEAD FLASHED &
UNCOUPLED
MPFDCS C-118, R-118 & arno C-118, R-118 60
smoke. SCU unit changed. SCU
defective as Arno voltage unit changed.
not sense, same changed
by shed and handed over
to firm for investigation.
MPCS make-Stesalit,
DOC-15.02.12.

EP Contactor L-4, L-5 & L-6 negative Pipeline changed. 297


pipeline heavy air leakage
due to common pipeline
cracked.
Pn. Valve cab-1 A-9 sticking & air A-9 changed. 23
leakage. On dismenle, it
was found that inlet &
exhaust valve seat having
rusty dust and 'o' ring
slightly pressed as
metallic coller bend.
diaphram- MGM of
Oct.'2010. Seat valve
assembly rod bend&
several pitting marks
around the
Traction QOP-1 drop due to TM-1 TM-1 changed 26
Motor armature earth & BBCR.
Make-CLW, Arm no. KPA-
110-2012, Stator no.
4674112
Battery CHBA Not Working. CHBA Diode changed. 93
Charger unit checked and found
(CHBA) diode punctured and
shorted.
Control DJ tripped and panto QPDJ incoming 464
Circuit lowered automatically cable no. D738
due to CCPT melted. found slightly
Same replaced and rubbing with jali
worked. At BRC shed, above SMGR in
found QPDJ incoming HT3. Same
cable no. D738 found attended by
slightly rubbing with jali applying tape.
above SMGR in HT3. Tightness of
Same attended by control cables
applying tape. ensured in both
cab SBs during
every sch. insp
IA/IB/IC.
Arno LP Sh. M.P. Bind/ALD Arno changed at 14
reported that after GZB shed. Make:
passing N/sec. observed Jyoti Ltd. S. No.
tripping. Checked found A-127A. Last
relay QLA & QOA overhaul during
dropped & smoke POH at BSL.
emission from Arno.
SIV CHBA changed and proper tightness 109
Inverter-2 flat bend done in there
cable, proper tightness respective ports.
done in there respective
ports.
Pn. Pipeline VCB COPPER PIPE BRAZING DONE 554
BROKEN FROM BRAZING AT MGS
JOINT.
Miscellaneou 1. Cab1 BP T joint air All defects and 0
s leakage from brazing .2. defeciencied
Stel pipe below Cab1 attnded
leakage.3. Cab2 RS
gauge defective.
Miscellaneou W/NO.5,6 SKIDDING Wheel turning 417
s MARK done at ELS/AQ
Pn. Pipeline 1. 1/2" MS pipe was All the defects 2
provided for BP attended by
incoming / out going near ELS/LGD
the panel instead of 3/4".
Hence brake releasing
time has increased
beyond the limits. (>12
sec). 2. Pipelines are
provided with multiple
welded joints even for
shorter length at different
plac
Bogie & its Wheel no. 9, 11 shock Bolt fitted. 87
Mech. equip. observer bolt missing.
Transformer Oil leakage from SR-2 oil Same attended. 14
pump during checking
found oil leakage from
TFP-2 oil pump junction
box base bolt.

Miscellaneou W/SKIDDING ON W/NO. Wheel turning 22


s 1,2,3,4,5,6 done
Pn. Valve GM-ST AT VTA YARD BP angle cock 459
CAB2 BP ANGLE COCK changed.
AIR LEAKAGE.
Miscellaneou Reverser not throwing. J1-J2 servo motor 43
s Heavy air leakage from J- gasket changed.
1 servo motor. Gasket
damaged.
Roof ACDC N/S FLASHING ON 705
Equipments ROOF & C/B TRIP AS
misc. DCLA SHORT & OPEN
CKT. DUE TO HIGH
SURGE
ESMON SPM2 NOT WORKING AS SPM changed 156
POWER SUPPLY CARD
DEFECTIVE
Aux. BUR-2 isolate as BUR-2 43
converter ‘R’ & ‘T’
(BUR) ’T’ phase phase WRE
WRE defective. OCB- changed.OCB-1
1housing loose. PBU2 changed as
defective. housing loose.
PBU2 defective.
Same changed.
Traction HMCS-II on 2nd. TM-4 TM-4 changed. 99
Motor open circuit.
Arno ARNO Smoke emission. ARNO changed. 62

Traction QOP-2 permanent. TM-5 TM-5 & Gear 64


Motor Armature winding BBCR case-5 changed.
& Gear case -5 top
fixation bolt (M-36x90)
head broken as well as
Gear case -5 bottom half
cracked.
Pantograph PT-1 not raising. VE PT-1 Coil changed. 80
coil cut.
Central Cab-2 not working. STB-2 STB-2 card 53
Electronics life sign missing. changed.
Aux. BUR-2 inverter over Same changed. 35
converter current. WRE
(BUR) ‘S’ phase
GDU defective.
HT/LT cable HOBA Off. HQOP-1 off. Same changed by 22
Block-1 isolate. During RB Stesalit. Cable
Cab-2 Ammeter (TM-4) connection
showing TE side. On attended.
checking found power
circuit of TM box-1 burnt
& earthed. Cable No. BH-
24, CH-24, DH-24 & EH-
24 connected at the point
in SB BA-2.
Pantograph PT-2 isolate. Panto Panto carbon 57
carbon strip broken. strip changed at
MGS.
Harmonic H/F isolate. Harmonic Contactor 69
filter filter contactor 8.41 stuck changed.
off.
RSI block Block-1 isolate. QOP-1 Loco attended by 6
drop. Smoke came from POH shop/ KGP.
near RSI-1 & QRSI. QOP
& QLM dropped. HO-1 &
HO-2 short. Wrong
connection in CTF-2 tips
No. 4,5 & 6 to fixed tips
No. 12 of J-2 cable
No..H-33 connected with
HO-1 instead of fixed tips
No.4 of CTF-2. RSI-1, 07

Traction Bogie-2 isolate.NSC-2 Same changed. 38


converter GBC. SR-2 12/2 V3 gate
(SR) unit defective.
Auxiliary Cab-1 SA9 not working. Cab-1 SA9 46
Motor MVMT-2 abnormal sound. changed at TATA
MVMT-2 impeller on 29/06/11.
defective. MVMT-2
changed.
Traction Bogie-1 isolate. Same changed. 27
converter Disturbance in converter-
(SR) 1. ASC-1/NSC-1 card
defective.
Compressor/ Heavy air leakage from CP-1 changed. 15
Aux. CP-1 unloader valve.
compressor Copper fins came out
from inter cooler/after
cooler of CP-1.