Notes
Domestic 1 – Hydraulic Separator (Low Loss Header)
5 Water
uncouples flow through heat distribution
Hot Cold system from flow through boiler, as well as
providing air and dirt separation.
2 – Radiant floor circuit (typical of five);
Outdoor Reset programming for lower
return water temperatures and higher
efficiency recommended.
3 3 – DHW load receives priority operation.
1 4 – Boiler pump for boiler model SL 14-115 G3
IBC is UPS 15-58 on speed 2 or 3, or equivalent.
Boiler boiler Inlet and outlet connections 1' NPT.
5 – Fill station with isolation valve closed, or:
fill tank
6 – Outdoor Sensor mounted on North-facing
exterior wall, above snow line and protected
4 7 from any heat sources.
7 – IBC controller can control up to four load
pumps; when zoning by more than four
pumps a Pump Control Module is
IBC Indirect Domestic recommended. See wiring details p. 2.
Hot Water Tank

6
ibc 1.2.PumpModule
DRAWN BY DATE

BRAD POULSEN 25/09/2019


DESCRIPTION

Installation with two loads off a low-loss header


Domestic hot water receives priority operation.
Space heating zoned by pump and uses external
CAUTION: This drawing is a simple schematic guide to a successful installation. There may be many necessary components not shown here. We
require that our boilers be installed by licensed and experienced trades people who are familiar with the applicable local and national codes. relay box.
PAGE
System design is to be completed by an experienced hydronic designer or Engineer. It is necessary to carefully read and follow the installation 1 OF 2
instructions that come with the boiler along with the application drawing that fits your system .
120VAC Wiring Diagram
(HOT) (COM)
G
black
AC in L
Field-wiring

white
N
Bundle

Primary L yellow
Wiring Notes
Boiler
white
Pump N Pump 1 – No external voltages to be applied to TB2 control terminal strip connections 1-20.
red 2 – DHW sensor is not used this application, so that external pump module may
VS Output white Not used
receive DHW signal (through an aquastat).
3 – Outdoor sensor installed on North exterior wall, exposed to actual outdoor air
temperature.
4 – Boiler Pump can be controlled by boiler (shown, preferred) or by pump module.
4
Pump circuits are fused for a total draw of 5A; maximum amperage draw of 4A is
recommended.
5 – In this application as shown Taco Pump Module controls DHW pump and
enforces priority operation.
Factory-installed
NOTE—Alternative Wiring
For an alternative wiring scheme allowing a DHW sensor to
the boiler to replace the aquastat (and freeing up a zone on
the module) see concept drawing ibc 1.2PumpModule-alt.
Radiant T-stats
Aquastat

PO WER
CO NTR OLS SLAVE MASTER
PR IO RITY O FF
RE SET NO RMAL
X X X X A B C R W C R W C R W C R W C R W C R W C 12
1 PR IM AR Y PUMP O FF MAI N P RI ORIT Y EXPANSION ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6 NET
3 PO ST PUR GE
PR IO R. PR OTEC T
O FF
O FF
END SWI TC H THERMOS TATS (24 VA C) PRIORITY

PU MP E XERC ISE O FF
30 SEC / 2 WK 4 MIN / 24 HR
SIX ZO NE LED
IND ICATO RS
LOW LIMIT (ZC) O FF EXPANDABLE PO WER
AC CESSO RY SW ITCHING RELAY ZO NE 1
PO RT
ZO NE 2

ZO NE 3
Programming Notes
Taco F USE
6 A MP
F USE
6 A MP
F USE
6 A MP
F USE
6 A MP
F USE
6 A MP
F USE
6 A MP
F USE
6 A MP
F USE
6 A MP
ZO NE 4

ZO NE 5
– In Installer Setup Menu / Edit, for all loads: Maximum
2 ZO NE 6
Supply Temperature acts as a high limit.
120 VA C 120 VOLT CIRCULATORS PRIORITY N/C INPUT
ZC ZR PRIMA RY ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6 ZONE 6 120 VA C
– For Therm. 1 and 2 wiring as shown, the boiler’s Load 1
H H N H N H N H N H N H N H N H N H N H will be defined at DHW and Load 2 will serve the radiant
SR 506-EXP-4 floor, defined as either Reset Heating or Set Point.
4
120VAC
(HOT) (COM) ibc 1.2.PumpModule
DRAWN BY DATE

BRAD POULSEN 25/09/2019


DESCRIPTION

Radiant Pumps DHW Installation with two loads off a low-loss header
Pump Domestic hot water receives priority operation.
Space heating zoned by pump and uses external
CAUTION: This drawing is a simple schematic guide to a successful installation. There may be many necessary components not shown here. We
require that our boilers be installed by licensed and experienced trades people who are familiar with the applicable local and national codes. relay box.
PAGE
System design is to be completed by an experienced hydronic designer or Engineer. It is necessary to carefully read and follow the installation 2 OF 2
instructions that come with the boiler along with the application drawing that fits your system .

You might also like