Professional Documents
Culture Documents
Tugas 8 - ASPK - Archyuda F - 25822028
Tugas 8 - ASPK - Archyuda F - 25822028
Park Park
Buy Basic Concrete
No. Criteria \ Alternative No Action Green Green Bypass Combine
Floodplain Greenway channel
North South
1 10 0 3 3 3 2 5 2 4
2 7 2 4 3 3 2 1 2 5
3 3 0 3 4 5 2 2 2 3
4 5 0 2 4 5 3 1 2 3
5 6 0 2 4 5 3 2 2 3
6 8 5 0 4 2 4 5 5 1 β= -0.00625
7 9 5 1 2 2 3 3 1 0 β= -0.30675
8 4 4 5 0 0 0 3 5 0 β= -0.12195
9 2 5 4 2 2 2 1 0 3
10 1 1 1 4 3 3 2 5 0
124.1 129.9 162.5 162.0 135.5 162.3 136.5 132.8
Alternatif Penanganan
Kriteria Tanggul - Retensi Relokasi
No. Tidak Ada SGS
Pompa Hulu Total
Deskripsi Nilai Alt 1 Alt 2 Alt 3 Alt 4 Alt 5
1 Pengurangan genangan 6 1 4 3 4 3
2 Biaya Konstruksi (Milyar) 5 5 4.92 4.91 3.98 2 β= -0.0009
3 Relokasi Penduduk / Sosial 4 4 3 2 4 1
4 Biaya OP (Milyar/tahun) 3 2 4.70 4.95 4.65 5.00 β= -0.5000
5 Kemudahan Pelaksanaan 2 4 3 3 2 1
6 Estetika 1 2 3 3 3 2
63.0 83.7 74.4 80.8 51.0
Kriteria
Alternatif Exp Cost Safe Nilai Akhir
0.29 0.14 0.56
BD 0.10 0.48 0.43 0.337 --> alternatif yang dipilih dengan nilai paling tinggi (Bandung)
BL 0.39 0.16 0.26 0.282
RA 0.37 0.07 0.08 0.164
BR 0.15 0.28 0.24 0.217
4. Criteria
D1-Rizka
Experince Cost Safety
Experience 1.00 5.00 0.17
Cost 1.00 0.14
Safety 1.00
D2-Ferdi
Experince Cost Safety
Experience 1.00 5.00 0.25
Cost 1.00 0.33
Safety 1.00
D3-Regina
Experince Cost Safety
Experience 1.00 4.00 0.25
Cost 1.00 0.33
Safety 1.00
D4-Archy
Experince Cost Safety
Experience 1.00 2.00 2.00
Cost 1.00 0.50
Safety 1.00
D5-Sandhi
Experince Cost Safety
Experience 1.00 0.33 0.20
Cost 1.00 0.50
Safety 1.00