Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

INTRA STO IN SAP MM WITH ONE STEP & TWO STEP PROCESS

 Sales Organization:

You can create new entry of you can copy from existing.
 Distribution Channel:
 Division:
 Assign Sales Organization to Company Code:

 Assign Distribution Channel to Sales Organization:


 Assign Division to Sales Organization:

 Setup Sales Area:

 Assign Sales Organization-Distribution Channel-Plant:
 Define Shipping Point:
 Assign Shipping Point to Supplying Plant:

 Material Master Data:


 Basic Data:
 Maintain Sales: sales org. 1

 Maintain Sales: sales org. 2

 Maintain Sales: General/plant


 Assign Supplying Plant to Vendor Master:

 Create Customer (XD01):

 Setup Stock Transfer Order:


 Define Shipping Data for Plant:
 For supplying plant assign sales area:

For receiving plant assign Customer and sales area:


 Assign Delivery Type and Checking Rule:
 Assign Document Type, One-Step Procedure, UnderDelivery
Tolerance
 Assign Shipping Point Determination:
 Assign Shipping Point:
Here all the configuration for Stock Transfer Order is done.

 For testing go to ‘ME21N’


 Create Stock Transport Order (ME21N):

 ONE STEP STO:



 Create Outbound Delivery (VL10B):
 Post Goods Issue (VL02N):
 TWO STEP STO:

 Remove the One Step allow in this for two step STO
 Create STO:

 Create Outbound Delivery (VL10B):


 Post Goods Issue (VL02N):
 Go to ‘MMBE’
STO process is working as per Configuration for One Step & Two Step
STO.

You might also like