S No Activity Hazards identified Control measures required/proposed Additional Recommendations
Severity
Severity
1 Materials shifting & Activity shall be carried out only under the supervision of site engineer /
Storing at work location supervisor.
from stores - Manually Use of hand gloves during material lifting & shifting.
Slip trip of manpower and fall of Remove all obstacles from pathway.
9
material.
3 3 9 3 1 3
Do not carry out overload & use of shoulder pad during material shifting on
shoulder.
Area must be barricade near stored material.
Stopper must be ensured to avoid rolling of the GI Conduit material.
Maximum load permitted for manual handling by a person is 25kg
only as per on manual handling
9 Back injury 3 3 9
Manual material handling training to be provided for workers
2 1 2
engaged for manual shifting activity.
2 Wall Drilling for saddle All electrical connection shall be done by authorized electrician only.
fixing Conduit support
& fitting of switch box Ensure the all power supply through ELCB/ RCCB (30 mA) and all
and other accessories power cable should be double insulated and overhead.
by portable power
ELCB Tripping sensitivity to be checked before undertaking drilling
tool.
work.
15 Electric Shock. 5 3 15 3 2 6
Job Specific training program to be conducted by site team. TBT to be
given by site team before start of work at job location.
Drilling / chipping machine should be inspected jointly by Electrical &
HSE engineer.
Ensure portable power supply cord is healthy and free from joints.
Double Lanyard & Full body harness must be used & check for any
cut, abrasion, burn, damage, before taking in use.
Use of anti-skid safety shoes, and other mandatory PPE’s.
Access & egress to be check before starting of the work.
Ladder shall be placed at a slope of 1:4 and extended rungs will be
tied with landing platform.
20 Fall of workmen 5 4 20 Ladder shall be provided for safe access on working platform. 3 2 6
Periodical checks for ladder will be conducted by Safety Officer.
No. of person at
Assessed risk Revised risk
Risk rating
Risk rating
Likelihood
Likelihood
risk
S No Activity Hazards identified Control measures required/proposed Additional Recommendations
Severity
Severity
20 Fall of workmen 5 4 20 3 2 6
Ensure 3-point contact while ascending & descending form the ladder.
Probable
Limited chances of occurance during
Non- significant Impact – No further control Non- Significant
4 4 8 12 16 20
normal activity but may occur once measure necessary (1-6)
in a while during a project lifetime
Occasional
Unlikely to occur during similar Medium impact to be reduced as low as
Medium
activity in normal operational 3 3 6 9 12 15 reasonably practicable -existing control to be
circumstances but may occur in (8-12)
monitored strictly
unusual conditions
Impact Restricted within Impact Restricted within Impact Restricted within Impact Restricted at Impact beyond the immediate
immediate surrounding of the extended surrounding the plant/site boundaries. immediate boundary and may impact the
occurance of occurance (in a single Eg-Nominal spills, local boundary of the premises. near by Locality / Village/
block, floor etc). emissions etc. Eg-Major spills, discharge, Town.
Eg-few drops leakage, bulk emissions, Major land Eg-Huge Spills, catastropic
Scale of Impact seepage etc. contamination etc. emissions, major water body
pollution, land contamination
of vicinity, Local ecological
destruction etc.
Self Assimilating Revesrible with little Reversible with moderate Reversible with High Non reversible and
efforts and can be managed efforts and to be managed Efforts and may involve permanent and shall require
Severity of impact locally without ERT by the ERT/ specialized help from local authorities. help and reporting to local
team. authorities/ ministry.
Detoriation lasts for less Detoriation lasts for one Detoriation lasts upto one Detoriation lasts upto a Detoriation lasts more than a
than 1 hour and shift and local team can day and ERT/specialized week and local authority's week and help/reporting to
Duration contained/clear contain/clear it. team's help is required to help is involved. local authorty is needed.
immediately contain/clear it.
No social impact Minor effect over the Considerable impact on Huge impact on community
livelihood / social setup / local community through issues and complaint from the
Social Impact local infrastructure for community griveance / local bodies/statutory