Serial No. Description No. (pc) D (m)


1 Beam 1 (Phenolic board) 6 0.4

No. of Boards Total Bd


2"x2"x10' lumber 10 296.

No. (pc) a (m)


2 Column (Phenolic Board) 45 0.3

No. of Boards Total Bd


2"x2"x12' lumber 180 5340
No. (pc) width (m)
3 Floor Slab (1st Floor Marine Plywood) 1 38.3

No. (pc) width (m)


Floor Joist (2"x3"x12') 1 38.3

No. (pc) width (m)


Stinger (2"x3"x10') 1 38.3

No. (pc) width (m)


Shoring (2"x3"x10') 1 38.3
Formworks Area of Plywood
B (m) Length (m) Perimeter (m) Area Total (m2) (m2)
0.3 3.7 1.2 26.64 2.88

Total Bd. Ft. Number of pcs


296.7 90

b (m) length (m) Perimeter (m) Area total (m) Area Plywood (m)
0.3 8.2 1.4 516.6 2.88

Total Bd. Ft. Number of pcs


5340.6 1336
width (m) length (m) Perimeter (m) Area total (m) Area Plywood (m)
38.3 34.1 76.8 2618.88 2.88

width (m) length (m) length of lumber (m) Spacing (m) No. of lines required
38.3 34.1 3.6 0.4 87

width (m) length (m) length of lumber Spacing (m) No. of lines required
38.3 34.1 3 1 40
No. of acrow props
width (m) length (m) length of lumber Spacing (m) on longer side
38.3 34.1 3 1 40
No. of Pieces Unit Cost Total Cost
10 2000 20000

Number of pcs Unit Cost Total Cost


90 120 10800

No. of Pcs Unit Cost Total Cost


180 2000 360,000.00

Number of pcs Unit Cost Total Cost


1336 140 187040
No. of Pcs Unit Cost Total Cost
910 1200 1092000

No. of pcs Unit Cost Total Cost


11 220 2420

No. of pcs Unit Cost Total Cost


12 180 2160
No. of acrow props
on shorter side Unit Cost Total Cost
35 35