WORK INSPECTION REQUEST (WIR)

Project: IMI Warehouse Ref.No.: PSCC--CVL-03


Consult.: New Submittal Re-Submittal
Contractor: PROJECT SUPPORT CONTRACTING CO. SUBMITED DATE
Location: Ras Al-khair

From: PROJECT SUPPORT CONTRACTING CO. To: DORAR TAMMAM TRADING & CONTRACTING
Item
Description TYPE QTY Rev Dim SIZE (m3)
No.
F2 72 0 4.00M*4.00M*10CM 115.2

SF2 4 0 16.40M*6.60M*10CM 43.296

F5 18 0 4.70M*4.70M*10CM 39.762

F1 2 0 5.20M*5.20M*10CM 5.408

FR 10 0 1.70M*1.70M*10CM 2.89

F7 4 0 5.40M*5.40M*10CM 11.664

F4 2 0 6.00M*6.00M*10CM 7.2

CF1 4 0 14.40M*5.20M*10CM 29.952


PLAIN CONCRETE FOR FOUNDATIONS 10CM (
1 F6 8 0 5.60M*5.60M*10CM 25.088
CUMULATIVE) TILL INVOICE N #6
F3 4 0 4.20M*4.20M*10CM 7.056

SF1 4 0 14.40M*5.20M*10CM 29.952

CF3 4 0 15.40M*4.90M*10CM 30.184

CF4 4 0 13.40M*4.70M*10CM 25.192

F8 4 0 6.00M*6.00M*10CM 14.4

CF2 4 0 16.40M*6.60M*10CM 43.296

GB1 ____________ 0 _______________ 28.5

PIT FOUNDATION ____________ 0 _______________ 52

Total 148 511.04


Discipline:
Architectural Mechanical Civil Electrical Plumbing Others (state)
Drawing Ref:

Specs Ref.:

BOQ Ref.:
Transmitted by Contractor
PROJECT MANAGER CIVIL ENGINEER
Name: Name:
Signature: Signature:
Date: Date:
Action
A Approved B Approved As Noted Resubmittal Required C D Not Approved

Date:
Contractor:
PM / Supervision Engineer Reply:

Supervision Engineer / PM
Date: