The plant and equipment audit conducted by Eng. Victor, Mr. Umar, and Mr. Ateeq at the St. Regis Residence B1B2 project site on May 22, 2023 assessed the condition of the crane, rig machine, and generator. The audit checked for proper licensing and maintenance, safety equipment and controls, signs of damage, and potential hazards. Some items were found to need immediate attention or consideration for additional controls, while most required controls were in place. The results will aid in reviewing control measures and safety to minimize risks.
The plant and equipment audit conducted by Eng. Victor, Mr. Umar, and Mr. Ateeq at the St. Regis Residence B1B2 project site on May 22, 2023 assessed the condition of the crane, rig machine, and generator. The audit checked for proper licensing and maintenance, safety equipment and controls, signs of damage, and potential hazards. Some items were found to need immediate attention or consideration for additional controls, while most required controls were in place. The results will aid in reviewing control measures and safety to minimize risks.
The plant and equipment audit conducted by Eng. Victor, Mr. Umar, and Mr. Ateeq at the St. Regis Residence B1B2 project site on May 22, 2023 assessed the condition of the crane, rig machine, and generator. The audit checked for proper licensing and maintenance, safety equipment and controls, signs of damage, and potential hazards. Some items were found to need immediate attention or consideration for additional controls, while most required controls were in place. The results will aid in reviewing control measures and safety to minimize risks.
The plant and equipment audit conducted by Eng. Victor, Mr. Umar, and Mr. Ateeq at the St. Regis Residence B1B2 project site on May 22, 2023 assessed the condition of the crane, rig machine, and generator. The audit checked for proper licensing and maintenance, safety equipment and controls, signs of damage, and potential hazards. Some items were found to need immediate attention or consideration for additional controls, while most required controls were in place. The results will aid in reviewing control measures and safety to minimize risks.
Company Name: Dutch Foundation Project Name: St. Regis Residence B1B2 Conducted By: Eng. Victor/Mr. Umar/ Mr. Ateeq Date: 22.05.2023 Poor: Absence of major control measures (high risk), work to be stopped and risk assessment to be reviewed immediately. Fair: Some minor controls are missing (medium risk), additional control measures to be implemented. Good: All required controls are in place (low risk), only monitoring is required. DESCRIPTION S. No. Description A B C D E Crane 1 Operator with License 2 Tyre conditions 3 Foot brake 4 Hand brake working 5 Head lights condition 6 Horn working 7 Indicators working 8 Reverse lights 9 Reverse alarm 10 Side / Rear view mirrors 11 Wind screen / wipers 12 Boom condition 13 Derricking interlock system 14 Out riggers condition 15 Out riggers pads 16 Safe angle indicators 17 Condition of wire rope 18 Safe working load indicator 19 Conditions of chain slings 20 Hook with Safety Latch 21 Hydraulic leaks 22 Third party test certificate 23 Others 24 Special Appliance Rig Machine 1 Check oil and water levels (hydraulic oil after start up) 2 Complete a walk round inspection 3 Are all high-pressure connections chained? 4 After start up (before moving off) 5 Check instruments are reading correctly
Version 01 Date: Apr 2023 Page 1 of 2
DFC/HSE/M/CCC/23 Dutch Foundation & Concrete Processing Co. LLC
6 Are there any obvious signs of cracks, overhangs on/behind the
face? 7 Is the brake operational? 8 Is your shelter up wind of the rig? 9 Is the compressor on level ground? 10 Inspect for oil, water, or fuel leaks and unusual smells or noises 11 Grease – in accordance with manufacturer’s instructions 12 Are the holes properly sealed by the rubber skirt? Generator 1 Proper maintenance was done on generator 2 Earthing is done on generator 3 Isolation switch working properly 4 Guard and fully enclosed covered 5 Is there any diesel/oil leak A – YES, B – NO , C – ADEQUATE AT TIME OF INSPECTION, D – NEEDS IMMEDIATE ATTENTION, E – NEEDS CONSIDERATION