Merits:
CCPP’s are the most efficient method of adding electrical
Demerits:
capacity to areas with an abundance of natural gas, due to:
i. Only can use Gaseous
i. Low capital cost
or Liquid Fuels.
ii. Shorter construction time
ii. Abundance of water
iii. Low fuel cost
is needed.
iv. Lower emissions
v. High efficiency (55-60%) and high power density
STACK
INTAKE
ST
HRSG
GT
SINGLE
SHAFT
1 x GT
1 x HRSG
1 x ST
MULTI SHAFT
2 x 1 CONFIG.
Temperature of the exhaust gases at 559.5 °C Turbine exhaust pressure 0.1122 bar
the inlet of the HRSG/HRB
Courtesy: National Thermal Power Corporation Ltd. India.
Jan 2023, Dr. Md. Ehsan 9 Combined Cycle Power Plant
ME419: CCPP - Turbines
2GT x 132 MW
+ 1ST x 73 MW
= 337 MW
1
Jan 2023, Dr. Md. Ehsan 2 Combined Cycle Power Plant
ME419: CCPP - Example
2,000 MW LNG fired Combined Cycle plant located in Pembroke, Wales, UK. It consists of
5 modules of 400 MW each, equipped with an Alstom 288 MW GT 26B gas turbine, a
heat recovery boiler and a 112 MW steam turbine.
1
Jan 2023, Dr. Md. Ehsan 3 Combined Cycle Power Plant
ME419: CCPP - HRSG
The pressure drop across the HRSG on the flue gas path is in the range of 200–375 mm
water column. This pressure drop is the back-pressure of the GT and influence its
generated power and efficiency by 1 and 2%, respectively. The HRSGs are provided
with a set of motor-operated valves that are installed in the steam and water lines.
HRSG two-loop circuits (two pressure) are the most common, but regulating of
them are much more difficult to achieve. There is a pinch economizer,
evaporator, superheater for each circuit. There is the smallest temperature
difference between heating gases and water. Usually, the smallest
temperature difference is at the outlet of the evaporator. The temperature
difference is quite significant at the exit from the HRSG block, and if you need
to dispose of it, another block is added.