Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

M/s. JINDAL STEEL & POWER LTD.

LIFT PLAN FOR PIPE ERECTION ( B, C, D, E, F, G & H Row)


NAME OF THE CONTRACTOR: MSPEPL
LOCATION:
Date: - / / Time: - AM/PM
Purpose: - Removal/Erection of pipe at height of _______Meters.

1. FARANA CAPACITY (Tons):


2. WORKING RADIUS (Meters):
3. MATERIAL WEIGHT (Tons):
4. CAPACITY OF FARANA IN WORKING RADIUS (Tons):
5. NO. OF SLINGS TO BE USED:
6. DIAMETER OF THE SLING (mm.):
7. LIFTING CAPACITY OF THE SLING (Tons):
8. NO. OF D-SHAKLES TO BE USED:
9. LIFTING CAPACITY OF THE D-SHAKLE (Tons):
10. LENGTH OF THE PIPE (Meters):
11. BOOM LENGTH (Meters):
12. FARANA BOOM ANGLE (Degree):
13. LOAD CAPACITY (Tons):

Meters

FARANA

Meters

You might also like