Professional Documents
Culture Documents
MRO Job Description
MRO Job Description
Overhaul (MRO)
C2 - Restricted
This document is the property of ALTEN Group. It cannot under any circumstances be reproduced or distributed without prior written permission.
1
Maintenance Repair & Overhaul – Gas Turbine Engines
(Repair Support & Life Cycle Engineering)
This document is the property of ALTEN Group. It cannot under any circumstances be reproduced or distributed without prior written permission.
2
• Follow a reverse chronological order.
• Conclude with the gain (eg 15% savings on the production, customer validation of
the quality procedure, optimization of a numerical model, design performed and
validated according to the initial planning, recovery hand of a runaway project...).
• Use short sentences.
• Please be seated in an area where there is no external sound or noise to help the
discussion.
NOTE: You are advised to join the meeting using a Computer by clicking on the link in the
email at least 10 minutes before the start to complete the set up process and download
the plugin (If you are unable to join the TEAMs meeting using your computer you can call
the conference number below in the email.
This document is the property of ALTEN Group. It cannot under any circumstances be reproduced or distributed without prior written permission.
3