问题分类

序号 专业 Problem 地点 问题描述
NO Professional Classifica Location Problem Description
tion

DK83+400中继站电力箱变场坪距离
供电专业 工程质量类
(电力) 问题 基础通风孔下沿不足100mm。
6136 Power supply Works DK83+400 DK83+400 relay station power box
professional quality substation is less than 100mm from the
(electric power) problem lower edge of the foundation
ventilation hole.
Jakarta-Bandung Hi
问题等级 提出问题依据
Problem Basis for Raising Questions
Level

根据《铁路电力设计规范》(TB-10008-2015)5.4.2-1“箱式变电站基础通
风口底高程应高于室外场坪高程100mm-150mm”的规定
B According to the "Railway Electric Power Design Code" (TB-10008-2015)
5.4.2-1 "The elevation of the bottom of the foundation vent of the box-type
substation should be 100mm-150mm higher than the elevation of the outdoor
field"
雅万高铁工程问题
-Bandung High-Speed Railway Works Problem Ba
建议整改方案 整改时限
检查人
Suggest a Corrective Deadline for
Check Person
Action Rectifications

整改后的箱变基础通风口底
程距场坪的高度不得小于
100mm 李平
After the rectification, the 4/15/2023 张丙其
height of the vent bottom of Li ping
the box-type substation Zhang Bingqi
foundation from the field floor
shall not be less than 100mm
雅万高铁工程问题库
y Works Problem Base (Chinese-English Versio
责任单位
检查日期 Unit of Responsibility
Check the Date 施工单位 监理单位
Construction unit Supervision unit

3/27/2023 SINO2
English Version)5884-6207
责任单位
it of Responsibility 问题整改意见回复
Reply to Rectification
设计单位 建设单位 Problem
Design Unit Constructing Unit
复验结论
整改情况 复验人 复验日期
Retest the
Rectification Re-Tester Retest Date
Conclusion
备注